Box Elder County Wage Decision.doc
DOC document 31 KB Posted
- Attached to
- BUILT UP ROOF IDIQ Federal contract opportunity
- Solicitation number
- FA8201-08-B-0002
About this file
Attachment 5
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 5.docx | DOCX document | |
| Responses to Questions FA8201-08-B-0002.docx | DOCX document | |
| Supplemental Line Item Description.pdf | ||
| Sup Sched B UTTR.pdf | ||
| Sup Sched B Little Mountain.pdf | ||
| Sup Schedule B Hill AFB.pdf | ||
| Amendment 4.doc | DOC document | |
| Amendment 3.doc | DOC document | |
| Amendment.doc | DOC document | |
| FA8201-08-B-0002.doc | DOC document | |
| 01000 General Requirements Bur.doc | DOC document | |
| Weber County Wage Decision.doc | DOC document | |
| 16859 Heating Cable.doc | DOC document | |
| Supplemental Schedule B.xlsx | XLSX spreadsheet | |
| 16610 Lightning Protection.doc | DOC document | |
| 07510 Built-up Bituminous Roofing.doc | DOC document | |
| Supplemental Line Item Description.xls | XLS spreadsheet | |
| List of Specifications.doc | DOC document |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Decision Number: UT080001 05/16/2008 UT1
Superseded General Decision Number: UT20070001
State: Utah
Construction Type: Building
Counties: Beaver, Box Elder, Cache, Carbon, Daggett, Duchesne, Emery, Garfield, Grand, Iron, Juab, Kane, Millard, Morgan, Piute, Rich, San Juan, Sanpete, Sevier, Summit, Uintah, Wasatch, Washington and Wayne Counties in Utah.
BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories)
Modification Number Publication Date
0 02/08/2008
1 03/14/2008
2 04/11/2008
3 05/16/2008
* BRUT0001-001 01/01/2008
Rates Fringes
Bricklayer and Stonemason........$ 20.75 6.55
MARBLE MASON (Includes Marble
Finisher, Tile Layer and Tile
Finisher)........................$ 19.05 5.51
* IRON0027-003 07/01/2007
Rates Fringes
IRONWORKER, REINFORCING..........$ 23.61 10.15
SFUT0669-001 04/01/2008
Rates Fringes
SPRINKLER FITTER.................$ 28.35 13.55
SHEE0312-001 07/01/2007
Rates Fringes
Sheet Metal Worker (Including
HVAC duct).......................$ 25.91 8.78
SUUT1990-001 10/04/1990
Rates Fringes
CARPENTER (Including acoustical)......................$ 10.72
CEMENT MASON/CONCRETE FINISHER...$ 10.69
ELECTRICIAN (Including low voltage).........................$ 13.82 2.78
IRONWORKER, STRUCTURAL...........$ 11.12
LABORER..........................$ 7.10
PLUMBER (Including Hvac work)....$ 13.96 2.67
Power equipment operators:
Backhoe.....................$ 11.16
Crane.......................$ 12.32
Roller......................$ 9.50
TRUCK DRIVER.....................$ 9.59 2.22
***The following wage for roofers was received from the U.S. Department of Labor on 30 June 2008 and applies to roofers working in Box Elder County***
Roofer…………………………………………………………………..$ 10.69
FOOTNOTE:
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
File details come from the government source that posted it. Updated .