16859 Heating Cable.doc
DOC document 22 KB Posted
- Attached to
- BUILT UP ROOF IDIQ Federal contract opportunity
- Solicitation number
- FA8201-08-B-0002
About this file
Heating Cable Section 16859
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Responses to Questions FA8201-08-B-0002.docx | DOCX document | |
| Amendment 5.docx | DOCX document | |
| Supplemental Line Item Description.pdf | ||
| Sup Schedule B Hill AFB.pdf | ||
| Sup Sched B UTTR.pdf | ||
| Sup Sched B Little Mountain.pdf | ||
| Amendment 4.doc | DOC document | |
| Amendment 3.doc | DOC document | |
| Amendment.doc | DOC document | |
| 16610 Lightning Protection.doc | DOC document | |
| Box Elder County Wage Decision.doc | DOC document | |
| 07510 Built-up Bituminous Roofing.doc | DOC document | |
| Supplemental Line Item Description.xls | XLS spreadsheet | |
| List of Specifications.doc | DOC document | |
| Supplemental Schedule B.xlsx | XLSX spreadsheet | |
| FA8201-08-B-0002.doc | DOC document | |
| 01000 General Requirements Bur.doc | DOC document | |
| Weber County Wage Decision.doc | DOC document |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 16859
HEATING CABLE
PART I – GENERAL
1.1 GENERAL REQUIREMENTS:
A. Delivery and Storage:
1. Deliver material to site in undamaged condition.
1.2 REQUIRED SUBMITTALS:
A. General: Submit each item in this Section according to the Condition of the Contract and Division 1 Specification Section.
B. Manufacturers Literature:
1. Technical Data, Catalog Cuts, Installation Procedures and Operation & Maintenance Manuals.
PART II – PRODUCTS
2.1 HEATING CABLE:
A. Heat cable shall be Chromalox SRF5-1RG or SRF5-2RG Roof and Gutter Heating Cable or approved equal. 16 AWG, nickel-coated copper, tinned copper ground braid under jacket, U.V. stabilized weatherproof jacket and 12 watts/ft. output wattage in snow or ice @ 32 degrees F.
2.2 AUTOMATIC TEMPERATURE CONTROLS:
A. Temperature Controls shall be Chromalox RTAS or RTAS-EP Ambient Sensing Single Point On/Off Temperature Controls or approved equal. Ambient sensing thermostats, 0-225 degrees F. temperature rating, 9/16” O.D. x 4” stainless steel probe, stainless steel hardware, Ordinary or Hazardous (Div. 2) Areas and rated NEMA 4X. Set controls at 40 degrees F.
PART III – EXECUTION
3.1 INSTALLATION:
A. Project Work shall include at least a 20 amp circuit breaker installed in an existing power panel. Breakers shall be marked “roof heating cable controls” in the panel.
B. Controls shall be wired through a pilot light mounted next to the existing main power panel. Pilot light shall be red in color.
C. Heat cable shall not be cut or spliced unless absolutely necessary. Heat cable shall be a continuous run along the gutter and twice through the downspout to form a cable run that is free of splices. When splicing is required, the contractor shall use manufacturer recommended splice and tee kits. The contractor shall use manufacturer recommended end seal kits where needed.
D. Install heat Cable in all gutters and downspouts. Install heat cable in a manner that will prevent the wind from lifting the heat cable from the gutter and downspout.