This file is a Construction Cost Estimate Breakdown spreadsheet for a CNS Alternate Transformer Substation project at Moron Air Base, Spain. The detailed excel document provides a comprehensive line-item breakdown of estimated costs across multiple work categories including demolition, civil works, architectural works, electrical works, and various infrastructure installations. The project, identified as QUUG 10-1049, is valued between $1,000,000 and $5,000,000, with specific focus on electrical infrastructure upgrades involving high voltage switchgear, transformers, underground cabling, grounding systems, and control/protection equipment.
The solicitation (FA557525B0010) is specifically targeted at local Spanish sources authorized to execute government works, with a pre-proposal conference/site visit scheduled for 16 July 2025 and bid submissions due by 10:00 hours local time on 6 August 2025. The project is being managed by the Department of the Air Force, United States Air Forces in Europe - Air Forces Africa, with bids expected to remain valid through 31 December 2025. Notably, the solicitation emphasizes using Spanish material, labor, and equipment whenever feasible, and requires contractors to meet Spanish legislative requirements for government work execution.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and Answers v2.pdf | ||
| Questions and Answers.pdf | ||
| Solicitation Amendment FA557525B00100002 SF 30.pdf | ||
| 4. English Specifications - AMD 1.pdf | ||
| 5. Especificaciones Español - AMD 1.pdf | ||
| Solicitation Amendment FA557525B00100001 SF 30.pdf | ||
| 3. Drawings - Additive 2.pdf | ||
| 5. Especificaciones Español.pdf | ||
| 6. Construction Cost Estimate Breakdown (BLANK).xlsx | XLSX spreadsheet | |
| 7. Schedule of Material Submittals.xlsx | XLSX spreadsheet | |
| Solicitation - FA557525B0010.pdf | ||
| 2. Drawings - Additive 1.pdf | ||
| 4. English Specifications.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUMMARY
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||
| CONTRACTOR | ADDRESS | |||
| MORÓN AIR BASE, SPAIN | ||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||
| CNS ALT SUBSTATION. AMMENDMENT #1 | SUMMARY | EUROS | 0.00 € |
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | |||||
| QUUG 10-1049 | MORÓN AIR BASE, SPAIN | ||||||
| TOTAL EUROS | TOTAL EUROS | TOTAL USD $ | TOTAL USD $ | ||||
| LIN | ITEM | ||||||
| NO. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | |
| (3) | (4) | (5) | (6) | (7) | (8) | ||
| SUMMARY | |||||||
| RESUMEN | |||||||
| 1 | BASIC PACKAGE | 0.00 € | $0.00 | ||||
| PAQUETE BÁSICO | |||||||
| 2 | ADDITIVE #1 | 0.00 € | $0.00 | ||||
| ADICIONAL #1 | |||||||
| 3 | ADDITIVE #2 | 0.00 € | $0.00 | ||||
| ADICIONAL #2 |
DATE: FIRM NAME:
These costs and overhead and profit percentages will be applied in any possible future modifications
&"Times New Roman,Normal"&9 CONSTRUCTION COST ESTIMATE BREAKDOWN &"Times New Roman,Normal"&9Page &P of &N
BASIC PACKAGE
| CONSTRUCTION COST ESTIMATE BREAKDOWN | incluso carga sobre camión de residuos, transporte y entrega a gestor autorizado de vertidos. | |||||||||
| CONTRACTOR | ADDRESS | |||||||||
| MORÓN AIR BASE, SPAIN | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| CNS ALT SUBSTATION. AMMENDMENT #1 | BASIC PACKAGE | 0.00 € | ||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG 10-1049 | MORÓN AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| DEMOLITION WORKS | ||||||||||
| TRABAJOS DE DEMOLICIÓN | ||||||||||
| 1 | Exterior pavements demolition. | |||||||||
| Demolición de pavimentos exteriores. | m2 | 0.00 | 0.00 | 0.00 | ||||||
| 2 | Building #1280 security fence demolition. | |||||||||
| Demolición de vallado de seguridad de edificio #1280. | m | 0.00 | 0.00 | 0.00 | ||||||
| 3 | High voltage yard security fence demolition. | |||||||||
| Demolición de vallado de seguridad de parque de alta tensión. | m | 0.00 | 0.00 | 0.00 | ||||||
| 4 | Removal of MV underground cabling. | |||||||||
| Retirada de cableado MT soterrado. | m | 0.00 | 0.00 | 0.00 | ||||||
| 5 | Demolition of existing drainage conduit in its final section, including mahole reconstruction. | |||||||||
| Demolición de canalización de drenaje existente en su tramo final, incluso reconstrucción de arqueta. | m | 0.00 | 0.00 | 0.00 | ||||||
| 6 | Olive tree transplant. | |||||||||
| Transplante de olivo. | ea | 0.00 | 0.00 | 0.00 | ||||||
| TOTAL DEMOLITION WORKS | ||||||||||
| TOTAL TRABAJOS DE DEMOLICIÓN | 0.00 | 0.00 | 0.00 | 0.00 |
| CIVIL WORKS | ||||||
| TRABAJOS DE CIVIL | ||||||
| 7 | Site clearing & grading. | |||||
| Desbroce y nivelación del terreno. | m2 | 0.00 | 0.00 | 0.00 | ||
| 8 | Excavations and subgrade compaction. | |||||
| Excavaciones y compactación de fondo de excavación. | m3 | 0.00 | 0.00 | 0.00 | ||
| 9 | Ground improvements. | |||||
| Mejoras del terreno. | m3 | 0.00 | 0.00 | 0.00 | ||
| 10 | Service corridors concrete slab (Sidewalk). | |||||
| Solera de hormigón de pasillos de servicio (Acerado). | m2 | 0.00 | 0.00 | 0.00 | ||
| 11 | Crushed stone surface finish, anti weed mesh, artificial ballast ZA 0/20 and geotextile. | |||||
| Acabado superficial de piedra machacada, malla anti-hierba, zahorra artificial ZA 0/20 y geotextil. | m2 | 0.00 | 0.00 | 0.00 | ||
| 12 | Transformer drainage system, including manhole, steel piping, mortar slope and earthworks. | |||||
| Sistema de drenaje de transformador, incluso arqueta, canalizaciones de acero, formación de pendientes de mortero y movimiento de tierras. | JOB | 0.00 | 0.00 | 0.00 | ||
| 13 | Site drainage system, including handholes, stormwater manhole, HDPE pipe, precast concrete headwall, linning ditch, riprap and related accesories. | |||||
| Sistema de drenaje del terreno, incluso arquetas, pozo de registro, cunata revestida, rip-rap, embocadira de hormigón prefabricado, colector PEAD y accesorios relacionados. | JOB | 0.00 | 0.00 | 0.00 | ||
| 14 | 25 cm reinforded concrete access slab with steel rails. | |||||
| Solera de acceso de hormigón armado de 25 cm con railes de acero. | m2 | 0.00 | 0.00 | 0.00 | ||
| 15 | Transformer foundation, including steel rails, gratings and crushed stone. | |||||
| Cimentación de transformador, incluso railes de acero, rejillas y piedra machacada. | m3 | 0.00 | 0.00 | 0.00 | ||
| 16 | Manholes. Including cover, cable racks, excavation, compaction, backfill and miscellaneous. | |||||
| Arquetas, incluyendo tapas, soportes para cables, excavaciones, rellenos, y demás accesorios. | JOB | 0.00 | 0.00 | 0.00 | ||
| 17 | HV Ductbank Z1 2 x Ø200 mm. | |||||
| Banco de canalizaciones de AT Z1 2xØ200 mm. | m | 0.00 | 0.00 | 0.00 | ||
| 18 | HV Ductbank Z2 2 x Ø200 mm. | |||||
| Banco de canalizaciones de AT Z2 2xØ200 mm. | m | 0.00 | 0.00 | 0.00 | ||
| 19 | HV Ductbank Z3 3 x Ø200 mm. | |||||
| Banco de canalizaciones de AT Z3 3xØ200 mm. | m | 0.00 | 0.00 | 0.00 | ||
| 20 | HV Ductbank Z4 2 x Ø200 mm. | |||||
| Banco de canalizaciones de AT Z4 2xØ200 mm. | m | 0.00 | 0.00 | 0.00 | ||
| 21 | Precast cables trenches. | |||||
| Canales de hormigón prefabricado revisables para cables. | m | 0.00 | 0.00 | 0.00 | ||
| 22 | Security fence with concrete wall and access doors. | |||||
| Vallado de seguridad con muro de hormigón y puertas de acceso. | m | 0.00 | 0.00 | 0.00 | ||
| 23 | Security fence and access doors. | |||||
| Vallado de seguridad y puertas de acceso. | m | 0.00 | 0.00 | 0.00 | ||
| TOTAL CIVIL WORKS | ||||||
| TOTAL TRABAJOS DE CIVIL | 0.00 | 0.00 | 0.00 | 0.00 |
| HV SWITCHGEAR STEEL SUPPORTS | ||||||
| SOPORTES DE APARAMENTA DE AT DE ACERO | ||||||
| 24 | Hot dip galvanized steelwork structures. | |||||
| Estructuras de acero galvanizado. | kg | 0.00 | 0.00 | 0.00 | ||
| 25 | Plain concrete foundation. | |||||
| Cimentación de hormigón en masa. | m3 | 0.00 | 0.00 | 0.00 | ||
| 26 | Pre-engineered transformer wiring steel support. | |||||
| Soporte prefabricado de acero de cableado del transformador. | ea | 0.00 | 0.00 | 0.00 | ||
| TOTAL HV SWITCHGEAR STEEL SUPPORTS | ||||||
| TOTAL SOPORTES DE APARAMENTA DE AT DE ACERO | 0.00 | 0.00 | 0.00 | 0.00 |
| ARCHITECTURAL WORKS | ||||||
| TRABAJOS DE ARQUITECTURA | ||||||
| 27 | Concrete slab foundation. | |||||
| Cimentación de losa de hormigón. | m3 | 0.00 | 0.00 | 0.00 | ||
| 28 | Concrete masonry units (CMU) bearing walls includin concrete beams. | |||||
| Muros de carga de bloques de hormigón (CMU) incluso vigas de hormigón. | m2 | 0.00 | 0.00 | 0.00 | ||
| 29 | Concrete slab roof deck. | |||||
| Forjado de cubierta de losa maciza. | m2 | 0.00 | 0.00 | 0.00 | ||
| 30 | Facade thermal insulation. | |||||
| Aislamiento térmico de fachada. | m2 | 0.00 | 0.00 | 0.00 | ||
| 31 | Perforated brick wall facade interior leaf and partitions. | |||||
| Hoja interior de fachada y particiones de ladrillo perforado. | m2 | 0.00 | 0.00 | 0.00 | ||
| 32 | Exterior openings. | |||||
| Carpinterías exteriores. | ea | 0.00 | 0.00 | 0.00 | ||
| 33 | AASS Transformer access door. | |||||
| Puerta de acceso a transformador de SSAA. | ea | 0.00 | 0.00 | 0.00 | ||
| 34 | Cement mortar coating (exterior walls). | |||||
| Revestimiento de mortero de cemento (muros exteriores). | m2 | 0.00 | 0.00 | 0.00 | ||
| 35 | Cement mortar coating (interior walls). | |||||
| Revestimiento de mortero de cemento (muros interior) | m2 | 0.00 | 0.00 | 0.00 | ||
| 36 | Exterior painting. | |||||
| Pintura exterior. | m2 | 0.00 | 0.00 | 0.00 | ||
| 37 | Interior painting. | |||||
| Pintura interior. | m2 | 0.00 | 0.00 | 0.00 | ||
| 38 | Equipment skids made of masonry, steel profiles and patterned steel sheet. | |||||
| Bancadas para equipamiento realizadas con albañilería, perfiles metálicos y chapa lagrimada de acero. | JOB | 0.00 | 0.00 | 0.00 | ||
| 39 | Terrazo interior pavement and pit finish, base layers included. | |||||
| Pavimento interior de terrazo y acabado de foso capas base incluidas. | m2 | 0.00 | 0.00 | 0.00 | ||
| 40 | Low slope roofing system finished with insulated filtering tiles. | |||||
| Sistema de cubierta de baja pendiente acabado con losas filtrantes aisladas. | m2 | 0.00 | 0.00 | 0.00 | ||
| 41 | Fall arrest system. | |||||
| Sistema anticaidas. | ea | 0.00 | 0.00 | 0.00 | ||
| TOTAL ARCHITECTURAL WORKS | ||||||
| TOTAL TRABAJOS DE ARQUITECTURA | 0.00 | 0.00 | 0.00 | 0.00 |
| PLUMBING WORKS. | ||||||
| TRABAJOS DE FONTANERÍA. | ||||||
| 42 | Gutter & Downspout. | |||||
| Canalón y bajante. | m | 0.00 | 0.00 | 0.00 | ||
| TOTAL PLUMBING WORKS | ||||||
| TOTAL TRABAJOS DE FONTANERÍA | 0.00 | 0.00 | 0.00 | 0.00 |
| MECHANICAL WORKS | ||||||
| TRABAJOS DE MECÁNICA | ||||||
| 43 | HVAC System. | |||||
| Sistema HVAC. | ea | 0.00 | 0.00 | 0.00 | ||
| TOTAL MECHANICAL WORKS | ||||||
| TOTAL TRABAJOS DE MECÁNICA | 0.00 | 0.00 | 0.00 | 0.00 |
| ELECTRICAL WORKS | ||||||
| TRABAJOS DE ELECTRICIDAD | ||||||
| Power Transformer | ||||||
| Transformador de Potencia | ||||||
| 44 | 5MVA Power transformer. | |||||
| Transformador de potencia 5MVA. | ea | 0.00 | 0.00 | 0.00 | ||
| 45 | Neutral grounding resistor (NGR). | |||||
| Resistencia de puesta a tierra del neutro (NGR). | ea | 0.00 | 0.00 | 0.00 | ||
| Total Power Transformer | ||||||
| Transformador de Potencia Total | 0.00 | 0.00 | 0.00 | 0.00 |
| HV Switchgear and accesories. | ||||||
| Aparamenta de AT y accesorios. | ||||||
| 46 | HV Switchgear Circuit breaker 66kV/2000A/31.5kA, SF6. Including installation accessories. | |||||
| Celda de Interruptor automático de AT de 66kV/2000A/31.5kA, SF6. Incluso accesorios de instalación. | ea | 0.00 | 0.00 | 0.00 | ||
| 47 | HV Current transformer 66kV. Including instllation accessories. | |||||
| Transformador de Corriente de AT de 66kV. Incluso accesorios de instalación. | ea | 0.00 | 0.00 | 0.00 | ||
| 48 | HV Voltage transformer 66kV. Including instllation accessories. | |||||
| Transformador de tensión de AT de 66kV. Incluso accesorios de instalación. | ea | 0.00 | 0.00 | 0.00 | ||
| 49 | 3-phase HV disconnector, 72,5kV, 2000A, 31,5/80 kA. Including installation accessories. | |||||
| Seccionador trifásico de AT, 72,5kV, 2000A, 31,5/80 Ka.. Incluso accesorios de instalación. | ea | 0.00 | 0.00 | 0.00 | ||
| 50 | HV 1-phase surge arrester, 66kV. Including instllation accessories. | |||||
| Pararrayos de AT monofásico, 66kV. Incluso accesorios de instalación. | ea | 0.00 | 0.00 | 0.00 | ||
| Total HV Switchgear and accesories. | ||||||
| Aparamenta de AT y accesorios. | 0.00 | 0.00 | 0.00 | 0.00 |
| MV Switchgear and accesories. | ||||||
| Aparamenta de MT y accesorios. | ||||||
| 51 | MV Cabinets. | |||||
| Celdas de MT. | ea | 0.00 | 0.00 | 0.00 | ||
| Total MV Switchgear and accesories. | ||||||
| Aparamenta de Mt y accesorios. | 0.00 | 0.00 | 0.00 | 0.00 |
| HV Overhead Wiring. | ||||||
| Cableado Aéreo de AT. | ||||||
| 52 | Cable C2 Supply and installation of Al pipe, diameter 100/84 mm. | |||||
| Cable C2 Suministro y montaje de tubo de Al, de diámetro 100/84 mm. | m | 0.00 | 0.00 | 0.00 | ||
| 53 | Supply and assembly of pipe plug Al 100 mm fittings and connection. | |||||
| Suministro y montaje tapón tubo Al 100 mm de conectores y accesorios. | JOB | 0.00 | 0.00 | 0.00 | ||
| Total HV Overhead Wiring | ||||||
| Total Cableado Aéreo de AT | 0.00 | 0.00 | 0.00 | 0.00 |
| MV underground distribution wiring | ||||||
| Cableado distribución soterrada en MT | ||||||
| 54 | C3 HV Wiring. 3c-1x240 mm² HEPRZ1 Al. Including connectors, terminators, cable cleats and related accesories. | |||||
| Cable AT C3 3c-1x240 mm² HEPRZ1 Al. Incluso conectores, terminales, grapas y accesorios relacionados. | 0.00 | 0.00 | 0.00 | |||
| 55 | C4 HV Wiring. 3c-1x185 mm² / 1x16 mm² RHZ1-OL H16 Al. Including connectors, terminators, cable cleats and related accesories. | |||||
| Cableado AT C4. 3c-1x185 mm² / 1x16 mm² RHZ1-OL H16 Al. Incluso conectores, terminales, grapas y accesorios relacionados. | m | 0.00 | 0.00 | 0.00 | ||
| 56 | C5 HV Wiring. 3c-1x185 mm² / 1x16 mm² RHZ1-OL H16 Al. Including connectors, terminators, cable cleats and related accesories. | |||||
| Cableado AT C5. 3c-1x185 mm² / 1x16 mm² RHZ1-OL H16 Al. Incluso conectores, terminales, grapas y accesorios relacionados. | m | 0.00 | 0.00 | 0.00 | ||
| 57 | C7 HV Wiring. 3c-1x95 mm² / 1x16 mm² RHZ1-OL H16 Al. Including connectors, terminators, clamps and accesories. | |||||
| Cableado AT C7. 3c-1x95 mm² / 1x16 mm² RHZ1-OL H16 Al. Incluso conectores, terminales, grapas y accesorios relacionados. | m | 0.00 | 0.00 | 0.00 | ||
| Total MV underground distribution wiring | ||||||
| Total cableado distribución soterrada en MT | 0.00 | 0.00 | 0.00 | 0.00 |
| LV and signal main wiring | ||||||
| Cableado principal de BT y señal | ||||||
| 58 | Wiring RC4Z1-K(AS) 0.6/1 kV, 1c-2x10 mm². | |||||
| Cableado RC4Z1-K(AS) 0.6/1 kV, 1c-2x10 mm². | m | 0.00 | 0.00 | 0.00 | ||
| 59 | Wiring RC4Z1-K(AS) 0.6/1 kV, 1c-2x6. | |||||
| Cableado RC4Z1-K(AS) 0.6/1 kV, 1c-2x6. | m | 0.00 | 0.00 | 0.00 | ||
| 60 | Wiring RZ1MZ1-K(AS) 0.6/1 kV, 1c-3x6 mm². | |||||
| Cableado RZ1MZ1-K(AS) 0.6/1 kV, 1c-3x6 mm². | m | 0.00 | 0.00 | 0.00 | ||
| 61 | Wiring RZ1MZ1-K(AS) 0.6/1 kV, 1c-7x2.5 mm². | |||||
| Cable RZ1MZ1-K(AS) 0.6/1 kV, 1c-7x2.5 mm². | m | 0.00 | 0.00 | 0.00 | ||
| 62 | Wiring RZ1MZ1-K(AS) 0.6/1 kV, 1c-10x2.5 mm². | |||||
| Cable RZ1MZ1-K(AS) 0.6/1 kV, 1c-10x2.5 mm². | m | 0.00 | 0.00 | 0.00 | ||
| 63 | Wiring RZ1MZ1-K(AS) 0.6/1 kV, 1c-12x2.5 mm². | |||||
| Cable RZ1MZ1-K(AS) 0.6/1 kV, 1c-12x2.5 mm². | m | 0.00 | 0.00 | 0.00 | ||
| 64 | Wiring RZ1MZ1-K(AS) 0.6/1 kV, 1c-5x10 mm². | |||||
| Cable RZ1MZ1-K(AS) 0.6/1 kV, 1c-5x10 mm². | m | 0.00 | 0.00 | 0.00 | ||
| 65 | Wiring RZ1MAZ1-K(AS) 0.6/1 kV, 4c-1x35 mm². | |||||
| Cable RZ1MAZ1-K(AS) 0.6/1 kV, 4c-1x35 mm². | m | 0.00 | 0.00 | 0.00 | ||
| 66 | Wiring RZ1-K(AS) 0.6/1 kV, 3c-1x2.5 mm². | |||||
| Cable RZ1-K(AS) 0.6/1 kV, 3c-1x2.5 mm². | m | 0.00 | 0.00 | 0.00 | ||
| 67 | Wiring RZ1-K(AS) 0.6/1 kV, 3c-1x4 mm². | |||||
| Cable RZ1-K(AS) 0.6/1 kV, 3c-1x4 mm². | m | 0.00 | 0.00 | 0.00 | ||
| 68 | Wiring RZ1-K(AS) 0.6/1 kV, 3c-1x6 mm². | |||||
| Cable RZ1-K(AS) 0.6/1 kV, 3c-1x6 mm². | m | 0.00 | 0.00 | 0.00 | ||
| 69 | Wiring RZ1-K(AS) 0.6/1 kV, 3c-1x10 mm². | |||||
| Cable RZ1-K(AS) 0.6/1 kV, 3c-1x10 mm². | m | 0.00 | 0.00 | 0.00 | ||
| 70 | Wiring RZ1-K(AS) 0.6/1 kV, 3c-1x16 mm². | |||||
| Cable RZ1-K(AS) 0.6/1 kV, 3c-1x16 mm². | m | 0.00 | 0.00 | 0.00 | ||
| 71 | Wiring RZ1-K(AS) 0.6/1 kV, 5c-1x6 mm². | |||||
| Cable RZ1-K(AS) 0.6/1 kV, 5c-1x6 mm². | m | 0.00 | 0.00 | 0.00 | ||
| 72 | Wiring RZ1-K(AS) 0.6/1 kV, 4c-1x35 mm². | |||||
| Cable RZ1-K(AS) 0.6/1 kV, 4c-1x35 mm². | m | 0.00 | 0.00 | 0.00 | ||
| Total LV and signal main wiring | ||||||
| Total Cableado principal de BT y señal | 0.00 | 0.00 | 0.00 | 0.00 |
| BLDG1282 Raceways, devices, interior distribution, miscellaneous | ||||||
| Edif1282 Canalizaciones, mecanismos, distribución interior BT y varios. | ||||||
| 73 | BLDG1282 Raceways, devices, interior distribution, miscellaneous. | |||||
| Edif1282 Canalizaciones, mecanismos, distribución interior BT y varios. | JOB | 0.00 | 0.00 | 0.00 | ||
| Total BLDG1282 Raceways, devices, interior distribution, miscellaneous | ||||||
| Total Edif1282 Canalizaciones, mecanismos, distribución interior BT y varios. | 0.00 | 0.00 | 0.00 | 0.00 |
| Bldg1282 Interior grounding system | ||||||
| Edif 1282 Puesta a tierra interior | ||||||
| 74 | Bldg1282 Interior grounding system. | |||||
| Edif 1282 Puesta a tierra interior. | JOB | 0.00 | 0.00 | 0.00 | ||
| Total Bldg1282 Interior grounding system | ||||||
| Total Edif 1282 Puesta a tierra interior | 0.00 | 0.00 | 0.00 | 0.00 |
| Interior and Exterior Lighting System | ||||||
| Sistema de Iluminación Interior y Exterior | ||||||
| 75 | L1 luminaries. Including wring, conduits, control devices and accesories. | |||||
| Luminarias L1. Incluso cableado, canalizaciones, dispositivos de control y accesorios. | ea | 0.00 | 0.00 | 0.00 | ||
| 76 | L2 luminaries. Including wring, conduits, control devices and accesories. | |||||
| Luminarias L2. Incluso cableado, canalizaciones, dispositivos de control y accesorios. | ea | 0.00 | 0.00 | 0.00 | ||
| 77 | L2 luminaries (emergency). Including wring, conduits, control devices and accesories. | |||||
| Luminarias L2 (emergencia). Incluso cableado, canalizaciones, dispositivos de control y accesorios. | ea | 0.00 | 0.00 | 0.00 | ||
| Total Interior and Exterior Lighting System | ||||||
| Total Sistema de Iluminación Interior y Exterior | 0.00 | 0.00 | 0.00 | 0.00 |
| Emergency generator connection receptacle | ||||||
| Base de corriente para conexión de generador de emergencia | ||||||
| 78 | Emergency generator connection receptacle. | |||||
| Base de corriente para conexión de generador de emergencia. | ea | 0.00 | 0.00 | 0.00 | ||
| Total Emergency generator connection receptacle | ||||||
| Total Base de corriente para conexión de generador de emergencia | 0.00 | 0.00 | 0.00 | 0.00 |
| B1282 AASS transformer | ||||||
| Transformador SSAA EDIF 1282 | ||||||
| 79 | B1282 AASS 25 kVA transformer. | |||||
| Transformador de 25kVA. | ea | 0.00 | 0.00 | 0.00 | ||
| Total B1282 AASS transformer | ||||||
| Total Transformador SSAA EDIF 1282 | 0.00 | 0.00 | 0.00 | 0.00 |
| AASS LV Panelboards | ||||||
| Cuadros BT SSAA | ||||||
| 80 | Transfer load panel. | |||||
| Panel de transferencia. | ea | 0.00 | 0.00 | 0.00 | ||
| 81 | 125 DC Panel. | |||||
| Panel 125 DC. | ea | 0.00 | 0.00 | 0.00 | ||
| 82 | 24 DC Panel. | |||||
| Panel 24 DC. | ea | 0.00 | 0.00 | 0.00 | ||
| 83 | AASS panelboard. | |||||
| Panel SSAA. | ea | 0.00 | 0.00 | 0.00 | ||
| Total AASS LV Panelboards | ||||||
| Total Cuadros BT SSAA | 0.00 | 0.00 | 0.00 | 0.00 |
| Rectifier-Batteries System | ||||||
| Sistema Rectificador-Baterías | ||||||
| 84 | 125Vdc Battery Rectifier. | |||||
| Rectificador de Baterías 125Vcc. | ea | 0.00 | 0.00 | 0.00 | ||
| Tota Rectifier-Batteries System | ||||||
| Total Sistema Rectificador-Baterías | 0.00 | 0.00 | 0.00 | 0.00 |
| Energy metering and cabinet | ||||||
| Medidores de energía y armario | ||||||
| 85 | Energy company's metering cabinet and equipment. | |||||
| Armario y equipos de medida de compañía comercializadora. | ea | 0.00 | 0.00 | 0.00 | ||
| Tota Energy metering and cabinet | ||||||
| Total Medidores de energía y armario | 0.00 | 0.00 | 0.00 | 0.00 |
| AVR current transformers T3CT3x | ||||||
| Transformadores de corriente AVR T3CT3x | ||||||
| 86 | Three ring-type current transformers for AVR (T3CT3x). | |||||
| Juaego de transformador de intensidad tipo toroidal para AVR (T3CT3x). | ea | 0.00 | 0.00 | 0.00 | ||
| Total AVR current transformers T3CT3x | ||||||
| Total Transformadores de corriente AVR T3CT3x | 0.00 | 0.00 | 0.00 | 0.00 |
| Exterior Grounding System | ||||||
| Puesta a Tierra Exteriror | ||||||
| 87 | Exterior Grounding System. | |||||
| Puesta a Tierra Exteriror. | JOB | 0.00 | 0.00 | 0.00 | ||
| Total Exterior Grounding System | ||||||
| Total Puesta a Tierra Exteriror | 0.00 | 0.00 | 0.00 | 0.00 |
| Lightning protection system | ||||||
| Sistema de protección contra el rayo | ||||||
| 88 | Lightning protection system. | |||||
| Sistema de protección contra el rayo. | JOB | 0.00 | 0.00 | 0.00 | ||
| Total Lightning protection system | ||||||
| Total Sistema de protección contra el rayo | 0.00 | 0.00 | 0.00 | 0.00 |
| Integrated Control and Protection System | ||||||
| Sistema de Protección y Control Integrado | ||||||
| 89 | Substation Control Unit (SCU). | |||||
| Unidad de Control de Subestación (SCU). | JOB | 0.00 | 0.00 | 0.00 | ||
| 90 | Bay Control Unit (BCU-A2). | |||||
| Unidad de Control de Posición (BCU-A2). | JOB | 0.00 | 0.00 | 0.00 | ||
| 91 | Bay Control Unit (BCU-A3). | |||||
| Unidad de Control de Posición (BCU-A3). | JOB | 0.00 | 0.00 | 0.00 | ||
| 92 | Bay Control Unit (BCU-Mx). | |||||
| Unidad de Control de Posición (BCU-Mx). | JOB | 0.00 | 0.00 | 0.00 | ||
| Total Integrated Control and Protection System | ||||||
| Total Sistema de Protección y Control Integrado | 0.00 | 0.00 | 0.00 | 0.00 |
| Telecomunication wiring system | ||||||
| Sistema de cableado de Telecomunicaciones | ||||||
| 93 | Telecomunication wiring system. | |||||
| Sistema de cableado de Telecomunicaciones. | JOB | 0.00 | 0.00 | 0.00 | ||
| Total Telecomunication wiring system | ||||||
| Total Sistema de cableado de Telecomunicaciones | 0.00 | 0.00 | 0.00 | 0.00 |
| HV safety equipment and signaling | ||||||
| Equipo de protección de AT y señalización | ||||||
| 94 | HV safety equipment and signaling. | |||||
| Equipo de protección de AT y señalización. | JOB | 0.00 | 0.00 | 0.00 | ||
| Total HV safety equipment and signaling | ||||||
| Total Equipo de protección de AT y señalización | 0.00 | 0.00 | 0.00 | 0.00 |
| Testing and verifications | ||||||
| Verificaciones y ensayos | ||||||
| 95 | Testing and verifications. | |||||
| Verificaciones y ensayos. | JOB | 0.00 | 0.00 | 0.00 | ||
| Total Testing and verifications | ||||||
| Total Verificaciones y ensayos | 0.00 | 0.00 | 0.00 | 0.00 |
| Technical Direction & Commissioning Services | ||||||
| Dirección Técnica y Servicios de puesta en marcha | ||||||
| 96 | Technical Direction, commissioning and legalization services for the utilities. | |||||
| Dirección Técnica, servicios de puesta en marcha y legalización de las instalaciones. | JOB | 0.00 | 0.00 | 0.00 | ||
| Total Technical Direction & Commissioning Services | ||||||
| Total Dirección Técnica y Servicios de puesta en marcha | 0.00 | 0.00 | 0.00 | 0.00 |
| Protection Devices Selectivity Studies Services | ||||||
| Servicios de estudio de coordinación de protecciones | ||||||
| 97 | Protection devices selectivity studies services. | |||||
| Servicios de estudio de coordinación de protecciones. | JOB | 0.00 | 0.00 | 0.00 | ||
| Total Protection Devices Selectivity Studies Services | ||||||
| Total Servicios de estudio de coordinación de protecciones | 0.00 | 0.00 | 0.00 | 0.00 |
| Endesa's Technical and Economic Conditions | ||||||
| Condiciones Técnicas y Económicas de Endesa | ||||||
| 98 | Endesa: works (material and labor), supervision services and fees. | |||||
| Endesa: Trabajos (materiales y mano de obra), servicios de supervision y tasas. | JOB | 0.00 | 0.00 | 0.00 | ||
| Total Endesa's Technical and Economic Conditions | ||||||
| Total Condiciones Técnicas y Económicas de Endesa | 0.00 | 0.00 | 0.00 | 0.00 | ||
| TOTAL ELECTRICAL WORKS | ||||||
| TOTAL TRABAJOS ELÉCTRICOS | 0.00 | 0.00 | 0.00 | 0.00 |
| WORK SUMMARY | ||||
| RESUMEN TRABAJOS | ||||
| TOTAL DEMOLITION WORKS | ||||
| TOTAL TRABAJOS DE DEMOLICIÓN | 0.00 | 0.00 | 0.00 | 0.00 |
| TOTAL CIVIL WORKS | ||||
| TOTAL TRABAJOS DE CIVIL | 0.00 | 0.00 | 0.00 | 0.00 |
| TOTAL HV SWITCHGEAR STEEL SUPPORTS | ||||
| TOTAL SOPORTES DE APARAMENTA DE AT DE ACERO | 0.00 | 0.00 | 0.00 | 0.00 |
| TOTAL ARCHITECTURAL WORKS | ||||
| TOTAL TRABAJOS DE ARQUITECTURA | 0.00 | 0.00 | 0.00 | 0.00 |
| TOTAL PLUMBING WORKS | ||||
| TOTAL TRABAJOS DE FONTANERÍA | 0.00 | 0.00 | 0.00 | 0.00 |
| TOTAL MECHANICAL WORKS | ||||
| TOTAL TRABAJOS DE MECÁNICA | 0.00 | 0.00 | 0.00 | 0.00 |
| TOTAL ELECTRICAL WORKS | ||||
| TOTAL TRABAJOS DE ELECTRICIDAD | 0.00 | 0.00 | 0.00 | 0.00 |
| TOTAL | ||||
| TOTAL | 0.00 | 0.00 | 0.00 | 0.00 |
TOTAL MATERIAL COSTS 0.00
TOTAL LABOR COSTS 0.00
TOTAL OTHER DIRECT COSTS 0.00
TOTAL DIRECT COSTS 0.00
OVERHEAD 0.00 % 0.00
PROFIT 0.00 % 0.00
TOTAL PROJECT EUROS 0.00
DATE: FIRM NAME:
These costs and overhead and profit percentages will be applied in any possible future modifications
&"Times New Roman,Normal"&9 CONSTRUCTION COST ESTIMATE BREAKDOWN &"Times New Roman,Normal"&9Page &P of &N
ADDITIVE 1
| CONSTRUCTION COST ESTIMATE BREAKDOWN | incluso carga sobre camión de residuos, transporte y entrega a gestor autorizado de vertidos. | |||||||||
| CONTRACTOR | ADDRESS | |||||||||
| MORÓN AIR BASE, SPAIN | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| CNS ALT SUBSTATION. AMMENDMENT #1 | ADDITIVE #1 | 0.00 € | ||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG 10-1049 | MORÓN AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM | OF | DIRECT | LINE | ||||||
| NO. | ADDITIVE 1 | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| Electrical Works | ||||||||||
| Trabajos de Electricidad | ||||||||||
| 1 | ICPS emergency direct current (DC) power supply. | |||||||||
| Alimentación de corriente continua de emergencia para ICPS. | EA | 0.00 | 0.00 | 0.00 | ||||||
| Total Electrical Works | ||||||||||
| Total Trabajos de Electricidad | 0.00 | 0.00 | 0.00 | 0.00 |
| WORK SUMMARY | ||||
| RESUMEN TRABAJOS | ||||
| TOTAL ELECTRICAL WORKS | ||||
| TOTAL TRABAJOS DE ELECTRICIDAD | 0.00 | 0.00 | 0.00 | 0.00 |
| TOTAL | ||||
| TOTAL | 0.00 | 0.00 | 0.00 | 0.00 |
TOTAL MATERIAL COSTS 0.00
TOTAL LABOR COSTS 0.00
TOTAL OTHER DIRECT COSTS 0.00
TOTAL DIRECT COSTS 0.00
OVERHEAD 0.00 % 0.00
PROFIT 0.00 % 0.00
TOTAL PROJECT EUROS 0.00
DATE: FIRM NAME:
These costs and overhead and profit percentages will be applied in any possible future modifications
&"Times New Roman,Normal"&9 CONSTRUCTION COST ESTIMATE BREAKDOWN &"Times New Roman,Normal"&9Page &P of &N
ADDITIVE 2
| CONSTRUCTION COST ESTIMATE BREAKDOWN | incluso carga sobre camión de residuos, transporte y entrega a gestor autorizado de vertidos. | |||||||||
| CONTRACTOR | ADDRESS | |||||||||
| MORÓN AIR BASE, SPAIN | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| CNS ALT SUBSTATION. AMMENDMENT #1 | ADDITIVE #2 | 0.00 € | ||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG 10-1049 | MORÓN AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM | OF | DIRECT | LINE | ||||||
| NO. | ADDITIVE 2 | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| Demolition Works | ||||||||||
| Trabajos de Demolición | ||||||||||
| 1 | High voltage yard security fence demolition. | |||||||||
| Demolición de vallado de seguridad de parque de alta tensión. | m | 0.00 | 0.00 | 0.00 | ||||||
| Total Demolition Works | ||||||||||
| Total Trabajos de Demolición | 0.00 | 0.00 | 0.00 | 0.00 |
| Civil Works | ||||||
| Trabajos de Civil | ||||||
| 2 | Excavations and subgrade compaction. | |||||
| Excavaciones y compactación de fondo de excavación. | m3 | 0.00 | 0.00 | 0.00 | ||
| 3 | Security fence with concrete wall and access door. | |||||
| Vallado de seguridad con muro de hormigón y puerta de acceso. | m | 0.00 | 0.00 | 0.00 | ||
| Total Civil Works | ||||||
| Total Trabajos de Civil | 0.00 | 0.00 | 0.00 | 0.00 |
| WORK SUMMARY | ||||
| RESUMEN TRABAJOS | ||||
| TOTAL DEMOLITION WORKS | ||||
| TOTAL TRABAJOS DE DEMOLICIÓN | 0.00 | 0.00 | 0.00 | 0.00 |
| TOTAL CIVIL WORKS | ||||
| TOTAL TRABAJOS DE CIVIL | 0.00 | 0.00 | 0.00 | 0.00 |
| TOTAL | ||||
| TOTAL | 0.00 | 0.00 | 0.00 | 0.00 |
TOTAL MATERIAL COSTS 0.00
TOTAL LABOR COSTS 0.00
TOTAL OTHER DIRECT COSTS 0.00
TOTAL DIRECT COSTS 0.00
OVERHEAD 0.00 % 0.00
PROFIT 0.00 % 0.00
TOTAL PROJECT EUROS 0.00
DATE: FIRM NAME:
These costs and overhead and profit percentages will be applied in any possible future modifications
&"Times New Roman,Normal"&9 CONSTRUCTION COST ESTIMATE BREAKDOWN &"Times New Roman,Normal"&9Page &P of &N
File details come from the government source that posted it. Updated .