Complete_CDRL_Package_-_24_Feb_12.pdf
PDF 3 MB Posted
- Attached to
- Communication, Detection, and Coherent Radiation Equipment Federal contract opportunity
- Solicitation number
- FA8102-12-R-0001
About this file
Updated CDRL package 24 Feb 2012.
View the file
Other files for this federal contract opportunity
Show all 48
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA8102-12-R-0001
21 February 2012
The requirements specified in this CDRL are identified in accordance with procedures in DOD 5010.12M. Data Item Descriptions, DD Forms 1664, specified on the CDRL are those listed in the Acquisition Management Systems and Data Requirements Control List, DOD 5010.12L.
CONTRACT DATA REQUIREMENTS LIST (CDRL)
NAVAIDS Family of Systems Modernization
Data Request Control Number
Contract Reference
DRAFT
1. METHOD OF TRANSMITTAL
a. Unless otherwise noted on the CDRL Form (DD Form 1423) in Block 16, all data shall be delivered electronically via email or CD/DVD, and shall be in a software file format that is compatible with Government systems. If the required data cannot be delivered electronically, the Contractor shall distribute per Block 14 of the CDRL.
b. All data submitted by a letter of transmittal or DD Form 250 shall be delivered to the attention of the Requiring Office (Block 6) and will identify the contract number, Data Item Description number, CDRL sequence number, document number and title.
c. Unless otherwise specified in Block 16 of the CDRL, the data submittal date is interpreted as the date the Government (Block 14) receives the data or the date it is submitted electronically.
d. For each data item in the CDRL, the Contractor shall clearly state in the final transmittal letter that this is the last submittal being made and that all contractual requirements concerning the data item have been fulfilled.
2. MODIFICATION OF DATA REQUIREMENTS
a. The Data Manager (DM) is a member of the NAVAIDS FOS Modernization Program Integrated Product Team (IPT). No changes to the data requirements of this contract shall be made without coordination of the DM and specific approval of the Procurement Contracting Officer (PCO).
b. Changes to Requiring Office (Block 6) and Distribution (Block 14) may be authorized and directed by a PCO letter to be incorporated by subsequent contract modification.
3. DATA APPROVAL:
Unless otherwise specified in the Remarks (Block 16) of the appropriate data item, the following definition applies to Block 8 of the CDRL:
a. The use of an “A” in Block 8 means the document identified is critical and requires written Government approval. The review cycle for data will begin on the date the last addressee receives the data, or upon submittal if delivered electronically. The Office of Primary Responsibility (OPR) designated in Block 6 of the DD Form 1423 will consolidate the evaluations performed by the data recipients with his own and respond through the PCO to the Contractor within thirty (30) working days after receipt of the data submittal, unless otherwise specified.
b. The absence of an “A” in Block 8 does not relieve the Contractor of the obligation to comply with the Data Item Description (DID) requirements.
c. Data submittal requirements shall not be considered to have been met until the CO has determined that all contractual requirements have been met regarding the identified data.
4. REVISIONS TO DATA SUBMITTALS AND RESUBMITTALS OF DATA:
Unless otherwise specified, data submittals that are disapproved by the Government shall be revised and resubmitted by the Contractor within thirty (30) days from the date of the PCO letter unless otherwise noted on the CDRL.
5. TAILORED DATA ITEMS
A slash (/) and the letter “T” (i.e. DI-E-3103A/T) added to the DID number in Block 4 of the CDRL denotes the DID has been tailored to comply with specific program requirements. If data preparation instructions contained in Block 10 of the DID conflict with those of the CDRL, the CDRL instructions will govern.
6. ACRONYMS:
ACO Administrative Contracting Officer ASREQ As Required CO Contracting Officer DAC Days After Contract Award IAW In Accordance With MTHLY Monthly ONE/R One time with revisions LT Letter of Transmittal
7. MARKING TECHNICAL DOCUMENTATION
a. Distribution Marking System:
i. In accordance with Section 1.30 of Title 10, “United States Code” a DoD distribution marking system for technical data has been established by DoD Directive 5230.24, “Distribution Statements on Technical Documents,” 18 March 1987. The intent of the system is to stem the flow of military-related technical data to our adversaries, without inhibiting technological growth or blocking the exchange of technical data that is vital to progress and innovation. All DoD components responsible for technical data are required to determine the distribution availability and arrange to mark the data appropriately before primary distribution. Distribution statements and export-control statements, supplemental to any security markings, shall be marked on all technical data to denote the extent of its availability for secondary distribution, release, and disclosure without need for additional approvals and authorizations from the controlling DoD office.
ii. Based on the technical content of the data, one of seven distribution statements defined in DoD Directive 5230.24 is to be applied to indicate the extent of secondary distribution. The seven authorized distribution statements provide options ranging from unlimited distribution to no secondary distribution without specific authority of the controlling DoD office. Distribution statements should be selected to denote the audience for which the data is intended. The statement selected shall not restrict the data any further than is actually required to protect the interests of the Government. The authority to withhold unclassified technical data from the public is found in Section 130 of Title 10, “United States Code” as implemented by DoD Directive 5230.25 “Withholding of Unclassified Technical Data from Public Disclosure,” 6 November 1984.
iii. It is the responsibility of the program office to select the correct distribution statement, to ensure that the corresponding code letter (“A”, “B”, “C”, “D”, “E”, “F”, or “X”) is in Block 9 of the DD Form 1423 or that Block 16 of the DD Form 1423 contains instructions on application of the correct distribution statement before initial distribution of the technical data. If the Contractor feels that a different statement is required, he may formally notify the contracting officer in a letter, make it a subject of discussion during negotiations or at one of the scheduled program audits or reviews.
b. Marking Technical Data:
i. All new or requested unmarked production, engineering, logistics, and scientific and technical information, regardless of its medium, physical form, or characteristics, including preliminary drafts and working papers, shall be marked with a distribution statement. This includes technical reports, blueprints, drawings, technical orders, technical manuals, plans, instructions, computer software, viewgraphs, film, technical papers, photographs, etc. If the document contains export-controlled technical data, it also must be marked with an export control warning statement. Distribution statements can be applied to technical data that contain or reveal proprietary information used.
(Location suggestions for placing the statements on the data may be obtained from MIL-STD-1806.)
ii. Technical data categorized as cryptographic/communications security, communications/electronic intelligence, and similar categories as may be designated by the Director, National Security Agency, whose distribution is limited through alternate methods, are exempt from these marking provisions.
iii. Certain types of technical data preclude placing the entire notice on the document. To accommodate this problem, each distribution statement contains an authorized abbreviation form. Abbreviated distribution statements are to be used only when space precludes placing the entire notice on the document. The use and wording of these statements are described in the following paragraphs.
c. Controlling Office: The following address shall be used for the “controlling office” for the program: OC- ALC/GKAKB, 3001 Staff Dr. Ste 2AC-81A, Tinker AFB, OK 73145
d. Export-Controlled Warning Statement: Besides a distribution statement, the marking system also requires the use of a warning notice on all documents that contain export-controlled technical data. That notice may be used in conjunction with any of the six limited distribution statements (“B”, “C”, “D”, “E”, “F” and “X”.) Statement “A”, which denotes public release, cannot be used in conjunction with the export-control warning notice.
e. Destruction Notice: All unclassified technical data marked with distribution statements “B”, “C”, “D”, “E”, “F” or “X” shall be handled and destroyed as “For Official Use Only” (FOUO) documents, as described in DoD 5400.7-R. Classified data and classified limited technical data shall be handled and destroyed in accordance with the procedures in Chapter IX of DoD 5200.1-R “Information Security Program Regulation” or follow the procedures in DoD 5220.22-M “Industrial Security Manual”.
8. ELECTRONIC DATA TRANSMISSION
a. Electronic Data Transmission Statement for the CDRL:
i. The recipients will be notified by email of each submission of CDRL data. All submissions will be via email or CD/ DVD, unless other arrangements are approved by the Government. The versions of this software shall remain compatible with current program office software. The Contractor shall inform OC-ALC/GKAKB if any of their data deliverables cannot comply with the above electronic formats.
In such cases the Contractor shall recommend, for program office approval, alternative delivery format(s).
ii. The Government review cycle for data will begin on the date the last addressee listed in Block 14 receives the data or the date it is submitted electronically.
"WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS
RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751 ET
SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50,
U.S.C.. APP. 2401, ET SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO
SEVERE CRIMINAL PENALTIES. DISSEMINATE IN ACCORDANCE WITH THE
PROVISIONS OF DOD DIRECTIVE 5230.25.
9. MAILING LISTS:
OFFICE SYMBOL/MAIL ADDRESS E-MAIL ADDRESS
OC-ALC/GKAKB
3001 Staff Drive, Post 2AC-81A Tinker AFB, OK 73145 Attn: Mr. David Hancock
David.Hancock@tinker.af.mil
OC-ALC/GKAAA
3580 D Ave, Bldg 201W, RM 74 Tinker AFB, OK 73145 Attn: Mr. Julius Logan
OC-ALC/ENSDAA
3001 Staff Drive, Ste 1AB-83A Tinker AFB, OK 73145 Attn: Mr. Thomas Meadows
420 SCMS/GUMAA
7851 Arnold St, Bldg 3, RM 102 Tinker AFB, OK 73145 Attn: Ms. Verlisher Strain
420 SCMS/GUMAB
7851 Arnold St, Bldg 3, RM 102 Tinker AFB, OK 73145 Attn: Mr. Michael Ferik
Julius.Logan@us.af.mil
Thomas.Meadows@tinker.af.mil
Verlisher.strain@tinker.af.mil oc-alc.provisioning@tinker.af.mil
CONTRACT DATA REQUIREMENTS LIST
TABLE OF CONTENTS
CDRL
No.
Authority CDRL Title - Subtitle
A001 DI-MGMT-80004A Program Management Plan A002 DI-MGMT-80227/T Contractor's Progress, Status And Management Report A003 DI-MGMT-81650/T Integrated Master Schedule (IMS) A004 DI-ADMN-81249A/T Conference Agenda – Meeting Agenda A005 DI-ADMN-81250A Conference Minutes – Meeting Minutes A006 DI-MCCR-80700 Computer Software Product End Items A007 DI-IPSC-81442A Software Version Description (SVD) A008 DI-MISC-81381 Site Survey Report A009 DI-MGMT-81024/T System Engineering Management Plan (SEMP) A010 DI-CMAN-80858B Contractor’s Configuration Management Plan A011 DI-CMAN-80639C Engineering Change Proposal (ECP) A012 DI-CMAN-80640C Request for Deviation (RFD) A013 DI-CMAN-81022C Configuration Audit Summary Report A014 DI-NDTI-80603A/T Test Procedures A015 DI-NDTI-80809B/T Test/Inspection Report A016 DI-SAFT-80101B System Safety Hazard Analysis Report (SSHA) A017 DI-SAFT-81626 System Safety Program Plan (SSPP) A018 DI-ILSS-80095/T Integrated Logistics Support Plan A019 DI-ALSS-81529/T Logistics Management Information (LMI) Data Products – Provisioning
Technical Document (PTD) A020 DI-ALSS-81557/T Supplemental Data for Provisioning (SDFP) A021 DI-SESS-81000D/T Product Drawings/Models and Associated Lists A022 MIL-PRF-38804C Time Compliance Technical Order A023 TM-86-01N Technical Order A024 DI-ILSS-80872/T Training Material
A025 DI-ALSS-81530/T
Logistics Management Information (LMI) Summaries – SE Recommendation Data (SERD) – Standard/Modified Hand Tools List
A026 DI-CMAN-81248A Interface Control Document (ICD) A027 DI-PACK-80120B Preservation and Packing Data A028 DI-PACK-80121B Special Packaging Instructions (SPI) Drawing/Narrative Instructions A029 DI-PACK-80683B Container Design Retrieval System (CDRS) Research Request A030 DI-PACK-80684B Container Design Retrieval System (CDRS) Data Input DRAFT
C O N T R A C T D A T A R E Q U I R E M E N T S L I S T (1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
0003 A TDP ______ TM ______ OTHER _MGMT_____________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Modernization of the NAVAIDS FOS FA8102-12-R-0001
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
A001 Management Plan Program Management Plan
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18.
ESTIMATED
TOTAL PRICE
DI-MGMT-80004A SOW Para. 1.4 OC-ALC/GKAAA
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
DD ONE TIME 30 DAC b. COPIES
8. APP CODE A 11. AS OF DATE 13. DATE OF SUBSEQUENT SUBM. a. ADDRESSEE Draft
Final
N/A N/A ASREQ
Reg Repro
16. REMARKS:
Block 14: Electronic Media compatible with Microsoft Office Suite 2007 is required.
“Repro” copy defined as electronic media.
OC-ALC/
GKAKB
GKAAA
15. TOTAL -----------> 0 0 2
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Carolyn Pullen/GKAAB/Data Manager
05 Jan 2012
DD Form 1423-1, 1 Jun 90 Previous Editions are Obsolete Page _1_ of _1_ Pages
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
0003 B TDP ______ TM ______ OTHER _MGMT_____________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Modernization of the NAVAIDS FOS FA8102-12-R-0001
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
A002 Contract’s Progress, Status and Management Report
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18.
ESTIMATED
TOTAL PRICE
DI-MGMT-80227/T SOW Paragraph 1.4 OC-ALC/GKAAA
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT MTHLY SEE BLOCK 16 b. COPIES
8. APP CODE B 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBM.
a. ADDRESSEE Draft
Final
N/A SEE BLOCK 16 SEE BLOCK 16
Block 4: The data item description is tailored as follows:
a. Para 10.2: The report shall be delivered electronically so format requirements specific to hard copies are deleted.
b. Para 10.3 g through i: Cost information is only required for CLINs that are not firm-fixed price.
Blocks 11, 12 & 13: Submit by the 10th of each month beginning the month following contract award.
Block 14: Electronic Media compatible with Microsoft Office Suite 2007 is required.
Submission shall be delivered concurrently with Integrated Master Schedule, CDRL A003. “Repro” copy defined as electronic media.
DD Form 1423-1, 1 Jun 90 Previous Editions are Obsolete Page _1_ of _1_ Pages
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
0003 C TDP ______ TM ______ OTHER _ MGMT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Modernization of the NAVAIDS FOS FA8102-12-R-0001
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
A003 Integrated Master Schedule (IMS)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18.
ESTIMATED
TOTAL PRICE
DI-MGMT-81650/T SOW Paragraph 1.4.1 OC-ALC/GKAAA
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
SEE BLOCK 16 MTHLY 20 DAC b. COPIES
a. ADDRESSEE Draft
Final
SEE BLOCK 16 N/A SEE BLOCK 16
a. Para 2.4.1.15 to 2.3.1.16: Delete paragraphs in their entirety.
b. Para 2.4.1.17: Delete last sentence.
Block 7 & 8: The first submittal shall be delivered with a DD 250 with a code of DD and Government inspection and approval is required (App Code A). All subsequent submissions shall be delivered with a letter of transmittal (LT) with no Government approval required (App Code N/A).
Block 13: Submit concurrent with Program Status Report. Updates to the IMS shall be as required. For the first submittal, Government comments, if any, shall be incorporated within 10 calendar days of receipt of comments.
Block 14: An electronic copy compatible with Microsoft Project 2004 and a copy in Adobe Acrobat .PDF format are required. Submission shall be delivered concurrently with Program Status Report, CDRL A004. “Repro” copy defined as electronic media.
DD Form 1423-1, 1 Jun 90 Previous Editions are Obsolete Page _1_ of _1_ Pages
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
0003 D TDP ______ TM ______ OTHER ADMN ___________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Modernization of the NAVAIDS FOS FA8102-12-R-0001
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
A004 Conference Agenda Meeting Agenda
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18.
ESTIMATED
TOTAL PRICE
DI-ADMN-81249A/T SOW Paragraph 1.4.2 OC-ALC/GKAAA
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
L/T ASREQ SEE BLOCK 16 b. COPIES
a. ADDRESSEE Draft
Final
N/A N/A SEE BLOCK 16
a. Para 10.2e: Add “…, if applicable” to the end of the sentence.
b. As an attachment, submit a list of Contractor’s quality design standards for the Kickoff Meeting Agenda.
Blocks 12 & 13: Submission shall be 10 calendar days prior to each meeting.
DD Form 1423-1, 1 Jun 90 Previous Editions are Obsolete Page _1_ of _1_ Pages
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
0003 E TDP ______ TM ______ OTHER _ ADMN
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Modernization of the NAVAIDS FOS FA8102-12-R-0001
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
A005 Conference Minutes Meeting Minutes
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18.
ESTIMATED
TOTAL PRICE
DI-ADMN-81250A SOW Paragraph 1.4.2 OC-ALC/GKAAA
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
LT AS REQ SEE BLOCK 16 b. COPIES
a. ADDRESSEE Draft
Final
Blocks 12 & 13: Report shall be submitted within 10 calendar days after each meeting.
DD Form 1423-1, 1 Jun 90 Previous Editions are Obsolete Page _1_ of _1_ Pages
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
0003 F TDP ______ TM ______ OTHER _MCCR
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Modernization of the NAVAIDS FOS FA8102-12-R-0001
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
A006 Computer Software Products End Items
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18.
ESTIMATED
TOTAL PRICE
DI-MCCR-80700 SOW Paragraph 1.6.3 OC-ALC/GKAAA
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
DD SEE BLOCK 16 SEE BLOCK 16 b. COPIES
a. ADDRESSEE Draft
Final
Block 7: Contractor may identify the software on the same DD 250 as the computers when delivered preinstalled.
Block 9: A minimum number of licenses for the software required to operate and sustain the NAVAIDS FOS shall be granted. This would be the software loaded on the computers typically within a remote maintenance center. This minimum number shall include a license for each computer delivered as well as the 2 copies of the software delivered to OC-ALC/GKAAA. In any event, this minimum number shall not be less than 40 licenses.
Blocks 10, 12, 13: All NAVAIDS FOS systems shall be delivered with all operating, maintenance, test, and communications software preinstalled. The software used to control the operation and sustainment functions at the remote maintenance center shall be delivered preinstalled on all delivered computers. In addition 1 copy of the software used to control the operation and sustainment functions are to be delivered 10 calendar days prior to Technical Readiness Review and another concurrent with the final acceptance of the first of the first article systems.
Block 14: The exact content, media and format shall be agreed upon by the Government and the Contractor at the kickoff meeting. “Repro” copy defined as electronic media.
*The quantity for the software delivered preinstalled on the NAVAIDS FOS does not include the software used by the computers within the remote maintenance center to control the operation and sustainment. The delivered quantity of this software shall only be that required for pre-installation on the delivered computers and the copies delivered to OC-ALC/GKAAA.
PREINSTALLED
ON NAVAIDS
FOS MOD
EQUIPMENT
127*
15. TOTAL -----------> 0 0 141
DD Form 1423-1, 1 Jun 90 Previous Editions are Obsolete Page _1_ of _1_ Pages
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
0003 G TDP ______ TM ______ OTHER _IPSC_____________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Modernization of the NAVAIDS FOS FA8102-12-R-0001
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
A007 Software Version Description (SVD)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18.
ESTIMATED
TOTAL PRICE
DI-IPSC-81442A SOW Paragraph 1.6.3 OC-ALC/GKAAA
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
DD ONE/R 60 DAC b. COPIES
a. ADDRESSEE
Draft
Final
A N/A ASREQ Reg Repro
DD Form 1423-1, 1 Jun 90 Previous Editions are Obsolete Page _1_ of _1_ Pages
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
0003 H TDP ______ TM ______ OTHER _MISC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Modernization of the NAVAIDS FOS FA8102-12-R-0001
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
A008 Site Survey Report (SSR)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18.
ESTIMATED
TOTAL PRICE
DI-MISC-81381 SOW Paragraph 1.6.4.1 OC-ALC/GKAAA
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
L/T ASREQ SEE BLOCK 16 b. COPIES
a. ADDRESSEE Draft
Final
Blocks 12 & 13: Report shall be submitted within 10 calendar days after each site survey.
Block 14. Electronic Media compatible with Microsoft Office 2007 is required.
15. TOTAL ----------->
DD Form 1423-1, 1 Jun 90 Previous Editions are Obsolete Page _1_ of _1_ Pages
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
0003 J TDP ______ TM ______ OTHER _ MGMT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Modernization of the NAVAIDS FOS FA8102-12-R-0001
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
A009 System Engineering Management Plan (SEMP)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18.
ESTIMATED
TOTAL PRICE
DI-MGMT-81024/T SOW Paragraph 1.7 OC-ALC/GKAAA
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
DD ONE/R 30 DAC b. COPIES
a. ADDRESSEE Draft
Final
A N/A ASREQ
a. Para10.2.1b: Delete in its entirety.
b. Para 10.2.2 f & j: Delete in their entirety.
Block 14. Submittal in Microsoft Office 2007 or Extensible Markup Language (XML) is preferred but Adobe Acrobat .PDF is acceptable. “Repro” copy defined as electronic media.
DD Form 1423-1, 1 Jun 90 Previous Editions are Obsolete Page _1_ of _1_ Pages
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
0003 K TDP ______ TM ______ OTHER _ CMAN
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Modernization of the NAVAIDS FOS FA8102-12-R-0001
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
A010 Contractor’s Configuration Management Plan
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18.
ESTIMATED
TOTAL PRICE
DI-CMAN-80858B SOW Paragraph 1.7.1 OC-ALC/GKAAA
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
a. ADDRESSEE Draft
Final
Block 14: “Repro” copy defined as electronic media.
DD Form 1423-1, 1 Jun 90 Previous Editions are Obsolete Page _1_ of _1_ Pages
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
0003 L TDP ______ TM ______ OTHER _ CMAN
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Modernization of the NAVAIDS FOS FA8102-12-R-0001
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
A011 Engineering Change Proposal (ECP)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18.
ESTIMATED
TOTAL PRICE
DI-CMAN-80639C SOW Paragraph 1.7.1.1 OC-ALC/GKAAA
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
DD ASREQ SEE BLOCK 16 b. COPIES
a. ADDRESSEE Draft
Final
A N/A SEE BLOCK 16
Blocks 12 & 13: The Contractor shall deliver an ECP upon the request of the Government in accordance with the PCO’s direction. In addition, the Contractor shall deliver a no-cost ECP when the baseline configurations require a change to correct discrepancies or deficiencies as required by the SOW.
DD Form 1423-1, 1 Jun 90 Previous Editions are Obsolete Page _1_ of _1_ Pages
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
0003 M TDP ______ TM ______ OTHER _ CMAN
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Modernization of the NAVAIDS FOS FA8102-12-R-0001
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
A012 Request for Deviation (RFD)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18.
ESTIMATED
TOTAL PRICE
DI-CMAN-80640C SOW Paragraph 1.7.1.1 OC-ALC/GKAAA
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
DD ASREQ SEE BLOCK 16 b. COPIES
a. ADDRESSEE Draft
Final
A N/A SEE BLOCK 16
Blocks 12 & 13: Submit request when, prior to manufacture, it is necessary to temporarily depart from a particular requirement of an item’s current approved configuration documentation for a specified number of units or for a specified period of time or to obtain authorization to deliver non-conforming material which does not meet the prescribed configuration identification documentation.
Block 14: Electronic Media compatible with Microsoft Office 2007 is required.
"Repro" copy defined as electronic media.
DD Form 1423-1, 1 Jun 90 Previous Editions are Obsolete Page _1_ of _1_ Pages
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
0003 N TDP ______ TM ______ OTHER _ CMAN
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Modernization of the NAVAIDS FOS FA8102-12-R-0001
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
A013 Configuration Audit and Summary Report
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE
SOW Paragraph 1.7.1.2
6. REQUIRING OFFICE 18.
ESTIMATED
TOTAL PRICE
DI-CMAN-81022C SOW Paragraph 1.7.1.3 OC-ALC/GKAAA
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
a. ADDRESSEE Draft
Final
A SEE BLOCK 16 SEE BLOCK 16
Block 8: MIL-HDBK-61A, Section 8 will be used as guidance to conduct the Physical Configuration Audit (PCA) and Functional Configuration Audit (FCA).
Block 10, 11, 12 & 13: Submit a report within 10 calendar days after each audit. This shall include a PCA at the Contractor’s facility prior to first article installation and a FCA at the Government’s facility after each first article testing. Updates shall be as required. Comments, if any, by the Government shall be incorporated within 10 calendar days of receipt of comments.
Block 14: "Repro" copy defined as electronic media.
DD Form 1423-1, 1 Jun 90 Previous Editions are Obsolete Page _1_ of _1_ Pages
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
0003 P TDP ______ TM ______ OTHER _ NDTI
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Modernization of the NAVAIDS FOS FA8102-12-R-0001
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
A014 Test Procedures SEE BLOCK 16
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE
SOW Paragraph 1.7.2.2
6. REQUIRING OFFICE 18.
ESTIMATED
TOTAL PRICE
DI-NDTI-80603A/T SOW Paragraph 1.7.2.4 OC-ALC/GKAAA
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
a. ADDRESSEE Draft
Final
a. Para 2: The report shall be delivered electronically so format requirements specific to hard copies are deleted.
Block 3: Two sets of test procedures shall be submitted and are subtitled as:
- Qualification Test & Evaluation (QT&E) Procedures
- Functional Ground Test Procedures
Block 10, 11, 12 & 13: Submit QT&E Procedures 60 calendar days after contract award. Submit Functional Ground Test Procedures 45 calendar days prior to first production installation. Comments, if any, by the Government shall be incorporated within 10 calendar days of receipt of comments.
Block 14: Submittal in Microsoft Office 2007 or Extensible Markup Language (XML) is preferred but Adobe Acrobat .PDF is acceptable. "Repro" copy defined as electronic media.
DD Form 1423-1, 1 Jun 90 Previous Editions are Obsolete Page _1_ of _1_ Pages
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
0003 Q TDP ______ TM ______ OTHER _ NDTI
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Modernization of the NAVAIDS FOS FA8102-12-R-0001
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
A015 Test / Inspection Report SEE BLOCK 16
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE
SOW Paragraph 1.7.2.2
6. REQUIRING OFFICE 18.
ESTIMATED
TOTAL PRICE
DI-NDTI-80809B/T SOW Paragraph 1.7.2.4 OC-ALC/GKAAA
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
a. ADDRESSEE Draft
Final
a. Para 10.2.6.2: If all this information is identified within the test procedures, the Contractor can just refer to the procedures.
b. Para 10.2.6.3: Contractor can simply refer to the test procedures unless there were any Government approved variances.
Block 3: Depending on the test performed, the test reports shall be subtitled as either:
- Qualification Test & Evaluation (QT&E) Report
- Functional Ground Test Report
Block 10, 11, 12 &13: Submit a QT&E Report within 10 calendar days of the completion of the QT&E of each first article system. Submit a Functional Ground Test Report within 10 calendar days of the completion of the Functional Ground Test of each production system.
Block 14: Electronic submittal in Microsoft Office 2007 or Extensible Markup Language (XML). "Repro" copy defined as electronic media.
DD Form 1423-1, 1 Jun 90 Previous Editions are Obsolete Page _1_ of _1_ Pages
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
0003 R TDP ______ TM ______ OTHER _ SAFT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Modernization of the NAVAIDS FOS FA8102-12-R-0001
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
A016 System Safety Hazard Analysis Report (SSHA)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18.
ESTIMATED
TOTAL PRICE
DI-SAFT-80101B SOW Paragraph 1.7.3 OC-ALC/GKAAA
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
a. ADDRESSEE Draft
Final
Block 14: Submit in Contractor format. Submittal in Microsoft Office 2007 or Extensible Markup Language (XML) is required. "Repro" copy defined as electronic media.
DD Form 1423-1, 1 Jun 90 Previous Editions are Obsolete Page _1_ of _1_ Pages
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
0003 S TDP ______ TM ______ OTHER _ SAFT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Modernization of the NAVAIDS FOS FA8102-12-R-0001
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
A017 System Safety Program Plan (SSPP)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18.
ESTIMATED
TOTAL PRICE
DI-SAFT-81626 SOW Paragraph 1.7.3 OC-ALC/GKAAA
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
a. ADDRESSEE Draft
Final
Block 14: Submittal in Microsoft Office 2007 or Extensible Markup Language (XML) is required. "Repro" copy defined as electronic media.
DD Form 1423-1, 1 Jun 90 Previous Editions are Obsolete Page _1_ of _1_ Pages
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
0003 T TDP ______ TM ______ OTHER _ ILSS
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Modernization of the NAVAIDS FOS FA8102-12-R-0001
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
A018 Integrated Logistics Support Plan
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18.
ESTIMATED
TOTAL PRICE
DI-ILSS-80095/T SOW Paragraph 1.7.4 OC-ALC/GKAAA
7. DD 250 REQ 9. DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
a. ADDRESSEE Draft
Final
Block 4: All elements of the NAVAIDS FOS shall be focused toward the logistics required to sustain the NAVAIDS FOS at 99% operational availability throughout the expected life of the systems. The data item description is tailored as follows:
a. Para 10.3: The report shall be delivered electronically so format requirements specific to hard copies are deleted.
b. Para 10.3.5: All referenced publications shall be included as attachments.
Block 14: Submittal in Microsoft Office 2007 or Extensible Markup Language (XML) is required. "Repro" copy defined as electronic media.
DD Form 1423-1, 1 Jun 90 Previous Editions are Obsolete Page _1_ of _1_ Pages
(1 Data I tem)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this bur den, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .