BUILT UP ROOF IDIQ Federal contract opportunity
Solicitation number
FA8201-08-B-0002
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

Schedule B in PDF Form for UTTR

View the file

Other files for this federal contract opportunity

Other files attached to BUILT UP ROOF IDIQ, newest first.
File Type Posted
Responses to Questions FA8201-08-B-0002.docx DOCX document
Amendment 5.docx DOCX document
Supplemental Line Item Description.pdf PDF
Sup Schedule B Hill AFB.pdf PDF
Sup Sched B Little Mountain.pdf PDF
Amendment 4.doc DOC document
Amendment 3.doc DOC document
Amendment.doc DOC document
16610 Lightning Protection.doc DOC document
Box Elder County Wage Decision.doc DOC document
07510 Built-up Bituminous Roofing.doc DOC document
Supplemental Line Item Description.xls XLS spreadsheet
List of Specifications.doc DOC document
Supplemental Schedule B.xlsx XLSX spreadsheet
01000 General Requirements Bur.doc DOC document
Weber County Wage Decision.doc DOC document
16859 Heating Cable.doc DOC document
FA8201-08-B-0002.doc DOC document
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LINE ITEM DESCRIPTION UNIT Quantity Amount TOTAL Quantity Amount TOTAL Quantity Amount TOTAL

A REMOVE EXISTING 4-PLY BUILT-UP ROOF SF 15,984 $0 15,984 $0 15,984 $0

B REMOVE COAL TAR PITCH BUR SF 1,598 $0 1,598 $0 1,598 $0

C REMOVE EXISTING SINGLE LAYER SHINGLED ROOF SF 799 $0 799 $0 799 $0

D REMOVE EXISTING INSULATION SF 15,984 $0 15,984 $0 15,984 $0

E REMOVE LIGHTWEIGHT CONCRETE GYPSUM FILL SF 799 $0 799 $0 799 $0

F REMOVE AND INSTALL NEW ROOF DRAINS EA 8 $0 8 $0 8 $0

G REMOVE / INSTALL LIGHTNING PROTECTION LF 400 $0 400 $0 400 $0

H REMOVE EXISTING GUTTERS AND DOWNSPOUTS LF 400 $0 400 $0 400 $0

I SET-UP ( EAVE HEIGHT 15' - 30' ) LS 4 $0 4 $0 4 $0

J SET- UP ( EAVE HEIGHT 30' AND ABOVE ) LS 2 $0 2 $0 2 $0

K

INSTALL A 3-PLY (20 YEAR) BUILT-UP ROOF WITH MODIFIED CAP

SHEET

SF 3,996 $0 3,996 $0 3,996 $0

L

FURNISH AND INSTALL A 3-PLY, HOT MOPPED, 20 YEAR BUR WITH AN

SBS MODIFIED CAP SHEET

SF 11,988 $0 11,988 $0 11,988 $0

M INSTALL A 4-PLY (20 YEAR) BUILT-UP ROOF SF 3,996 $0 3,996 $0 3,996 $0

N INSTALL 3/4" PERLITE BOARD (MOPPED ON) SF 15,984 $0 15,984 $0 15,984 $0

O INSTALL 3/4" SHEATHING SF 799 $0 799 $0 799 $0

P INSTALL PRIME COAT AND ROSIN PAPER TO ROOF DECK SF 7,992 $0 7,992 $0 7,992 $0

Q INSTALL TAPERED INSULATION BD 7,992 $0 7,992 $0 7,992 $0

R INSTALL ASPHALT SHINGLES WITH #30 FELT SQ 799 $0 799 $0 799 $0

S PROVIDE AND INSTALL MEMBRANE ROOF RESTORATION SF 1,998 $0 1,998 $0 1,998 $0

T INSTALL SCUPPER EA 8 $0 8 $0 8 $0

U INSTALL PITCH POCKETS EA 32 $0 32 $0 32 $0

V INSTALL 1/2" PLYWOOD FOR FASCIA OR SHEATHING SF 799 $0 799 $0 799 $0

W FURNISH AND INSTALL WOOD CURBS LF 40 $0 40 $0 40 $0

X

INSTALL GALV. METAL COUNTER FLASHING ON EQUIPMENT AND

CURBS

LF 799 $0 799 $0 799 $0

Y INSTALL GALV. METAL GRAVEL STOP WITH 6" FACE LF 400 $0 400 $0 400 $0

Z INSTALL METAL DRIP EDGE WITH 4" FACE LF 400 $0 400 $0 400 $0

2008 Built-Up Roofs IDIQ Contract Cost Estimates

UTTR

Year 1 (Basic) Year 2 Year 3

AA LIFT AND RESET EQUIPMENT SMALLER THAN 4' X 4' EA 24 $0 24 $0 24 $0

AB LIFT AND RESET EQUIPMENT LARGER THAN 4' X 4' EA 8 $0 8 $0 8 $0

AC

REMOVE NON-FRIABLE ASBESTOS BASE FLASHING, INCLUDES OFF-

BASE DUMPING AND HAULING CHARGES

SF 1,598 $0 1,598 $0 1,598 $0

AD REMOVE MISC. EQUIPMENT, PIPES, OR HOODS EA 4 $0 4 $0 4 $0

AE INSTALL EXPANSION JOINT LF 80 $0 80 $0 80 $0

AF INSTALL ANCHORS / GUY LINES TO EQUIPMENT OR STACKS EA 8 $0 8 $0 8 $0

AG INSTALL NEW CLEAN-OUTS TO EXISTING DRAIN SYSTEM EA 8 $0 8 $0 8 $0

AH

PROVIDE 24 GA. METAL TO COVER PENETRATIONS, EQUIPMENT, OR

WINDOWS (PRIMED & PAINTED), AND INSULATED AS REQUIRED

SF 160 $0 160 $0 160 $0

AI INSTALL 5" ALUMINUM GUTTERS AND DOWNSPOUTS LF 160 $0 160 $0 160 $0

AJ INSTALL 4" GALVANIZED GUTTERS AND DOWNSPOUTS LF 319 $0 319 $0 319 $0

AK INSTALL R-19 RIGID INSULATION SF 11,988 $0 11,988 $0 11,988 $0

AL INSTALL R-19 GLASS BATT INSULATION SF 3,996 $0 3,996 $0 3,996 $0

AM REPAIR / MATCH EXISTING SIDING SF 1,998 $0 1,998 $0 1,998 $0

AN INSTALL METAL PARAPET CAP LF 400 $0 400 $0 400 $0

AO INSTALL 3' WALKWAY LF 80 $0 80 $0 80 $0

AP

INSTALL SERVICE AND CONTROLS FOR HEAT TAPE TO INCLUDE

UNIT, PILOT SWITCH, WIRE AND CONDUIT TO 50'

LS 4 $0 4 $0 4 $0

AQ

INSTALL ADDITIONAL POWER SUPPLY TO INCLUDE WIRE AND

CONDUIT BEYOND 50'

LS 2 $0 2 $0 2 $0

AR INSTALL ADDITIONAL CONTROLS FOR HEAT TAPE LF 80 $0 80 $0 80 $0

AS INSTALL ADDITIONAL HEAT CABLE LF 200 $0 200 $0 200 $0

AT HAULING DEBRIS TO DUMP/LANDFILL TON 80 $0 80 $0 80 $0

AU APPLY CAULK / SEALANT AS NEEDED LF 400 $0 400 $0 400 $0

AV CLEAN OUT GUTTERS, DOWNSPOUTS, AND DRAINS LF 799 $0 799 $0 799 $0

AW INFRARED SURVEY SF 3,996 $0 3,996 $0 3,996 $0

AX EPDM REPAIRS ( 60 MIL ) SF 1,998 $0 1,998 $0 1,998 $0

AY RENTAL TRUCK MOUNTED CRANE, 25 TON WITH 10' RADIUS PER DAY EA 4 $0 4 $0 4 $0

AZ

RENTAL TRUCK MOUNTED CRANE, 25 TON WITH 10' RADIUS PER

WEEK

EA 4 $0 4 $0 4 $0

TOTAL FOR EACH UNIT COST WEIGHT AT UTTR: $0 $0 $0