Sup Schedule B Hill AFB.pdf
PDF 55 KB Posted
- Attached to
- BUILT UP ROOF IDIQ Federal contract opportunity
- Solicitation number
- FA8201-08-B-0002
About this file
Schedule B in PDF Form for Hill AFB
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Responses to Questions FA8201-08-B-0002.docx | DOCX document | |
| Amendment 5.docx | DOCX document | |
| Supplemental Line Item Description.pdf | ||
| Sup Sched B UTTR.pdf | ||
| Sup Sched B Little Mountain.pdf | ||
| Amendment 4.doc | DOC document | |
| Amendment 3.doc | DOC document | |
| Amendment.doc | DOC document | |
| 01000 General Requirements Bur.doc | DOC document | |
| Weber County Wage Decision.doc | DOC document | |
| 16859 Heating Cable.doc | DOC document | |
| 16610 Lightning Protection.doc | DOC document | |
| Box Elder County Wage Decision.doc | DOC document | |
| 07510 Built-up Bituminous Roofing.doc | DOC document | |
| Supplemental Line Item Description.xls | XLS spreadsheet | |
| List of Specifications.doc | DOC document | |
| Supplemental Schedule B.xlsx | XLSX spreadsheet | |
| FA8201-08-B-0002.doc | DOC document |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LINE ITEM DESCRIPTION UNIT Quantity Amount TOTAL Quantity Amount TOTAL Quantity Amount TOTAL
A REMOVE EXISTING 4-PLY BUILT-UP ROOF SF 60,000 $0 60,000 $0 60,000 $0
B REMOVE COAL TAR PITCH BUR SF 6,000 $0 6,000 $0 6,000 $0
C REMOVE EXISTING SINGLE LAYER SHINGLED ROOF SF 3,000 $0 3,000 $0 3,000 $0
D REMOVE EXISTING INSULATION SF 60,000 $0 60,000 $0 60,000 $0
E REMOVE LIGHTWEIGHT CONCRETE GYPSUM FILL SF 3,000 $0 3,000 $0 3,000 $0
F REMOVE AND INSTALL NEW ROOF DRAINS EA 30 $0 30 $0 30 $0
G REMOVE / INSTALL LIGHTNING PROTECTION LF 1,500 $0 1,500 $0 1,500 $0
H REMOVE EXISTING GUTTERS AND DOWNSPOUTS LF 1,500 $0 1,500 $0 1,500 $0
I SET-UP ( EAVE HEIGHT 15' - 30' ) LS 6 $0 6 $0 6 $0
J SET- UP ( EAVE HEIGHT 30' AND ABOVE ) LS 5 $0 5 $0 5 $0
K
INSTALL A 3-PLY (20 YEAR) BUILT-UP ROOF WITH MODIFIED CAP
SHEET
SF 15,000 $0 15,000 $0 15,000 $0
L
FURNISH AND INSTALL A 3-PLY, HOT MOPPED, 20 YEAR BUR WITH AN
SBS MODIFIED CAP SHEET
SF 45,000 $0 45,000 $0 45,000 $0
M INSTALL A 4-PLY (20 YEAR) BUILT-UP ROOF SF 15,000 $0 15,000 $0 15,000 $0
N INSTALL 3/4" PERLITE BOARD (MOPPED ON) SF 60,000 $0 60,000 $0 60,000 $0
O INSTALL 3/4" SHEATHING SF 3,000 $0 3,000 $0 3,000 $0
P INSTALL PRIME COAT AND ROSIN PAPER TO ROOF DECK SF 30,000 $0 30,000 $0 30,000 $0
Q INSTALL TAPERED INSULATION BD 30,000 $0 30,000 $0 30,000 $0
R INSTALL ASPHALT SHINGLES WITH #30 FELT SQ 3,000 $0 3,000 $0 3,000 $0
S PROVIDE AND INSTALL MEMBRANE ROOF RESTORATION SF 7,500 $0 7,500 $0 7,500 $0
T INSTALL SCUPPER EA 30 $0 30 $0 30 $0
U INSTALL PITCH POCKETS EA 120 $0 120 $0 120 $0
V INSTALL 1/2" PLYWOOD FOR FASCIA OR SHEATHING SF 3,000 $0 3,000 $0 3,000 $0
W FURNISH AND INSTALL WOOD CURBS LF 150 $0 150 $0 150 $0
X
INSTALL GALV. METAL COUNTER FLASHING ON EQUIPMENT AND
CURBS
LF 3,000 $0 3,000 $0 3,000 $0
Y INSTALL GALV. METAL GRAVEL STOP WITH 6" FACE LF 1,500 $0 1,500 $0 1,500 $0
Z INSTALL METAL DRIP EDGE WITH 4" FACE LF 1,500 $0 1,500 $0 1,500 $0
2008 Built-Up Roofs IDIQ Contract Cost Estimates
Hill AFB
Year 1 (Basic) Year 2 Year 3
AA LIFT AND RESET EQUIPMENT SMALLER THAN 4' X 4' EA 90 $0 90 $0 90 $0
AB LIFT AND RESET EQUIPMENT LARGER THAN 4' X 4' EA 30 $0 30 $0 30 $0
AC
REMOVE NON-FRIABLE ASBESTOS BASE FLASHING, INCLUDES OFF-
BASE DUMPING AND HAULING CHARGES
SF 6,000 $0 6,000 $0 6,000 $0
AD REMOVE MISC. EQUIPMENT, PIPES, OR HOODS EA 15 $0 15 $0 15 $0
AE INSTALL EXPANSION JOINT LF 300 $0 300 $0 300 $0
AF INSTALL ANCHORS / GUY LINES TO EQUIPMENT OR STACKS EA 30 $0 30 $0 30 $0
AG INSTALL NEW CLEAN-OUTS TO EXISTING DRAIN SYSTEM EA 30 $0 30 $0 30 $0
AH
PROVIDE 24 GA. METAL TO COVER PENETRATIONS, EQUIPMENT, OR
WINDOWS (PRIMED & PAINTED), AND INSULATED AS REQUIRED
SF 600 $0 600 $0 600 $0
AI INSTALL 5" ALUMINUM GUTTERS AND DOWNSPOUTS LF 600 $0 600 $0 600 $0
AJ INSTALL 4" GALVANIZED GUTTERS AND DOWNSPOUTS LF 1,200 $0 1,200 $0 1,200 $0
AK INSTALL R-19 RIGID INSULATION SF 45,000 $0 45,000 $0 45,000 $0
AL INSTALL R-19 GLASS BATT INSULATION SF 15,000 $0 15,000 $0 15,000 $0
AM REPAIR / MATCH EXISTING SIDING SF 7,500 $0 7,500 $0 7,500 $0
AN INSTALL METAL PARAPET CAP LF 1,500 $0 1,500 $0 1,500 $0
AO INSTALL 3' WALKWAY LF 300 $0 300 $0 300 $0
AP
INSTALL SERVICE AND CONTROLS FOR HEAT TAPE TO INCLUDE
UNIT, PILOT SWITCH, WIRE AND CONDUIT TO 50'
LS 8 $0 8 $0 8 $0
AQ
INSTALL ADDITIONAL POWER SUPPLY TO INCLUDE WIRE AND
CONDUIT BEYOND 50'
LS 3 $0 3 $0 3 $0
AR INSTALL ADDITIONAL CONTROLS FOR HEAT TAPE LF 300 $0 300 $0 300 $0
AS INSTALL ADDITIONAL HEAT CABLE LF 750 $0 750 $0 750 $0
AT HAULING DEBRIS TO DUMP/LANDFILL TON 300 $0 300 $0 300 $0
AU APPLY CAULK / SEALANT AS NEEDED LF 1,500 $0 1,500 $0 1,500 $0
AV CLEAN OUT GUTTERS, DOWNSPOUTS, AND DRAINS LF 3,000 $0 3,000 $0 3,000 $0
AW INFRARED SURVEY SF 15,000 $0 15,000 $0 15,000 $0
AX EPDM REPAIRS ( 60 MIL ) SF 7,500 $0 7,500 $0 7,500 $0
AY RENTAL TRUCK MOUNTED CRANE, 25 TON WITH 10' RADIUS PER DAY EA 8 $0 8 $0 8 $0
AZ
RENTAL TRUCK MOUNTED CRANE, 25 TON WITH 10' RADIUS PER
WEEK
EA 8 $0 8 $0 8 $0
GROUND COVERED ROOF FACILITIES 0 $0 0 $0 0 $0
BA
PROVIDE AND INSTALL HOT RUBBERIZED ASPHALT
WATERPROOFING SYSTEM WITH DRAINAGE AND PROTECTION
BOARD
SF 7,500 $0 7,500 $0 7,500 $0
BB
PROVIDE AND INSTALL SELF ADHERING WATERPROOFING
MEMBRANE WITH DRAINAGE AND PROTECTION BOARD
SF 7,500 $0 7,500 $0 7,500 $0
BC REMOVE EXISTING WATERPROOFING SF 7,500 $0 7,500 $0 7,500 $0
BD REMOVE EARTH BERM AND BACKFILL CY 600 $0 600 $0 600 $0
BE INSTALL REQUIRED EARTH BERM CY 600 $0 600 $0 600 $0
BF INSTALL VEGETATION, GRASS SF 4,800 $0 4,800 $0 4,800 $0
TOTAL FOR EACH UNIT COST WEIGHT AT HAFB $0 $0 $0