Attachment 2
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 5.docx | DOCX document | |
| Responses to Questions FA8201-08-B-0002.docx | DOCX document | |
| Supplemental Line Item Description.pdf | ||
| Sup Sched B UTTR.pdf | ||
| Sup Sched B Little Mountain.pdf | ||
| Sup Schedule B Hill AFB.pdf | ||
| Amendment 4.doc | DOC document | |
| Amendment 3.doc | DOC document | |
| Amendment.doc | DOC document | |
| FA8201-08-B-0002.doc | DOC document | |
| 16610 Lightning Protection.doc | DOC document | |
| Box Elder County Wage Decision.doc | DOC document | |
| 07510 Built-up Bituminous Roofing.doc | DOC document | |
| Supplemental Line Item Description.xls | XLS spreadsheet | |
| List of Specifications.doc | DOC document | |
| 01000 General Requirements Bur.doc | DOC document | |
| Weber County Wage Decision.doc | DOC document | |
| 16859 Heating Cable.doc | DOC document |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Hill
| 2008 Built-Up Roofs IDIQ Contract Cost Estimates | |||||||||||
| Hill AFB | |||||||||||
| Year 1 (Basic) | Year 2 | Year 3 | |||||||||
| LINE ITEM DESCRIPTION | UNIT | Quantity | Amount | TOTAL | Quantity | Amount | TOTAL | Quantity | Amount | TOTAL | |
| A | REMOVE EXISTING 4-PLY BUILT-UP ROOF | SF | 60,000 | $0 | 60,000 | $0 | 60,000 | $0 | |||
| B | REMOVE COAL TAR PITCH BUR | SF | 6,000 | $0 | 6,000 | $0 | 6,000 | $0 | |||
| C | REMOVE EXISTING SINGLE LAYER SHINGLED ROOF | SF | 3,000 | $0 | 3,000 | $0 | 3,000 | $0 | |||
| D | REMOVE EXISTING INSULATION | SF | 60,000 | $0 | 60,000 | $0 | 60,000 | $0 | |||
| E | REMOVE LIGHTWEIGHT CONCRETE GYPSUM FILL | SF | 3,000 | $0 | 3,000 | $0 | 3,000 | $0 | |||
| F | REMOVE AND INSTALL NEW ROOF DRAINS | EA | 30 | $0 | 30 | $0 | 30 | $0 | |||
| G | REMOVE / INSTALL LIGHTNING PROTECTION | LF | 1,500 | $0 | 1,500 | $0 | 1,500 | $0 | |||
| H | REMOVE EXISTING GUTTERS AND DOWNSPOUTS | LF | 1,500 | $0 | 1,500 | $0 | 1,500 | $0 | |||
| I | SET-UP ( EAVE HEIGHT 15' - 30' ) | LS | 6 | $0 | 6 | $0 | 6 | $0 | |||
| J | SET- UP ( EAVE HEIGHT 30' AND ABOVE ) | LS | 5 | $0 | 5 | $0 | 5 | $0 | |||
| K | INSTALL A 3-PLY (20 YEAR) BUILT-UP ROOF WITH MODIFIED CAP SHEET | SF | 15,000 | $0 | 15,000 | $0 | 15,000 | $0 | |||
| L | FURNISH AND INSTALL A 3-PLY, HOT MOPPED, 20 YEAR BUR WITH AN SBS MODIFIED CAP SHEET | SF | 45,000 | $0 | 45,000 | $0 | 45,000 | $0 | |||
| M | INSTALL A 4-PLY (20 YEAR) BUILT-UP ROOF | SF | 15,000 | $0 | 15,000 | $0 | 15,000 | $0 | |||
| N | INSTALL 3/4" PERLITE BOARD (MOPPED ON) | SF | 60,000 | $0 | 60,000 | $0 | 60,000 | $0 | |||
| O | INSTALL 3/4" SHEATHING | SF | 3,000 | $0 | 3,000 | $0 | 3,000 | $0 | |||
| P | INSTALL PRIME COAT AND ROSIN PAPER TO ROOF DECK | SF | 30,000 | $0 | 30,000 | $0 | 30,000 | $0 | |||
| Q | INSTALL TAPERED INSULATION | BD | 30,000 | $0 | 30,000 | $0 | 30,000 | $0 | |||
| R | INSTALL ASPHALT SHINGLES WITH #30 FELT | SQ | 3,000 | $0 | 3,000 | $0 | 3,000 | $0 | |||
| S | PROVIDE AND INSTALL MEMBRANE ROOF RESTORATION | SF | 7,500 | $0 | 7,500 | $0 | 7,500 | $0 | |||
| T | INSTALL SCUPPER | EA | 30 | $0 | 30 | $0 | 30 | $0 | |||
| U | INSTALL PITCH POCKETS | EA | 120 | $0 | 120 | $0 | 120 | $0 | |||
| V | INSTALL 1/2" PLYWOOD FOR FASCIA OR SHEATHING | SF | 3,000 | $0 | 3,000 | $0 | 3,000 | $0 | |||
| W | FURNISH AND INSTALL WOOD CURBS | LF | 150 | $0 | 150 | $0 | 150 | $0 | |||
| X | INSTALL GALV. METAL COUNTER FLASHING ON EQUIPMENT AND CURBS | LF | 3,000 | $0 | 3,000 | $0 | 3,000 | $0 | |||
| Y | INSTALL GALV. METAL GRAVEL STOP WITH 6" FACE | LF | 1,500 | $0 | 1,500 | $0 | 1,500 | $0 | |||
| Z | INSTALL METAL DRIP EDGE WITH 4" FACE | LF | 1,500 | $0 | 1,500 | $0 | 1,500 | $0 | |||
| AA | LIFT AND RESET EQUIPMENT SMALLER THAN 4' X 4' | EA | 90 | $0 | 90 | $0 | 90 | $0 | |||
| AB | LIFT AND RESET EQUIPMENT LARGER THAN 4' X 4' | EA | 30 | $0 | 30 | $0 | 30 | $0 | |||
| AC | REMOVE NON-FRIABLE ASBESTOS BASE FLASHING, INCLUDES OFF-BASE DUMPING AND HAULING CHARGES | SF | 6,000 | $0 | 6,000 | $0 | 6,000 | $0 | |||
| AD | REMOVE MISC. EQUIPMENT, PIPES, OR HOODS | EA | 15 | $0 | 15 | $0 | 15 | $0 | |||
| AE | INSTALL EXPANSION JOINT | LF | 300 | $0 | 300 | $0 | 300 | $0 | |||
| AF | INSTALL ANCHORS / GUY LINES TO EQUIPMENT OR STACKS | EA | 30 | $0 | 30 | $0 | 30 | $0 | |||
| AG | INSTALL NEW CLEAN-OUTS TO EXISTING DRAIN SYSTEM | EA | 30 | $0 | 30 | $0 | 30 | $0 | |||
| AH | PROVIDE 24 GA. METAL TO COVER PENETRATIONS, EQUIPMENT, OR WINDOWS (PRIMED & PAINTED), AND INSULATED AS REQUIRED | SF | 600 | $0 | 600 | $0 | 600 | $0 | |||
| AI | INSTALL 5" ALUMINUM GUTTERS AND DOWNSPOUTS | LF | 600 | $0 | 600 | $0 | 600 | $0 | |||
| AJ | INSTALL 4" GALVANIZED GUTTERS AND DOWNSPOUTS | LF | 1,200 | $0 | 1,200 | $0 | 1,200 | $0 | |||
| AK | INSTALL R-19 RIGID INSULATION | SF | 45,000 | $0 | 45,000 | $0 | 45,000 | $0 | |||
| AL | INSTALL R-19 GLASS BATT INSULATION | SF | 15,000 | $0 | 15,000 | $0 | 15,000 | $0 | |||
| AM | REPAIR / MATCH EXISTING SIDING | SF | 7,500 | $0 | 7,500 | $0 | 7,500 | $0 | |||
| AN | INSTALL METAL PARAPET CAP | LF | 1,500 | $0 | 1,500 | $0 | 1,500 | $0 | |||
| AO | INSTALL 3' WALKWAY | LF | 300 | $0 | 300 | $0 | 300 | $0 | |||
| AP | INSTALL SERVICE AND CONTROLS FOR HEAT TAPE TO INCLUDE UNIT, PILOT SWITCH, WIRE AND CONDUIT TO 50' | LS | 8 | $0 | 8 | $0 | 8 | $0 | |||
| AQ | INSTALL ADDITIONAL POWER SUPPLY TO INCLUDE WIRE AND CONDUIT BEYOND 50' | LS | 3 | $0 | 3 | $0 | 3 | $0 | |||
| AR | INSTALL ADDITIONAL CONTROLS FOR HEAT TAPE | LF | 300 | $0 | 300 | $0 | 300 | $0 | |||
| AS | INSTALL ADDITIONAL HEAT CABLE | LF | 750 | $0 | 750 | $0 | 750 | $0 | |||
| AT | HAULING DEBRIS TO DUMP/LANDFILL | TON | 300 | $0 | 300 | $0 | 300 | $0 | |||
| AU | APPLY CAULK / SEALANT AS NEEDED | LF | 1,500 | $0 | 1,500 | $0 | 1,500 | $0 | |||
| AV | CLEAN OUT GUTTERS, DOWNSPOUTS, AND DRAINS | LF | 3,000 | $0 | 3,000 | $0 | 3,000 | $0 | |||
| AW | INFRARED SURVEY | SF | 15,000 | $0 | 15,000 | $0 | 15,000 | $0 | |||
| AX | EPDM REPAIRS ( 60 MIL ) | SF | 7,500 | $0 | 7,500 | $0 | 7,500 | $0 | |||
| AY | RENTAL TRUCK MOUNTED CRANE, 25 TON WITH 10' RADIUS PER DAY | EA | 8 | $0 | 8 | $0 | 8 | $0 | |||
| AZ | RENTAL TRUCK MOUNTED CRANE, 25 TON WITH 10' RADIUS PER WEEK | EA | 8 | $0 | 8 | $0 | 8 | $0 | |||
| GROUND COVERED ROOF FACILITIES | 0 | $0 | 0 | $0 | 0 | $0 | |||||
| BA | PROVIDE AND INSTALL HOT RUBBERIZED ASPHALT WATERPROOFING SYSTEM WITH DRAINAGE AND PROTECTION BOARD | SF | 7,500 | $0 | 7,500 | $0 | 7,500 | $0 | |||
| BB | PROVIDE AND INSTALL SELF ADHERING WATERPROOFING MEMBRANE WITH DRAINAGE AND PROTECTION BOARD | SF | 7,500 | $0 | 7,500 | $0 | 7,500 | $0 | |||
| BC | REMOVE EXISTING WATERPROOFING | SF | 7,500 | $0 | 7,500 | $0 | 7,500 | $0 | |||
| BD | REMOVE EARTH BERM AND BACKFILL | CY | 600 | $0 | 600 | $0 | 600 | $0 | |||
| BE | INSTALL REQUIRED EARTH BERM | CY | 600 | $0 | 600 | $0 | 600 | $0 | |||
| BF | INSTALL VEGETATION, GRASS | SF | 4,800 | $0 | 4,800 | $0 | 4,800 | $0 | |||
| TOTAL FOR EACH UNIT COST WEIGHT AT HAFB | $0 | $0 | $0 | ||||||||
| $0 |
Ltl Mtn
| 2008 Built-Up Roofs IDIQ Contract Cost Estimates | |||||||||||
| Little Mountain | |||||||||||
| Year 1 (Basic) | Year 2 | Year 3 | |||||||||
| LINE ITEM DESCRIPTION | UNIT | Quantity | Amount | TOTAL | Quantity | Amount | TOTAL | Quantity | Amount | TOTAL | |
| A | REMOVE EXISTING 4-PLY BUILT-UP ROOF | SF | 4,000 | $0 | 4,000 | $0 | 4,000 | $0 | |||
| B | REMOVE COAL TAR PITCH BUR | SF | 400 | $0 | 400 | $0 | 400 | $0 | |||
| C | REMOVE EXISTING SINGLE LAYER SHINGLED ROOF | SF | 200 | $0 | 200 | $0 | 200 | $0 | |||
| D | REMOVE EXISTING INSULATION | SF | 4,000 | $0 | 4,000 | $0 | 4,000 | $0 | |||
| E | REMOVE LIGHTWEIGHT CONCRETE GYPSUM FILL | SF | 200 | $0 | 200 | $0 | 200 | $0 | |||
| F | REMOVE AND INSTALL NEW ROOF DRAINS | EA | 2 | $0 | 2 | $0 | 2 | $0 | |||
| G | REMOVE / INSTALL LIGHTNING PROTECTION | LF | 100 | $0 | 100 | $0 | 100 | $0 | |||
| H | REMOVE EXISTING GUTTERS AND DOWNSPOUTS | LF | 100 | $0 | 100 | $0 | 100 | $0 | |||
| I | SET-UP ( EAVE HEIGHT 15' - 30' ) | LS | 2 | $0 | 2 | $0 | 2 | $0 | |||
| J | SET- UP ( EAVE HEIGHT 30' AND ABOVE ) | LS | 2 | $0 | 2 | $0 | 2 | $0 | |||
| K | INSTALL A 3-PLY (20 YEAR) BUILT-UP ROOF WITH MODIFIED CAP SHEET | SF | 1,000 | $0 | 1,000 | $0 | 1,000 | $0 | |||
| L | FURNISH AND INSTALL A 3-PLY, HOT MOPPED, 20 YEAR BUR WITH AN SBS MODIFIED CAP SHEET | SF | 3,000 | $0 | 3,000 | $0 | 3,000 | $0 | |||
| M | INSTALL A 4-PLY (20 YEAR) BUILT-UP ROOF | SF | 1,000 | $0 | 1,000 | $0 | 1,000 | $0 | |||
| N | INSTALL 3/4" PERLITE BOARD (MOPPED ON) | SF | 4,000 | $0 | 4,000 | $0 | 4,000 | $0 | |||
| O | INSTALL 3/4" SHEATHING | SF | 200 | $0 | 200 | $0 | 200 | $0 | |||
| P | INSTALL PRIME COAT AND ROSIN PAPER TO ROOF DECK | SF | 2,000 | $0 | 2,000 | $0 | 2,000 | $0 | |||
| Q | INSTALL TAPERED INSULATION | BD | 2,000 | $0 | 2,000 | $0 | 2,000 | $0 | |||
| R | INSTALL ASPHALT SHINGLES WITH #30 FELT | SQ | 200 | $0 | 200 | $0 | 200 | $0 | |||
| S | PROVIDE AND INSTALL MEMBRANE ROOF RESTORATION | SF | 500 | $0 | 500 | $0 | 500 | $0 | |||
| T | INSTALL SCUPPER | EA | 2 | $0 | 2 | $0 | 2 | $0 | |||
| U | INSTALL PITCH POCKETS | EA | 8 | $0 | 8 | $0 | 8 | $0 | |||
| V | INSTALL 1/2" PLYWOOD FOR FASCIA OR SHEATHING | SF | 200 | $0 | 200 | $0 | 200 | $0 | |||
| W | FURNISH AND INSTALL WOOD CURBS | LF | 10 | $0 | 10 | $0 | 10 | $0 | |||
| X | INSTALL GALV. METAL COUNTER FLASHING ON EQUIPMENT AND CURBS | LF | 200 | $0 | 200 | $0 | 200 | $0 | |||
| Y | INSTALL GALV. METAL GRAVEL STOP WITH 6" FACE | LF | 100 | $0 | 100 | $0 | 100 | $0 | |||
| Z | INSTALL METAL DRIP EDGE WITH 4" FACE | LF | 100 | $0 | 100 | $0 | 100 | $0 | |||
| AA | LIFT AND RESET EQUIPMENT SMALLER THAN 4' X 4' | EA | 6 | $0 | 6 | $0 | 6 | $0 | |||
| AB | LIFT AND RESET EQUIPMENT LARGER THAN 4' X 4' | EA | 2 | $0 | 2 | $0 | 2 | $0 | |||
| AC | REMOVE NON-FRIABLE ASBESTOS BASE FLASHING, INCLUDES OFF-BASE DUMPING AND HAULING CHARGES | SF | 400 | $0 | 400 | $0 | 400 | $0 | |||
| AD | REMOVE MISC. EQUIPMENT, PIPES, OR HOODS | EA | 1 | $0 | 1 | $0 | 1 | $0 | |||
| AE | INSTALL EXPANSION JOINT | LF | 20 | $0 | 20 | $0 | 20 | $0 | |||
| AF | INSTALL ANCHORS / GUY LINES TO EQUIPMENT OR STACKS | EA | 2 | $0 | 2 | $0 | 2 | $0 | |||
| AG | INSTALL NEW CLEAN-OUTS TO EXISTING DRAIN SYSTEM | EA | 2 | $0 | 2 | $0 | 2 | $0 | |||
| AH | PROVIDE 24 GA. METAL TO COVER PENETRATIONS, EQUIPMENT, OR WINDOWS (PRIMED & PAINTED), AND INSULATED AS REQUIRED | SF | 40 | $0 | 40 | $0 | 40 | $0 | |||
| AI | INSTALL 5" ALUMINUM GUTTERS AND DOWNSPOUTS | LF | 40 | $0 | 40 | $0 | 40 | $0 | |||
| AJ | INSTALL 4" GALVANIZED GUTTERS AND DOWNSPOUTS | LF | 80 | $0 | 80 | $0 | 80 | $0 | |||
| AK | INSTALL R-19 RIGID INSULATION | SF | 3,000 | $0 | 3,000 | $0 | 3,000 | $0 | |||
| AL | INSTALL R-19 GLASS BATT INSULATION | SF | 1,000 | $0 | 1,000 | $0 | 1,000 | $0 | |||
| AM | REPAIR / MATCH EXISTING SIDING | SF | 500 | $0 | 500 | $0 | 500 | $0 | |||
| AN | INSTALL METAL PARAPET CAP | LF | 100 | $0 | 100 | $0 | 100 | $0 | |||
| AO | INSTALL 3' WALKWAY | LF | 20 | $0 | 20 | $0 | 20 | $0 | |||
| AP | INSTALL SERVICE AND CONTROLS FOR HEAT TAPE TO INCLUDE UNIT, PILOT SWITCH, WIRE AND CONDUIT TO 50' | LS | 2 | $0 | 2 | $0 | 2 | $0 | |||
| AQ | INSTALL ADDITIONAL POWER SUPPLY TO INCLUDE WIRE AND CONDUIT BEYOND 50' | LS | 1 | $0 | 1 | $0 | 1 | $0 | |||
| AR | INSTALL ADDITIONAL CONTROLS FOR HEAT TAPE | LF | 20 | $0 | 20 | $0 | 20 | $0 | |||
| AS | INSTALL ADDITIONAL HEAT CABLE | LF | 50 | $0 | 50 | $0 | 50 | $0 | |||
| AT | HAULING DEBRIS TO DUMP/LANDFILL | TON | 20 | $0 | 20 | $0 | 20 | $0 | |||
| AU | APPLY CAULK / SEALANT AS NEEDED | LF | 100 | $0 | 100 | $0 | 100 | $0 | |||
| AV | CLEAN OUT GUTTERS, DOWNSPOUTS, AND DRAINS | LF | 200 | $0 | 200 | $0 | 200 | $0 | |||
| AW | INFRARED SURVEY | SF | 1,000 | $0 | 1,000 | $0 | 1,000 | $0 | |||
| AX | EPDM REPAIRS ( 60 MIL ) | SF | 500 | $0 | 500 | $0 | 500 | $0 | |||
| AY | RENTAL TRUCK MOUNTED CRANE, 25 TON WITH 10' RADIUS PER DAY | EA | 2 | $0 | 2 | $0 | 2 | $0 | |||
| AZ | RENTAL TRUCK MOUNTED CRANE, 25 TON WITH 10' RADIUS PER WEEK | EA | 2 | $0 | 2 | $0 | 2 | $0 | |||
| TOTAL FOR EACH UNIT COST WEIGHT AT LTL MTN: | $0 | $0 | $0 | ||||||||
| $0 |
UTTR
| 2008 Built-Up Roofs IDIQ Contract Cost Estimates | |||||||||||
| UTTR | |||||||||||
| Year 1 (Basic) | Year 2 | Year 3 | |||||||||
| LINE ITEM DESCRIPTION | UNIT | Quantity | Amount | TOTAL | Quantity | Amount | TOTAL | Quantity | Amount | TOTAL | |
| A | REMOVE EXISTING 4-PLY BUILT-UP ROOF | SF | 15,984 | $0 | 15,984 | $0 | 15,984 | $0 | |||
| B | REMOVE COAL TAR PITCH BUR | SF | 1,598 | $0 | 1,598 | $0 | 1,598 | $0 | |||
| C | REMOVE EXISTING SINGLE LAYER SHINGLED ROOF | SF | 799 | $0 | 799 | $0 | 799 | $0 | |||
| D | REMOVE EXISTING INSULATION | SF | 15,984 | $0 | 15,984 | $0 | 15,984 | $0 | |||
| E | REMOVE LIGHTWEIGHT CONCRETE GYPSUM FILL | SF | 799 | $0 | 799 | $0 | 799 | $0 | |||
| F | REMOVE AND INSTALL NEW ROOF DRAINS | EA | 8 | $0 | 8 | $0 | 8 | $0 | |||
| G | REMOVE / INSTALL LIGHTNING PROTECTION | LF | 400 | $0 | 400 | $0 | 400 | $0 | |||
| H | REMOVE EXISTING GUTTERS AND DOWNSPOUTS | LF | 400 | $0 | 400 | $0 | 400 | $0 | |||
| I | SET-UP ( EAVE HEIGHT 15' - 30' ) | LS | 4 | $0 | 4 | $0 | 4 | $0 | |||
| J | SET- UP ( EAVE HEIGHT 30' AND ABOVE ) | LS | 2 | $0 | 2 | $0 | 2 | $0 | |||
| K | INSTALL A 3-PLY (20 YEAR) BUILT-UP ROOF WITH MODIFIED CAP SHEET | SF | 3,996 | $0 | 3,996 | $0 | 3,996 | $0 | |||
| L | FURNISH AND INSTALL A 3-PLY, HOT MOPPED, 20 YEAR BUR WITH AN SBS MODIFIED CAP SHEET | SF | 11,988 | $0 | 11,988 | $0 | 11,988 | $0 | |||
| M | INSTALL A 4-PLY (20 YEAR) BUILT-UP ROOF | SF | 3,996 | $0 | 3,996 | $0 | 3,996 | $0 | |||
| N | INSTALL 3/4" PERLITE BOARD (MOPPED ON) | SF | 15,984 | $0 | 15,984 | $0 | 15,984 | $0 | |||
| O | INSTALL 3/4" SHEATHING | SF | 799 | $0 | 799 | $0 | 799 | $0 | |||
| P | INSTALL PRIME COAT AND ROSIN PAPER TO ROOF DECK | SF | 7,992 | $0 | 7,992 | $0 | 7,992 | $0 | |||
| Q | INSTALL TAPERED INSULATION | BD | 7,992 | $0 | 7,992 | $0 | 7,992 | $0 | |||
| R | INSTALL ASPHALT SHINGLES WITH #30 FELT | SQ | 799 | $0 | 799 | $0 | 799 | $0 | |||
| S | PROVIDE AND INSTALL MEMBRANE ROOF RESTORATION | SF | 1,998 | $0 | 1,998 | $0 | 1,998 | $0 | |||
| T | INSTALL SCUPPER | EA | 8 | $0 | 8 | $0 | 8 | $0 | |||
| U | INSTALL PITCH POCKETS | EA | 32 | $0 | 32 | $0 | 32 | $0 | |||
| V | INSTALL 1/2" PLYWOOD FOR FASCIA OR SHEATHING | SF | 799 | $0 | 799 | $0 | 799 | $0 | |||
| W | FURNISH AND INSTALL WOOD CURBS | LF | 40 | $0 | 40 | $0 | 40 | $0 | |||
| X | INSTALL GALV. METAL COUNTER FLASHING ON EQUIPMENT AND CURBS | LF | 799 | $0 | 799 | $0 | 799 | $0 | |||
| Y | INSTALL GALV. METAL GRAVEL STOP WITH 6" FACE | LF | 400 | $0 | 400 | $0 | 400 | $0 | |||
| Z | INSTALL METAL DRIP EDGE WITH 4" FACE | LF | 400 | $0 | 400 | $0 | 400 | $0 | |||
| AA | LIFT AND RESET EQUIPMENT SMALLER THAN 4' X 4' | EA | 24 | $0 | 24 | $0 | 24 | $0 | |||
| AB | LIFT AND RESET EQUIPMENT LARGER THAN 4' X 4' | EA | 8 | $0 | 8 | $0 | 8 | $0 | |||
| AC | REMOVE NON-FRIABLE ASBESTOS BASE FLASHING, INCLUDES OFF-BASE DUMPING AND HAULING CHARGES | SF | 1,598 | $0 | 1,598 | $0 | 1,598 | $0 | |||
| AD | REMOVE MISC. EQUIPMENT, PIPES, OR HOODS | EA | 4 | $0 | 4 | $0 | 4 | $0 | |||
| AE | INSTALL EXPANSION JOINT | LF | 80 | $0 | 80 | $0 | 80 | $0 | |||
| AF | INSTALL ANCHORS / GUY LINES TO EQUIPMENT OR STACKS | EA | 8 | $0 | 8 | $0 | 8 | $0 | |||
| AG | INSTALL NEW CLEAN-OUTS TO EXISTING DRAIN SYSTEM | EA | 8 | $0 | 8 | $0 | 8 | $0 | |||
| AH | PROVIDE 24 GA. METAL TO COVER PENETRATIONS, EQUIPMENT, OR WINDOWS (PRIMED & PAINTED), AND INSULATED AS REQUIRED | SF | 160 | $0 | 160 | $0 | 160 | $0 | |||
| AI | INSTALL 5" ALUMINUM GUTTERS AND DOWNSPOUTS | LF | 160 | $0 | 160 | $0 | 160 | $0 | |||
| AJ | INSTALL 4" GALVANIZED GUTTERS AND DOWNSPOUTS | LF | 319 | $0 | 319 | $0 | 319 | $0 | |||
| AK | INSTALL R-19 RIGID INSULATION | SF | 11,988 | $0 | 11,988 | $0 | 11,988 | $0 | |||
| AL | INSTALL R-19 GLASS BATT INSULATION | SF | 3,996 | $0 | 3,996 | $0 | 3,996 | $0 | |||
| AM | REPAIR / MATCH EXISTING SIDING | SF | 1,998 | $0 | 1,998 | $0 | 1,998 | $0 | |||
| AN | INSTALL METAL PARAPET CAP | LF | 400 | $0 | 400 | $0 | 400 | $0 | |||
| AO | INSTALL 3' WALKWAY | LF | 80 | $0 | 80 | $0 | 80 | $0 | |||
| AP | INSTALL SERVICE AND CONTROLS FOR HEAT TAPE TO INCLUDE UNIT, PILOT SWITCH, WIRE AND CONDUIT TO 50' | LS | 4 | $0 | 4 | $0 | 4 | $0 | |||
| AQ | INSTALL ADDITIONAL POWER SUPPLY TO INCLUDE WIRE AND CONDUIT BEYOND 50' | LS | 2 | $0 | 2 | $0 | 2 | $0 | |||
| AR | INSTALL ADDITIONAL CONTROLS FOR HEAT TAPE | LF | 80 | $0 | 80 | $0 | 80 | $0 | |||
| AS | INSTALL ADDITIONAL HEAT CABLE | LF | 200 | $0 | 200 | $0 | 200 | $0 | |||
| AT | HAULING DEBRIS TO DUMP/LANDFILL | TON | 80 | $0 | 80 | $0 | 80 | $0 | |||
| AU | APPLY CAULK / SEALANT AS NEEDED | LF | 400 | $0 | 400 | $0 | 400 | $0 | |||
| AV | CLEAN OUT GUTTERS, DOWNSPOUTS, AND DRAINS | LF | 799 | $0 | 799 | $0 | 799 | $0 | |||
| AW | INFRARED SURVEY | SF | 3,996 | $0 | 3,996 | $0 | 3,996 | $0 | |||
| AX | EPDM REPAIRS ( 60 MIL ) | SF | 1,998 | $0 | 1,998 | $0 | 1,998 | $0 | |||
| AY | RENTAL TRUCK MOUNTED CRANE, 25 TON WITH 10' RADIUS PER DAY | EA | 4 | $0 | 4 | $0 | 4 | $0 | |||
| AZ | RENTAL TRUCK MOUNTED CRANE, 25 TON WITH 10' RADIUS PER WEEK | EA | 4 | $0 | 4 | $0 | 4 | $0 | |||
| TOTAL FOR EACH UNIT COST WEIGHT AT UTTR: | $0 | $0 | $0 | ||||||||