About this file

Response to industry questions

View the file

Other files for this federal contract opportunity

Other files attached to Communication, Detection, and Coherent Radiation Equipment, newest first.
File Type Posted
FA810212R0001_______0003_Performance_Work_Statement_Addendum_1.pdf PDF
FA810212R0001_______0003.RTF RTF text file
Industry Question and Answers 3 May 2012.pdf PDF
Response to Industry questions April 25.pdf PDF
Industry Questions April 18.pdf PDF
FA810212R0001_______0002.RTF RTF text file
Industry questions April 13.pdf PDF
FA810212R0001_______0001.RTF RTF text file
FA810212R0001_Complete_CDRL_Package_-_19_Mar_12.pdf PDF
FA810212R0001.RTF RTF text file
FA810212R0001_FOS_SOW_13_Mar_2012_with_Attachment_1.pdf PDF
FA810212R0001_FoS_Ship_To_05_Apr_12.pdf PDF
FA810212R0001_FOS_PWS_21_Feb_12.pdf PDF
FA810212R0001_TM-86-01N-14_Mar_2012.pdf PDF
FA810212R0001_NAVAIDS_FOS_Modernization_Pre-installation_Survey_7_Feb_12_with_Attachments.pdf PDF
FA810212R0001_FOS_QASP_15_Feb_12.pdf PDF
FA810212R0001_Fixed-base_TACAN_VOR_VORTAC_Specification_Ver-_21_Feb_2012.pdf PDF
Industry Questions 21 Mar QA.pdf PDF
FOS_QASP_24_Feb_12.pdf PDF
Fixed-base_TACAN_VOR_VORTAC_Specification_Ver-_24_Feb_2012 —
FOS_PWS_24_Feb_12.pdf PDF
NAVAIDS_FOS_Modernization_Pre-installation_Survey_24_Feb_12_with_Attachments.pdf PDF
FA810212R0001 ver 2.pdf PDF
Complete_CDRL_Package_-_24_Feb_12.pdf PDF
FOS_SOW_24_Feb_2012_with_Attachment_1.pdf PDF
FoS_Ship_To_02-24-12.pdf PDF
TM-86-01N-24_Feb_2012 —
NAVAIDS FOS Modernization Pre-installation Survey 7 Feb 12 with Attachments.pdf PDF
Pre Solicitation Notice.docx DOCX document
CDRL Package - 1 Feb 12 with Provisioning CDRLs.pdf PDF
FOS SOW 1 Feb 2012.pdf PDF
Fixed-base TACAN VOR VORTAC Specification Draft-11 27 Jan 2012.pdf PDF
FOS PWS 24 Jan 12.pdf PDF
TM-86-01N - 27 Jan 2012.pdf PDF
FOS Comments-Gov't Responses 30 Jan 12.pdf PDF
FOS Comments-Gov't Responses.pdf PDF
TM-86-01N - 30 NOV 11.pdf PDF
FOS_SOW_30_NOV_2011.pdf PDF
Fixed-base_TACAN_VOR_VORTAC_Specification_Draft-10_29_Nov_2011.pdf PDF
FA810212R0001.pdf PDF
FOS_PWS_29_Nov_11.pdf PDF
FoS_Ship_To_11-30-11.pdf PDF
CDRL_Package_for_NAVAIDS_FOS_Modernization_-_11-30-11.pdf PDF
QASP_Nov_11.pdf PDF
FOS TACAN 4.zip ZIP file
FOS TACAN 2.zip ZIP file
FOS TACAN 1.zip ZIP file
FOS TACAN 3.zip ZIP file
Show all 48

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Queston Response

Since the contractor is responsible for bidding travel costs for site surveys and installation as well as shipping costs and duties to the destinations, we feel that such ambiguities cannot exist in a LPTA type of procurement. There is a significant difference in costs when dealing with international –vs- domestic sites. If there are 102 equipments to be delivered per the CLIN structures, there should be 102 sites clearly identified for the basis of bid. We recognize that the USAF may need to change some of the destinations after contract award but there should be no ambiguities for the basis of contractor bids.

At this point, the definite equipment quantity will be 121 systems. The number of ship to locations is 103 sites. However, for pricing purposes, the delta of 18 between the number of systems and the number of locations will be shipped to Tinker AFB (15 TACANS and 3 VORTACS). The Ship To list will reflect this upon release of the RFP.

At present, there is mention in the CLIN description in Section B for the ICS (CLIN X007) that it commences “upon expiration of initial year of support.”

This implies that all equipment delivered comes with a 1 year initial warrant however we see no requirement in the SOW for this warranty. Can you please direct us to where this requirement is stated (assuming we are missing it) or provide clarification to all potential contractors that a 1-year warranty is a firm requirement.

The requirement for one year sustainment with the equipment can be found in the SOW, paras 1.6.2.4 and 1.6.2.5. “The Contractor shall supply one full year of sustainment support from the time the modernized system is accepted by the Government. This sustainment support shall provide for the same level of Contractor support as the Interim Contractor Support (ICS) described in the Performance Work Statement (PWS).”

Paragraph 1.1 of the PWS for ICS states that “During the ICS period the contractor shall be responsible for all depot level maintenance repair actions and field level repair actions as required”. This differs from our understanding of the maintenance philosophy in which the USAF site personnel will have responsibility for removal and replacement of LRUs in the field and that the contractor is then responsible for the repair of returned items. The statement in the PWS seems to imply that the contractor will be responsible for putting someone on a plane to conduct any field-level maintenance action needed. Please clarify so that we fully understand the expectation. Also please clarify if the contractor is truly responsible for the conduct of field maintenance that the travel associated with this is covered under CLIN X005 as I don’t know how it would otherwise be able to be accurately bid.

Paragraph 1.1 of the PWS for ICS states that “During the ICS period the contractor shall be responsible for all depot level maintenance repair actions and field level repair actions as required.” The emphasis should be on the “as required” for field level repair. If there is a need for repair actions in the field that are above those of the on-site government technicians, then the contractor will be expected to provide those field level repair actions. Additionally all Travel will be applied to CLIN 0005.

This differs from what was briefed in the Pre-Solicitation Conference when stated Travel for install will be rolled into the equipment CLINs. Now ALL travel will be on CLIN 0005.

FoS Response to Industry Questions 4/5/12