1. Attachment A_Price Worksheet Rev.1.xlsx

XLSX spreadsheet 110 KB Posted

Attached to
FY26 Household Goods Packing DPM
Solicitation number
FA568226Q0012
Issued by

About this file

This is a Price Worksheet for Direct Procurement Method (DPM) household goods packing, containerization, and local drayage services at Aviano Air Base, Italy, covering a base year (1 December 2026 – 30 November 2027) and four one-year option periods through 30 November 2031. The worksheet is structured in three schedules: Schedule I (Outbound Services), Schedule II (Inbound Services), and Schedule III (Intra-City and Intra-Area Moves), with identical service requirements and line items repeated for each contract period using item numbers prefixed by 0 (base year), 1 (first option), 2 (second option), 3 (third option), and 4 (fourth option).

Schedule I outbound services include complete household goods (HHG) packing and containerization at member residences or contractor facilities per ASTM-D4169-01 and SDDC Pamphlet 55-12 standards (8,800 NCWT estimated annual quantity); overflow and specialty crating services (20 specialty crates); unaccompanied baggage services (72 NCWT); storage (600 NCWT per 30-day period); container furnishing; remarking and assembly/disassembly services (150 hours annually); quality control reporting; attempted pickup charges; and drayage to Port of Livorno seaport terminal or Aviano Air Base air terminal. Schedule II inbound services mirror outbound activities, including complete HHG delivery (110 NCWT), contractor facility delivery options, unaccompanied baggage handling (12 NCWT), storage, remarking and coopering, attempted delivery charges, and reweighing services. Schedule III covers intra-city and intra-area moves (275 NCWT) with pre-move surveys, packing, loading, drayage, delivery, and unpacking at new residences. All pricing is to be submitted in Euros, with contractor capacity requirements of 200–250 NCWT minimum daily capability depending on service type, and bidders must guarantee capacity equal to or exceeding government minimum acceptable daily requirements or face bid rejection.

View the file

Other files

File Type Posted
Solicitation Amendment FA568226Q00120007 SF 30.pdf PDF
6. Attachment A-E2 OCONUS PACIFC EUROPE Priority Instruction Rev.2.pdf PDF
1. Attachment A_Price Worksheet Rev.2_Protected.xlsx XLSX spreadsheet
Solicitation Amendment FA568226Q00120006 SF 30.pdf PDF
FA568226Q0012 Questions and Answers 3 Sep 2026.pdf PDF
6. Attachment A-E2 OCONUS PACIFC EUROPE Priority Instruction Rev.1.pdf PDF
Solicitation Amendment FA568226Q00120005 SF 30.pdf PDF
Solicitation Amendment FA568226Q00120004 SF 30 (1).pdf PDF
Solicitation Amendment 3 FA568226Q00120003 SF 30.pdf PDF
Solicitation Amendment FA568226Q00120002 SF 30.pdf PDF
Solicitation Amendment FA568226Q00120001 SF 30.pdf PDF
11. Attachment A-G5 Acronyms.pdf PDF
7. Attachment A-G1 Forms.pdf PDF
5. Attachment A-E1 OCONUS PACIFIC EUROPE Fire prevention and Warehouse Standards.pdf PDF
6. Attachment A-E2 OCONUS PACIFC EUROPE Priority Instruction.pdf PDF
3. Appendix A-E Warehouse Inspection Guide Instructions for Preparation.pdf PDF
12. Attachment A-G6 DPM Claims and Liability Procedures.pdf PDF
2. Appendix A-D Pre Award Survey Guidelines DD Form 1811.pdf PDF
Solicitation - FA568226Q0012.pdf PDF
8. Attachment A-G2 Publications and Commercial Standards.pdf PDF
9. Attachment A-G3 Contractor Documents Requirement Listings.pdf PDF
4. Appendix A-G Performance Work Statement.pdf PDF
10. Attachment A-G4 Definitions.pdf PDF
1. Attachment A_Price Worksheet.xlsx XLSX spreadsheet
13. Attachment A-G7 DPM Third Party Payment System TPPS.pdf PDF
Contractor Assertion Template.docx DOCX document
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TOTALS

Area: Aviano Air Base
Base Year1st Option2nd Option3rd Option4th OptionTotal in EuroTotals in Dollars
Schedule I€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00$0.000.9303

Schedule II € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 $0.00

Schedule III € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 $0.00

Total € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00 € 0.00

Base Year

**** NOTE: FOR EVALUATION PURPOSE ONLY. REFER TO ADDENDUM 52.212-2. ****
(BASE YEAR 1-DEC-26- 30-NOV-27)

The quantities shown by area of performance for each item in this Solicitation are the Government's estimates of requirements, which may be ordered during the period of the contract.

The Government's estimated maximum daily requirements, excluding Saturday, Sunday; National, State, and local holidays are listed below by area of performance within each schedule. Bidders must complete the "Bidder's Guaranteed Daily Capability", which must equal or exceed the Government's minimum acceptable daily capability, for all items within an area of performance for which they submit bids. Failure to do so must render the bid nonresponsive.

Contractor Capacity is the total capacity of the offeror to provide pick-up and/or delivery of personal property, as measured in NCWT, which the offeror must assure is available to meet Government requirements during one working day, between the hours of 0800 – 1700, before being committed to non-Government requirements.

Area: Aviano Air Base The area of Aviano AB is defined as a radius of 50 miles/80 kilometers

Governments Estimated Max
Daily RequirementGovernments Estimated Min
Daily RequirementBidder's Guaranteed Daily Capability
OUTBOUNDNCWTNCWTNCWT
(Schedule I)600200
INBOUNDNCWTNCWTNCWT
(Schedule II)300200
INTRA-CITY AREANCWTNCWTNCWT
(Schedule III)350250
NCTW - Net Hundredweight
SCHEDULE I
Outbound Services
Item 0001. Complete Service ‑ Outbound (HHG). Services must include pre-move survey, servicing of appliances, disassembly of furniture, packaging, inventorying, tagging, wrapping, padding, packing and bracing of HHG in Government-owned and furnished shipping containers (Shipping Container Commercial Spec ASTM-D4169-01, SDDC Pamphlet 55-12) at member’s/employee’s residence, or at contractor’s facility when ordered by the contracting officer, properly securing and sealing for shipment, weighing, obliterating old markings, marking, strapping, and drayage of the container within an area of performance. Service must also include loading shipments on linehaul carrier equipment at the contractor’s facility. When containers will not accommodate all articles of any one lot, loose articles must be packed in the said containers before any over-packed articles are placed therein. Overflow, oversize, and other shipments must be paid for under Item 0003.
Estimated Annual Quantity (Pounds)Unit NCWTUnit PriceTotal
880,0008,800€ - 0€ - 0
Item 0003. Complete Service-Outbound (HHG‑Overflow Articles and HHG Shipments requiring other than ASTM-D4169-01 or SDDC Pam. 55-12 Containers). Service must be the same as Item 0001 except that the loose articles are drayed to contractor's facility when ordered by the contracting officer for containerization in Government‑furnished or contractor‑furnished containers.

Overflow, other shipments, and oversize containers must be constructed IAW ASTM-D6251. Each container must be caulked during assembly. Overflow boxes and other shipments that normally require a lesser size box than specified in ASTM-D4169-01 or SDDC Pamphlet 55-12 and oversized containers are always of a greater size than specified in Commercial Spec ASTM-D4169-01 or SDDC Pamphlet 55-12. One or more of these containers may be required per shipment. Price bid for Item 0003 includes container plus weight of its contents.

Est. Annual Qty. Required # Unit Price Total

AG. Contractor‑Furnished Containers:20€ - 0€ - 0Unit price: Cost to stencil 1 specialy crate
Specialty Stenciling (External Crate)
AH. Contractor‑Furnished Containers:20€ - 0€ - 0Unit price: Cost to build 1 External Specialy Crate
External Crating
AI. Contractor‑Furnished Containers:20€ - 0€ - 0Unit price: Cost to build 1 Internal Specialy Crate
Internal Crating
Est. Annual Qty.Unit CBFTUnit PriceTotal
AN. Contractor‑Furnished Containers:4,000€ - 0€ - 0
Billed per cubic foot
Item 0004. Complete Service ‑ Outbound (Unaccompanied Baggage). Service includes packaging, inventorying, packing in Government approved containers, weighing, strapping, obliteration of old markings, marking, and loading shipments on the line‑haul carrier’s equipment. Service must be performed at member/employee's residence. (Service may be performed at contractor's facility when ordered by the Ordering Officer.)
Estimated Annual Quantity (Pounds)Unit NCWTUnit PriceTotal
7,20072€ - 0€ - 0
Item 0006. Outbound Service - Unaccompanied Baggage Packed by Member/employee. Service must include weighing, strapping, banding, obliterating old markings, and marking. Service may include (when necessary) containerization in outer shipping containers as ordered by the contracting officer.
Est. Annual Qty.Unit NCWTUnit PriceTotal
11€ - 0€ - 0
Item 0009. Storage. Storage of containerized articles must be furnished when ordered by the ordering office. Charges must not commence earlier than the sixth (6th) workday following date of ordering office’s receipt of notification of completion of containerization service. Storage charges apply for each 30‑day period or fraction thereof. Date of release from storage must not be considered in computation of storage charges.
Est. Annual Qty.Unit NCWTUnit PriceTotal
20 shipments / 30 Days each600€ - 0€ - 0
Item 0010. Containers. Service must consist of the furnishing of the following types of new containers or specially constructed wooden crates. Containers furnished or specially constructed are to be assembled and ready for loading. When a specific container from SDDC Pamphlet 55-12 is ordered, the order will indicate the SDDC approval number.
Est. Annual Qty.Unit EachUnit PriceTotal
11€ - 0€ - 0
Item 0011. Remarking, Coopering and Assembly/Disassembly Service.
Est. Annual Qty.# of HoursUnit PriceTotal
Billed per Hour150€ - 0€ - 0
Item 0012. Quality Control Metrix: Report monthly metrix for outbound DPM services.
Est. Annual Qty.# of ReportUnit PriceTotal
AA. Household goods1€ - 0€ - 0
AB. Unaccompanied baggage1€ - 0€ - 0
Item 0013. Attempted Pickup. When the initial attempt to pick up a shipment at the member’s/employee's residence is unsuccessful, charges apply provided the Contractor notified the ordering office via telephone and provided that after contractor's notification, the ordering office (a) cannot locate the member/employee within 30 minutes, (b) cannot have the member/employee at the residence within one hour after notification, and (c) the contractor left a notice of attempted pickup at the residence.
Est. Annual Qty.Unit Each ShipmentUnit PriceTotal
AA. Household goods25€ - 0€ - 0
AB. Unaccompanied baggage2€ - 0€ - 0
NOTE: All Above Items are included in the evaluation of bids.
Item 0A-E2I. Ref. to Attachment A-E2 Rev.1 Aviano Local Instructions.Transportation cost to sea and air terminal. The order of precedence for Direct Procurement Movement (DPM) shipment drop-off locations for onward movement is as follows. Primary option: Port of Livorno, this is the first and preferred delivery location for onward movement of DPM shipments. Secondary option: (Air Terminal): Aviano Air Base (AMS), use of this air terminal requires prior approval from the ITO before usage and should only be used for emergencies.
Est. Annual Qty.Unit NCWTUnit PriceTotal
880,0008800€ - 0€ - 0AA. Livorno seaport terminal
7,20072€ - 0€ - 0AC. Aviano AMS air terminal
NOTE: All Above Items are included in the evaluation of bids.
Item 0014. Additional Services. The contractor must provide additional services not included in the schedule but required for satisfactory completion of the services ordered under this contract, at a rate comparable to the rate for like services as contained in tenders on file with the state regulatory bodies or SDDC, in effect at the time of the order.
RECAPITULATION SCHEDULE I
Schedule, I Total€ 0.00
SCHEDULE II

INBOUND SERVICES

Item 0015. Complete Service ‑ Inbound (HHG). Service must include drayage from contractor's facility to storage warehouses, air and surface transportation terminals, military installation shipping offices and ocean or river terminals/piers and return, unloading from the delivering carrier’s vehicle, handling into contractor’s facility, drayage to member’s/employee’s residence, decontainerization and unpacking of loaded containers of HHG and placing goods in rooms as directed by member/employee, disconnecting appliance, assembly of any disassembled articles and removing shipping containers, barrels, boxes/crates, and debris from member’s/employee’s residence and drayage of empty containers to contractor’s or Government facility.

Estimated Annual Quantity (Pounds)Unit NCWTUnit PriceTotal
11,000110€ - 0€ - 0
Item 0016. Complete Service Inbound (HHG). Service must be the same as Item 0015 above except removal of items from outer container must be at the contractor's facility and articles must be drayed to member’s/employee's residence.
Estimated Annual Quantity (Pounds)Unit NCWTUnit PriceTotal
1001€ - 0€ - 0
Item 0018. Inbound Service ‑ Contractor Facility (HHG). Services must include drayage from storage warehouses, air and surface transportation terminals, military installation shipping offices, and ocean or river terminals/piers to contractor’s facility, unloading from the delivery carrier’s vehicle into the contractor’s facility and delivery of articles to property member/employee, motor van carrier, or NTS contractor at the contractor’s facility.
Estimated Annual Quantity (Pounds)Unit NCWTUnit PriceTotal
1001€ - 0€ - 0
Item 0020. Complete Service ‑ Inbound (Unaccompanied Baggage). Service must include drayage from contractor's facility to storage warehouses, air and surface transportation terminals, military installation shipping offices and ocean or river terminals/piers and return, unloading from the delivering carrier's vehicle, handling into contractor's facility, drayage of unaccompanied baggage containers to member’s/employee's residence, unpacking of containers, reassembly of articles and removal of all shipping containers and debris from the residence.
Estimated Annual Quantity (Pounds)Unit NCWTUnit PriceTotal
1,20012€ - 0€ - 0
Item 0022. Inbound Service ‑ Contractor Facility (Unaccompanied Baggage). Service must be the same as Item 0020 above except service must also include removal of unaccompanied baggage from outer shipping containers for pickup by the member/employee or release to a motor carrier or other contractor at the contractor's facility.
Estimated Annual Quantity (Pounds)Unit NCWTUnit PriceTotal
1001€ - 0€ - 0
Item 0023. Storage. Storage of containerized articles must be furnished when ordered. Charges under this item must not commence earlier than the sixth (6th) workday following date of contractor's notification to the transportation office of arrival of shipment. Storage charges apply for each 30‑day period or fraction thereof. Date of release from storage must not be considered in computation of storage charges.
Estimated Annual Quantity (Pounds)Unit NCWTUnit PriceTotal
12,200122€ - 0€ - 0
Item 0024. Remarking, Coopering and Assembly/Disassembly Service.
Est. Annual Qty.Unit EachUnit PriceTotal
AA. Remarking of Shipments for Reconsignment. Services must include drayage from storage warehouses, air and surface transportation terminals, military installation shipping offices, and ocean or river terminals/piers to contractor’s facility, unloading from the delivering carrier’s vehicle, handling into contractor’s facility, obliteration of all old markings, stenciling of necessary information on loaded shipping containers schedule for reconsignment loading on the hauling carrier’s vehicle.6€ - 0€ - 0Billed per hour
AB. Coopering. Service must consist of repairing containers not to exceed 30 percent of total area of shipping container or costs of repairs must not exceed 50 percent of the container replacement cost. Minor repairs, such as replacing bolts, renailing, and rebanding, must be completed at no expense to the Government.1€ - 0€ - 0Billed per hour
Item 0025. Attempted Delivery. When the initial attempt to deliver a shipment at the member’s/employee's residence is unsuccessful, charges apply provided the contractor notified the ordering office via telephone and provided that after contractor's notification, the ordering office (a) cannot locate the member/employee within 30 minutes, (b) cannot have the member/employee at the residence within one hour after notification, and (c) the contractor left a notice of attempted delivery at the residence.
Est. Annual Qty.Unit Each
ShipmentUnit PriceTotal
AA. Household goods1€ - 0€ - 0
AB. Unaccompanied baggage1€ - 0€ - 0
Item 0026. Reweighing. Service must consist of weighing the loaded containers prior to delivery and weighing the empty containers after delivery.
Est. Annual Qty.Unit Each ShipmentUnit PriceTotal
AA. Household goods10€ - 0€ - 0
AB. Unaccompanied baggage5€ - 0€ - 0
Item 0027. Quality Control Metrix: Report monthly metrix for outbound DPM services.
Est. Annual Qty.Unit Per Loaded
MileUnit PriceTotal
AA. Household goods1€ - 0€ - 0Cost to provide 12 monthly reports of IB HHG
AB. Unaccompanied baggage1€ - 0€ - 0Cost to provide 12 monthly reports of IB UB
Item 0028. Partial Withdrawal. Service must be the same as Items 0015, 0016, 0020, or 0021 except for partial removal of the items from the outer container will be performed at the contractor's facility. Articles not removed from the shipment will remain at the contractor's facility.
Est. Annual Qty.Unit NCWTUnit PriceTotal
AA.Household Goods1€ - 0€ - 0
Drayage included
AB.Household Goods1.0€ - 0€ - 0
Drayage not included
AC.Unaccompanied Baggage1€ - 0€ - 0
Drayage included
AD. Unaccompanied Baggage1.0€ - 0€ - 0
Drayage not included
Item 0A-E2I. Ref. to Attachment A-E2 Rev.1 Aviano Local Instructions.Transportation cost to sea and air terminal. The order of precedence for Direct Procurement Movement (DPM) shipment drop-off locations for onward movement is as follows. Primary option: Port of Livorno, this is the first and preferred delivery location for onward movement of DPM shipments. Secondary option: (Air Terminal): Aviano Air Base (AMS), use of this air terminal requires prior approval from the ITO before usage and should only be used for emergencies.
Est. Annual Qty.Unit Per Loaded MileUnit PriceTotal
55,000550€ - 0€ - 0AA. Livorno seaport terminal
7,20072€ - 0€ - 0AC. Aviano AMS air terminal
NOTE: All Above Items are included in the evaluation of bids
Item 0029-0030 Additional Services. The contractor must provide additional services not included in the schedule but required for satisfactory completion of the services ordered under this contract, at a rate comparable to the rate for like services as contained in tenders on file with the state regulatory bodies or SDDC, in effect at the time of the order.
NOTE: All Above Items are included in the evaluation of bids
RECAPITULATION SCHEDULE II
Schedule, II Total€ 0.00
SCHEDULE III

INTRA-CITY AND INTRA-AREA MOVES

Item 0031. Complete Service for Intra‑City and Intra‑Area Moves. Service must include a premove survey, servicing of appliances, packaging and packing at member’s/employee’s residence to protect household goods properly during transit, tagging of items, inventorying, loading, weighing, drayage, unloading, unpacking, and placing of each article in member’s/employee’s new residence as directed by member/employee or member’s/employee’s designated representative and removal of all empty containers and materials from residence.
Estimated Annual Quantity (Pounds)Unit NCWTUnit PriceTotal
27,500275€ - 0€ - 0
Item 0032. Attempted Pickup or Delivery. When the initial attempt to pick up or deliver a shipment at the member’s/employee’s residence is unsuccessful, charges apply provided the contractor notified the ordering office via telephone and provided that after contractor’s notification, the ordering office (a) cannot locate the member/employee within 30 minutes, (b) cannot have the member/employee at the residence within one hour after notification, and (c) the contractor left a notice of attempted pickup or delivery at the residence.
Est. Annual Qty.Unit Each ShipmentUnit PriceTotal
AA. Attempted Pickup1€ - 0€ - 0
AB. Attempted Delivery1€ - 0€ - 0
Item 0033. Quality Control Metrix: Report monthly metrix for Local Move services.
Est. Annual Qty.UnitUnit PriceTotal
AA. Local Moves1€ - 0€ - 0Cost to provide 12 monthly reports of Local Moves
AB. Unaccompanied baggage1€ - 0€ - 0
Item 0034 Additional Services. The contractor must provide additional services not included in the schedule but required for satisfactory completion of the services ordered under this contract, at a rate comparable to the rate for like services as contained in tenders on file with the state regulatory bodies or SDDC, in effect at the time of the order.
NOTE: All Above Items are included in the evaluation of bids.
RECAPITULATION SCHEDULE III
Schedule, III Total€ 0.00

chatgpt://generic-entity/?number=0chatgpt://generic-entity/?number=0 Fisrt Option Year

**** NOTE: FOR EVALUATION PURPOSE ONLY. REFER TO ADDENDUM 52.212-2. ****
(FIRST OPTION YEAR 1-DEC-27- 30-NOV-28)

The quantities shown by area of performance for each item in this Solicitation are the Government's estimates of requirements, which may be ordered during the period of the contract.

The Government's estimated maximum daily requirements, excluding Saturday, Sunday; National, State, and local holidays are listed below by area of performance within each schedule. Bidders must complete the "Bidder's Guaranteed Daily Capability", which must equal or exceed the Government's minimum acceptable daily capability, for all items within an area of performance for which they submit bids. Failure to do so must render the bid nonresponsive.

Contractor Capacity is the total capacity of the offeror to provide pick-up and/or delivery of personal property, as measured in NCWT, which the offeror must assure is available to meet Government requirements during one working day, between the hours of 0800 – 1700, before being committed to non-Government requirements.

Area: Aviano Air Base The area of Aviano AB is defined as a radius of 50 miles/80 kilometers

Governments Estimated Max
Daily RequirementGovernments Estimated Min
Daily RequirementBidder's Guaranteed Daily Capability
OUTBOUNDNCWTNCWTNCWT
(Schedule I)600200
INBOUNDNCWTNCWTNCWT
(Schedule II)300200
INTRA-CITY AREANCWTNCWTNCWT
(Schedule III)350250
NCTW - Net Hundredweight
SCHEDULE I
Outbound Services
Item 1001. Complete Service ‑ Outbound (HHG). Services must include pre-move survey, servicing of appliances, disassembly of furniture, packaging, inventorying, tagging, wrapping, padding, packing and bracing of HHG in Government-owned and furnished shipping containers (Shipping Container Commercial Spec ASTM-D4169-01, SDDC Pamphlet 55-12) at member’s/employee’s residence, or at contractor’s facility when ordered by the contracting officer, properly securing and sealing for shipment, weighing, obliterating old markings, marking, strapping, and drayage of the container within an area of performance. Service must also include loading shipments on linehaul carrier equipment at the contractor’s facility. When containers will not accommodate all articles of any one lot, loose articles must be packed in the said containers before any over-packed articles are placed therein. Overflow, oversize, and other shipments must be paid for under Item 1003.
Estimated Annual Quantity (Pounds)Unit NCWTUnit PriceTotal
880,0008,800€ - 0€ - 0
Item 1003. Complete Service-Outbound (HHG‑Overflow Articles and HHG Shipments requiring other than ASTM-D4169-01 or SDDC Pam. 55-12 Containers). Service must be the same as Item 1001 except that the loose articles are drayed to contractor's facility when ordered by the contracting officer for containerization in Government‑furnished or contractor‑furnished containers.

Overflow, other shipments, and oversize containers must be constructed IAW ASTM-D6251. Each container must be caulked during assembly. Overflow boxes and other shipments that normally require a lesser size box than specified in ASTM-D4169-01 or SDDC Pamphlet 55-12 and oversized containers are always of a greater size than specified in Commercial Spec ASTM-D4169-01 or SDDC Pamphlet 55-12. One or more of these containers may be required per shipment. Price bid for Item 1003 includes container plus weight of its contents.

Est. Annual Qty.Required #Unit PriceTotal
AG. Contractor‑Furnished Containers:20€ - 0€ - 0Unit price: Cost to stencil 1 specialy crate
Specialty Stenciling (External Crate)
AH. Contractor‑Furnished Containers:20€ - 0€ - 0Unit price: Cost to build 1 External Specialy Crate
External Crating
AI. Contractor‑Furnished Containers:20€ - 0€ - 0Unit price: Cost to build 1 Internal Specialy Crate
Internal Crating
Est. Annual Qty.Unit CBFTUnit PriceTotal
AN. Contractor‑Furnished Containers:4,000€ - 0€ - 0
Billed per cubic foot
Item 1004. Complete Service ‑ Outbound (Unaccompanied Baggage). Service includes packaging, inventorying, packing in Government approved containers, weighing, strapping, obliteration of old markings, marking, and loading shipments on the line‑haul carrier’s equipment. Service must be performed at member/employee's residence. (Service may be performed at contractor's facility when ordered by the Ordering Officer.)
Estimated Annual Quantity (Pounds)Unit NCWTUnit PriceTotal
7,20072€ - 0€ - 0
Item 1006. Outbound Service - Unaccompanied Baggage Packed by Member/employee. Service must include weighing, strapping, banding, obliterating old markings, and marking. Service may include (when necessary) containerization in outer shipping containers as ordered by the contracting officer.
Est. Annual Qty.Unit NCWTUnit PriceTotal
11€ - 0€ - 0
Item 1009. Storage. Storage of containerized articles must be furnished when ordered by the ordering office. Charges must not commence earlier than the sixth (6th) workday following date of ordering office’s receipt of notification of completion of containerization service. Storage charges apply for each 30‑day period or fraction thereof. Date of release from storage must not be considered in computation of storage charges.
Est. Annual Qty.Unit NCWTUnit PriceTotal
20 shipments / 30 Days each600€ - 0€ - 0
Item 1010. Containers. Service must consist of the furnishing of the following types of new containers or specially constructed wooden crates. Containers furnished or specially constructed are to be assembled and ready for loading. When a specific container from SDDC Pamphlet 55-12 is ordered, the order will indicate the SDDC approval number.
Est. Annual Qty.Unit EachUnit PriceTotal
11€ - 0€ - 0
Item 1011. Remarking, Coopering and Assembly/Disassembly Service.
Est. Annual Qty.# of HoursUnit PriceTotal
Billed per Hour150€ - 0€ - 0
Item 1012. Quality Control Metrix: Report monthly metrix for outbound DPM services.
Est. Annual Qty.# of ReportUnit PriceTotal
AA. Household goods1€ - 0€ - 0
AB. Unaccompanied baggage1€ - 0€ - 0
Item 1013. Attempted Pickup. When the initial attempt to pick up a shipment at the member’s/employee's residence is unsuccessful, charges apply provided the Contractor notified the ordering office via telephone and provided that after contractor's notification, the ordering office (a) cannot locate the member/employee within 30 minutes, (b) cannot have the member/employee at the residence within one hour after notification, and (c) the contractor left a notice of attempted pickup at the residence.
Est. Annual Qty.Unit Each ShipmentUnit PriceTotal
AA. Household goods25€ - 0€ - 0
AB. Unaccompanied baggage2€ - 0€ - 0
NOTE: All Above Items are included in the evaluation of bids.
Item 1A-E2I. Ref. to Attachment A-E2 Rev.1 Aviano Local Instructions.Transportation cost to sea and air terminal. The order of precedence for Direct Procurement Movement (DPM) shipment drop-off locations for onward movement is as follows. Primary option: Port of Livorno, this is the first and preferred delivery location for onward movement of DPM shipments. Secondary option: (Air Terminal): Aviano Air Base (AMS), use of this air terminal requires prior approval from the ITO before usage and should only be used for emergencies.
Est. Annual Qty.Unit NCWTUnit PriceTotal
880,0008800€ - 0€ - 0AA. Livorno seaport terminal
7,20072€ - 0€ - 0AC. Aviano AMS air terminal
NOTE: All Above Items are included in the evaluation of bids.
Item 1014. Additional Services. The contractor must provide additional services not included in the schedule but required for satisfactory completion of the services ordered under this contract, at a rate comparable to the rate for like services as contained in tenders on file with the state regulatory bodies or SDDC, in effect at the time of the order.
RECAPITULATION SCHEDULE I
Schedule, I Total€ 0.00
SCHEDULE II

INBOUND SERVICES

Item 1015. Complete Service ‑ Inbound (HHG). Service must include drayage from contractor's facility to storage warehouses, air and surface transportation terminals, military installation shipping offices and ocean or river terminals/piers and return, unloading from the delivering carrier’s vehicle, handling into contractor’s facility, drayage to member’s/employee’s residence, decontainerization and unpacking of loaded containers of HHG and placing goods in rooms as directed by member/employee, disconnecting appliance, assembly of any disassembled articles and removing shipping containers, barrels, boxes/crates, and debris from member’s/employee’s residence and drayage of empty containers to contractor’s or Government facility.
Estimated Annual Quantity (Pounds)Unit NCWTUnit PriceTotal
11,000110€ - 0€ - 0
Item 1016. Complete Service Inbound (HHG). Service must be the same as Item 1015 above except removal of items from outer container must be at the contractor's facility and articles must be drayed to member’s/employee's residence.
Estimated Annual Quantity (Pounds)Unit NCWTUnit PriceTotal
1001€ - 0€ - 0
Item 1018. Inbound Service ‑ Contractor Facility (HHG). Services must include drayage from storage warehouses, air and surface transportation terminals, military installation shipping offices, and ocean or river terminals/piers to contractor’s facility, unloading from the delivery carrier’s vehicle into the contractor’s facility and delivery of articles to property member/employee, motor van carrier, or NTS contractor at the contractor’s facility.
Estimated Annual Quantity (Pounds)Unit NCWTUnit PriceTotal
1001€ - 0€ - 0
Item 1020. Complete Service ‑ Inbound (Unaccompanied Baggage). Service must include drayage from contractor's facility to storage warehouses, air and surface transportation terminals, military installation shipping offices and ocean or river terminals/piers and return, unloading from the delivering carrier's vehicle, handling into contractor's facility, drayage of unaccompanied baggage containers to member’s/employee's residence, unpacking of containers, reassembly of articles and removal of all shipping containers and debris from the residence.
Estimated Annual Quantity (Pounds)Unit NCWTUnit PriceTotal
1,20012€ - 0€ - 0
Item 1022. Inbound Service ‑ Contractor Facility (Unaccompanied Baggage). Service must be the same as Item 1020 above except service must also include removal of unaccompanied baggage from outer shipping containers for pickup by the member/employee or release to a motor carrier or other contractor at the contractor's facility.
Estimated Annual Quantity (Pounds)Unit NCWTUnit PriceTotal
1001€ - 0€ - 0
Item 1023. Storage. Storage of containerized articles must be furnished when ordered. Charges under this item must not commence earlier than the sixth (6th) workday following date of contractor's notification to the transportation office of arrival of shipment. Storage charges apply for each 30‑day period or fraction thereof. Date of release from storage must not be considered in computation of storage charges.
Estimated Annual Quantity (Pounds)Unit NCWTUnit PriceTotal
12,200122€ - 0€ - 0
Item 1024. Remarking, Coopering and Assembly/Disassembly Service.
Est. Annual Qty.Unit EachUnit PriceTotal
AA. Remarking of Shipments for Reconsignment. Services must include drayage from storage warehouses, air and surface transportation terminals, military installation shipping offices, and ocean or river terminals/piers to contractor’s facility, unloading from the delivering carrier’s vehicle, handling into contractor’s facility, obliteration of all old markings, stenciling of necessary information on loaded shipping containers schedule for reconsignment loading on the hauling carrier’s vehicle.6€ - 0€ - 0Billed per hour
AB. Coopering. Service must consist of repairing containers not to exceed 30 percent of total area of shipping container or costs of repairs must not exceed 50 percent of the container replacement cost. Minor repairs, such as replacing bolts, renailing, and rebanding, must be completed at no expense to the Government.1€ - 0€ - 0Billed per hour
Item 1025. Attempted Delivery. When the initial attempt to deliver a shipment at the member’s/employee's residence is unsuccessful, charges apply provided the contractor notified the ordering office via telephone and provided that after contractor's notification, the ordering office (a) cannot locate the member/employee within 30 minutes, (b) cannot have the member/employee at the residence within one hour after notification, and (c) the contractor left a notice of attempted delivery at the residence.
Est. Annual Qty.Unit Each
ShipmentUnit PriceTotal
AA. Household goods1€ - 0€ - 0
AB. Unaccompanied baggage1€ - 0€ - 0
Item 1026. Reweighing. Service must consist of weighing the loaded containers prior to delivery and weighing the empty containers after delivery.
Est. Annual Qty.Unit Each ShipmentUnit PriceTotal
AA. Household goods10€ - 0€ - 0
AB. Unaccompanied baggage5€ - 0€ - 0
Item 1027. Quality Control Metrix: Report monthly metrix for outbound DPM services.
Est. Annual Qty.Unit Per Loaded
MileUnit PriceTotal
AA. Household goods1€ - 0€ - 0Cost to provide 12 monthly reports of IB HHG
AB. Unaccompanied baggage1€ - 0€ - 0Cost to provide 12 monthly reports of IB UB
Item 1028. Partial Withdrawal. Service must be the same as Items 1015, 1016, 1020, or 1021 except for partial removal of the items from the outer container will be performed at the contractor's facility. Articles not removed from the shipment will remain at the contractor's facility.
Est. Annual Qty.Unit NCWTUnit PriceTotal
AA.Household Goods1€ - 0€ - 0
Drayage included
AB.Household Goods1€ - 0€ - 0
Drayage not included
AC.Unaccompanied Baggage1€ - 0€ - 0
Drayage included
AD. Unaccompanied Baggage1€ - 0€ - 0
Drayage not included
Item 1A-E2I. Ref. to Attachment A-E2 Rev.1 Aviano Local Instructions.Transportation cost to sea and air terminal. The order of precedence for Direct Procurement Movement (DPM) shipment drop-off locations for onward movement is as follows. Primary option: Port of Livorno, this is the first and preferred delivery location for onward movement of DPM shipments. Secondary option: (Air Terminal): Aviano Air Base (AMS), use of this air terminal requires prior approval from the ITO before usage and should only be used for emergencies.
Est. Annual Qty.Unit Per Loaded MileUnit PriceTotal
55,000550€ - 0€ - 0AA. Livorno seaport terminal
7,20072€ - 0€ - 0AC. Aviano AMS air terminal
NOTE: All Above Items are included in the evaluation of bids
Item 1029-1030 Additional Services. The contractor must provide additional services not included in the schedule but required for satisfactory completion of the services ordered under this contract, at a rate comparable to the rate for like services as contained in tenders on file with the state regulatory bodies or SDDC, in effect at the time of the order.
NOTE: All Above Items are included in the evaluation of bids
RECAPITULATION SCHEDULE II
Schedule, II Total€ 0.00
SCHEDULE III

INTRA-CITY AND INTRA-AREA MOVES

Item 1031. Complete Service for Intra‑City and Intra‑Area Moves. Service must include a premove survey, servicing of appliances, packaging and packing at member’s/employee’s residence to protect household goods properly during transit, tagging of items, inventorying, loading, weighing, drayage, unloading, unpacking, and placing of each article in member’s/employee’s new residence as directed by member/employee or member’s/employee’s designated representative and removal of all empty containers and materials from residence.
Estimated Annual Quantity (Pounds)Unit NCWTUnit PriceTotal
27,500275€ - 0€ - 0
Item 1032. Attempted Pickup or Delivery. When the initial attempt to pick up or deliver a shipment at the member’s/employee’s residence is unsuccessful, charges apply provided the contractor notified the ordering office via telephone and provided that after contractor’s notification, the ordering office (a) cannot locate the member/employee within 30 minutes, (b) cannot have the member/employee at the residence within one hour after notification, and (c) the contractor left a notice of attempted pickup or delivery at the residence.
Est. Annual Qty.Unit Each ShipmentUnit PriceTotal
AA. Attempted Pickup1€ - 0€ - 0
AB. Attempted Delivery1€ - 0€ - 0
Item 1033. Quality Control Metrix: Report monthly metrix for Local Move services.
Est. Annual Qty.UnitUnit PriceTotal
AA. Local Moves1€ - 0€ - 0Cost to provide 12 monthly reports of Local Moves
AB. Unaccompanied baggage1€ - 0€ - 0
Item 1034 Additional Services. The contractor must provide additional services not included in the schedule but required for satisfactory completion of the services ordered under this contract, at a rate comparable to the rate for like services as contained in tenders on file with the state regulatory bodies or SDDC, in effect at the time of the order.
NOTE: All Above Items are included in the evaluation of bids.
RECAPITULATION SCHEDULE III
Schedule, III Total€ 0.00

chatgpt://generic-entity/?number=0chatgpt://generic-entity/?number=0 Second Option Year

**** NOTE: FOR EVALUATION PURPOSE ONLY. REFER TO ADDENDUM 52.212-2. ****
(SECOND OPTION YEAR 1-DEC-28- 30-NOV-29)

The quantities shown by area of performance for each item in this Solicitation are the Government's estimates of requirements, which may be ordered during the period of the contract.

The Government's estimated maximum daily requirements, excluding Saturday, Sunday; National, State, and local holidays are listed below by area of performance within each schedule. Bidders must complete the "Bidder's Guaranteed Daily Capability", which must equal or exceed the Government's minimum acceptable daily capability, for all items within an area of performance for which they submit bids. Failure to do so must render the bid nonresponsive.

Contractor Capacity is the total capacity of the offeror to provide pick-up and/or delivery of personal property, as measured in NCWT, which the offeror must assure is available to meet Government requirements during one working day, between the hours of 0800 – 1700, before being committed to non-Government requirements.

Area: Aviano Air Base The area of Aviano AB is defined as a radius of 50 miles/80 kilometers

Governments Estimated Max
Daily RequirementGovernments Estimated Min
Daily RequirementBidder's Guaranteed Daily Capability
OUTBOUNDNCWTNCWTNCWT
(Schedule I)600200
INBOUNDNCWTNCWTNCWT
(Schedule II)300200
INTRA-CITY AREANCWTNCWTNCWT
(Schedule III)350250
NCTW - Net Hundredweight
SCHEDULE I
Outbound Services
Item 2001. Complete Service ‑ Outbound (HHG). Services must include pre-move survey, servicing of appliances, disassembly of furniture, packaging, inventorying, tagging, wrapping, padding, packing and bracing of HHG in Government-owned and furnished shipping containers (Shipping Container Commercial Spec ASTM-D4169-01, SDDC Pamphlet 55-12) at member’s/employee’s residence, or at contractor’s facility when ordered by the contracting officer, properly securing and sealing for shipment, weighing, obliterating old markings, marking, strapping, and drayage of the container within an area of performance. Service must also include loading shipments on linehaul carrier equipment at the contractor’s facility. When containers will not accommodate all articles of any one lot, loose articles must be packed in the said containers before any over-packed articles are placed therein. Overflow, oversize, and other shipments must be paid for under Item 2003.
Estimated Annual Quantity (Pounds)Unit NCWTUnit PriceTotal
880,0008,800€ - 0€ - 0
Item 2003. Complete Service-Outbound (HHG‑Overflow Articles and HHG Shipments requiring other than ASTM-D4169-01 or SDDC Pam. 55-12 Containers). Service must be the same as Item 2001 except that the loose articles are drayed to contractor's facility when ordered by the contracting officer for containerization in Government‑furnished or contractor‑furnished containers.

Overflow, other shipments, and oversize containers must be constructed IAW ASTM-D6251. Each container must be caulked during assembly. Overflow boxes and other shipments that normally require a lesser size box than specified in ASTM-D4169-01 or SDDC Pamphlet 55-12 and oversized containers are always of a greater size than specified in Commercial Spec ASTM-D4169-01 or SDDC Pamphlet 55-12. One or more of these containers may be required per shipment. Price bid for Item 2003 includes container plus weight of its contents.

Est. Annual Qty.Required #Unit PriceTotal
AG. Contractor‑Furnished Containers:20€ - 0€ - 0Unit price: Cost to stencil 1 specialy crate
Specialty Stenciling (External Crate)
AH. Contractor‑Furnished Containers:20€ - 0€ - 0Unit price: Cost to build 1 External Specialy Crate
External Crating
AI. Contractor‑Furnished Containers:20€ - 0€ - 0Unit price: Cost to build 1 Internal Specialy Crate
Internal Crating
Est. Annual Qty.Unit CBFTUnit PriceTotal
AN. Contractor‑Furnished Containers:4,000€ - 0€ - 0
Billed per cubic foot
Item 2004. Complete Service ‑ Outbound (Unaccompanied Baggage). Service includes packaging, inventorying, packing in Government approved containers, weighing, strapping, obliteration of old markings, marking, and loading shipments on the line‑haul carrier’s equipment. Service must be performed at member/employee's residence. (Service may be performed at contractor's facility when ordered by the Ordering Officer.)
Estimated Annual Quantity (Pounds)Unit NCWTUnit PriceTotal
7,20072€ - 0€ - 0
Item 2006. Outbound Service - Unaccompanied Baggage Packed by Member/employee. Service must include weighing, strapping, banding, obliterating old markings, and marking. Service may include (when necessary) containerization in outer shipping containers as ordered by the contracting officer.
Est. Annual Qty.Unit NCWTUnit PriceTotal
11€ - 0€ - 0
Item 2009. Storage. Storage of containerized articles must be furnished when ordered by the ordering office. Charges must not commence earlier than the sixth (6th) workday following date of ordering office’s receipt of notification of completion of containerization service. Storage charges apply for each 30‑day period or fraction thereof. Date of release from storage must not be considered in computation of storage charges.
Est. Annual Qty.Unit NCWTUnit PriceTotal
20 shipments / 30 Days each600€ - 0€ - 0
Item 2010. Containers. Service must consist of the furnishing of the following types of new containers or specially constructed wooden crates. Containers furnished or specially constructed are to be assembled and ready for loading. When a specific container from SDDC Pamphlet 55-12 is ordered, the order will indicate the SDDC approval number.
Est. Annual Qty.Unit EachUnit PriceTotal
11€ - 0€ - 0
Item 2011. Remarking, Coopering and Assembly/Disassembly Service.
Est. Annual Qty.# of HoursUnit PriceTotal
Billed per Hour150€ - 0€ - 0
Item 2012. Quality Control Metrix: Report monthly metrix for outbound DPM services.
Est. Annual Qty.# of ReportUnit PriceTotal
AA. Household goods1€ - 0€ - 0
AB. Unaccompanied baggage1€ - 0€ - 0
Item 2013. Attempted Pickup. When the initial attempt to pick up a shipment at the member’s/employee's residence is unsuccessful, charges apply provided the Contractor notified the ordering office via telephone and provided that after contractor's notification, the ordering office (a) cannot locate the member/employee within 30 minutes, (b) cannot have the member/employee at the residence within one hour after notification, and (c) the contractor left a notice of attempted pickup at the residence.
Est. Annual Qty.Unit Each ShipmentUnit PriceTotal
AA. Household goods25€ - 0€ - 0
AB. Unaccompanied baggage2€ - 0€ - 0
NOTE: All Above Items are included in the evaluation of bids.
Item 2A-E2I. Ref. to Attachment A-E2 Rev.1 Aviano Local Instructions.Transportation cost to sea and air terminal. The order of precedence for Direct Procurement Movement (DPM) shipment drop-off locations for onward movement is as follows. Primary option: Port of Livorno, this is the first and preferred delivery location for onward movement of DPM shipments. Secondary option: (Air Terminal): Aviano Air Base (AMS), use of this air terminal requires prior approval from the ITO before usage and should only be used for emergencies.
Est. Annual Qty.Unit NCWTUnit PriceTotal
880,0008800€ - 0€ - 0AA. Livorno seaport terminal
7,20072€ - 0€ - 0AC. Aviano AMS air terminal
NOTE: All Above Items are included in the evaluation of bids.
Item 2014. Additional Services. The contractor must provide additional services not included in the schedule but required for satisfactory completion of the services ordered under this contract, at a rate comparable to the rate for like services as contained in tenders on file with the state regulatory bodies or SDDC, in effect at the time of the order.
RECAPITULATION SCHEDULE I
Schedule, I Total€ 0.00
SCHEDULE II

INBOUND SERVICES

Item 2015. Complete Service ‑ Inbound (HHG). Service must include drayage from contractor'sfacility to storage warehouses, air and surface transportation terminals, military installation shipping offices and ocean or river terminals/piers and return, unloading from the delivering carrier’s vehicle, handling into contractor’s facility, drayage to member’s/employee’s residence, decontainerization and unpacking of loaded containers of HHG and placing goods in rooms as directed by member/employee, disconnecting appliance, assembly of any disassembled articles and removing shipping containers, barrels, boxes/crates, and debris from member’s/employee’s residence and drayage of empty containers to contractor’s or Government facility.
Estimated Annual Quantity (Pounds)Unit NCWTUnit PriceTotal
11,000110€ - 0
Item 2016. Complete Service Inbound (HHG). Service must be the same as Item 2015 above except removal of items from outer container must be at the contractor's facility and articles must be drayed to member’s/employee's residence.
Estimated Annual Quantity (Pounds)Unit NCWTUnit PriceTotal
1001€ - 0
Item 2018. Inbound Service ‑ Contractor Facility (HHG). Services must include drayage from storage warehouses, air and surface transportation terminals, military installation shipping offices, and ocean or river terminals/piers to contractor’s facility, unloading from the delivery carrier’s vehicle into the contractor’s facility and delivery of articles to property member/employee, motor van carrier, or NTS contractor at the contractor’s facility.
Estimated Annual Quantity (Pounds)Unit NCWTUnit PriceTotal
1001€ - 0
Item 2020. Complete Service ‑ Inbound (Unaccompanied Baggage). Service must include drayage from contractor's facility to storage warehouses, air and surface transportation terminals, military installation shipping offices and ocean or river terminals/piers and return, unloading from the delivering carrier's vehicle, handling into contractor's facility, drayage of unaccompanied baggage containers to member’s/employee's residence, unpacking of containers, reassembly of articles and removal of all shipping containers and debris from the residence.
Estimated Annual Quantity (Pounds)Unit NCWTUnit PriceTotal
1,20012€ - 0
Item 2022. Inbound Service ‑ Contractor Facility (Unaccompanied Baggage). Service must be the same as Item 2020 above except service must also include removal of unaccompanied baggage from outer shipping containers for pickup by the member/employee or release to a motor carrier or other contractor at the contractor's facility.
Estimated Annual Quantity (Pounds)Unit NCWTUnit PriceTotal
1001€ - 0
Item 2023. Storage. Storage of containerized articles must be furnished when ordered. Charges under this item must not commence earlier than the sixth (6th) workday following date of contractor's notification to the transportation office of arrival of shipment. Storage charges apply for each 30‑day period or fraction thereof. Date of release from storage must not be considered in computation of storage charges.
Estimated Annual Quantity (Pounds)Unit NCWTUnit PriceTotal
12,200122€ - 0
Item 2024. Remarking, Coopering and Assembly/Disassembly Service.
Est. Annual Qty.Unit EachUnit PriceTotal
AA. Remarking of Shipments for Reconsignment. Services must include drayage from storage warehouses, air and surface transportation terminals, military installation shipping offices, and ocean or river terminals/piers to contractor’s facility, unloading from the delivering carrier’s vehicle, handling into contractor’s facility, obliteration of all old markings, stenciling of necessary information on loaded shipping containers schedule for reconsignment loading on the hauling carrier’s vehicle.6€ - 0Billed per hour
AB. Coopering. Service must consist of repairing containers not to exceed 30 percent of total area of shipping container or costs of repairs must not exceed 50 percent of the container replacement cost. Minor repairs, such as replacing bolts, renailing, and rebanding, must be completed at no expense to the Government.1€ - 0Billed per hour
Item 2025. Attempted Delivery. When the initial attempt to deliver a shipment at the member’s/employee's residence is unsuccessful, charges apply provided the contractor notified the ordering office via telephone and provided that after contractor's notification, the ordering office (a) cannot locate the member/employee within 30 minutes, (b) cannot have the member/employee at the residence within one hour after notification, and (c) the contractor left a notice of attempted delivery at the residence.
Est. Annual Qty.Unit Each
ShipmentUnit PriceTotal
AA. Household goods1€ - 0
AB. Unaccompanied baggage1€ - 0
Item 2026. Reweighing. Service must consist of weighing the loaded containers prior to delivery and weighing the empty containers after delivery.
Est. Annual Qty.Unit Each ShipmentUnit PriceTotal
AA. Household goods10€ - 0
AB. Unaccompanied baggage5€ - 0
Item 2027. Quality Control Metrix: Report monthly metrix for outbound DPM services.
Est. Annual Qty.Unit Per Loaded
MileUnit PriceTotal
AA. Household goods1€ - 0Cost to provide 12 monthly reports of IB HHG
AB. Unaccompanied baggage1€ - 0Cost to provide 12 monthly reports of IB UB
Item 2028. Partial Withdrawal. Service must be the same as Items 2015, 2016, 2020, or 2021 except for partial removal of the items from the outer container will be performed at the contractor's facility. Articles not removed from the shipment will remain at the contractor's facility.
Est. Annual Qty.Unit NCWTUnit PriceTotal
AA.Household Goods1€ - 0
Drayage included
AB.Household Goods1€ - 0
Drayage not included
AC.Unaccompanied Baggage1€ - 0
Drayage included
AD. Unaccompanied Baggage1€ - 0
Drayage not included
Item 2A-E2I. Ref. to Attachment A-E2 Rev.1 Aviano Local Instructions.Transportation cost to sea and air terminal. The order of precedence for Direct Procurement Movement (DPM) shipment drop-off locations for onward movement is as follows. Primary option: Port of Livorno, this is the first and preferred delivery location for onward movement of DPM shipments. Secondary option: (Air Terminal): Aviano Air Base (AMS), use of this air terminal requires prior approval from the ITO before usage and should only be used for emergencies.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .