16859 Heating Cable.doc

DOC document 22 KB Posted

Attached to
BUILT UP ROOF IDIQ Federal contract opportunity
Solicitation number
FA8201-08-B-0002
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

Heating Cable Section 16859

View the file

Other files for this federal contract opportunity

Other files attached to BUILT UP ROOF IDIQ, newest first.
File Type Posted
Responses to Questions FA8201-08-B-0002.docx DOCX document
Amendment 5.docx DOCX document
Supplemental Line Item Description.pdf PDF
Sup Schedule B Hill AFB.pdf PDF
Sup Sched B UTTR.pdf PDF
Sup Sched B Little Mountain.pdf PDF
Amendment 4.doc DOC document
Amendment 3.doc DOC document
Amendment.doc DOC document
16610 Lightning Protection.doc DOC document
Box Elder County Wage Decision.doc DOC document
07510 Built-up Bituminous Roofing.doc DOC document
Supplemental Line Item Description.xls XLS spreadsheet
List of Specifications.doc DOC document
Supplemental Schedule B.xlsx XLSX spreadsheet
FA8201-08-B-0002.doc DOC document
01000 General Requirements Bur.doc DOC document
Weber County Wage Decision.doc DOC document
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 16859

HEATING CABLE

PART I – GENERAL

1.1 GENERAL REQUIREMENTS:

A. Delivery and Storage:

1. Deliver material to site in undamaged condition.

1.2 REQUIRED SUBMITTALS:

A. General: Submit each item in this Section according to the Condition of the Contract and Division 1 Specification Section.

B. Manufacturers Literature:

1. Technical Data, Catalog Cuts, Installation Procedures and Operation & Maintenance Manuals.

PART II – PRODUCTS

2.1 HEATING CABLE:

A. Heat cable shall be Chromalox SRF5-1RG or SRF5-2RG Roof and Gutter Heating Cable or approved equal. 16 AWG, nickel-coated copper, tinned copper ground braid under jacket, U.V. stabilized weatherproof jacket and 12 watts/ft. output wattage in snow or ice @ 32 degrees F.

2.2 AUTOMATIC TEMPERATURE CONTROLS:

A. Temperature Controls shall be Chromalox RTAS or RTAS-EP Ambient Sensing Single Point On/Off Temperature Controls or approved equal. Ambient sensing thermostats, 0-225 degrees F. temperature rating, 9/16” O.D. x 4” stainless steel probe, stainless steel hardware, Ordinary or Hazardous (Div. 2) Areas and rated NEMA 4X. Set controls at 40 degrees F.

PART III – EXECUTION

3.1 INSTALLATION:

A. Project Work shall include at least a 20 amp circuit breaker installed in an existing power panel. Breakers shall be marked “roof heating cable controls” in the panel.

B. Controls shall be wired through a pilot light mounted next to the existing main power panel. Pilot light shall be red in color.

C. Heat cable shall not be cut or spliced unless absolutely necessary. Heat cable shall be a continuous run along the gutter and twice through the downspout to form a cable run that is free of splices. When splicing is required, the contractor shall use manufacturer recommended splice and tee kits. The contractor shall use manufacturer recommended end seal kits where needed.

D. Install heat Cable in all gutters and downspouts. Install heat cable in a manner that will prevent the wind from lifting the heat cable from the gutter and downspout.