CDRL_Package_for_NAVAIDS_FOS_Modernization_-_11-30-11.pdf

PDF 1 MB Posted

Attached to
Communication, Detection, and Coherent Radiation Equipment Federal contract opportunity
Solicitation number
FA8102-12-R-0001
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Tinker Air Force Base

About this file

Draft CDRL requirements.

View the file

Other files for this federal contract opportunity

Other files attached to Communication, Detection, and Coherent Radiation Equipment, newest first.
File Type Posted
FA810212R0001_______0003_Performance_Work_Statement_Addendum_1.pdf PDF
FA810212R0001_______0003.RTF RTF text file
Industry Question and Answers 3 May 2012.pdf PDF
Response to Industry questions April 25.pdf PDF
Industry Questions April 18.pdf PDF
FA810212R0001_______0002.RTF RTF text file
Industry questions April 13.pdf PDF
FA810212R0001_______0001.RTF RTF text file
FA810212R0001_FOS_SOW_13_Mar_2012_with_Attachment_1.pdf PDF
FA810212R0001_FoS_Ship_To_05_Apr_12.pdf PDF
FA810212R0001_FOS_PWS_21_Feb_12.pdf PDF
FA810212R0001_TM-86-01N-14_Mar_2012.pdf PDF
FA810212R0001_NAVAIDS_FOS_Modernization_Pre-installation_Survey_7_Feb_12_with_Attachments.pdf PDF
FA810212R0001_FOS_QASP_15_Feb_12.pdf PDF
FA810212R0001_Fixed-base_TACAN_VOR_VORTAC_Specification_Ver-_21_Feb_2012.pdf PDF
FA810212R0001_Complete_CDRL_Package_-_19_Mar_12.pdf PDF
FA810212R0001.RTF RTF text file
FOS Comments-Responses 5 Apr.pdf PDF
Industry Questions 21 Mar QA.pdf PDF
NAVAIDS_FOS_Modernization_Pre-installation_Survey_24_Feb_12_with_Attachments.pdf PDF
FA810212R0001 ver 2.pdf PDF
Complete_CDRL_Package_-_24_Feb_12.pdf PDF
FOS_SOW_24_Feb_2012_with_Attachment_1.pdf PDF
FoS_Ship_To_02-24-12.pdf PDF
TM-86-01N-24_Feb_2012 —
FOS_QASP_24_Feb_12.pdf PDF
Fixed-base_TACAN_VOR_VORTAC_Specification_Ver-_24_Feb_2012 —
FOS_PWS_24_Feb_12.pdf PDF
NAVAIDS FOS Modernization Pre-installation Survey 7 Feb 12 with Attachments.pdf PDF
Pre Solicitation Notice.docx DOCX document
Fixed-base TACAN VOR VORTAC Specification Draft-11 27 Jan 2012.pdf PDF
FOS PWS 24 Jan 12.pdf PDF
TM-86-01N - 27 Jan 2012.pdf PDF
CDRL Package - 1 Feb 12 with Provisioning CDRLs.pdf PDF
FOS SOW 1 Feb 2012.pdf PDF
FOS Comments-Gov't Responses 30 Jan 12.pdf PDF
FOS Comments-Gov't Responses.pdf PDF
TM-86-01N - 30 NOV 11.pdf PDF
FA810212R0001.pdf PDF
FOS_PWS_29_Nov_11.pdf PDF
FoS_Ship_To_11-30-11.pdf PDF
QASP_Nov_11.pdf PDF
FOS_SOW_30_NOV_2011.pdf PDF
Fixed-base_TACAN_VOR_VORTAC_Specification_Draft-10_29_Nov_2011.pdf PDF
FOS TACAN 2.zip ZIP file
FOS TACAN 1.zip ZIP file
FOS TACAN 3.zip ZIP file
FOS TACAN 4.zip ZIP file
Show all 48

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The requirements specified in this CDRL are identified in accordance with procedures in DOD 5010.12M. Data Item Descriptions, DD Forms 1664, specified on the CDRL are those listed in the Acquisition Management Systems and Data Requirements Control List, DOD 5010.12L.

CONTRACT DATA REQUIREMENTS LIST (CDRL)

NAVAIDS Family of Systems Modernization

Data Request Control Number

Contract Reference

30 November 2011

DRAFT

FA#

DRCN PS-11-11-067

1. METHOD OF TRANSMITTAL

a. Unless otherwise noted on the CDRL Form (DD Form 1423) in Block 16, all data shall be delivered electronically via email or CD/DVD, and shall be in a software file format that is compatible with Government systems. If the required data cannot be delivered electronically, the Contractor shall distribute per Block 14 of the CDRL.

b. All data submitted by a letter of transmittal or DD Form 250 shall be delivered to the attention of the Requiring Office (Block 6) and will identify the contract number, Data Item Description number, CDRL sequence number, document number and title.

c. Unless otherwise specified in Block 16 of the CDRL, the data submittal date is interpreted as the date the Government (Block 14) receives the data or the date it is submitted electronically.

d. For each data item in the CDRL, the Contractor shall clearly state in the final transmittal letter that this is the last submittal being made and that all contractual requirements concerning the data item have been fulfilled.

2. MODIFICATION OF DATA REQUIREMENTS

a. The Data Manager (DM) is a member of the NAVAIDS FOS Modernization Program Integrated Product Team (IPT). No changes to the data requirements of this contract shall be made without coordination of the DM and specific approval of the Procurement Contracting Officer (PCO).

b. Changes to Requiring Office (Block 6) and Distribution (Block 14) may be authorized and directed by a PCO letter to be incorporated by subsequent contract modification.

3. DATA APPROVAL:

Unless otherwise specified in the Remarks (Block 16) of the appropriate data item, the following definition applies to Block 8 of the CDRL:

a. The use of an “A” in Block 8 means the document identified is critical and requires written Government approval. The review cycle for data will begin on the date the last addressee receives the data, or upon submittal if delivered electronically. The Office of Primary Responsibility (OPR) designated in Block 6 of the DD Form 1423 will consolidate the evaluations performed by the data recipients with his own and respond through the PCO to the Contractor within thirty (30) working days after receipt of the data submittal, unless otherwise specified.

b. The absence of an “A” in Block 8 does not relieve the Contractor of the obligation to comply with the Data Item Description (DID) requirements.

c. Data submittal requirements shall not be considered to have been met until the CO has determined that all contractual requirements have been met regarding the identified data.

4. REVISIONS TO DATA SUBMITTALS AND RESUBMITTALS OF DATA:

Unless otherwise specified, data submittals that are disapproved by the Government shall be revised and resubmitted by the Contractor within thirty (30) days from the date of the PCO letter unless otherwise noted on the CDRL.

5. TAILORED DATA ITEMS

A slash (/) and the letter “T” (i.e. DI-E-3103A/T) added to the DID number in Block 4 of the CDRL denotes the DID has been tailored to comply with specific program requirements. If data preparation instructions contained in Block 10 of the DID conflict with those of the CDRL, the CDRL instructions will govern.

6. ACRONYMS:

ACO Administrative Contracting Officer ASREQ As Required CO Contracting Officer DAC Days After Contract Award IAW In Accordance With MTHLY Monthly ONE/R One time with revisions LT Letter of Transmittal

1. MARKING TECHNICAL DOCUMENTATION

a. Distribution Marking System:

i. In accordance with Section 1.30 of Title 10, “United States Code” a DoD distribution marking system for technical data has been established by DoD Directive 5230.24, “Distribution Statements on Technical Documents,” 18 March 1987. The intent of the system is to stem the flow of military-related technical data to our adversaries, without inhibiting technological growth or blocking the exchange of technical data that is vital to progress and innovation. All DoD components responsible for technical data are required to determine the distribution availability and arrange to mark the data appropriately before primary distribution. Distribution statements and export-control statements, supplemental to any security markings, shall be marked on all technical data to denote the extent of its availability for secondary distribution, release, and disclosure without need for additional approvals and authorizations from the controlling DoD office.

ii. Based on the technical content of the data, one of seven distribution statements defined in DoD Directive 5230.24 is to be applied to indicate the extent of secondary distribution. The seven authorized distribution statements provide options ranging from unlimited distribution to no secondary distribution without specific authority of the controlling DoD office. Distribution statements should be selected to denote the audience for which the data is intended. The statement selected shall not restrict the data any further than is actually required to protect the interests of the Government. The authority to withhold unclassified technical data from the public is found in Section 130 of Title 10, “United States Code” as implemented by DoD Directive 5230.25 “Withholding of Unclassified Technical Data from Public Disclosure,” 6 November 1984.

iii. It is the responsibility of the program office to select the correct distribution statement, to ensure that the corresponding code letter (“A”, “B”, “C”, “D”, “E”, “F”, or “X”) is in Block 9 of the DD Form 1423 or that Block 16 of the DD Form 1423 contains instructions on application of the correct distribution statement before initial distribution of the technical data. If the Contractor feels that a different statement is required, he may formally notify the contracting officer in a letter, make it a subject of discussion during negotiations or at one of the scheduled program audits or reviews.

b. Marking Technical Data:

i. All new or requested unmarked production, engineering, logistics, and scientific and technical information, regardless of its medium, physical form, or characteristics, including preliminary drafts and working papers, shall be marked with a distribution statement. This includes technical reports, blueprints, drawings, technical orders, technical manuals, plans, instructions, computer software, viewgraphs, film, technical papers, photographs, etc. If the document contains export-controlled technical data, it also must be marked with an export control warning statement. Distribution statements can be applied to technical data that contain or reveal proprietary information used.

(Location suggestions for placing the statements on the data may be obtained from MIL-STD-1806.)

ii. Technical data categorized as cryptographic/communications security, communications/electronic intelligence, and similar categories as may be designated by the Director, National Security Agency, whose distribution is limited through alternate methods, are exempt from these marking provisions.

iii. Certain types of technical data preclude placing the entire notice on the document. To accommodate this problem, each distribution statement contains an authorized abbreviation form. Abbreviated distribution statements are to be used only when space precludes placing the entire notice on the document. The use and wording of these statements are described in the following paragraphs.

c. Distribution Statements: The following statements regarding distribution must appear on the cover and title page of each document submitted, including the first sheet of each drawing.

The abbreviated form is: “Statement B, U.S. Government Agencies, 747 ACSG/PKB.”

d. Controlling Office: The following address shall be used for the “controlling office” for the program: 747 ACSG/PKB, 3001 Staff Dr. Ste 2AC-81A, Tinker AFB, OK 73145

e. Export-Controlled Warning Statement: Besides a distribution statement, the marking system also requires the use of a warning notice on all documents that contain export-controlled technical data. That notice may be used in conjunction with any of the six limited distribution statements (“B”, “C”, “D”, “E”, “F” and “X”.) Statement “A”, which denotes public release, cannot be used in conjunction with the export-control warning notice.

f. Destruction Notice: All unclassified technical data marked with distribution statements “B”, “C”, “D”, “E”, “F” or “X” shall be handled and destroyed as “For Official Use Only” (FOUO) documents, as described in DoD 5400.7-R. Classified data and classified limited technical data shall be handled and destroyed in accordance with the procedures in Chapter IX of DoD 5200.1-R “Information Security Program Regulation” or follow the procedures in DoD 5220.22-M “Industrial Security Manual”.

2. ELECTRONIC DATA TRANSMISSION

a. Electronic Data Transmission Statement for the CDRL:

i. The recipients will be notified by email of each submission of CDRL data. All submissions will be via email or CD/ DVD, unless other arrangements are approved by the Government. The versions of this software shall remain compatible with current program office software. The Contractor shall inform 747 ACSG/PKB if any of their data deliverables cannot comply with the above electronic formats. In such cases the Contractor shall recommend, for program office approval, alternative delivery format(s).

"WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS

RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751 ET

SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50,

U.S.C.. APP. 2401, ET SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO

SEVERE CRIMINAL PENALTIES. DISSEMINATE IN ACCORDANCE WITH THE

PROVISIONS OF DOD DIRECTIVE 5230.25.

DISTRIBUTION STATEMENT B

“Distribution authorized to U.S. Government Agencies only; proprietary information; October 2010.

Other requests for this document shall be referred to the NAVAIDS Family of Systems Modernization Contracting Officer, OC-ALC/GKAKB, 3001 Staff Dr. Ste 2AC-81A, Tinker AFB, OK 73145.”

ii. The Government review cycle for data will begin on the date the last addressee listed in Block 14 receives the data or the date it is submitted electronically.

3. MAILING LISTS:

OFFICE SYMBOL/MAIL ADDRESS E-MAIL ADDRESS

OC-ALC/GKAKB

3001 Staff Drive, Post 2AC-81A Tinker AFB, OK 73145 Attn: Mr. David Hancock

David.Hancock@tinker.af.mil

OC-ALC/GKAAA

3580 D Ave, Bldg 201W, RM 74 Tinker AFB, OK 73145 Attn: Mr. Julius Logan

OC-ALC/ENSDAA

3001 Staff Drive, Post 1AA-82A Tinker AFB, OK 73145

Julius.Logan@us.af.mil

CONTRACT DATA REQUIREMENTS LIST

TABLE OF CONTENTS

CDRL

No. Authority

A001

CDRL Title - Subtitle

DI-MGMT-80004A Program Management Plan A002 DI-MGMT-80227 Contractor's Progress, Status And Management Report A003 DI-MGMT-81650 Integrated Master Schedule (IMS) A004 DI-ADMN-81249A Conference Agenda – Meeting Agenda A005 DI-ADMN-81250A Conference Minutes – Meeting Minutes A006 DI-MCCR-80700 Computer Software Product End Items A007 DI-IPSC-81442A Software Version Description (SVD) A008 DI-MISC-81381 Site Survey Report A009 DI-MGMT-81024 System Engineering Management Plan (SEMP) A010 DI-CMAN-80858B Contractor’s Configuration Management Plan A011 DI-CMAN-80639C Engineering Change Proposal (ECP) A012 DI-CMAN-80640C Request for Deviation (RFD) A013 DI-CMAN-81022C Configuration Audit Summary Report A014 DI-NDTI-80603A Test Procedures A015 DI-NDTI-80809B Test/Inspection Report A016 DI-SAFT-80101B System Safety Hazard Analysis Report (SSHA) A017 DI-SAFT-81626 System Safety Program Plan (SSPP) A018 DI-ILSS-80095 Integrated Logistics Support Plan A019 DI-SESS-81705 Depot Level Repair Instructions A020 DI-ALSS-81557 Supplemental Data for Provisioning (SDFP) – Provisioning Parts List A021 DI-ILSS-80134A Proposed Spare Parts List A022 DI-SESS-81000D Product Drawings/Models and Associated Lists A023 MIL-PRF-38804 Time Compliance Technical Order A024 TM-86-01N Technical Order Updates A025 DI-ILSS-80872 Training Material

A026 DI-SESS-80294B

Maintenance Test and Support Equipment List – Support Equipment Requirements Documents (SERD)

A027 DI-CMAN-81248A Interface Control Document (ICD)

C O N T R A C T D A T A R E Q U I R E M E N T S L I S T (1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0002 A TDP ______ TM ______ OTHER

D. SYSTEM/ITEM

_MGMT_____________________

E. CONTRACT/PR NO. F. CONTRACTOR

Modernization of the NAVAIDS FOS

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

GROUP

A001 Program Management Plan

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18.

ESTIMATED

TOTAL PRICE

DI-MGMT-80004A SOW Para. 1.4 OC-ALC/GKAAA

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

DD ONE TIME 30 DAC b. COPIES

8. APP CODE A 11. AS OF DATE 13. DATE OF SUBSEQUENT SUBM. a. ADDRESSEE Draft

Final

N/A N/A ASREQ

Reg

Repro

16. REMARKS:

Block 14: Electronic Media compatible with Microsoft Office Suite 2007 is required.

“Repro” copy defined as electronic media.

OC-ALC/

GKAKB

GKAAA

15. TOTAL -----------> 0 0 2

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Carolyn Pullen/GKAAB/Data Manager

30 Nov 2011

DD Form 1423-1, 1 Jun 90 Previous Editions are Obsolete Page _1_ of _1_ Pages

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0002 B TDP ______ TM ______ OTHER

D. SYSTEM/ITEM

_MGMT_____________________

E. CONTRACT/PR NO. F. CONTRACTOR

Modernization of the NAVAIDS FOS

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

GROUP

A002 Contract’s Progress, Status and Management Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18.

ESTIMATED

TOTAL PRICE

DI-MGMT-80227/T SOW Paragraph 1.4 OC-ALC/GKAAA

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION

LT MTHLY SEE BLOCK 16 b. COPIES

8. APP CODE B 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBM.

a. ADDRESSEE Draft

Final

N/A SEE BLOCK 16 SEE BLOCK 16

Block 4: The data item description is tailored as follows:

a. Para 10.2: The report shall be delivered electronically so format requirements specific to hard copies are deleted.

b. Para 10.3 g through i: Cost information is only required for CLINs that are not firm-fixed price.

Blocks 11, 12 & 13: Submit by the 10th of each month beginning the month following contract award.

Block 14: Electronic Media compatible with Microsoft Office Suite 2007 is required.

Submission shall be delivered concurrently with Integrated Master Schedule, CDRL A003. “Repro” copy defined as electronic media.

DD Form 1423-1, 1 Jun 90 Previous Editions are Obsolete Page _1_ of _1_ Pages

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0002 C TDP ______ TM ______ OTHER _

D. SYSTEM/ITEM

MGMT

E. CONTRACT/PR NO. F. CONTRACTOR

Modernization of the NAVAIDS FOS

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

GROUP

A003 Integrated Master Schedule (IMS)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18.

ESTIMATED

TOTAL PRICE

DI-MGMT-81650A/T SOW Paragraph 1.4.1 OC-ALC/GKAAA

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SEE BLOCK 16 MTHLY 20 DAC b. COPIES

a. ADDRESSEE Draft

Final

SEE BLOCK 16 N/A SEE BLOCK 16

a. Para 2.4.1.15 to 2.3.1.16: Delete paragraphs in their entirety.

b. Para 2.4.1.17: Delete last sentence.

Block 7 & 8: The first submittal shall be delivered with a DD 250 with a code of DD and Government inspection and approval is required (App Code A). All subsequent submissions shall be delivered with a letter of transmittal (LT) with no Government approval required (App Code N/A).

Block 13: Submit concurrent with Program Status Report. Updates to the IMS shall be as required. For the first submittal, Government comments, if any, shall be incorporated within 10 calendar days of receipt of comments.

Block 14: An electronic copy compatible with Microsoft Project 2004 and a copy in Adobe Acrobat .PDF format are required. Submission shall be delivered concurrently with Program Status Report, CDRL A004. “Repro” copy defined as electronic media.

DD Form 1423-1, 1 Jun 90 Previous Editions are Obsolete Page _1_ of _1_ Pages

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0002 D TDP ______ TM ______ OTHER ADMN

D. SYSTEM/ITEM

E. CONTRACT/PR NO. F. CONTRACTOR

Modernization of the NAVAIDS FOS

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

GROUP

A004 Conference Agenda Meeting Agenda

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18.

ESTIMATED

TOTAL PRICE

DI-ADMN-81249A/T SOW Paragraph 1.4.2 OC-ALC/GKAAA

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

L/T ASREQ SEE BLOCK 16 b. COPIES

a. ADDRESSEE Draft

Final

N/A N/A SEE BLOCK 16

a. Para 10.2e: Add “…, if applicable” to the end of the sentence.

b. As an attachment, submit a list of Contractor’s quality design standards for the Kickoff Meeting Agenda.

Blocks 12 & 13: Submission shall be 10 calendar days prior to each meeting.

DD Form 1423-1, 1 Jun 90 Previous Editions are Obsolete Page _1_ of _1_

Pages

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0002 E TDP ______ TM ______ OTHER

D. SYSTEM/ITEM

_ ADMN

E. CONTRACT/PR NO. F. CONTRACTOR

Modernization of the NAVAIDS FOS

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

GROUP

A005 Conference Minutes Meeting Minutes

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18.

ESTIMATED

TOTAL PRICE

DI-ADMN-81250A SOW Paragraph 1.4.2 OC-ALC/GKAAA

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

LT AS REQ SEE BLOCK 16 b. COPIES

a. ADDRESSEE Draft

Final

Blocks 12 & 13: Report shall be submitted within 10 calendar days after each meeting.

DD Form 1423-1, 1 Jun 90 Previous Editions are Obsolete Page _1_ of _1_ Pages

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0002 F TDP ______ TM ______ OTHER

D. SYSTEM/ITEM

_MCCR

E. CONTRACT/PR NO. F. CONTRACTOR

Modernization of the NAVAIDS FOS

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

GROUP

A006 Computer Software Products End Items

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18.

ESTIMATED

TOTAL PRICE

DI-MCCR-80700 SOW Paragraph 1.6.3 OC-ALC/GKAAA

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

DD SEE BLOCK 16 SEE BLOCK 16 b. COPIES

a. ADDRESSEE Draft

Final

Block 7: Contractor may identify the software on the same DD 250 as the computers when delivered preinstalled.

Block 9: A minimum number of licenses for the software required to operate and sustain the NAVAIDS FOS shall be granted. This would be the software loaded on the computers typically within a remote maintenance center. This minimum number shall include a license for each computer delivered as well as the 2 copies of the software delivered to OC-ALC/GKAAA. In any event, this minimum number shall not be less than 40 licenses.

Blocks 10, 12, 13: All ILS systems shall be delivered with all operating, maintenance, test, and communications software preinstalled. The software used to control the operation and sustainment functions at the remote maintenance center shall be delivered preinstalled on all delivered computers. In addition 1 copy of the software used to control the operation and sustainment functions are to be delivered 10 calendar days prior to Technical Readiness Review and another concurrent with the final acceptance of the first of the first article systems.

Block 14: The exact content, media and format shall be agreed upon by the Government and the Contractor at the kickoff meeting. “Repro” copy defined as electronic media.

*The quantity for the software delivered preinstalled on the NAVAIDS FOS does not include the software used by the computers within the remote maintenance center to control the operation and sustainment. The delivered quantity of this software shall only be that required for pre-installation on the delivered computers and the copies delivered to OC-ALC/GKAAA.

PREINSTALLED

ON NAVAIDS

FOS MOD

EQUIPMENT

127*

15. TOTAL -----------> 0 0 141

DD Form 1423-1, 1 Jun 90 Previous Editions are Obsolete Page _1_ of _1_ Pages

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0002 G TDP ______ TM ______ OTHER

D. SYSTEM/ITEM

_IPSC_____________________

E. CONTRACT/PR NO. F. CONTRACTOR

Modernization of the NAVAIDS FOS

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

GROUP

A007 Software Version Description (SVD)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18.

ESTIMATED

TOTAL PRICE

DI-IPSC-81442A SOW Paragraph 1.6.3 OC-ALC/GKAAA

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

DD ONE/R 60 DAC b. COPIES

a. ADDRESSEE

Draft

Final

A N/A ASREQ Reg Repro

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0002 AD TDP ______ TM ______

D. SYSTEM/ITEM

OTHER _MISC

E. CONTRACT/PR NO. F. CONTRACTOR

Modernization of the NAVAIDS FOS

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

GROUP

A008 Site Survey Reports

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18.

ESTIMATED

TOTAL PRICE

DI-MISC-81381 SOW Paragraph 1.6.4.1 OC-ALC/GKAAA

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

L/T ASREQ SEE BLOCK 16 b. COPIES

a. ADDRESSEE Draft

Final

Blocks 12 & 13: Report shall be submitted within 10 calendar days after each site survey.

Block 14. Electronic Media compatible with Microsoft Office 2007 is required.

15. TOTAL ----------->

DD Form 1423-1, 1 Jun 90 Previous Editions are Obsolete Page _1_ of _1_ Pages

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0002 J TDP ______ TM ______ OTHER _

D. SYSTEM/ITEM

MGMT

E. CONTRACT/PR NO. F. CONTRACTOR

Modernization of the NAVAIDS FOS

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

GROUP

A009 System Engineering Management Plan (SEMP)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18.

ESTIMATED

TOTAL PRICE

DI-MGMT-81024/T SOW Paragraph 1.7 OC-ALC/GKAAA

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

DD ONE/R 30 DAC b. COPIES

a. ADDRESSEE Draft

Final

A N/A ASREQ

a. Para10.2.1b: Delete in its entirety.

b. Para 10.2.2 f & j: Delete in their entirety.

Block 14. Submittal in Microsoft Office 2007 or Extensible Markup Language (XML) is preferred but Adobe Acrobat .PDF is acceptable. “Repro” copy defined as electronic media.

DD Form 1423-1, 1 Jun 90 Previous Editions are Obsolete Page _1_ of _1_ Pages

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0002 K TDP ______ TM ______ OTHER _

D. SYSTEM/ITEM

CMAN

E. CONTRACT/PR NO. F. CONTRACTOR

Modernization of the NAVAIDS FOS

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

GROUP

A010 Contractor’s Configuration Management Plan

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18.

ESTIMATED

TOTAL PRICE

DI-CMAN-80858B SOW Paragraph 1.7.1 OC-ALC/GKAAA

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

a. ADDRESSEE Draft

Final

Block 14: “Repro” copy defined as electronic media.

DD Form 1423-1, 1 Jun 90 Previous Editions are Obsolete Page _1_ of _1_ Pages

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0002 L TDP ______ TM ______

D. SYSTEM/ITEM

OTHER _ CMAN

E. CONTRACT/PR NO. F. CONTRACTOR

Modernization of the NAVAIDS FOS

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

GROUP

A011 Engineering Change Proposal (ECP)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18.

ESTIMATED

TOTAL PRICE

DI-CMAN-80639C SOW Paragraph 1.7.1.1 OC-ALC/GKAAA

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

DD ASREQ SEE BLOCK 16 b. COPIES

a. ADDRESSEE Draft

Final

A N/A SEE BLOCK 16

Blocks 12 & 13: When an ECP is requested by the Government, the Contractor shall deliver the ECP in accordance with the PCO’s direction.

DD Form 1423-1, 1 Jun 90 Previous Editions are Obsolete Page _1_ of _1_ Pages

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0002 M TDP ______ TM ______ OTHER _

D. SYSTEM/ITEM

CMAN

E. CONTRACT/PR NO. F. CONTRACTOR

Modernization of the NAVAIDS FOS

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

GROUP

A012 Request for Deviation

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18.

ESTIMATED

TOTAL PRICE

DI-CMAN-80640C SOW Paragraph 1.7.1.1 OC-ALC/GKAAA

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

a. ADDRESSEE Draft

Final

A N/A SEE BLOCK 16

Blocks 12 & 13: Submit request when, prior to manufacture, it is necessary to temporarily depart from a particular requirement of an item’s current approved configuration documentation for a specified number of units or for a specified period of time or to obtain authorization to deliver non-conforming material which does not meet the prescribed configuration identification documentation.

Block 14: Electronic Media compatible with Microsoft Office 2007 is required.

"Repro" copy defined as electronic media.

DD Form 1423-1, 1 Jun 90 Previous Editions are Obsolete Page _1_ of _1_ Pages

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0002 N TDP ______ TM ______ OTHER _

D. SYSTEM/ITEM

CMAN

E. CONTRACT/PR NO. F. CONTRACTOR

Modernization of the NAVAIDS FOS

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

GROUP

A013 Configuration Audit and Summary Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE SOW Paragraph 1.7.1.2

6. REQUIRING OFFICE 18.

ESTIMATED

TOTAL PRICE

DI-CMAN-81022C SOW Paragraph 1.7.1.3 OC-ALC/GKAAA

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

a. ADDRESSEE Draft

Final

A SEE BLOCK 16 SEE BLOCK 16

Block 8: MIL-HDBK-61A, Section 8 will be used as guidance to conduct the Physical Configuration Audit (PCA) and Functional Configuration Audit (FCA).

Block 10, 11, 12 & 13: Submit a report within 10 calendar days after each audit. This shall include a PCA at the Contractor’s facility prior to first article installation and a FCA at the Government’s facility after each first article testing. Updates shall be as required. Comments, if any, by the Government shall be incorporated within 10 calendar days of receipt of comments.

Block 14: "Repro" copy defined as electronic media.

DD Form 1423-1, 1 Jun 90 Previous Editions are Obsolete Page _1_ of _1_ Pages

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0002 P TDP ______ TM ______ OTHER _

D. SYSTEM/ITEM

NDTI

E. CONTRACT/PR NO. F. CONTRACTOR

Modernization of the NAVAIDS FOS

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

GROUP

A014 Test Procedures SEE BLOCK 16

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE SOW Paragraph 1.7.2.2

6. REQUIRING OFFICE 18.

ESTIMATED

TOTAL PRICE

DI-NDTI-80603A/T SOW Paragraph 1.7.2.4 OC-ALC/GKAAA

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

a. ADDRESSEE Draft

Final

a. Para 2: The report shall be delivered electronically so format requirements specific to hard copies are deleted.

Block 3: Two sets of test procedures shall be submitted and are subtitled as:

- Qualification Test & Evaluation (QT&E) Procedures

- Functional Ground Test Procedures

Block 10, 11, 12 & 13: Submit QT&E Procedures 60 calendar days after contract award. Submit Functional Ground Test Procedures 45 calendar days prior to first production installation. Comments, if any, by the Government shall be incorporated within 10 calendar days of receipt of comments.

Block 14: Submittal in Microsoft Office 2007 or Extensible Markup Language (XML) is preferred but Adobe Acrobat .PDF is acceptable. "Repro" copy defined as electronic media.

DD Form 1423-1, 1 Jun 90 Previous Editions are Obsolete Page _1_ of _1_ Pages

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0002 Q TDP ______ TM ______ OTHER _

D. SYSTEM/ITEM

NDTI

E. CONTRACT/PR NO. F. CONTRACTOR

Modernization of the NAVAIDS FOS

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

GROUP

A015 Test / Inspection Report SEE BLOCK 16

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE SOW Paragraph 1.7.2.2

6. REQUIRING OFFICE 18.

ESTIMATED

TOTAL PRICE

DI-NDTI-80809B/T SOW Paragraph 1.7.2.4 OC-ALC/GKAAA

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

a. ADDRESSEE Draft

Final

a. Para 10.2.6.2: If all this information is identified within the test procedures, the Contractor can just refer to the procedures.

b. Para 10.2.6.3: Contractor can simply refer to the test procedures unless there were any Government approved variances.

Block 3: Depending on the test performed, the test reports shall be subtitled as either:

- Qualification Test & Evaluation (QT&E) Report

- Functional Ground Test Report

Block 10, 11, 12 &13: Submit a QT&E Report within 10 calendar days of the completion of the QT&E of each first article system. Submit a Functional Ground Test Report within 10 calendar days of the completion of the Functional Ground Test of each production system.

Block 14: Electronic submittal in Microsoft Office 2007 or Extensible Markup Language (XML). "Repro" copy defined as electronic media.

DD Form 1423-1, 1 Jun 90 Previous Editions are Obsolete Page _1_ of _1_ Pages

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0002 R TDP ______ TM ______ OTHER _

D. SYSTEM/ITEM

SAFT

E. CONTRACT/PR NO. F. CONTRACTOR

Modernization of the NAVAIDS FOS

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

GROUP

A016 System Safety Hazard Analysis Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18.

ESTIMATED

TOTAL PRICE

DI-SAFT-80101B SOW Paragraph 1.7.3 OC-ALC/GKAAA

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

a. ADDRESSEE Draft

Final

Block 14: Submit in Contractor format. Submittal in Microsoft Office 2007 or Extensible Markup Language (XML) is required. "Repro" copy defined as electronic media.

DD Form 1423-1, 1 Jun 90 Previous Editions are Obsolete Page _1_ of _1_ Pages

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0002 S TDP ______ TM ______ OTHER _

D. SYSTEM/ITEM

SAFT

E. CONTRACT/PR NO. F. CONTRACTOR

Modernization of the NAVAIDS FOS

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

GROUP

A017 System Safety Program Plan (SSPP)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18.

ESTIMATED

TOTAL PRICE

DI-SAFT-81626 SOW Paragraph 1.7.3 OC-ALC/GKAAA

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

a. ADDRESSEE Draft

Final

Block 14: Submittal in Microsoft Office 2007 or Extensible Markup Language (XML) is required. "Repro" copy defined as electronic media.

DD Form 1423-1, 1 Jun 90 Previous Editions are Obsolete Page _1_ of _1_ Pages

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0002 T TDP ______ TM ______ OTHER _

D. SYSTEM/ITEM

ILSS

E. CONTRACT/PR NO. F. CONTRACTOR

Modernization of the NAVAIDS FOS

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

GROUP

A018 Integrated Logistics Support Plan

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18.

ESTIMATED

TOTAL PRICE

DI-ILSS-80095/T SOW Paragraph 1.7.4 OC-ALC/GKAAA

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

a. ADDRESSEE Draft

Final

Block 4: All elements of the NAVAIDS FOS shall be focused toward the logistics required to sustain the NAVAIDS FOS at 98% operational availability throughout the expected life of the systems. The data item description is tailored as follows:

a. Para 10.3: The report shall be delivered electronically so format requirements specific to hard copies are deleted.

b. Para 10.3.5: All referenced publications shall be included as attachments.

DD Form 1423-1, 1 Jun 90 Previous Editions are Obsolete Page _1_ of _1_ Pages

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0002 U TDP ______ TM ______ OTHER _

D. SYSTEM/ITEM

SESS

E. CONTRACT/PR NO. F. CONTRACTOR

Modernization of the NAVAIDS FOS

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE

GROUP

A019 Depot Level Repair Instructions

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18.

ESTIMATED

TOTAL PRICE

DI-SESS-81705/T SOW Paragraph 1.7.4.2 OC-ALC/GKAAA

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

DD ONE/R SEE BLOCK 16 b. COPIES

a. ADDRESSEE Draft

Final

a. Para 3.1: Add “The instructions shall enable a Contractor or Government maintenance activity to restore a system, sub-system, or LRU to a serviceable condition and…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .