RFI_Posting_responses_20150923.docx

DOCX document 22 KB Posted

Attached to
USAFA Small Unmanned Aircraft Systems Support Services Federal contract opportunity
Solicitation number
FA7000-15-T-0117
Issued by
Department of the Air Force Headquarters Air Force Academy

About this file

Questions and Answers as of 23 Sep 2015

View the file

Other files for this federal contract opportunity

Other files attached to USAFA Small Unmanned Aircraft Systems Support Services, newest first.
File Type Posted
RFI_Posting_responses_20150922.docx DOCX document
20150814_USAFA_UAS_Reacquisition_Site_Visit_Briefing.pptx PPTX presentation
RFI_Posting_responses_20150910.docx DOCX document
RFI_Posting_responses.docx DOCX document
FA7000-15-T-0117_SOLICITATION.doc DOC document
FA7000-15-T-0117_DRAFT_SUAS_Support_Service.doc DOC document
Appendix_5_USAFA_SUAS_OI_VOL_2_20140418.pdf PDF
Appendix_7_USAFA_UAS_OI_VOL_3_2_20140601.pdf PDF
Appendix_3_AFI_11-502v1.pdf PDF
Attachment_3_SUAS_PPQ.doc DOC document
Appendix_3_AFI_11-502v3.pdf PDF
Appendix_1_Documentation_SUAS_Manual.pdf PDF
Appendix_9_SGFP_for_UAS_Program.pdf PDF
Attachment_4_-_Offeror's_Financial_References.doc DOC document
Attachment_2_Subcontractor_Consent_Letter.doc DOC document
Attachment_1_Performance_Work_Statement_FINAL.doc DOC document
Appendix_4_USAFA_SUAS_OI_VOL_1_20140418.pdf PDF
Appendix_2_USAFA_UAS_Raven_DDL_Inventory_4_Aug_2015.xlsx XLSX spreadsheet
Appendix_3_AFI_11-502v2.pdf PDF
Appendix_8_USAFA_SUAS_Operations_Supervisor_Operating_Instruction_20140101.pdf PDF
Appendix_6_USAFA_UAS_OI_VOL_3_1_20131223.pdf PDF
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

23 September 2015

RESPONSES TO SOLICITATION QUESTIONS

REQUIREMENT: US Air Force Academy Small Unmanned Aircraft Systems Support

1. There appears to be a conflict in the option periods listed in the Draft SF 1449-Continuation Sheets (6 years) vs. DRFP, pg. 33, 5.b) Part I- Price Proposal (5 years). Please clarify.

ANSWER: The correct schedule is a one-month base period with six (6) one-year option periods. Page 33, 5.b) Part I- Price Proposal is updated accordingly.

2. Is there an incumbent currently providing this support? Would the government release the incumbent’s name?

ANSWER: The incumbent contractor is Bosh Global Services (UAV Communications, INC.).

3. Will the government consider providing information on staffing levels? Guessing incorrectly could result in an offeror being found technically unacceptable. If there is an incumbent, their knowledge of current staffing levels gives them an unfair advantage.

ANSWER: The Government will not provide staffing levels. This is a performance-based service and as such requires the contractor to determine adequate staffing to fulfill the requirements of the Performance Work Statement. The Government Accountability Office has consistently held that a competitive advantage which a firm might enjoy by virtue of its incumbency on a similar contract is not unfair, so long as it is not the result of preferred treatment or other unfair Government action. (ROMAR CONSULTANTS, INC., B-206489, OCTOBER 15, 1982, 82-2 CPD 339)

4. The Technical factor and its evaluation focus on para 1.4.1.2 of the SOW. Specifically the task to “provide personnel to simultaneously support up to three separate flying sites while operating the AOC.” Para 1.3.2 of the SOW states the AOC will operate IAW USAFA UAS Operating Instructions, Volumes 1, 2 ,and 3. Those Operating Instructions are vague in describing contractor responsibilities, As an example Volume 2 states “ The Senior Stan/Eval officer will be a SUAS-E qualified officer or contractor.” How does an offeror develop a technical approach and price on a “maybe” requirement? Will the government consider providing a staffing laydown by position?

ANSWER: The Government will not provide a staffing laydown plan by position. This requirement is performance-based and as such, there are certain areas that contain potential performance risk that the offeror must determine how to mitigate. Contractors are responsible for determining adequate staffing to fulfill the requirements of the Performance Work Statement.

5. Can you please provide information regarding any incumbent(s) associated with this solicitation?

ANSWER: You can access https://www.fpds.gov and search “FA700013C0010” for current contract information.

6. Reference Addendum to FAR 52.212-1, 5. PART I - PRICE PROPOSAL. The instructions state to “complete blocks 12, 17a, 19, 20, 21, 22, 23, 24, 30(a) (b) and (c) of the SF 1449”, but block 20 states “SEE SCHEDULE”. Due to the number of CLINs to be priced, should we leave blocks 19 – 24 as is and only insert the information in the Pricing Schedule?

ANSWER: Correct. Leave blocks 19 – 24 blank and fill-in the Pricing Schedule.

7. Can you confirm the date of performance on SUAS contract?

ANSWER: Please review solicitation section titled “DELIVERY INFORMATION” on pages 26-28.

8. Does the page count requirements for the Technical Proposal exclude transmittal letter, Table of Contents, List of Acronyms, List of Figures and executive summary?

ANSWER: No. These items will not be counted towards the three page limit requirement for the Technical Proposal.