Sup Sched B Little Mountain.pdf

PDF 47 KB Posted

Attached to
BUILT UP ROOF IDIQ Federal contract opportunity
Solicitation number
FA8201-08-B-0002
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

Schedule B in PDF Form for Little Mountain

View the file

Other files for this federal contract opportunity

Other files attached to BUILT UP ROOF IDIQ, newest first.
File Type Posted
Responses to Questions FA8201-08-B-0002.docx DOCX document
Amendment 5.docx DOCX document
Supplemental Line Item Description.pdf PDF
Sup Sched B UTTR.pdf PDF
Sup Schedule B Hill AFB.pdf PDF
Amendment 4.doc DOC document
Amendment 3.doc DOC document
Amendment.doc DOC document
16610 Lightning Protection.doc DOC document
Box Elder County Wage Decision.doc DOC document
07510 Built-up Bituminous Roofing.doc DOC document
Supplemental Line Item Description.xls XLS spreadsheet
List of Specifications.doc DOC document
FA8201-08-B-0002.doc DOC document
Supplemental Schedule B.xlsx XLSX spreadsheet
01000 General Requirements Bur.doc DOC document
Weber County Wage Decision.doc DOC document
16859 Heating Cable.doc DOC document
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LINE ITEM DESCRIPTION UNIT Quantity Amount TOTAL Quantity Amount TOTAL Quantity Amount TOTAL

A REMOVE EXISTING 4-PLY BUILT-UP ROOF SF 4,000 $0 4,000 $0 4,000 $0

B REMOVE COAL TAR PITCH BUR SF 400 $0 400 $0 400 $0

C REMOVE EXISTING SINGLE LAYER SHINGLED ROOF SF 200 $0 200 $0 200 $0

D REMOVE EXISTING INSULATION SF 4,000 $0 4,000 $0 4,000 $0

E REMOVE LIGHTWEIGHT CONCRETE GYPSUM FILL SF 200 $0 200 $0 200 $0

F REMOVE AND INSTALL NEW ROOF DRAINS EA 2 $0 2 $0 2 $0

G REMOVE / INSTALL LIGHTNING PROTECTION LF 100 $0 100 $0 100 $0

H REMOVE EXISTING GUTTERS AND DOWNSPOUTS LF 100 $0 100 $0 100 $0

I SET-UP ( EAVE HEIGHT 15' - 30' ) LS 2 $0 2 $0 2 $0

J SET- UP ( EAVE HEIGHT 30' AND ABOVE ) LS 2 $0 2 $0 2 $0

K

INSTALL A 3-PLY (20 YEAR) BUILT-UP ROOF WITH MODIFIED CAP

SHEET

SF 1,000 $0 1,000 $0 1,000 $0

L

FURNISH AND INSTALL A 3-PLY, HOT MOPPED, 20 YEAR BUR WITH AN

SBS MODIFIED CAP SHEET

SF 3,000 $0 3,000 $0 3,000 $0

M INSTALL A 4-PLY (20 YEAR) BUILT-UP ROOF SF 1,000 $0 1,000 $0 1,000 $0

N INSTALL 3/4" PERLITE BOARD (MOPPED ON) SF 4,000 $0 4,000 $0 4,000 $0

O INSTALL 3/4" SHEATHING SF 200 $0 200 $0 200 $0

P INSTALL PRIME COAT AND ROSIN PAPER TO ROOF DECK SF 2,000 $0 2,000 $0 2,000 $0

Q INSTALL TAPERED INSULATION BD 2,000 $0 2,000 $0 2,000 $0

R INSTALL ASPHALT SHINGLES WITH #30 FELT SQ 200 $0 200 $0 200 $0

S PROVIDE AND INSTALL MEMBRANE ROOF RESTORATION SF 500 $0 500 $0 500 $0

T INSTALL SCUPPER EA 2 $0 2 $0 2 $0

U INSTALL PITCH POCKETS EA 8 $0 8 $0 8 $0

V INSTALL 1/2" PLYWOOD FOR FASCIA OR SHEATHING SF 200 $0 200 $0 200 $0

W FURNISH AND INSTALL WOOD CURBS LF 10 $0 10 $0 10 $0

X

INSTALL GALV. METAL COUNTER FLASHING ON EQUIPMENT AND

CURBS

LF 200 $0 200 $0 200 $0

Y INSTALL GALV. METAL GRAVEL STOP WITH 6" FACE LF 100 $0 100 $0 100 $0

Z INSTALL METAL DRIP EDGE WITH 4" FACE LF 100 $0 100 $0 100 $0

2008 Built-Up Roofs IDIQ Contract Cost Estimates

Little Mountain

Year 1 (Basic) Year 2 Year 3

AA LIFT AND RESET EQUIPMENT SMALLER THAN 4' X 4' EA 6 $0 6 $0 6 $0

AB LIFT AND RESET EQUIPMENT LARGER THAN 4' X 4' EA 2 $0 2 $0 2 $0

AC

REMOVE NON-FRIABLE ASBESTOS BASE FLASHING, INCLUDES OFF-

BASE DUMPING AND HAULING CHARGES

SF 400 $0 400 $0 400 $0

AD REMOVE MISC. EQUIPMENT, PIPES, OR HOODS EA 1 $0 1 $0 1 $0

AE INSTALL EXPANSION JOINT LF 20 $0 20 $0 20 $0

AF INSTALL ANCHORS / GUY LINES TO EQUIPMENT OR STACKS EA 2 $0 2 $0 2 $0

AG INSTALL NEW CLEAN-OUTS TO EXISTING DRAIN SYSTEM EA 2 $0 2 $0 2 $0

AH

PROVIDE 24 GA. METAL TO COVER PENETRATIONS, EQUIPMENT, OR

WINDOWS (PRIMED & PAINTED), AND INSULATED AS REQUIRED

SF 40 $0 40 $0 40 $0

AI INSTALL 5" ALUMINUM GUTTERS AND DOWNSPOUTS LF 40 $0 40 $0 40 $0

AJ INSTALL 4" GALVANIZED GUTTERS AND DOWNSPOUTS LF 80 $0 80 $0 80 $0

AK INSTALL R-19 RIGID INSULATION SF 3,000 $0 3,000 $0 3,000 $0

AL INSTALL R-19 GLASS BATT INSULATION SF 1,000 $0 1,000 $0 1,000 $0

AM REPAIR / MATCH EXISTING SIDING SF 500 $0 500 $0 500 $0

AN INSTALL METAL PARAPET CAP LF 100 $0 100 $0 100 $0

AO INSTALL 3' WALKWAY LF 20 $0 20 $0 20 $0

AP

INSTALL SERVICE AND CONTROLS FOR HEAT TAPE TO INCLUDE

UNIT, PILOT SWITCH, WIRE AND CONDUIT TO 50'

LS 2 $0 2 $0 2 $0

AQ

INSTALL ADDITIONAL POWER SUPPLY TO INCLUDE WIRE AND

CONDUIT BEYOND 50'

LS 1 $0 1 $0 1 $0

AR INSTALL ADDITIONAL CONTROLS FOR HEAT TAPE LF 20 $0 20 $0 20 $0

AS INSTALL ADDITIONAL HEAT CABLE LF 50 $0 50 $0 50 $0

AT HAULING DEBRIS TO DUMP/LANDFILL TON 20 $0 20 $0 20 $0

AU APPLY CAULK / SEALANT AS NEEDED LF 100 $0 100 $0 100 $0

AV CLEAN OUT GUTTERS, DOWNSPOUTS, AND DRAINS LF 200 $0 200 $0 200 $0

AW INFRARED SURVEY SF 1,000 $0 1,000 $0 1,000 $0

AX EPDM REPAIRS ( 60 MIL ) SF 500 $0 500 $0 500 $0

AY RENTAL TRUCK MOUNTED CRANE, 25 TON WITH 10' RADIUS PER DAY EA 2 $0 2 $0 2 $0

AZ

RENTAL TRUCK MOUNTED CRANE, 25 TON WITH 10' RADIUS PER

WEEK

EA 2 $0 2 $0 2 $0

TOTAL FOR EACH UNIT COST WEIGHT AT LTL MTN: $0 $0 $0

$0

File details come from the government source that posted it. Updated .