7. Schedule of Material Submittals.xlsx
XLSX spreadsheet 116 KB Posted
- Attached to
- CNS Alternate Transformer Substation Federal contract opportunity
- Solicitation number
- FA557525B0010
About this file
The file is a Schedule of Material Submittals for Project QUUG 10-1049, CNS Alternate Transformer Substation at Moron Air Base, Spain. The comprehensive document details 240 specific material and documentation submittal requirements across multiple sections including electrical systems, telecommunications, construction materials, environmental protection, and quality control. Submittals range from warranty letters and construction schedules to technical specifications for transformers, switchgear, high and low voltage equipment, cybersecurity documentation, and as-built drawings.
The project is a U.S. Air Force solicitation valued between $1-5 million, with bids due by 10:00 hours local time on 6 August 2025. A pre-proposal conference and site visit is scheduled for 16 July 2025. The solicitation is exclusively for local sources registered to conduct construction business in Spain, with a requirement to use Spanish material, labor, and equipment when feasible. Contractors must meet Spanish legislative requirements for government works, and the bid acceptance period should remain valid through 31 December 2025, with the government reserving the right to cancel the solicitation at any time.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and Answers v2.pdf | ||
| Questions and Answers.pdf | ||
| Solicitation Amendment FA557525B00100002 SF 30.pdf | ||
| 4. English Specifications - AMD 1.pdf | ||
| 5. Especificaciones Español - AMD 1.pdf | ||
| 6. Construction Cost Estimate Breakdown BLANK - AMD 1.xlsx | XLSX spreadsheet | |
| Solicitation Amendment FA557525B00100001 SF 30.pdf | ||
| 3. Drawings - Additive 2.pdf | ||
| 5. Especificaciones Español.pdf | ||
| 6. Construction Cost Estimate Breakdown (BLANK).xlsx | XLSX spreadsheet | |
| Solicitation - FA557525B0010.pdf | ||
| 2. Drawings - Additive 1.pdf | ||
| 4. English Specifications.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER | |||
| QUUG 10-1049 | CNS ALT SUBSTATION | |||
| SOLICITATION / CONTRACT NO. |
| (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||
| NUMBER OF COPIES REQUIRED | |||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATION | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | SCHEDULES, LISTINGS, REPORTS, PLANS | TECHNICAL DATA | TEST REPORTS | FIELD REPORTS | REQUIRED SUBMISSION DATE |
Autoría desconocida: Enter the due date from the Contractor (MM/DD/YY)
DATE RECEIVED IN CONTRACTING
Autoría desconocida: Enter the date received from the Contractor. (MM/DD/YY)
DATE TO CIVIL ENGINEERING
Autoría desconocida: Enter the date submittal was given to CE for review. (MM/DD/YY)
RETURN SUSPENSE DATE
Autoría desconocida: Enter the date the submittal is due back from CE
(MM/DD/YY)
SUBMITTAL NUMBERS
Autoría desconocida: Enter the Submittal Number
DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL
Autoría desconocida: Enter Resubmittal Number
FINAL APPROVAL
Autoría desconocida: Enter the submittal final approval date
(MM/DD/YY)
REMARKS
Autoría desconocida: Enter any comments pertaining to the submittal
APPROVED
Autoría desconocida: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
Autoría desconocida: Enter Resubmittal Number
DISAPPROVED
Autoría desconocida: Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
Autoría desconocida: Enter the submittal final approval date
Autoría desconocida: Enter any comments pertaining to the submittal
| SECTION 01 11 01 | |||||||||||||
| 1 | Warranty Letter | 1 | Acceptance+15 | ||||||||||
| 2 | Construction Schedule | 1 | Contract Award+7 | ||||||||||
| 3 | Progress Schedule | 1 | Contract Award+10 | ||||||||||
| 4 | Work Plan | 1 | Contract Award+7 | ||||||||||
| 5 | Mobility Plan | 1 | Contract Award+15 | ||||||||||
| 6 | Project Sign | 1 | Contract Award+15 | ||||||||||
| 7 | Quality Control Plan | 1 | Contract Award+15 | ||||||||||
| 8 | Environmental Protection Plan | 1 | Contract Award+15 | ||||||||||
| 9 | Waste & Construction Debris Management | 1 | Final Inspection | ||||||||||
| 10 | As-Built Drawings | 1 | Final Inspection+15 | ||||||||||
| 11 | Spatial Data | 1 | As-Built Drawings+10 | ||||||||||
| 12 | Key Staff | 1 | Contract Award+15 | ||||||||||
| 13 | Health and Safety Plan | 1 | Contract Award+15 | ||||||||||
| 14 | O&M Manuals | 1 | Prior to FI | ||||||||||
| SECTION 01 11 02 | |||||||||||||
| 15 | Power outage schedule | 1 | |||||||||||
| 16 | Contractor/sub-contrator individual’s personal license for installation of high voltage utilities AT2 | 1 | |||||||||||
| 17 | Documentation related to the legalization of the substation. | 1 | |||||||||||
| 18 | Schematic drawings of the substation wiring development. | 1 | |||||||||||
| SECTION 02 41 00 | |||||||||||||
| 19 | Demolition plan | 1 | |||||||||||
| 20 | Manager of waste from demolition and construction | 1 | |||||||||||
| 21 | Authorized dump or treatment and recovery plant; | 1 | |||||||||||
| 22 | Certified technician for Air Conditioning Systems demolition. | 1 | |||||||||||
| 23 | Delivery and disposal certificate of waste from construction and demolition | 1 | |||||||||||
| SECTION 03 30 53 | |||||||||||||
| 24 | Laboratory Qualifications for Concrete Qualification Testing | 1 | |||||||||||
| 25 | Laboratory Accreditation | 1 | |||||||||||
| 26 | Reinforcement | 1 | |||||||||||
| 27 | Epoxy resin for construction joints (bonding bridge), if used | 1 | |||||||||||
| 28 | Cementitious mortar | 1 | |||||||||||
| 29 | Curing compound, if used | 1 | |||||||||||
| 30 | Lightweight aggregates | 1 | |||||||||||
| 31 | Mix Design Data/Concrete Mixture Proportions | 1 | 1 | ||||||||||
| 32 | Quality Control Program | 1 | |||||||||||
| 33 | Compressive Strength Tests | 1 | |||||||||||
| SECTION 04 20 00 | |||||||||||||
| 34 | Concrete Masonry Units (CMU) | 1 | |||||||||||
| 35 | Perforated Bricks | 1 | |||||||||||
| 36 | Cementitious Mortar | 1 | |||||||||||
| 37 | Gypsum Mortar | 1 | |||||||||||
| 38 | Precast Lintels | 1 | |||||||||||
| 39 | Plaster Reinforcement | 1 | |||||||||||
| 40 | Capillary Barrier | 1 | 1 | ||||||||||
| 41 | Insulation | 1 | |||||||||||
| 42 | Wall penetrations sealing | 1 | |||||||||||
| SECTION 05 12 00 | |||||||||||||
| 43 | Steel | 1 | |||||||||||
| 44 | Bolts, Nuts, and Washers | 1 | |||||||||||
| 45 | Galvanizing | 1 | 1 | ||||||||||
| 46 | Welding Procedures and Qualifications | 1 | |||||||||||
| 47 | Fabrication Drawings | 1 | |||||||||||
| 48 | Structural Steel | 1 | 1 | ||||||||||
| 49 | Weld Inspection Reports | 1 | |||||||||||
| 50 | As-Built Drawings | 1 | |||||||||||
| 51 | Field Quality Control | 1 | |||||||||||
| SECTION 05 50 15 | |||||||||||||
| 52 | Qualification of welders | 1 | |||||||||||
| 53 | Pre-Engineered support system | 1 | 1 | 1 | |||||||||
| 54 | Steel cover plates; | 1 | 1 | ||||||||||
| 55 | Steel profiles for structures | 1 | |||||||||||
| 56 | Electrowelded steel grating | 1 | |||||||||||
| 57 | Extraction Handhole | 1 | |||||||||||
| 58 | Drainage System pipes | 1 | |||||||||||
| 59 | Anchors | 1 | |||||||||||
| 60 | Drainage System: Watertightness of the Extraction Manhole Report | 1 | |||||||||||
| 61 | Steelwork: Inspection Records | 1 | |||||||||||
| 62 | Nondestructive Testing | 1 | |||||||||||
| SECTION 07 55 00 | |||||||||||||
| 63 | Vapor barrier; | 1 | 1 | ||||||||||
| 64 | Lightweight Concrete; | 1 | 1 | 1 | |||||||||
| 65 | Protective Fleece Layer; | 1 | 1 | 1 | |||||||||
| 66 | Waterproof Membrane; | 1 | 1 | 1 | 1 | ||||||||
| 67 | Filtering tile; | 1 | 1 | 1 | |||||||||
| 68 | Flashing; | 1 | 1 | ||||||||||
| 69 | Chemical Welding Compunds (THF); | 1 | 1 | 1 | |||||||||
| 70 | Mastic; | 1 | 1 | 1 | |||||||||
| 71 | Sealant for Expansion Joints; | 1 | 1 | 1 | |||||||||
| 72 | Gutters and Downspouts; | 1 | 1 | ||||||||||
| 73 | Fall Arresting System. | 1 | 1 | ||||||||||
| 74 | Insulation; | 1 | |||||||||||
| SECTION 08 11 13 | |||||||||||||
| 75 | Doors | 1 | 1 | ||||||||||
| 76 | Hardware | 1 | 1 | ||||||||||
| 77 | Locking Device | 1 | 1 | ||||||||||
| SECTION 09 90 00 | |||||||||||||
| 78 | Coatings | 1 | 1 | ||||||||||
| 79 | Paints | 1 | 1 | ||||||||||
| 80 | Sealants | 1 | 1 | ||||||||||
| 81 | Solvents | 1 | 1 | ||||||||||
| 82 | Waterproofing | 1 | 1 | ||||||||||
| SECTION 23 07 00 | |||||||||||||
| 83 | Environmental Product Declaration | 1 | |||||||||||
| 84 | Pipe Insulation Systems | 1 | 1 | ||||||||||
| 85 | Duct Insulation Systems | 1 | 1 | ||||||||||
| SECTION 23 81 00 | |||||||||||||
| 86 | Qualification of Installer | 1 | |||||||||||
| 87 | Split-System Air Conditioners | 1 | 1 | ||||||||||
| 88 | Pipe, Fittings and End Connections | 1 | |||||||||||
| 89 | Operation and Maintenance Manuals | 1 | |||||||||||
| 90 | Posted Instructions | 1 | |||||||||||
| 91 | System Performance Tests | 1 | |||||||||||
| 92 | Refrigerant Piping Tests | 1 | |||||||||||
| SECTION 25 05 11 | |||||||||||||
| 93 | Software Licenses | 1 | |||||||||||
| 94 | Network Communication Report | 1 | |||||||||||
| 95 | Cybersecurity Riser Diagram | 1 | |||||||||||
| 96 | Control System Inventory Report | 1 | |||||||||||
| 97 | Control System Cybersecurity Documentation | 1 | |||||||||||
| 98 | Password Summary Report | 1 | |||||||||||
| 99 | Software Recovery And Reconstitution Images | 1 | |||||||||||
| SECTION 25 10 00 | |||||||||||||
| 100 | Qualifications | 1 | |||||||||||
| 101 | ICPS Contractor Design Drawings | 1 | |||||||||||
| 102 | Control System Devices | 1 | |||||||||||
| 103 | Product Data Sheet | 1 | |||||||||||
| 104 | Computer Software | 1 | |||||||||||
| 105 | Operation and Maintenance (O&M) Instructions | 1 | |||||||||||
| 106 | Training Documentation | 1 | |||||||||||
| 107 | Existing Conditions Report | 1 | |||||||||||
| 108 | Factory Test Report | 1 | |||||||||||
| 109 | Start-Up and Start-Up Testing Report | 1 | |||||||||||
| 110 | Performance Verification Test (PVT) | 1 | |||||||||||
| 111 | Draft As-Built Drawings | 1 | |||||||||||
| 112 | Final As-Built Drawings | 1 | |||||||||||
| SECTION 26 12 19 | |||||||||||||
| 113 | Authorized Control Body (OCA) by the Junta de Andalucía | 1 | |||||||||||
| 114 | Transformer Efficiencies | 1 | |||||||||||
| 115 | Warranty | 1 | |||||||||||
| 116 | Transformer | 1 | 1 | 1 | |||||||||
| 117 | On Load Tap-Changer (OLTC); | 1 | 1 | 1 | 1 | ||||||||
| 118 | OLTC Motor Drive Unit | 1 | 1 | 1 | 1 | ||||||||
| 119 | Terminal box | 1 | |||||||||||
| 120 | Bucholz Relay | 1 | 1 | 1 | |||||||||
| 121 | Neutral Grounding Resistor (NGR) | 1 | 1 | 1 | |||||||||
| 122 | FAT Test Plan | 1 | |||||||||||
| 123 | Transformer FAT | 1 | |||||||||||
| 124 | Neutral Grounding Resistor (NGR) FAT | 1 | |||||||||||
| 125 | Acceptance Checks and Tests | 1 | |||||||||||
| 126 | Transformer and Insulating Liquid Operation and Maintenance (O&M) Instructions | 1 | |||||||||||
| 127 | Bucholz Relay Operation and Maintenance (O&M) Instructions | 1 | |||||||||||
| 128 | Neutral Grounding Resistor (NGR) Instructions | 1 | |||||||||||
| 129 | Instruction of Government Employees | 1 | |||||||||||
| SECTION 26 13 13 | |||||||||||||
| 130 | Protective Relays Cybersecurity Certification | 1 | |||||||||||
| 131 | Warranty | 1 | |||||||||||
| 132 | Authorized Control Body (OCA) by the Junta de Andalucía | 1 | |||||||||||
| 133 | Switchgear | 1 | 1 | ||||||||||
| 134 | One-Line Switchgears Diagram | 1 | |||||||||||
| 135 | Current Transformers | 1 | |||||||||||
| 136 | Potential Transformers | 1 | |||||||||||
| 137 | Protective Relays | 1 | |||||||||||
| 138 | Operation and Maintenance (O&M) Instructions | 1 | |||||||||||
| 139 | Instruction of Government Employees | 1 | |||||||||||
| 140 | Protective device coordination study | 1 | |||||||||||
| 141 | Protective device settings | 1 | |||||||||||
| 142 | Switchgear Routine Tests | 1 | |||||||||||
| 143 | Acceptance Checks and Tests | 1 | |||||||||||
| 144 | As-Built drawings | 1 | |||||||||||
| 145 | Field Quality Control | 1 | |||||||||||
| SECTION 26 20 00 | |||||||||||||
| 146 | Contractor/sub-contrator individual’s personal license for installation of low voltage utilities | 1 | |||||||||||
| 147 | Authorized Control Body (OCA) by the Junta de Andalucía | 1 | |||||||||||
| 148 | Panelboards | 1 | 1 | 1 | |||||||||
| 149 | Conduits and Fittings | 1 | |||||||||||
| 150 | Cable Trays | 1 | |||||||||||
| 151 | Outlet boxes, junction boxes and covers | 1 | |||||||||||
| 152 | Wires and Cables | 1 | |||||||||||
| 153 | Circuit Breakers | 1 | |||||||||||
| 154 | Rectifier, batteries and converter set | 1 | |||||||||||
| 155 | Devices Subject to Manual Operation | 1 | |||||||||||
| 156 | Acceptance Checks and Tests | 1 | |||||||||||
| 157 | Single line diagram of the “as-built” building electrical system | 1 | |||||||||||
| 158 | Manufacturers’ operating and maintenance on active electrical equipment | 1 | |||||||||||
| 159 | Field Quality Control | 1 | |||||||||||
| SECTION 26 41 00 | |||||||||||||
| 160 | Authorized Control Body (OCA) by the Junta de Andalucía | 1 | |||||||||||
| 161 | Air terminals | 1 | |||||||||||
| 162 | Conductors | 1 | |||||||||||
| 163 | Lightning strike counter | 1 | |||||||||||
| 164 | Mounting Mast | 1 | |||||||||||
| 165 | Air Terminal-Mast Adapter Piece | 1 | |||||||||||
| 166 | Self-Supporting Steel Tower | 1 | |||||||||||
| 167 | Field Quality Control | 1 | |||||||||||
| SECTION 26 51 00 | |||||||||||||
| 168 | Lighting Fixture Type L1 | 1 | 1 | 1 | 1 | ||||||||
| 169 | Lighting Fixture Type L2 | 1 | 1 | 1 | 1 | ||||||||
| 170 | Lighting Control System | 1 | 1 | ||||||||||
| 171 | Photometric Plan | 1 | |||||||||||
| SECTION 27 10 00 | |||||||||||||
| 172 | Qualifications | 1 | |||||||||||
| 173 | Verification of Compliant Installation | 1 | |||||||||||
| 174 | Telecommunications Cabling | 1 | 1 | ||||||||||
| 175 | Telecommunications Outlet/Connector Assemblies | 1 | 1 | ||||||||||
| 176 | Switches | 1 | 1 | ||||||||||
| 177 | Testing | 1 | |||||||||||
| SECTION 31 00 00 | |||||||||||||
| 178 | Structural Fill; | 1 | |||||||||||
| 179 | Common Fill; | 1 | |||||||||||
| 180 | Compaction Density Tests; | 1 | |||||||||||
| SECTION 31 11 00 | |||||||||||||
| 181 | Tree Wound Paint | 1 | |||||||||||
| SECTION 32 04 22 | |||||||||||||
| 182 | Geotextile | 1 | 1 | ||||||||||
| SECTION 32 31 13 | |||||||||||||
| 183 | Fence Fabric | 1 | |||||||||||
| 184 | Barbed Wire | 1 | |||||||||||
| 185 | Barbed Wire Supporting Arms | 1 | |||||||||||
| SECTION 32 96 00 | |||||||||||||
| 186 | Tree Relocation References | 1 | |||||||||||
| 187 | Permits | 1 | |||||||||||
| 188 | Photograps Report | 1 | |||||||||||
| 189 | Trasplanting Plan | 1 | |||||||||||
| 190 | Equipment | 1 | |||||||||||
| 191 | Gypsum | 1 | |||||||||||
| 192 | Mulches Topdressing | 1 | |||||||||||
| 193 | Ground Stakes | 1 | |||||||||||
| 194 | Peat | 1 | |||||||||||
| 195 | Composted Derivatives | 1 | |||||||||||
| 196 | Rotted Manure | 1 | |||||||||||
| 197 | Organic Mulch Materials | 1 | |||||||||||
| 198 | Staking Material | 1 | |||||||||||
| 199 | Soil Test | 1 | |||||||||||
| SECTION 33 40 00 | |||||||||||||
| 200 | Headwalls & Wingwalls Manufacturer’s Certifications | 1 | |||||||||||
| 201 | Drainage Pipe | 1 | |||||||||||
| 202 | Precast Concrete Headwalls and Wingwalls | 1 | |||||||||||
| 203 | Post-Installation Inspection Report | 1 | |||||||||||
| SECTION 33 46 16 | |||||||||||||
| 204 | Pipe and Pipe Fittings | 1 | 1 | ||||||||||
| 205 | Precast Manhole | 1 | |||||||||||
| SECTION 33 71 01 | |||||||||||||
| 206 | Authorized Control Body (OCA) by the Junta de Andalucía | 1 | |||||||||||
| 207 | Contractor/sub-contractor individual’s personal license for installation of high voltage utilities | 1 | |||||||||||
| 208 | High Voltage Rigid Conductors | 1 | |||||||||||
| 209 | High Voltage Disconnecting Switch with Earthing Blades | 1 | |||||||||||
| 210 | High Voltage Current Transformers | 1 | |||||||||||
| 211 | High Voltage Voltage Inductive Transformers | 1 | |||||||||||
| 212 | High Voltage Three Pole Circuit Breaker | 1 | |||||||||||
| 213 | High Voltage Surge Arresters | 1 | |||||||||||
| 214 | Acceptance Checks and Tests | 1 | |||||||||||
| 215 | Ground Resistance Test Reports | 1 | |||||||||||
| 216 | High Voltage Disconnector Switch Operation and Maintenance (O&M) Instructions | 1 | |||||||||||
| 217 | High Voltage Current Transformers Operation and Maintenance (O&M) Instructions | 1 | |||||||||||
| 218 | High Voltage Voltage Transformers Operation and Maintenance (O&M) Instructions | 1 | |||||||||||
| 219 | High Voltage Circuit Breaker Operation and Maintenance (O&M) Instructions | 1 | |||||||||||
| 220 | High Voltage Surge Arresters Operation and Maintenance (O&M) Instructions | 1 | |||||||||||
| SECTION 33 71 02 | |||||||||||||
| 221 | Pre-cast concrete handholes and covers | 1 | 1 | ||||||||||
| 222 | Pre-cast concrete manholes and covers | 1 | 1 | ||||||||||
| 223 | Pre-cast concrete cable trench and covers | 1 | 1 | 1 | |||||||||
| 224 | Authorized Control Body (OCA) by the Junta de Andalucía | 1 | |||||||||||
| 225 | Handhole covers | 1 | |||||||||||
| 226 | Pre-cast handholes | 1 | |||||||||||
| 227 | Pre-cast manholes | 1 | |||||||||||
| 228 | Low voltage distribution conduits | 1 | |||||||||||
| 229 | High voltage distribution conduits | 1 | |||||||||||
| 230 | Underground low voltage cables | 1 | |||||||||||
| 231 | Underground high voltage cables | 1 | |||||||||||
| 232 | High voltage cables joints | 1 | 1 | ||||||||||
| 233 | High voltage cables terminations and separable insulator connectors | 1 | 1 | ||||||||||
| 234 | Buried Warning and Identification Tape | 1 | |||||||||||
| 235 | Ground wires | 1 | |||||||||||
| 236 | Grounding Test/Bar Box | 1 | |||||||||||
| 237 | Ground rods | 1 | |||||||||||
| 238 | Exothermic welding | 1 | 1 | ||||||||||
| 239 | High voltage cable supports (racks, arms and insulators) | 1 | |||||||||||
| 240 | Acceptance Checks and Tests | 1 |
MSS Sp
| LISTADO DE MATERIALES | NÚMERO DE PROYECTO | |||
| QUUG 10-1049 | CNS ALT SUBSTATION | |||
| SOLICITUD / Nº DE CONTRATO |
| (A cumplimentar por el ingeniero del proyecto) | (A cumplimentar por el Administrador del Contrato) | ||||||||||||||
| NÚMERO DE COPIAS NECESARIAS | |||||||||||||||
| NÚMERO DE LÍNEA | ARTÍCULO O DESCRIPCIÓN DEL ARTÍCULO, REFERENCIA DEL CONTRATO, TIPO DE PRESENTACIÓN | CERTIFICACIÓN DE CONFORMIDAD | PLANOS DE TALLER | MUESTRAS | SELECCIÓN DE COLORES | RECOMENDACIONES DEL FABRICANTE | GARANTÍA DEL FABRICANTE | DATOS DE CATÁLOGO | INSTRUCCIONES DE USO | PROGRAMAS, LISTADOS, INFORMES, PLANES | DATOS TÉCNICOS | INFORMES DE PRUEBAS | INFORMES DE CAMPO | FECHA DE PRESENTACIÓN REQUERIDA |
Autoría desconocida: Enter the due date from the Contractor (MM/DD/YY)
FECHA DE RECEPCIÓN EN CONTRATACIÓN
Autoría desconocida: Enter the date received from the Contractor. (MM/DD/YY)
FECHA DE RECEPCIÓN EN INGENIERÍA CIVIL
Autoría desconocida: Enter the date submittal was given to CE for review. (MM/DD/YY)
FECHA LÍMITE DE DEVOLUCIÓN
Autoría desconocida: Enter the date the submittal is due back from CE
(MM/DD/YY)
NÚMERO DE PRESENTACIÓN
Autoría desconocida: Enter the Submittal Number
FECHA DE NOTIFICACIÓN AL CONTRATISTA SEGUNDA PRESENTACIÓN DEL CONTRATISTA
Autoría desconocida: Enter Resubmittal Number
APROBACIÓN FINAL
Autoría desconocida: Enter the submittal final approval date
(MM/DD/YY)
OBSERVACIONES
Autoría desconocida: Enter any comments pertaining to the submittal
APROBADO
Autoría desconocida: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
Autoría desconocida: Enter Resubmittal Number
NO APROBADO
Autoría desconocida: Enter date the Contractor was notified of submittal disapproval
Autoría desconocida: Enter the submittal final approval date
Autoría desconocida: Enter any comments pertaining to the submittal
| SECCIÓN 01 11 01 | |||||||||||||
| 1 | Carta de Garantía | 1 | Aceptación+15 | ||||||||||
| 2 | Programa de Construcción | 1 | Adjudicación Contrato+7 | ||||||||||
| 3 | Programa de Progreso | 1 | Adjudicación Contrato+10 | ||||||||||
| 4 | Plan de Trabajo | 1 | Adjudicación Contrato+7 | ||||||||||
| 5 | Plan de Movilidad | 1 | Adjudicación Contrato+15 | ||||||||||
| 6 | Cartel del Proyecto | 1 | Adjudicación Contrato+15 | ||||||||||
| 7 | Plan de Control de Calidad | 1 | Adjudicación Contrato+15 | ||||||||||
| 8 | Plan de Protección Medioambiental | 1 | Adjudicación Contrato+15 | ||||||||||
| 9 | Gestión de Residuos y Escombros de la Construcción | 1 | Inspección Final | ||||||||||
| 10 | Planos As-Built | 1 | Inspección Final+15 | ||||||||||
| 11 | Datos Espaciales | 1 | Planos As-Built+10 | ||||||||||
| 12 | Personal Destacado | 1 | Adjudicación Contrato+15 | ||||||||||
| 13 | Plan de Salud y Seguridad | 1 | Adjudicación Contrato+15 | ||||||||||
| 14 | Manuales de Funcionamiento y Mantenimiento | 1 | Antes de Inspección final (IF) | ||||||||||
| SECCIÓN 01 11 02 | |||||||||||||
| 15 | Programa de cortes del suministro eléctrico | 1 | |||||||||||
| 16 | Licencia individual de contratista/subcontratista para instalación de servicios públicos de alta tensión, AT2 | 1 | |||||||||||
| 17 | Documentación relativa a la legalización de la subestación. | 1 | |||||||||||
| 18 | Planos de esquema del desarrollo del cableado de la subestación. | 1 | |||||||||||
| SECCIÓN 02 41 00 | |||||||||||||
| 19 | Plan de Demolición | 1 | |||||||||||
| 20 | Gestor de Residuos de Demolición y Construcción | 1 | |||||||||||
| 21 | Vertedero autorizado o Planta de Tratamiento y Recuperación | 1 | |||||||||||
| 22 | Técnico Autorizado para la Demolición de Sistemas de Aire Acondicionado | 1 | |||||||||||
| 23 | Certificado de Entrega y Eliminación de Residuos Procedentes de la Construcción y Demolición | 1 | |||||||||||
| SECCIÓN 03 30 53 | |||||||||||||
| 24 | Cualificaciones de laboratorio para ensayos de cualificación del hormigón | 1 | |||||||||||
| 25 | Acreditación de laboratorios | 1 | |||||||||||
| 26 | Refuerzo | 1 | |||||||||||
| 27 | Resina epoxi para juntas de construcción (puente de unión), si se utiliza | 1 | |||||||||||
| 28 | Mortero cementoso | 1 | |||||||||||
| 29 | Compuesto de curado, si se utiliza | 1 | |||||||||||
| 30 | Áridos ligeros | 1 | |||||||||||
| 31 | Datos de diseño de la mezcla/Proporciones de la mezcla de hormigón | 1 | 1 | ||||||||||
| 32 | Plan de Control de Calidad | 1 | |||||||||||
| 33 | Pruebas de resistencia a la compresión | 1 | |||||||||||
| SECCIÓN 04 20 00 | |||||||||||||
| 34 | Unidades de mampostería de hormigón (CMU) | 1 | |||||||||||
| 35 | Ladrillos perforados | 1 | |||||||||||
| 36 | Mortero cementoso | 1 | |||||||||||
| 37 | Mortero de yeso | 1 | |||||||||||
| 38 | Dinteles prefabricados | 1 | |||||||||||
| 39 | Refuerzo de enlucido | 1 | |||||||||||
| 40 | Barrera de capilaridad | 1 | 1 | ||||||||||
| 41 | Aislamiento | 1 | |||||||||||
| 42 | Sellante de penetraciones en muros | ||||||||||||
| SECCIÓN 05 12 00 | |||||||||||||
| 43 | Acero | 1 | |||||||||||
| 44 | Pernos, Tuercas y Arandelas | 1 | |||||||||||
| 45 | Galvanizado | 1 | 1 | ||||||||||
| 46 | Procedimientos de Soldadura y Cualificaciones | 1 | |||||||||||
| 47 | Acero Estructural | 1 | 1 | ||||||||||
| 48 | Planos de Fabricación | 1 | |||||||||||
| 49 | Informes de Inspección de Soldaduras | 1 | |||||||||||
| 50 | Planos As-Built | 1 | |||||||||||
| 51 | Control de Calidad sobre el Terreno | 1 | |||||||||||
| SECCIÓN 05 50 15 | |||||||||||||
| 52 | Certificados de soldador | 1 | |||||||||||
| 53 | Sistemas de estructuras prediseñadas | 1 | 1 | 1 | |||||||||
| 54 | Tapas de acero | 1 | 1 | ||||||||||
| 55 | Perfiles de acero para estructuras | 1 | |||||||||||
| 56 | Rejillas electrosoldadas de acero | 1 | |||||||||||
| 57 | Arqueta de extracción | 1 | |||||||||||
| 58 | Tubería de sistema de drenaje | 1 | |||||||||||
| 59 | Anclajes | 1 | |||||||||||
| 60 | Sistema de drenaje: Informe sobre la estanqueidad de la arqueta de extracción | 1 | |||||||||||
| 61 | Trabajos en acero: Registros de inspección | 1 | |||||||||||
| 62 | Ensayos no destructivos | 1 | |||||||||||
| SECCIÓN 07 55 00 | |||||||||||||
| 63 | Barrera de vapor | 1 | 1 | ||||||||||
| 64 | Hormigón Aligerado | 1 | 1 | 1 | |||||||||
| 65 | Lámina Antipunzonante | 1 | 1 | 1 | |||||||||
| 66 | Membrana impermeabilizante | 1 | 1 | 1 | 1 | ||||||||
| 67 | Losa Aislante-Filtrante | 1 | 1 | 1 | |||||||||
| 68 | Remates | 1 | 1 | ||||||||||
| 69 | Compuestos químicos de soldadura (THF) | 1 | 1 | 1 | |||||||||
| 70 | Masilla | 1 | 1 | 1 | |||||||||
| 71 | Sellante para juntas de Expansión | 1 | 1 | 1 | |||||||||
| 72 | Canalones y bajantes | 1 | 1 | ||||||||||
| 73 | Sistema Anticaídas | 1 | 1 | ||||||||||
| 74 | Aislamiento | 1 | |||||||||||
| SECCIÓN 08 11 13 | |||||||||||||
| 75 | Puertas | 1 | 1 | ||||||||||
| 76 | Herrajes | 1 | 1 | ||||||||||
| 77 | Marcos | 1 | 1 | ||||||||||
| SECCIÓN 09 90 00 | |||||||||||||
| 78 | Revestimientos | 1 | 1 | ||||||||||
| 79 | Pinturas | 1 | 1 | ||||||||||
| 80 | Sellantes | 1 | 1 | ||||||||||
| 81 | Disolventes | 1 | 1 | ||||||||||
| 82 | Impermeabilizaciones | 1 | 1 | ||||||||||
| SECCIÓN 23 07 00 | |||||||||||||
| 83 | Declaración Medioambiental del Producto | 1 | |||||||||||
| 84 | Sistemas de Aislamiento de Tuberías | 1 | 1 | ||||||||||
| 85 | Sistemas de Aislamiento de Conductos | 1 | 1 | ||||||||||
| SECCIÓN 23 81 00 | |||||||||||||
| 86 | Cualificación del instalador | 1 | |||||||||||
| 87 | Acondicionadores de aire split | 1 | 1 | ||||||||||
| 88 | Tuberías, accesorios y conexiones finales | 1 | |||||||||||
| 89 | Manuales de funcionamiento y mantenimiento | 1 | |||||||||||
| 90 | Instrucciones | 1 | |||||||||||
| 91 | Pruebas de rendimiento del sistema | 1 | |||||||||||
| 92 | Pruebas de tuberías de refrigerante | 1 | |||||||||||
| SECCIÓN 25 05 11 | |||||||||||||
| 93 | Licencias de software | 1 | |||||||||||
| 94 | Informes de red de comunicaciones | 1 | |||||||||||
| 95 | Esquema de ciberseguridad | 1 | |||||||||||
| 96 | Informe del inventario del sistema de control | 1 | |||||||||||
| 97 | Documentación del sistema de control de ciberseguridad | 1 | |||||||||||
| 98 | Informe del resumen de contraseñas | 1 | |||||||||||
| 99 | Imágenes de recuperación y reconstitución de software | 1 | |||||||||||
| SECCIÓN 25 10 00 | |||||||||||||
| 100 | Cualificaciones | 1 | |||||||||||
| 101 | Planos de diseño del contratista SICP | 1 | |||||||||||
| 102 | Dispositivos del sistema de control | 1 | |||||||||||
| 103 | Ficha técnica del producto | 1 | |||||||||||
| 104 | Programas informáticos | 1 | |||||||||||
| 105 | Instrucciones de uso y mantenimiento (U&M) | 1 | |||||||||||
| 106 | Documento de formación | 1 | |||||||||||
| 107 | Informe sobre las condiciones existentes | 1 | |||||||||||
| 108 | Informe de ensayo en fábrica | 1 | |||||||||||
| 109 | Puesta en marcha e informe de la prueba de arranque | 1 | |||||||||||
| 110 | Prueba de Verificación del Rendimiento(PVR) | 1 | |||||||||||
| 111 | Borrador de planos As-Built | 1 | |||||||||||
| 112 | Planos As-Built finales | 1 | |||||||||||
| SECCIÓN 26 12 19 | |||||||||||||
| 113 | Permiso del Organismo de Control Autorizado (OCA) por la Junta de Andalucía. | 1 | |||||||||||
| 114 | Eficiencias de los transformadores | 1 | |||||||||||
| 115 | Garantía | 1 | |||||||||||
| 116 | Transformador | 1 | 1 | 1 | |||||||||
| 117 | Cambiador de tomas en carga (OLTC) | 1 | 1 | 1 | 1 | ||||||||
| 118 | Unidad de Control de Motor de OLTC | 1 | 1 | 1 | 1 | ||||||||
| 119 | Armario de terminales | 1 | |||||||||||
| 120 | Relé Bucholz | 1 | 1 | 1 | |||||||||
| 121 | Resistencia de puesta a tierra del neutro (NGR) | 1 | 1 | 1 | |||||||||
| 122 | Plan de pruebas FAT | 1 | |||||||||||
| 123 | Pruebas FAT Transformador | 1 | |||||||||||
| 124 | Pruebas FAT Resistencia de puesta a tierra del neutro (NGR) | 1 | |||||||||||
| 125 | Resultados de las comprobaciones y ensayos de aceptación | 1 | |||||||||||
| 126 | Instrucciones de Uso y Mantenimiento (O&M) del Transformador y del Líquido Aislante | 1 | |||||||||||
| 127 | Instrucciones de Uso y Mantenimiento (O&M) del Relé Bucholz | 1 | |||||||||||
| 128 | Instrucciones de la Resistencia de puesta a tierra del neutro (NGR) | 1 | |||||||||||
| 129 | Instrucciones para empleados públicos | 1 | |||||||||||
| SECCIÓN 26 13 13 | |||||||||||||
| 130 | Certificación de ciberseguridad de relés de protección | 1 | |||||||||||
| 131 | Garantía | 1 | |||||||||||
| 132 | Organismo de Control Autorizado (OCA) por la Junta de Andalucía | 1 | |||||||||||
| 133 | Aparamenta | 1 | 1 | ||||||||||
| 134 | Diagrama unifilar de la aparamenta | 1 | |||||||||||
| 135 | Transformadores de corriente | 1 | |||||||||||
| 136 | Transformadores de potencia | 1 | |||||||||||
| 137 | Relés de protección | 1 | |||||||||||
| 138 | Instrucciones de funcionamiento y mantenimiento (O&M) | 1 | |||||||||||
| 139 | Instrucción de empleados públicos | 1 | |||||||||||
| 140 | Estudio de coordinación de dispositivos de protección | 1 | |||||||||||
| 141 | Configuración de los dispositivos de protección | 1 | |||||||||||
| 142 | Pruebas rutinarias de la aparamenta | 1 | |||||||||||
| 143 | Informe de resultados de las comprobaciones y ensayos de aceptación | 1 | |||||||||||
| 144 | Planos As-Built | 1 | |||||||||||
| 145 | Control de calidad sobre el terreno | 1 | |||||||||||
| SECCIÓN 26 20 00 | |||||||||||||
| 146 | Licencia individual de contratista/subcontratista para instalación de servicios públicos de baja tensión, IBTE | 1 | |||||||||||
| 147 | Organismo de Control Autorizado (OCA) por la Junta de Andalucía. | 1 | |||||||||||
| 148 | Cuadros de distribución | 1 | 1 | 1 | |||||||||
| 149 | Conductos y accesorios | 1 | |||||||||||
| 150 | Bandejas de cables | 1 | |||||||||||
| 151 | Cajas de Derivación, Empalme y Tapas | 1 | |||||||||||
| 152 | Hilos y Cables | 1 | |||||||||||
| 153 | Interruptores Automáticos | 1 | |||||||||||
| 154 | Rectificador, baterías y juego de convertidores | 1 | |||||||||||
| 155 | Dispositivos sujetos a accionamiento manual | 1 | |||||||||||
| 156 | Informe de resultados de las comprobaciones y ensayos de aceptación | 1 | |||||||||||
| 157 | Diagrama unifilar del sistema eléctrico del edificio As-Built | 1 | |||||||||||
| 158 | Manuales de funcionamiento y mantenimiento de los fabricantes de los equipos eléctricos activos | 1 | |||||||||||
| 159 | Control de Calidad sobre el Terreno | 1 | |||||||||||
| SECCIÓN 26 41 00 | |||||||||||||
| 160 | Organismo de Control Autorizado (OCA) por la Junta de Andalucía. | 1 | |||||||||||
| 161 | Terminales aéreos | 1 | |||||||||||
| 162 | Conductores | 1 | |||||||||||
| 163 | Contador de impactos de rayos | 1 | |||||||||||
| 164 | Mástil de montaje | 1 | |||||||||||
| 165 | Pieza adaptador mástil-terminal de aire | 1 | |||||||||||
| 166 | Torre de acero autoportante | 1 | |||||||||||
| 167 | Control de Calidad sobre el Terreno | 1 | |||||||||||
| SECTION 26 51 00 | |||||||||||||
| 168 | Luminaria Tipo L1 | 1 | 1 | 1 | 1 | ||||||||
| 169 | Luminaria Tipo L2 | 1 | 1 | 1 | 1 | ||||||||
| 170 | Sistema de Control de Iluminación | 1 | 1 | ||||||||||
| 171 | Plano Fotométrico | 1 | |||||||||||
| SECCIÓN 27 10 00 | |||||||||||||
| 172 | Cualificaciones | 1 | |||||||||||
| 173 | Verificación de la instalación conforme | 1 | |||||||||||
| 174 | Cableado de telecomunicaciones | 1 | 1 | ||||||||||
| 175 | Toma de telecomunicaciones/Ensamblajes de conectores | 1 | 1 | ||||||||||
| 176 | Switches (conmutadores) | 1 | 1 | ||||||||||
| 177 | Pruebas | 1 | |||||||||||
| SECCIÓN 31 00 00 | |||||||||||||
| 178 | Relleno estructural | 1 | |||||||||||
| 179 | Relleno común | 1 | |||||||||||
| 180 | Pruebas de densidad de compactación | 1 | |||||||||||
| SECCIÓN 31 11 00 | |||||||||||||
| 181 | Pintura Cicatrizante para árboles | 1 | |||||||||||
| SECCIÓN 32 04 22 | |||||||||||||
| 182 | Geotextil | 1 | 1 | ||||||||||
| SECCIÓN 32 31 13 | |||||||||||||
| 183 | Malla de la valla | 1 | |||||||||||
| 184 | Alambre de espino | 1 | |||||||||||
| 185 | Brazos de soporte del alambre de espino | 1 | |||||||||||
| SECCIÓN 32 96 00 | |||||||||||||
| 186 | Referencias de traspantes de árboles | 1 | |||||||||||
| 187 | Permisos | 1 | |||||||||||
| 188 | Reportaje Fotográfico | 1 | |||||||||||
| 189 | Plan de Trasplante | 1 | |||||||||||
| 190 | Equipo | 1 | |||||||||||
| 191 | Yeso | 1 | |||||||||||
| 192 | Capa de mulch | 1 | |||||||||||
| 193 | Estacas | 1 | |||||||||||
| 194 | Turba | 1 | |||||||||||
| 195 | Derivados compostados | 1 | |||||||||||
| 196 | Estiércol compostado | 1 | |||||||||||
| 197 | Materiales orgánicos para mantillo | 1 | |||||||||||
| 198 | Material de estacado | ||||||||||||
| 199 | Análisis del suelo | 1 | |||||||||||
| SECCIÓN 33 40 00 | |||||||||||||
| 200 | Certificado de calidad de fabricante de embocadura | 1 | |||||||||||
| 201 | Tuberías de drenaje | 1 | |||||||||||
| 202 | Embocadura de hormigón prefabricadas | 1 | |||||||||||
| 203 | Informe de inspección de la instalación | 1 | |||||||||||
| SECCIÓN 33 46 16 | |||||||||||||
| 204 | Tuberías y accesorios | 1 | 1 | ||||||||||
| 205 | Arquetas prefabricadas | 1 | |||||||||||
| SECCIÓN 33 71 01 | |||||||||||||
| 206 | Organismo de Control Autorizado (OCA) por la Junta de Andalucía | 1 | |||||||||||
| 207 | Licencia personal de contratista/subcontratista individual para instalación de servicios públicos de alta tensión | 1 | |||||||||||
| 208 | Conductores rígidos de alta tensión | 1 | |||||||||||
| 209 | Seccionador de Alta Tensión con cuchillas de puesta a tierra | 1 | |||||||||||
| 210 | Transformadores de Corriente de Alta Tensión | 1 | |||||||||||
| 211 | Transformadores Inductivos de Alta Tensión | 1 | |||||||||||
| 212 | Interruptor automático tripolar de alta tensión | 1 | |||||||||||
| 213 | Pararrayos de alta tensión | 1 | |||||||||||
| 214 | Informe de los resultados de las pruebas y verificaciones de aceptación | 1 | |||||||||||
| 215 | Informes de pruebas de resistencia de puesta a tierra | 1 | |||||||||||
| 216 | Instrucciones de Operación y Mantenimiento (O&M) de Interruptor Seccionador de Alta Tensión | 1 | |||||||||||
| 217 | Instrucciones de Operación y Mantenimiento (O&M) de Transformadores de Corriente de Alta Tensión | 1 | |||||||||||
| 218 | Instrucciones de Operación y Mantenimiento (O&M) de Transformadores de Tensión de Alta Tensión | 1 | |||||||||||
| 219 | Instrucciones de Operación y Mantenimiento (O&M) de Interruptor de Alta Tensión | 1 | |||||||||||
| 220 | Instrucciones de Operación y Mantenimiento (O&M) de Pararrayos de Alta Tensión | 1 | |||||||||||
| SECCIÓN 33 71 02 | |||||||||||||
| 221 | Pozos de registro y tapas de hormigón prefabricado | 1 | 1 | ||||||||||
| 222 | Arquetas y tapas de hormigón prefabricado | 1 | 1 | ||||||||||
| 223 | Zanjas para cables y tapas de hormigón prefabricado | 1 | 1 | 1 | |||||||||
| 224 | Organismo de Control Autorizado (OCA) por la Junta de Andalucía | 1 | |||||||||||
| 225 | Tapas de arquetas y pozos de registro | 1 | |||||||||||
| 226 | Pozos de registro prefabricados | 1 | |||||||||||
| 227 | Arquetas prefabricadas | 1 | |||||||||||
| 228 | Conductos de distribución de baja tensión | 1 | |||||||||||
| 229 | Conductos de distribución de alta tensión | 1 | |||||||||||
| 230 | Cables enterrados de baja tensión | 1 | |||||||||||
| 231 | Cables enterrados de alta tensión | 1 | |||||||||||
| 232 | Uniones de cables de alta tensión | 1 | 1 | ||||||||||
| 233 | Terminaciones de cables de alta tensión y conectores aislantes separables | 1 | 1 | ||||||||||
| 234 | Cinta de advertencia e identificación enterrada | 1 | |||||||||||
| 235 | Cables de tierra | 1 | |||||||||||
| 236 | Caja de prueba/embarrado de puesta a tierra | 1 | |||||||||||
| 237 | Picas de puesta a tierra | 1 | |||||||||||
| 238 | Soldadura exotérmica | 1 | 1 | ||||||||||
| 239 | Soportes de cables de alta tensión (racks, brazos y aisladores) | 1 | |||||||||||
| 240 | Informe de los resultados de los controles y ensayos de aceptación | 1 |
&"Times New Roman,Normal"&12&A
&"Times New Roman,Normal"&12Página &P
File details come from the government source that posted it. Updated .