NAVAIDS Family of Systems Modernization Pre-Installation Survey
View the file
Other files
Show all 48
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NAVAIDS Family of Systems Modernization Pre-Installation Survey
Page 1 7 Feb 12
1. PURPOSE: This document defines the requirements for a Navigational Aids (NAVAIDS) Family of Systems (FOS) Modernization Pre-Installation Survey. This site survey shall be performed by the Contractor to determine if existing NAVAIDS FOS meet design standards currently required of the system.
2. AFFECTED SYSTEM(S): AN/FRN-44 Very High Frequency Omni-Directional Range (VOR), AN/FRN-45 Tactical Air Navigation (TACAN), and AN/FRN-43 Very High Frequency Omni-Directional Range Tactical Air Navigation (VORTAC).
3. BACKGROUND:
3.1. The 38th Engineering Installation Group (EIG) initially installed most if not all of the FRN-43/44/45 systems using standard USAF drawings that included the antenna tower, building, and foundations. All FRN-43/44/45 systems should still comply with these drawings as well as other military standards and the FRN-43/44/45 Technical Orders (TOs).
3.2. The modernization program will not directly fund site rework that brings them back up to the standard level initially provided. Therefore, this pre-installation survey shall be used to identify potential site issues, so that they can be worked prior to scheduled installation of the NAVAIDS FOS Modernization.
4. SURVEY DATA COLLECTION:
4.1. Utilizing base support, inspect each VOR, TACAN and VORTAC utilizing the NAVAIDS FOS Modernization Pre- Installation Survey Checklist. Inspection points may be examined and verified through Base Civil Engineering (BCE) records for the NAVAIDS FOS or visually inspected at each location. The Contractor is to visually inspect only that which is visible or readily accessible. The Contractor shall coordinate access to the NAVAIDS FOS and BCE records as well as removal of any components during the inspection with personnel from the base.
4.2. The Contractor shall complete the attached NAVAIDS FOS Modernization Pre-Installation Survey Checklist for each VOR, TACAN and VORTAC. This shall include completing all general information at the top of the checklist for each system and then marking either the Yes, No or Unable to Verify block for each inspection point. If an inspection point is not applicable to a particular type of system, place N/A in the Yes block. For each inspection point marked as Unable to Verify, note why in the comments section. For each inspection point marked as No, note in the comments section or a separate piece of paper clear details on the discrepancy, recommended actions to resolve discrepancy, specific location(s) of the discrepancy within the system and indicate whether the discrepancy will have a direct impact on this modernization effort. To help convey the discrepancy, drawings, military standards, TOs, pictures, etc. can be redlined and/or marked-up and attached to the checklist. The checklist and any supporting documentation shall be provided electronically and the filename shall include the base name, type of system, directional reference (only if the base has more than one of a particular type of system) and type of document (e.g.
Lajes Field–TACAN-North-Checklist or Tinker-TACAN-Drawing1). The checklist shall be delivered in a MS Word format.
4.3. The Contractor may add inspection points to the survey checklist as required to help identify other discrepancies that will have a direct impact on the modernization effort. However, these inspection points must be supported by existing drawings, military standards or TOs applicable to each type of system.
4.4. The Contractor shall collect additional data about the configuration of each system. The Contractor shall provide this information to the Government with each completed checklist. This information shall be provided in a table format that can be copied and pasted to create and maintain a Government database for all the sites and systems. The exact table format and file type that is provided shall be established jointly between the Contractor and Government. Once the format and file type is established and approved by the Government, no changes shall be made without permission of the Government. As a minimum for each system, the Contractor shall provide the following information in the table:
Base Name Location of Base – State (if applicable), Country Type of System – VOR, TACAN, VORTAC
Page 2 7 Feb 12
System’s Serial Number Communication Method – Provide the communication method between the building/shelter and ATC tower
(Fiber, Twisted Pair, RF Link, etc.)
Number of Communication Lines – Provide the number of communication lines between the building/shelter and
ATC tower Building/Shelter Construction – Masonry, Concrete Block, Wood, Metal, etc.
Building/Shelter Shape – Rectangle, Round, etc.
Building/Shelter Dimensions – The dimensions collected will vary by the shape but should allow for volume to be known (length X width X height, diameter X height, etc). Show dimensions in feet.
BTU Rating of Facility Environmental Control Unit (ECU) – Both for heating and cooling TACAN/VORTAC Only o Antenna Mount Type – Tower or Facility o If Tower Mounted Antenna:
Tower Type – Part number reference (e.g. GRA-49) or description if part number unknown Tower Height – Show dimension in feet Distance of Tower from Shelter – Show dimension in feet Direction of Tower from Shelter – North, Northeast, East, etc.
VOR/VORTAC Only o Counterpoise Diameter – Show dimension in feet o Counterpoise Construction – Perforated, Ribbed, Smooth, etc.
o Finish on Counterpoise – e.g. Painted, Uncoated Stainless Steel, Covered with Rubber, etc.
Other Comments
4.5. The Contractor shall provide photos of each system. At a minimum, the Contractor shall provide a picture from all four sides of the outside of the equipment facility. If the TACAN antenna cannot be captured in these photos, a picture of the antenna and its tower mount shall also be included. The photo quality shall be no less than 6 megapixel and be delivered in a JPEG format. The filename for each picture shall include the base name, type of system, directional reference if the base has more than one of a particular type of system and type of document (e.g. Lajes Field–TACAN-North-Photo1).
5. ATTACHMENTS: The attachments to this document are shown below. If the Contractor does not have access to any of the other referenced documents, the Government will provide access upon request.
Attachment 1 – NAVAIDS FOS Modernization Pre-Installation Survey Checklist Attachment 2 – Standard Drawing LDBWS01425AD243 TACAN Masonry Building Attachment 3 - Standard Drawing LDBWS00359AD238 VORTAC Facility, Shelter Concrete Block Attachment 4 – Standard Drawing LDBWS01438AD238 VORTAC/VOR/TACAN Facility (Round Canned Shelter) Attachment 5 - Standard Drawing LDBWS00957AD243 Tower AB-589/GRA-49 Attachment 6 – Standard Drawing LDBSW00966AD243 TACAN Antenna and Tower
6. ATCALS SSM POC: Cynthia Hughes, OC-ALC/GKAAB, email: cynthia.hughes@tinker.af.mil, DSN: 339-9049, Commercial Phone: 405-739-9049 or Thomas Neel, OC-ALC/GKAAB, email: thomas.neel@tinker.af.mil, DSN: 339- 9562, Commercial Phone: 405-739-9562.
Attachment 1
NAVAIDS FOS Modernization Pre-Installation Survey Checklist
Attachment 1 ‐ NAVAID FOS Modernization Pre‐installation Survey Checklist
System Serial Number
Contractor Inspection POC Name & Phone Number:
No. Yes No Unable to
Verify Inspection Points Comments
1.1 Is an Earth Electrode Subsystem (EES) IAW MIL-STD-188-124 installed? This may be an Equipotentail Ground Plane underneath the facility or a Ring Ground System around the facility.
1.2 EES resistances less than 10 ohms?
1.3 When measuring the EES resistance, was "fall-of-potential" measurement method used? Provide comments if another method was used.
2.1 Are metal structures within 6 feet of the outside perimeter of the VOR/TACAN/VORTAC facility connected to the EES?
2.2 If other EES systems are within 20 feet of the VOR/TACAN/VORTAC system facility are they integrated into the VOR/TACAN/VORTAC system EES?
2.3 If other EES systems within 200 feet of the VOR/TACAN/VORTAC building, are they connected to the VOR/TACAN/VORTAC EES by a minimal two cables?
2.4 Are all exposed mechanical connections coated with a corrosion preventive or sealant?
2.5 Are the bend radius of the connection risers greater than 8-inches?
2.6 Are the bend angles of grounding and lightning connection risers greater than 90 degrees?
2.7 If EES conductors are running through metal conduit, are the conductors bonded to the conduit?
2.8 Do the EES conductors form a closed loop?
2.9 Are all metal pipes, conducts, and cables entering the facility connected to the
EES?
2.10 Are cable entry plates at the facility connected directly to the EES with a minimal 1/0 AWG, stranded cable?
2.11 Are metal cable raceways and trays bonded to each other and to the EES?
Base POC Name, Phone Number & Military Organization:Base Name:
System Type: (Circle One)
VOR TACAN VORTAC
Date of Inspection:
1.0 Inspect the records. Reference BCE records for systems facilities grounding:
2.0 Inspect the Earth Electrode Subsystem (EES). Reference Mil-Std-188-124:
Page 1 of 5 Attch 1 ‐ NAVAIDS FOS Modernization Pre‐Installation Survey Checklist 7 Feb 12
No. Yes No Unable to
Verify Inspection Points Comments
2.12 Are all external enclosures for power, signal or grounding connected to the EES via a grounding conductor?
2.13 Are connections made to the EES with a minimum of 6 AWG solid or 2 AWG stranded copper wire?
2.14 VOR or VORTAC facility only: Is the counterpoise grounded at the four cardinal points (90, 180, 270, and 360 degrees) to the EES?
2.15 VOR or VORTAC facility only: Is the VOR antenna bridge (transmission line coupler) bonded to the EES?
3.1 Are the external generator fuel tanks bonded directly to the EES by a minimal 2 AWG stranded wire?
3.2 Are there air terminals (lightning rods) protecting the VOR/TACAN/VORTAC antenna?
3.3
Are there air terminals (lightning rods) protecting the VOR/TACAN/VORTAC facility? (If the facility falls within the zone of protection provided by the air terminals of the antenna, it is acceptable for the facility to not have separate air terminals. If this is the case, note this in the comments block.)
3.4 Are there a minimum of two down conductors for the LPS?
3.5 Are all conductors at least 1/0 AWG?
3.6 If the conductors are stranded, is each strand in the conductor greater than 14
AWG?
3.7 Do all conductors have a bend radius greater than 8-inches and a bend angle greater than 90 degrees?
3.8 Do the down conductors follow a continuous path (no open cables) from air terminal to EES?
3.9 Is there a minimum separation of 6-feet between the lightning down conductors and exposed power and signal cables?
3.10 Are all accessible bonds made by high compression UL (Underwriters Laboratory) approved clamping devices? UL approved devices will have a UL stamp, sticker, or plate.
3.11 Are all power lines protected by UL approved lightning arrestors (surge protection) at the facility?
3.12 Tower Mounted TACAN Antenna only: Are the TACAN antenna tower down conductors bonded to the base of each tower leg?
If separate air terminals are present for the facility and antenna, item numbers 3.4 through 3.11 shall be considered for both the facility and antenna LPS subsystems.
3.0 Inspect the Lightning Protection Subsystem (LPS). Reference Mil-Std-188-124.
Page 2 of 5 Attch 1 ‐ NAVAIDS FOS Modernization Pre‐Installation Survey Checklist 7 Feb 12
Unable to
Verify Inspection Points Comments
3.13 Tower Mounted TACAN Antenna only: Are conductors that pass through foundations or footings installed in plastic or non-metallic conduit?
3.14 Tower Mounted TACAN Antenna only: Are all exterior nonstructural metal elements (tower hand rails, ladders, stairways, etc) electrically connected to each other and the tower structural elements? (No open circuits)
4.1 Are all metallic structural members electrically continuous and connected to the EES ground system?
4.2 Are all metallic piping, tubing, and conduit electrically continuous and connected, either directly or indirectly, to the ground system?
4.3 Are all electrical support structures (boxes, enclosures, stands, etc) electrically continuous and connected, either directly or indirectly, to the ground system?
4.4 Are all power carrying conductors in the power panels (including the neutral) copper?
4.5 Are IEEE standard power surge protectors installed?
4.6 If surge protectors are installed, are the they installed as close as practical (within 12 inches) to the service disconnect?
4.7 Are all the cables used for connection to any power surge protection free of loops, sharp bends (greater then 90 degrees), kinks, and deep cuts?
5.1 Are all removable connections that are able to be inspected tight and coated with corrosion preventive or sealant?
5.2 Are all welded or brazed bonds coated with a corrosion preventive or sealant?
5.3 Are all bonding connections appropriately fastened in such a way as they do not use C-clamps, spring clamps, or self-tapping screws?
6.0 Facility, General. Note: Facility design is varied. Common facility designs can be of masonry construct, wood construct, or metal canned/round shelter.
LDBWS01425AD243 TACAN Masonry Building LDBWS00359AD238 VORTAC Facility, Shelter Concrete Block
There may be further variances (rectangular shelters or prefabricated enclosures initially meant for other use).
Reference Standard Drawings for common masonry construct or round shelter per below:
LDBWS01438AD238 VORTAC/VOR/TACAN Facility (Round Canned Shelter) LDBWS00957AD243 Tower AB-589/GRA-49 LDBSW00966AD243 TACAN Antenna and Tower
5.0 Inspection of Grounding and Bonding Elements. Reference Mil-Std-188-124:
4.0 Inspect the Fault Protection Subsystem. Reference Mil-Std-188-124:
Page 3 of 5 Attch 1 ‐ NAVAIDS FOS Modernization Pre‐Installation Survey Checklist 7 Feb 12
Unable to
Verify Inspection Points Comments
6.1 Does the building/shelter have only standard fixtures (ECU or possibly fiber optic modem all weather enclosure) mounted to the exterior of the building? Describe any other fixtures in comments section.
6.2 Does it appear that the building/shelter was constructed utilizing one of the supplied Standard Drawings? If not, note the type of construction.
6.3 If answer to item 6.2 is "Yes", does the building/shelter match the design layouts of the supplied Standard Drawings? Note major deviations in the Comments section.
6.4 Does an all-weather access road and turn-around exist at the facility?
6.5 Does it appear that the elevation of the foundation and/or the drainage from the facility will ensure that the facility will not flood?
6.6 Are power and telephone termination boxes on a pedestal near the facility?
Comment on type of pdedstal present (Wood, Concrete, etc.).
6.7 Is the power/telephone pedestal of frangible construct?
6.8 Does building/shelter interior have only standard (ie: equipment related only to the VOR/TACAN/VORTAC system) fixtures mounted to the interior ceiling, walls, or floor? Describe any other fixtures in comments section.
6.9
Is the overall integrity of the building/shelter in good condition? Inspect and comment on any evidence that the building/shelter lacks overall integrity including leaks, physical damage or, if shelter, improperly secured shelter to foundation.
(Examples: rotting wood, mold or mildew intrusion, holes, corrosion, cracked or broken structure, etc).
6.10 If VOR or VORTAC facility: Is the counterpoise free of corrosion? Describe location and type/severity of corrosion if present.
6.11 If VOR or VORTAC facility: Is the counterpoise free of surface undulations (where moisture can puddle)? Describe any surface anomolies in comment block.
6.12 If TACAN facility: Is the TACAN antenna tower the type noted in the standard drawings (ie: Tower AB-589/GRA-49)? If tower is different, describe in comments block.
Page 4 of 5 Attch 1 ‐ NAVAIDS FOS Modernization Pre‐Installation Survey Checklist 7 Feb 12
Unable to
Verify Inspection Points Comments
7.1 Are there an adequate number of communication lines between the system equipment facility and the Air Traffic Control (ATC) tower for the modernized systems?
7.2 Is the line loss for each required communication line between the system equipment facility and the ATC tower less than 10 dB at 2800 Hz? If not, note the line loss for each line.
7.0 Inspect Communications Infrastructure
Page 5 of 5 Attch 1 ‐ NAVAIDS FOS Modernization Pre‐Installation Survey Checklist 7 Feb 12
Attachment 2
Standard Drawing LDBWS01425AD243 TACAN Masonry Building
Cynthia.Hughes Typewritten Text
Cynthia.Hughes Typewritten Text X
Cynthia.Hughes Typewritten Text
Attachment 3
Standard Drawing LDBWS00359AD238 VORTAC Facility, Shelter Concrete Block
Attachment 4
Standard Drawing LDBWS01438AD238 VORTAC/VOR/TACAN Facility (Round Canned Shelter)
Attachment 5
Standard Drawing LDBWS00957AD243 Tower AB-589/GRA-49
Attachment 6
Standard Drawing LDBSW00966AD243 TACAN Antenna and Tower
| LDBWS01425AD243(AllSheets).pdf |
| LDBWS01425AD242-01 |
| LDBWS01425AD242-02 |
| LDBWS01425AD242-03 |
| LDBWS01425AD242-04 |
| LDBWS01425AD242-05 |
| LDBWS01425AD242-06 |
| LDBWS01425AD242-07 |
| LDBWS01425AD242-08 |
| LDBWS00359AD238(AllSheets).pdf |
| LDBWS00359AD238-01 |
| LDBWS00359AD238-02 |
| LDBWS00359AD238-03 |
| LDBWS00359AD238-04 |
| LDBWS00359AD238-05 |
| LDBWS00359AD238-06 |
| LDBWS00359AD238-07 |
| LDBWS00359AD238-08 |
| LDBWS00359AD238-09 |
| LDBWS00359AD238-10 |
| LDBWS00957AD243(AllSheets).pdf |
| LDBWS00957AD243-01 |
| LDBWS00957AD243-02 |
| LDBWS00957AD243-03 |
| LDBWS00966AD243(AllSheets).pdf |
| LDBWS00966AD243-01 |
| LDBWS00966AD243-02 |
| LDBWS00966AD243-03 |
| LDBWS00966AD243-04 |
| LDBWS00966AD243-05 |
| LDBWS00966AD243-06 |
File details come from the government source that posted it. Updated .