RFP_Questions_and_Answers_15_Jan_2015.pdf
PDF 62 KB Posted
- Attached to
- C-32/C-40 Contractor Logistics Support Federal contract opportunity
- Solicitation number
- FA8106-13-R-0002
About this file
RFP Questions and Answers dated 15 January 2015
View the file
Other files for this federal contract opportunity
Show all 38
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA8106-13-R-0002
POST RFP QUESTIONS AND ANSWERS
15 JANUARY 2015
REF # QUESTION RESPONSE
RFP
3-1
"The following C-32A Task Cards appear early to need;
were they included in error?
• Task Card 55-190-00-01 due in 8C, 9C, and 10C
• Task Card 55-194-00-01, due in 8C, 9C and 10C
• Task Card 57-330-00-01, due in 9C
• Task Card 57-334-00-01, due in 9C
• Task Card 57-394-00-01, due in 9C
• Task Card 57-348-00-01, due in 9C"
Yes, they were included in error. Task Cards 55-190-00-01 due in 8C, 9C, and 10C; 55-194-00-01, due in 8C, 9C and 10C; Task Cards 57-330-00-01, due in 9C; Task Cards 57-334-00-01, due in 9C; Task Cards 57-394-00-01, due in 9C; and Task Cards 57-348-00-01, due in 9C are no longer requirements and Offerors shall not include these cards in their CLIN cost for the applicable C Checks.
Based upon these changes, the applicable C-32A file identified in the 8 Dec 2014 Post RFP Questions and Answers for RFP 2-1 has been updated to:
For C-32A: Bidder’s Library/Boeing Proprietary/C-32A Task Cards/00 C- 32A_Task_Inquiry_12-17-14.xlsx
RFP
3-2
C-40B 4C Check for Tail # 01-0041 includes Task Card 55- 614-10-01 which appears early to need; was it included by error?
Yes, it was included in error. Task Card 55-614-10-01 is no longer a requirement and Offerors shall not include this card in their CLIN cost for the C-40 4C Checks.
Based upon this changes, the applicable C-40B/C file identified in the 8 Dec 2014 Post RFP Questions and Answers has been updated to:
For C-40B: Bidder’s Library/Boeing Proprietary/C-40B Task Cards/ 00 C- 40B_&_C-40C_Task_Inquiry_12-7-14.xlsx
15 JANUARY 2015
REF # QUESTION RESPONSE
RFP
3-3
What are the building/hangar numbers and square feet (sf) available in the two primary C-32/C-40 COMBS warehouses at JB Andrews?
The primary building is #1752 which contains both storage and admin areas for C-32/C-40 CLS Contractor's use. The floor storage is approximately 9000 square feet sf with mezzanine storage of about 4750 sf. The secondary building is # 1762, which is a joint use facility which has approximately 11,000 sf of floor storage available to the C‑32/C-40 CLS contractor. Also, building 1933 is a common use building where several different users store larger items such as spare engines and APUs on a space-available basis. We have provided layouts of the facilities in file: Joint Base Andrews C-32 C-40 CLS Contractor Use Facilities.pdf)
RFP
3-4
Can you breakout admin vs. storage area measurements for the storage buildings at JB Andrews?
The usable C-32/C-40 CLS admin area in building 1752 is approximately 3700 sf. However, part of that is shared with other system FSRs. Buildings 1762 and 1933 do not have Admin areas for the C-32/C-40 CLS contractor.
RFP
3-5
What is the storage area of the mezzanine in the first C- 32/C-40 hanger we visited at Joint Base Andrews? Building 1752 has mezzanine storage of approximately 4750 sf.
RFP
3-6
Is there any C-32/C-40 COMBS storage in the 201st Hangar at JB Andrews?
There is currently no dedicated C-32/C-40 CLS Contractor storage in the 201st hangar. However, there are tail number bins available.
RFP
3-7
Are the COMBS admin areas at JB Andrews furnished with desks and computer?
No. The Offeror shall be required to furnish all office furnishings. However, Base phone and network drops will be available.
RFP
3-8
Do the racks in the warehouse at JB Andrews come as
GFP?
There are GFP racks in 1752 and 1762 and they will remain with the warehouses.
RFP
3-9
Can you provide contractor use facility information for Scott AFB? Yes, see layouts provided in file: C-40 CLS Facility Layout Scott AFB.pdf
15 JANUARY 2015
REF # QUESTION RESPONSE
RFP
3-10
Can you provide contractor use facility information for Hickam Field?
Yes, see layouts provided in file: C-40 CLS Maintenance Facility Layout Hickam.pdf
RFP
3-11
Can you provide contractor use facility information for Ramstein AB?
Yes, see layouts provided in file: C-40 CLS Maintenance Facility Layout Ramstein.pdf
RFP
3-12
Do the aircraft always deploy with a MSK for all flights off-station?
Normally - Yes, but they are tailored based upon the mission purpose, destination, duration and scheduled passengers. Enroute resupply shall be supported for long duration missions.
RFP
3-13
ETOPS is not annotated on the Task Cards and there is no manual with C-32A/C-40B&C ETOPS guidance. How does a Contractor know what task cards require ETOPS maintenance practices.
We have issued a new Appendix A, Attachment 15, EXTENDED OPERATIONS (ETOPS) GUIDELINES, to the PWS and RFP. This provides general instructions and references for which to base ETOPS maintenance actions and controls.
RFP
3-14
If the Contractor chooses to use the local wheel and tire shop for wheel and tire build-up, how will the FAR 121/145 certification process work? Is the Government owned wheel and tire shop a FAR Part 145 certificated repair station?
AF Wheel and tire shops are not FAA certificated (121 nor 145) nor do they have the applicable unique 737/757 adapters/support equipment to support Contractor Operation. The PWS update posted on 02 Dec 2014 was incorrect and a new PWS update is posted with the correct information.
Bottom line is that the Contractor is responsible for providing built-up wheel and tire assemblies with appropriate FAA certification (8130) at the Covered Aircraft locations as well as in execution of world-wide sustainment and support.
RFP
3-15
If not certificated, will the Government assist the Contractor in obtaining FAA Part 145 repair station certification? Or will the Government waive the requirement for FAR 145 certification of the wheel and tire shop?
For the purposes of this proposal, Offerors shall not assume the Government waives any such FAA requirement that may or may not exist nor shall they assume the Government will take extraordinary actions to assist in any such certification actions. As these base level wheel and tire shops are not dedicated to this contract/covered aircraft, there are too many unknowns to make such an assumption.
RFP
3-16
Vol III, 5.1, General Instructions, has no required response;
recommend deleting 5.1, General Information from Table 2.1.
Nonconcur.
15 JANUARY 2015
REF # QUESTION RESPONSE
RFP
3-17
5.6.1 Section 1 – General Information references the Table
of Contents and descriptions of systems for estimating, purchasing, and accounting systems. These are also required in 5.7.1, 5.7.2, and 5.7.3 respectively.
5.6.3 Section 3 – Other Information requires “proposed
rates.” 5.7.4 Labor Rate and O&A Overhead Rate Support
5.6.1 Section 1 – General Information references the Table
of Contents and descriptions of systems for estimating, purchasing, and accounting systems. These are also required in 5.7.1, 5.7.2, and 5.7.3 respectively.
5.6.3 Section 3 – Other Information requires “proposed
rates.” 5.7.4 Labor Rate and O&A Overhead Rate Support also requires various rates, many are the same.
a) Recommend deleting 5.6.1 from Table 2.1.
b) Recommend removing “Section 1” from the 5.6.1 paragraph title and renumbering subsequent sections.
c) Please clarify where the Offeror is required to respond to the requirement for estimating, purchasing, and accounting systems.
d) Please clarify where the Offeror is required to respond to the requirement for “rates.”
e) Please clarify if 5.7 – 5.7.11.2 is to be a separately numbered section in the proposal or to be incorporated into
5.6.3 Section 3 - Other Information.
Offerors are to use Table 2.1 to organize their proposal. Section 5.6 provides for the detailed information required with Section 5.7 providing both specific and general directions and discussions. Sections 5.6.1 - 5.6.4 are specific call-outs for the associated information (General Information; Pricing Information and Supporting Data; Other Information; and Completed RFP Appendix G with Offeror's Proposed Prices, respectively). Any information the Offeror needs to submit on Pricing Support not covered in the above sections would be placed in Section 5.7 per Table 2.1 of Appendix L.
Information need not be duplicated between Sections 5.6 and 5.7, but sufficient and relative data shall be submitted in the Price Volume to meet the RFP requirements.
RFP
3-18
What was the Work scope of last shop visit? What was the date of last shop visit for each engine?
Available C-32A engine data is in Appendix O, but was missing data on two government engines. Appendix O has been updated with the information for these two engines, 727239 and 727287. No C-40 B/C engine has completed a shop visit (one is in process) since delivery.
RFP
3-19
Does the Appendix B, Attachment 1 contain any items sustained by another Government Contract? No. Offeror shall sustain all items.
15 JANUARY 2015
REF # QUESTION RESPONSE
RFP
3-20
Can LOPA for each aircraft be supplied for bidding information? Equivalent data has been added to the Bidder’s Library.
RFP
3-21
The OEM licensing costs may be a significant cost to non- OEM Offerors. Will the Government consider separately purchasing the data or enter into a Data Licensing Agreement (DLA) with Boeing for the required technical data. The subsequent winning Offeror is then provided restricted access IAW the DLA. This removes this price factor from the evaluated proposal. As an option, will the Government entertain making the cost of the OEM data rights licensing a non-evaluated price factor that would not be part of the Total Evaluated Price (TEP)
No. See RFP-54 response posted to FBO on 3 Dec 14. The Government will not accept either option. Any cost of OEM data licensing/access will remain part of the TEP and the technical evaluation of the Offeror's proposal. This was addressed in the Pre-Proposal Conference.