6. Construction Cost Estimate Breakdown BLANK - AMD 1.xlsx

XLSX spreadsheet 144 KB Posted

Attached to
CNS Alternate Transformer Substation Federal contract opportunity
Solicitation number
FA557525B0010
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

This file is a Construction Cost Estimate Breakdown spreadsheet for a CNS Alternate Transformer Substation project at Moron Air Base, Spain. The detailed excel document provides a comprehensive line-item breakdown of estimated costs across multiple work categories including demolition, civil works, architectural works, electrical works, and various infrastructure installations. The project, identified as QUUG 10-1049, is valued between $1,000,000 and $5,000,000, with specific focus on electrical infrastructure upgrades involving high voltage switchgear, transformers, underground cabling, grounding systems, and control/protection equipment.

The solicitation (FA557525B0010) is specifically targeted at local Spanish sources authorized to execute government works, with a pre-proposal conference/site visit scheduled for 16 July 2025 and bid submissions due by 10:00 hours local time on 6 August 2025. The project is being managed by the Department of the Air Force, United States Air Forces in Europe - Air Forces Africa, with bids expected to remain valid through 31 December 2025. Notably, the solicitation emphasizes using Spanish material, labor, and equipment whenever feasible, and requires contractors to meet Spanish legislative requirements for government work execution.

View the file

Other files for this federal contract opportunity

Other files attached to CNS Alternate Transformer Substation, newest first.
File Type Posted
Questions and Answers v2.pdf PDF
Questions and Answers.pdf PDF
Solicitation Amendment FA557525B00100002 SF 30.pdf PDF
4. English Specifications - AMD 1.pdf PDF
5. Especificaciones Español - AMD 1.pdf PDF
Solicitation Amendment FA557525B00100001 SF 30.pdf PDF
3. Drawings - Additive 2.pdf PDF
5. Especificaciones Español.pdf PDF
6. Construction Cost Estimate Breakdown (BLANK).xlsx XLSX spreadsheet
7. Schedule of Material Submittals.xlsx XLSX spreadsheet
Solicitation - FA557525B0010.pdf PDF
2. Drawings - Additive 1.pdf PDF
4. English Specifications.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUMMARY

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
MORÓN AIR BASE, SPAIN
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
CNS ALT SUBSTATION. AMMENDMENT #1SUMMARYEUROS0.00 €
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 10-1049MORÓN AIR BASE, SPAIN
TOTAL EUROSTOTAL EUROSTOTAL USD $TOTAL USD $
LINITEM
NO.QUANTI.UNITTOTALMH/MDAV.RATTOTAL
(3)(4)(5)(6)(7)(8)
SUMMARY
RESUMEN
1BASIC PACKAGE0.00 €$0.00
PAQUETE BÁSICO
2ADDITIVE #10.00 €$0.00
ADICIONAL #1
3ADDITIVE #20.00 €$0.00
ADICIONAL #2

DATE: FIRM NAME:

These costs and overhead and profit percentages will be applied in any possible future modifications

&"Times New Roman,Normal"&9 CONSTRUCTION COST ESTIMATE BREAKDOWN &"Times New Roman,Normal"&9Page &P of &N

BASIC PACKAGE

CONSTRUCTION COST ESTIMATE BREAKDOWNincluso carga sobre camión de residuos, transporte y entrega a gestor autorizado de vertidos.
CONTRACTORADDRESS
MORÓN AIR BASE, SPAIN
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
CNS ALT SUBSTATION. AMMENDMENT #1BASIC PACKAGE0.00 €
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 10-1049MORÓN AIR BASE, SPAIN
UNITMATERIAL COSTLABOR COSTSOTHER
LINITEMOFDIRECTLINE
NO.MEAS.QUANTI.UNITTOTALMH/MDAV.RATTOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
DEMOLITION WORKS
TRABAJOS DE DEMOLICIÓN
1Exterior pavements demolition.
Demolición de pavimentos exteriores.m20.000.000.00
2Building #1280 security fence demolition.
Demolición de vallado de seguridad de edificio #1280.m0.000.000.00
3High voltage yard security fence demolition.
Demolición de vallado de seguridad de parque de alta tensión.m0.000.000.00
4Removal of MV underground cabling.
Retirada de cableado MT soterrado.m0.000.000.00
5Demolition of existing drainage conduit in its final section, including mahole reconstruction.
Demolición de canalización de drenaje existente en su tramo final, incluso reconstrucción de arqueta.m0.000.000.00
6Olive tree transplant.
Transplante de olivo.ea0.000.000.00
TOTAL DEMOLITION WORKS
TOTAL TRABAJOS DE DEMOLICIÓN0.000.000.000.00
CIVIL WORKS
TRABAJOS DE CIVIL
7Site clearing & grading.
Desbroce y nivelación del terreno.m20.000.000.00
8Excavations and subgrade compaction.
Excavaciones y compactación de fondo de excavación.m30.000.000.00
9Ground improvements.
Mejoras del terreno.m30.000.000.00
10Service corridors concrete slab (Sidewalk).
Solera de hormigón de pasillos de servicio (Acerado).m20.000.000.00
11Crushed stone surface finish, anti weed mesh, artificial ballast ZA 0/20 and geotextile.
Acabado superficial de piedra machacada, malla anti-hierba, zahorra artificial ZA 0/20 y geotextil.m20.000.000.00
12Transformer drainage system, including manhole, steel piping, mortar slope and earthworks.
Sistema de drenaje de transformador, incluso arqueta, canalizaciones de acero, formación de pendientes de mortero y movimiento de tierras.JOB0.000.000.00
13Site drainage system, including handholes, stormwater manhole, HDPE pipe, precast concrete headwall, linning ditch, riprap and related accesories.
Sistema de drenaje del terreno, incluso arquetas, pozo de registro, cunata revestida, rip-rap, embocadira de hormigón prefabricado, colector PEAD y accesorios relacionados.JOB0.000.000.00
1425 cm reinforded concrete access slab with steel rails.
Solera de acceso de hormigón armado de 25 cm con railes de acero.m20.000.000.00
15Transformer foundation, including steel rails, gratings and crushed stone.
Cimentación de transformador, incluso railes de acero, rejillas y piedra machacada.m30.000.000.00
16Manholes. Including cover, cable racks, excavation, compaction, backfill and miscellaneous.
Arquetas, incluyendo tapas, soportes para cables, excavaciones, rellenos, y demás accesorios.JOB0.000.000.00
17HV Ductbank Z1 2 x Ø200 mm.
Banco de canalizaciones de AT Z1 2xØ200 mm.m0.000.000.00
18HV Ductbank Z2 2 x Ø200 mm.
Banco de canalizaciones de AT Z2 2xØ200 mm.m0.000.000.00
19HV Ductbank Z3 3 x Ø200 mm.
Banco de canalizaciones de AT Z3 3xØ200 mm.m0.000.000.00
20HV Ductbank Z4 2 x Ø200 mm.
Banco de canalizaciones de AT Z4 2xØ200 mm.m0.000.000.00
21Precast cables trenches.
Canales de hormigón prefabricado revisables para cables.m0.000.000.00
22Security fence with concrete wall and access doors.
Vallado de seguridad con muro de hormigón y puertas de acceso.m0.000.000.00
23Security fence and access doors.
Vallado de seguridad y puertas de acceso.m0.000.000.00
TOTAL CIVIL WORKS
TOTAL TRABAJOS DE CIVIL0.000.000.000.00
HV SWITCHGEAR STEEL SUPPORTS
SOPORTES DE APARAMENTA DE AT DE ACERO
24Hot dip galvanized steelwork structures.
Estructuras de acero galvanizado.kg0.000.000.00
25Plain concrete foundation.
Cimentación de hormigón en masa.m30.000.000.00
26Pre-engineered transformer wiring steel support.
Soporte prefabricado de acero de cableado del transformador.ea0.000.000.00
TOTAL HV SWITCHGEAR STEEL SUPPORTS
TOTAL SOPORTES DE APARAMENTA DE AT DE ACERO0.000.000.000.00
ARCHITECTURAL WORKS
TRABAJOS DE ARQUITECTURA
27Concrete slab foundation.
Cimentación de losa de hormigón.m30.000.000.00
28Concrete masonry units (CMU) bearing walls includin concrete beams.
Muros de carga de bloques de hormigón (CMU) incluso vigas de hormigón.m20.000.000.00
29Concrete slab roof deck.
Forjado de cubierta de losa maciza.m20.000.000.00
30Facade thermal insulation.
Aislamiento térmico de fachada.m20.000.000.00
31Perforated brick wall facade interior leaf and partitions.
Hoja interior de fachada y particiones de ladrillo perforado.m20.000.000.00
32Exterior openings.
Carpinterías exteriores.ea0.000.000.00
33AASS Transformer access door.
Puerta de acceso a transformador de SSAA.ea0.000.000.00
34Cement mortar coating (exterior walls).
Revestimiento de mortero de cemento (muros exteriores).m20.000.000.00
35Cement mortar coating (interior walls).
Revestimiento de mortero de cemento (muros interior)m20.000.000.00
36Exterior painting.
Pintura exterior.m20.000.000.00
37Interior painting.
Pintura interior.m20.000.000.00
38Equipment skids made of masonry, steel profiles and patterned steel sheet.
Bancadas para equipamiento realizadas con albañilería, perfiles metálicos y chapa lagrimada de acero.JOB0.000.000.00
39Terrazo interior pavement and pit finish, base layers included.
Pavimento interior de terrazo y acabado de foso capas base incluidas.m20.000.000.00
40Low slope roofing system finished with insulated filtering tiles.
Sistema de cubierta de baja pendiente acabado con losas filtrantes aisladas.m20.000.000.00
41Fall arrest system.
Sistema anticaidas.ea0.000.000.00
TOTAL ARCHITECTURAL WORKS
TOTAL TRABAJOS DE ARQUITECTURA0.000.000.000.00
PLUMBING WORKS.
TRABAJOS DE FONTANERÍA.
42Gutter & Downspout.
Canalón y bajante.m0.000.000.00
TOTAL PLUMBING WORKS
TOTAL TRABAJOS DE FONTANERÍA0.000.000.000.00
MECHANICAL WORKS
TRABAJOS DE MECÁNICA
43HVAC System.
Sistema HVAC.ea0.000.000.00
TOTAL MECHANICAL WORKS
TOTAL TRABAJOS DE MECÁNICA0.000.000.000.00
ELECTRICAL WORKS
TRABAJOS DE ELECTRICIDAD
Power Transformer
Transformador de Potencia
445MVA Power transformer.
Transformador de potencia 5MVA.ea0.000.000.00
45Neutral grounding resistor (NGR).
Resistencia de puesta a tierra del neutro (NGR).ea0.000.000.00
Total Power Transformer
Transformador de Potencia Total0.000.000.000.00
HV Switchgear and accesories.
Aparamenta de AT y accesorios.
46HV Switchgear Circuit breaker 66kV/2000A/31.5kA, SF6. Including installation accessories.
Celda de Interruptor automático de AT de 66kV/2000A/31.5kA, SF6. Incluso accesorios de instalación.ea0.000.000.00
47HV Current transformer 66kV. Including instllation accessories.
Transformador de Corriente de AT de 66kV. Incluso accesorios de instalación.ea0.000.000.00
48HV Voltage transformer 66kV. Including instllation accessories.
Transformador de tensión de AT de 66kV. Incluso accesorios de instalación.ea0.000.000.00
493-phase HV disconnector, 72,5kV, 2000A, 31,5/80 kA. Including installation accessories.
Seccionador trifásico de AT, 72,5kV, 2000A, 31,5/80 Ka.. Incluso accesorios de instalación.ea0.000.000.00
50HV 1-phase surge arrester, 66kV. Including instllation accessories.
Pararrayos de AT monofásico, 66kV. Incluso accesorios de instalación.ea0.000.000.00
Total HV Switchgear and accesories.
Aparamenta de AT y accesorios.0.000.000.000.00
MV Switchgear and accesories.
Aparamenta de MT y accesorios.
51MV Cabinets.
Celdas de MT.ea0.000.000.00
Total MV Switchgear and accesories.
Aparamenta de Mt y accesorios.0.000.000.000.00
HV Overhead Wiring.
Cableado Aéreo de AT.
52Cable C2 Supply and installation of Al pipe, diameter 100/84 mm.
Cable C2 Suministro y montaje de tubo de Al, de diámetro 100/84 mm.m0.000.000.00
53Supply and assembly of pipe plug Al 100 mm fittings and connection.
Suministro y montaje tapón tubo Al 100 mm de conectores y accesorios.JOB0.000.000.00
Total HV Overhead Wiring
Total Cableado Aéreo de AT0.000.000.000.00
MV underground distribution wiring
Cableado distribución soterrada en MT
54C3 HV Wiring. 3c-1x240 mm² HEPRZ1 Al. Including connectors, terminators, cable cleats and related accesories.
Cable AT C3 3c-1x240 mm² HEPRZ1 Al. Incluso conectores, terminales, grapas y accesorios relacionados.0.000.000.00
55C4 HV Wiring. 3c-1x185 mm² / 1x16 mm² RHZ1-OL H16 Al. Including connectors, terminators, cable cleats and related accesories.
Cableado AT C4. 3c-1x185 mm² / 1x16 mm² RHZ1-OL H16 Al. Incluso conectores, terminales, grapas y accesorios relacionados.m0.000.000.00
56C5 HV Wiring. 3c-1x185 mm² / 1x16 mm² RHZ1-OL H16 Al. Including connectors, terminators, cable cleats and related accesories.
Cableado AT C5. 3c-1x185 mm² / 1x16 mm² RHZ1-OL H16 Al. Incluso conectores, terminales, grapas y accesorios relacionados.m0.000.000.00
57C7 HV Wiring. 3c-1x95 mm² / 1x16 mm² RHZ1-OL H16 Al. Including connectors, terminators, clamps and accesories.
Cableado AT C7. 3c-1x95 mm² / 1x16 mm² RHZ1-OL H16 Al. Incluso conectores, terminales, grapas y accesorios relacionados.m0.000.000.00
Total MV underground distribution wiring
Total cableado distribución soterrada en MT0.000.000.000.00
LV and signal main wiring
Cableado principal de BT y señal
58Wiring RC4Z1-K(AS) 0.6/1 kV, 1c-2x10 mm².
Cableado RC4Z1-K(AS) 0.6/1 kV, 1c-2x10 mm².m0.000.000.00
59Wiring RC4Z1-K(AS) 0.6/1 kV, 1c-2x6.
Cableado RC4Z1-K(AS) 0.6/1 kV, 1c-2x6.m0.000.000.00
60Wiring RZ1MZ1-K(AS) 0.6/1 kV, 1c-3x6 mm².
Cableado RZ1MZ1-K(AS) 0.6/1 kV, 1c-3x6 mm².m0.000.000.00
61Wiring RZ1MZ1-K(AS) 0.6/1 kV, 1c-7x2.5 mm².
Cable RZ1MZ1-K(AS) 0.6/1 kV, 1c-7x2.5 mm².m0.000.000.00
62Wiring RZ1MZ1-K(AS) 0.6/1 kV, 1c-10x2.5 mm².
Cable RZ1MZ1-K(AS) 0.6/1 kV, 1c-10x2.5 mm².m0.000.000.00
63Wiring RZ1MZ1-K(AS) 0.6/1 kV, 1c-12x2.5 mm².
Cable RZ1MZ1-K(AS) 0.6/1 kV, 1c-12x2.5 mm².m0.000.000.00
64Wiring RZ1MZ1-K(AS) 0.6/1 kV, 1c-5x10 mm².
Cable RZ1MZ1-K(AS) 0.6/1 kV, 1c-5x10 mm².m0.000.000.00
65Wiring RZ1MAZ1-K(AS) 0.6/1 kV, 4c-1x35 mm².
Cable RZ1MAZ1-K(AS) 0.6/1 kV, 4c-1x35 mm².m0.000.000.00
66Wiring RZ1-K(AS) 0.6/1 kV, 3c-1x2.5 mm².
Cable RZ1-K(AS) 0.6/1 kV, 3c-1x2.5 mm².m0.000.000.00
67Wiring RZ1-K(AS) 0.6/1 kV, 3c-1x4 mm².
Cable RZ1-K(AS) 0.6/1 kV, 3c-1x4 mm².m0.000.000.00
68Wiring RZ1-K(AS) 0.6/1 kV, 3c-1x6 mm².
Cable RZ1-K(AS) 0.6/1 kV, 3c-1x6 mm².m0.000.000.00
69Wiring RZ1-K(AS) 0.6/1 kV, 3c-1x10 mm².
Cable RZ1-K(AS) 0.6/1 kV, 3c-1x10 mm².m0.000.000.00
70Wiring RZ1-K(AS) 0.6/1 kV, 3c-1x16 mm².
Cable RZ1-K(AS) 0.6/1 kV, 3c-1x16 mm².m0.000.000.00
71Wiring RZ1-K(AS) 0.6/1 kV, 5c-1x6 mm².
Cable RZ1-K(AS) 0.6/1 kV, 5c-1x6 mm².m0.000.000.00
72Wiring RZ1-K(AS) 0.6/1 kV, 4c-1x35 mm².
Cable RZ1-K(AS) 0.6/1 kV, 4c-1x35 mm².m0.000.000.00
Total LV and signal main wiring
Total Cableado principal de BT y señal0.000.000.000.00
BLDG1282 Raceways, devices, interior distribution, miscellaneous
Edif1282 Canalizaciones, mecanismos, distribución interior BT y varios.
73BLDG1282 Raceways, devices, interior distribution, miscellaneous.
Edif1282 Canalizaciones, mecanismos, distribución interior BT y varios.JOB0.000.000.00
Total BLDG1282 Raceways, devices, interior distribution, miscellaneous
Total Edif1282 Canalizaciones, mecanismos, distribución interior BT y varios.0.000.000.000.00
Bldg1282 Interior grounding system
Edif 1282 Puesta a tierra interior
74Bldg1282 Interior grounding system.
Edif 1282 Puesta a tierra interior.JOB0.000.000.00
Total Bldg1282 Interior grounding system
Total Edif 1282 Puesta a tierra interior0.000.000.000.00
Interior and Exterior Lighting System
Sistema de Iluminación Interior y Exterior
75L1 luminaries. Including wring, conduits, control devices and accesories.
Luminarias L1. Incluso cableado, canalizaciones, dispositivos de control y accesorios.ea0.000.000.00
76L2 luminaries. Including wring, conduits, control devices and accesories.
Luminarias L2. Incluso cableado, canalizaciones, dispositivos de control y accesorios.ea0.000.000.00
77L2 luminaries (emergency). Including wring, conduits, control devices and accesories.
Luminarias L2 (emergencia). Incluso cableado, canalizaciones, dispositivos de control y accesorios.ea0.000.000.00
Total Interior and Exterior Lighting System
Total Sistema de Iluminación Interior y Exterior0.000.000.000.00
Emergency generator connection receptacle
Base de corriente para conexión de generador de emergencia
78Emergency generator connection receptacle.
Base de corriente para conexión de generador de emergencia.ea0.000.000.00
Total Emergency generator connection receptacle
Total Base de corriente para conexión de generador de emergencia0.000.000.000.00
B1282 AASS transformer
Transformador SSAA EDIF 1282
79B1282 AASS 25 kVA transformer.
Transformador de 25kVA.ea0.000.000.00
Total B1282 AASS transformer
Total Transformador SSAA EDIF 12820.000.000.000.00
AASS LV Panelboards
Cuadros BT SSAA
80Transfer load panel.
Panel de transferencia.ea0.000.000.00
81125 DC Panel.
Panel 125 DC.ea0.000.000.00
8224 DC Panel.
Panel 24 DC.ea0.000.000.00
83AASS panelboard.
Panel SSAA.ea0.000.000.00
Total AASS LV Panelboards
Total Cuadros BT SSAA0.000.000.000.00
Rectifier-Batteries System
Sistema Rectificador-Baterías
84125Vdc Battery Rectifier.
Rectificador de Baterías 125Vcc.ea0.000.000.00
Tota Rectifier-Batteries System
Total Sistema Rectificador-Baterías0.000.000.000.00
Energy metering and cabinet
Medidores de energía y armario
85Energy company's metering cabinet and equipment.
Armario y equipos de medida de compañía comercializadora.ea0.000.000.00
Tota Energy metering and cabinet
Total Medidores de energía y armario0.000.000.000.00
AVR current transformers T3CT3x
Transformadores de corriente AVR T3CT3x
86Three ring-type current transformers for AVR (T3CT3x).
Juaego de transformador de intensidad tipo toroidal para AVR (T3CT3x).ea0.000.000.00
Total AVR current transformers T3CT3x
Total Transformadores de corriente AVR T3CT3x0.000.000.000.00
Exterior Grounding System
Puesta a Tierra Exteriror
87Exterior Grounding System.
Puesta a Tierra Exteriror.JOB0.000.000.00
Total Exterior Grounding System
Total Puesta a Tierra Exteriror0.000.000.000.00
Lightning protection system
Sistema de protección contra el rayo
88Lightning protection system.
Sistema de protección contra el rayo.JOB0.000.000.00
Total Lightning protection system
Total Sistema de protección contra el rayo0.000.000.000.00
Integrated Control and Protection System
Sistema de Protección y Control Integrado
89Substation Control Unit (SCU).
Unidad de Control de Subestación (SCU).JOB0.000.000.00
90Bay Control Unit (BCU-A2).
Unidad de Control de Posición (BCU-A2).JOB0.000.000.00
91Bay Control Unit (BCU-A3).
Unidad de Control de Posición (BCU-A3).JOB0.000.000.00
92Bay Control Unit (BCU-Mx).
Unidad de Control de Posición (BCU-Mx).JOB0.000.000.00
Total Integrated Control and Protection System
Total Sistema de Protección y Control Integrado0.000.000.000.00
Telecomunication wiring system
Sistema de cableado de Telecomunicaciones
93Telecomunication wiring system.
Sistema de cableado de Telecomunicaciones.JOB0.000.000.00
Total Telecomunication wiring system
Total Sistema de cableado de Telecomunicaciones0.000.000.000.00
HV safety equipment and signaling
Equipo de protección de AT y señalización
94HV safety equipment and signaling.
Equipo de protección de AT y señalización.JOB0.000.000.00
Total HV safety equipment and signaling
Total Equipo de protección de AT y señalización0.000.000.000.00
Testing and verifications
Verificaciones y ensayos
95Testing and verifications.
Verificaciones y ensayos.JOB0.000.000.00
Total Testing and verifications
Total Verificaciones y ensayos0.000.000.000.00
Technical Direction & Commissioning Services
Dirección Técnica y Servicios de puesta en marcha
96Technical Direction, commissioning and legalization services for the utilities.
Dirección Técnica, servicios de puesta en marcha y legalización de las instalaciones.JOB0.000.000.00
Total Technical Direction & Commissioning Services
Total Dirección Técnica y Servicios de puesta en marcha0.000.000.000.00
Protection Devices Selectivity Studies Services
Servicios de estudio de coordinación de protecciones
97Protection devices selectivity studies services.
Servicios de estudio de coordinación de protecciones.JOB0.000.000.00
Total Protection Devices Selectivity Studies Services
Total Servicios de estudio de coordinación de protecciones0.000.000.000.00
Endesa's Technical and Economic Conditions
Condiciones Técnicas y Económicas de Endesa
98Endesa: works (material and labor), supervision services and fees.
Endesa: Trabajos (materiales y mano de obra), servicios de supervision y tasas.JOB0.000.000.00
Total Endesa's Technical and Economic Conditions
Total Condiciones Técnicas y Económicas de Endesa0.000.000.000.00
TOTAL ELECTRICAL WORKS
TOTAL TRABAJOS ELÉCTRICOS0.000.000.000.00
WORK SUMMARY
RESUMEN TRABAJOS
TOTAL DEMOLITION WORKS
TOTAL TRABAJOS DE DEMOLICIÓN0.000.000.000.00
TOTAL CIVIL WORKS
TOTAL TRABAJOS DE CIVIL0.000.000.000.00
TOTAL HV SWITCHGEAR STEEL SUPPORTS
TOTAL SOPORTES DE APARAMENTA DE AT DE ACERO0.000.000.000.00
TOTAL ARCHITECTURAL WORKS
TOTAL TRABAJOS DE ARQUITECTURA0.000.000.000.00
TOTAL PLUMBING WORKS
TOTAL TRABAJOS DE FONTANERÍA0.000.000.000.00
TOTAL MECHANICAL WORKS
TOTAL TRABAJOS DE MECÁNICA0.000.000.000.00
TOTAL ELECTRICAL WORKS
TOTAL TRABAJOS DE ELECTRICIDAD0.000.000.000.00
TOTAL
TOTAL0.000.000.000.00

TOTAL MATERIAL COSTS 0.00

TOTAL LABOR COSTS 0.00

TOTAL OTHER DIRECT COSTS 0.00

TOTAL DIRECT COSTS 0.00

OVERHEAD 0.00 % 0.00

PROFIT 0.00 % 0.00

TOTAL PROJECT EUROS 0.00

DATE: FIRM NAME:

These costs and overhead and profit percentages will be applied in any possible future modifications

&"Times New Roman,Normal"&9 CONSTRUCTION COST ESTIMATE BREAKDOWN &"Times New Roman,Normal"&9Page &P of &N

ADDITIVE 1

CONSTRUCTION COST ESTIMATE BREAKDOWNincluso carga sobre camión de residuos, transporte y entrega a gestor autorizado de vertidos.
CONTRACTORADDRESS
MORÓN AIR BASE, SPAIN
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
CNS ALT SUBSTATION. AMMENDMENT #1ADDITIVE #10.00 €
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 10-1049MORÓN AIR BASE, SPAIN
UNITMATERIAL COSTLABOR COSTSOTHER
LINITEMOFDIRECTLINE
NO.ADDITIVE 1MEAS.QUANTI.UNITTOTALMH/MDAV.RATTOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
Electrical Works
Trabajos de Electricidad
1ICPS emergency direct current (DC) power supply.
Alimentación de corriente continua de emergencia para ICPS.EA0.000.000.00
Total Electrical Works
Total Trabajos de Electricidad0.000.000.000.00
WORK SUMMARY
RESUMEN TRABAJOS
TOTAL ELECTRICAL WORKS
TOTAL TRABAJOS DE ELECTRICIDAD0.000.000.000.00
TOTAL
TOTAL0.000.000.000.00

TOTAL MATERIAL COSTS 0.00

TOTAL LABOR COSTS 0.00

TOTAL OTHER DIRECT COSTS 0.00

TOTAL DIRECT COSTS 0.00

OVERHEAD 0.00 % 0.00

PROFIT 0.00 % 0.00

TOTAL PROJECT EUROS 0.00

DATE: FIRM NAME:

These costs and overhead and profit percentages will be applied in any possible future modifications

&"Times New Roman,Normal"&9 CONSTRUCTION COST ESTIMATE BREAKDOWN &"Times New Roman,Normal"&9Page &P of &N

ADDITIVE 2

CONSTRUCTION COST ESTIMATE BREAKDOWNincluso carga sobre camión de residuos, transporte y entrega a gestor autorizado de vertidos.
CONTRACTORADDRESS
MORÓN AIR BASE, SPAIN
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
CNS ALT SUBSTATION. AMMENDMENT #1ADDITIVE #20.00 €
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 10-1049MORÓN AIR BASE, SPAIN
UNITMATERIAL COSTLABOR COSTSOTHER
LINITEMOFDIRECTLINE
NO.ADDITIVE 2MEAS.QUANTI.UNITTOTALMH/MDAV.RATTOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
Demolition Works
Trabajos de Demolición
1High voltage yard security fence demolition.
Demolición de vallado de seguridad de parque de alta tensión.m0.000.000.00
Total Demolition Works
Total Trabajos de Demolición0.000.000.000.00
Civil Works
Trabajos de Civil
2Excavations and subgrade compaction.
Excavaciones y compactación de fondo de excavación.m30.000.000.00
3Security fence with concrete wall and access door.
Vallado de seguridad con muro de hormigón y puerta de acceso.m0.000.000.00
Total Civil Works
Total Trabajos de Civil0.000.000.000.00
WORK SUMMARY
RESUMEN TRABAJOS
TOTAL DEMOLITION WORKS
TOTAL TRABAJOS DE DEMOLICIÓN0.000.000.000.00
TOTAL CIVIL WORKS
TOTAL TRABAJOS DE CIVIL0.000.000.000.00
TOTAL
TOTAL0.000.000.000.00

TOTAL MATERIAL COSTS 0.00

TOTAL LABOR COSTS 0.00

TOTAL OTHER DIRECT COSTS 0.00

TOTAL DIRECT COSTS 0.00

OVERHEAD 0.00 % 0.00

PROFIT 0.00 % 0.00

TOTAL PROJECT EUROS 0.00

DATE: FIRM NAME:

These costs and overhead and profit percentages will be applied in any possible future modifications