BUILT UP ROOF IDIQ Federal contract opportunity
Solicitation number
FA8201-08-B-0002
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

Schedule B in PDF Form for Hill AFB

View the file

Other files for this federal contract opportunity

Other files attached to BUILT UP ROOF IDIQ, newest first.
File Type Posted
Responses to Questions FA8201-08-B-0002.docx DOCX document
Amendment 5.docx DOCX document
Supplemental Line Item Description.pdf PDF
Sup Sched B UTTR.pdf PDF
Sup Sched B Little Mountain.pdf PDF
Amendment 4.doc DOC document
Amendment 3.doc DOC document
Amendment.doc DOC document
01000 General Requirements Bur.doc DOC document
Weber County Wage Decision.doc DOC document
16859 Heating Cable.doc DOC document
16610 Lightning Protection.doc DOC document
Box Elder County Wage Decision.doc DOC document
07510 Built-up Bituminous Roofing.doc DOC document
Supplemental Line Item Description.xls XLS spreadsheet
List of Specifications.doc DOC document
Supplemental Schedule B.xlsx XLSX spreadsheet
FA8201-08-B-0002.doc DOC document
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LINE ITEM DESCRIPTION UNIT Quantity Amount TOTAL Quantity Amount TOTAL Quantity Amount TOTAL

A REMOVE EXISTING 4-PLY BUILT-UP ROOF SF 60,000 $0 60,000 $0 60,000 $0

B REMOVE COAL TAR PITCH BUR SF 6,000 $0 6,000 $0 6,000 $0

C REMOVE EXISTING SINGLE LAYER SHINGLED ROOF SF 3,000 $0 3,000 $0 3,000 $0

D REMOVE EXISTING INSULATION SF 60,000 $0 60,000 $0 60,000 $0

E REMOVE LIGHTWEIGHT CONCRETE GYPSUM FILL SF 3,000 $0 3,000 $0 3,000 $0

F REMOVE AND INSTALL NEW ROOF DRAINS EA 30 $0 30 $0 30 $0

G REMOVE / INSTALL LIGHTNING PROTECTION LF 1,500 $0 1,500 $0 1,500 $0

H REMOVE EXISTING GUTTERS AND DOWNSPOUTS LF 1,500 $0 1,500 $0 1,500 $0

I SET-UP ( EAVE HEIGHT 15' - 30' ) LS 6 $0 6 $0 6 $0

J SET- UP ( EAVE HEIGHT 30' AND ABOVE ) LS 5 $0 5 $0 5 $0

K

INSTALL A 3-PLY (20 YEAR) BUILT-UP ROOF WITH MODIFIED CAP

SHEET

SF 15,000 $0 15,000 $0 15,000 $0

L

FURNISH AND INSTALL A 3-PLY, HOT MOPPED, 20 YEAR BUR WITH AN

SBS MODIFIED CAP SHEET

SF 45,000 $0 45,000 $0 45,000 $0

M INSTALL A 4-PLY (20 YEAR) BUILT-UP ROOF SF 15,000 $0 15,000 $0 15,000 $0

N INSTALL 3/4" PERLITE BOARD (MOPPED ON) SF 60,000 $0 60,000 $0 60,000 $0

O INSTALL 3/4" SHEATHING SF 3,000 $0 3,000 $0 3,000 $0

P INSTALL PRIME COAT AND ROSIN PAPER TO ROOF DECK SF 30,000 $0 30,000 $0 30,000 $0

Q INSTALL TAPERED INSULATION BD 30,000 $0 30,000 $0 30,000 $0

R INSTALL ASPHALT SHINGLES WITH #30 FELT SQ 3,000 $0 3,000 $0 3,000 $0

S PROVIDE AND INSTALL MEMBRANE ROOF RESTORATION SF 7,500 $0 7,500 $0 7,500 $0

T INSTALL SCUPPER EA 30 $0 30 $0 30 $0

U INSTALL PITCH POCKETS EA 120 $0 120 $0 120 $0

V INSTALL 1/2" PLYWOOD FOR FASCIA OR SHEATHING SF 3,000 $0 3,000 $0 3,000 $0

W FURNISH AND INSTALL WOOD CURBS LF 150 $0 150 $0 150 $0

X

INSTALL GALV. METAL COUNTER FLASHING ON EQUIPMENT AND

CURBS

LF 3,000 $0 3,000 $0 3,000 $0

Y INSTALL GALV. METAL GRAVEL STOP WITH 6" FACE LF 1,500 $0 1,500 $0 1,500 $0

Z INSTALL METAL DRIP EDGE WITH 4" FACE LF 1,500 $0 1,500 $0 1,500 $0

2008 Built-Up Roofs IDIQ Contract Cost Estimates

Hill AFB

Year 1 (Basic) Year 2 Year 3

AA LIFT AND RESET EQUIPMENT SMALLER THAN 4' X 4' EA 90 $0 90 $0 90 $0

AB LIFT AND RESET EQUIPMENT LARGER THAN 4' X 4' EA 30 $0 30 $0 30 $0

AC

REMOVE NON-FRIABLE ASBESTOS BASE FLASHING, INCLUDES OFF-

BASE DUMPING AND HAULING CHARGES

SF 6,000 $0 6,000 $0 6,000 $0

AD REMOVE MISC. EQUIPMENT, PIPES, OR HOODS EA 15 $0 15 $0 15 $0

AE INSTALL EXPANSION JOINT LF 300 $0 300 $0 300 $0

AF INSTALL ANCHORS / GUY LINES TO EQUIPMENT OR STACKS EA 30 $0 30 $0 30 $0

AG INSTALL NEW CLEAN-OUTS TO EXISTING DRAIN SYSTEM EA 30 $0 30 $0 30 $0

AH

PROVIDE 24 GA. METAL TO COVER PENETRATIONS, EQUIPMENT, OR

WINDOWS (PRIMED & PAINTED), AND INSULATED AS REQUIRED

SF 600 $0 600 $0 600 $0

AI INSTALL 5" ALUMINUM GUTTERS AND DOWNSPOUTS LF 600 $0 600 $0 600 $0

AJ INSTALL 4" GALVANIZED GUTTERS AND DOWNSPOUTS LF 1,200 $0 1,200 $0 1,200 $0

AK INSTALL R-19 RIGID INSULATION SF 45,000 $0 45,000 $0 45,000 $0

AL INSTALL R-19 GLASS BATT INSULATION SF 15,000 $0 15,000 $0 15,000 $0

AM REPAIR / MATCH EXISTING SIDING SF 7,500 $0 7,500 $0 7,500 $0

AN INSTALL METAL PARAPET CAP LF 1,500 $0 1,500 $0 1,500 $0

AO INSTALL 3' WALKWAY LF 300 $0 300 $0 300 $0

AP

INSTALL SERVICE AND CONTROLS FOR HEAT TAPE TO INCLUDE

UNIT, PILOT SWITCH, WIRE AND CONDUIT TO 50'

LS 8 $0 8 $0 8 $0

AQ

INSTALL ADDITIONAL POWER SUPPLY TO INCLUDE WIRE AND

CONDUIT BEYOND 50'

LS 3 $0 3 $0 3 $0

AR INSTALL ADDITIONAL CONTROLS FOR HEAT TAPE LF 300 $0 300 $0 300 $0

AS INSTALL ADDITIONAL HEAT CABLE LF 750 $0 750 $0 750 $0

AT HAULING DEBRIS TO DUMP/LANDFILL TON 300 $0 300 $0 300 $0

AU APPLY CAULK / SEALANT AS NEEDED LF 1,500 $0 1,500 $0 1,500 $0

AV CLEAN OUT GUTTERS, DOWNSPOUTS, AND DRAINS LF 3,000 $0 3,000 $0 3,000 $0

AW INFRARED SURVEY SF 15,000 $0 15,000 $0 15,000 $0

AX EPDM REPAIRS ( 60 MIL ) SF 7,500 $0 7,500 $0 7,500 $0

AY RENTAL TRUCK MOUNTED CRANE, 25 TON WITH 10' RADIUS PER DAY EA 8 $0 8 $0 8 $0

AZ

RENTAL TRUCK MOUNTED CRANE, 25 TON WITH 10' RADIUS PER

WEEK

EA 8 $0 8 $0 8 $0

GROUND COVERED ROOF FACILITIES 0 $0 0 $0 0 $0

BA

PROVIDE AND INSTALL HOT RUBBERIZED ASPHALT

WATERPROOFING SYSTEM WITH DRAINAGE AND PROTECTION

BOARD

SF 7,500 $0 7,500 $0 7,500 $0

BB

PROVIDE AND INSTALL SELF ADHERING WATERPROOFING

MEMBRANE WITH DRAINAGE AND PROTECTION BOARD

SF 7,500 $0 7,500 $0 7,500 $0

BC REMOVE EXISTING WATERPROOFING SF 7,500 $0 7,500 $0 7,500 $0

BD REMOVE EARTH BERM AND BACKFILL CY 600 $0 600 $0 600 $0

BE INSTALL REQUIRED EARTH BERM CY 600 $0 600 $0 600 $0

BF INSTALL VEGETATION, GRASS SF 4,800 $0 4,800 $0 4,800 $0

TOTAL FOR EACH UNIT COST WEIGHT AT HAFB $0 $0 $0

$0