2. Drawings - Additive 1.pdf

PDF 5 MB Posted

Attached to
CNS Alternate Transformer Substation Federal contract opportunity
Solicitation number
FA557525B0010
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

These are detailed engineering drawings for a CNS (Communications, Navigation, Surveillance) Transformer Substation project at Morón Air Base in Spain, prepared for the 496th Air Base Squadron of United States Air Forces in Europe (USAFE). The seven-sheet drawing set includes location maps, site plans, general notes, electrical diagrams, and auxiliary services schematics for a transformer substation project with an estimated value between $1-5 million. The drawings specify electrical infrastructure including two 25 kVA transformers (10kV/0.4kV), auxiliary service panels, manual transfer switches, and associated electrical routing and protection equipment. The project drawings are dated April 30th, 2025, and are part of Project QUUG 10-1049, with design completed to 100% level by GISA engineering firm.

View the file

Other files for this federal contract opportunity

Other files attached to CNS Alternate Transformer Substation, newest first.
File Type Posted
Questions and Answers v2.pdf PDF
Questions and Answers.pdf PDF
Solicitation Amendment FA557525B00100002 SF 30.pdf PDF
4. English Specifications - AMD 1.pdf PDF
5. Especificaciones Español - AMD 1.pdf PDF
6. Construction Cost Estimate Breakdown BLANK - AMD 1.xlsx XLSX spreadsheet
Solicitation Amendment FA557525B00100001 SF 30.pdf PDF
3. Drawings - Additive 2.pdf PDF
5. Especificaciones Español.pdf PDF
6. Construction Cost Estimate Breakdown (BLANK).xlsx XLSX spreadsheet
7. Schedule of Material Submittals.xlsx XLSX spreadsheet
Solicitation - FA557525B0010.pdf PDF
4. English Specifications.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N

N

N

LA UBICACIÓN Y DIMENSIONES MOSTRADAS EN LOS PLANOS SE MUESTRAN SÓLO COMO REFERENCIA.

LOCATION AND DIMENSIONS SHOWN FOR REFERENCE PURPOSE ONLY.

MAPA DE VECINDAD

NOT TO SCALE

SIN ESCALA

ESCALA

SCALE

BASE MAP

MAPA DE LA BASE

1 : 25.000

VICINITY MAP

NOT TO SCALE

SIN ESCALA

KEY MAP OF SPAIN

MAPA CLAVE DE ESPAÑA

REFERENCE KEY

CLAVE DE REFERENCIA

IDENTIFICACIÓN DEL DETALLE

DETAIL IDENTIFICATION

HOJA DONDE SE MUESTRA EL DETALLE

SHEET WHERE DETAIL IS SHOWN

IDENTIFICACIÓN DE LA SECCIÓN

SECTION IDENTIFICATION

HOJA DONDE SE MUESTRA LA SECCIÓN

SHEET WHERE SECTION IS SHOWN

IDENTIFICACIÓN DEL ALZADO

ELEVATION IDENTIFICATION

HOJA DONDE SE MUESTRA EL ALZADO

SHEET WHERE ELEVATION IS SHOWN

ÁREA DE TRABAJO

WORK SITE

ORGANIZATION

REVIEWED BY:

SIGNATURE

PROJECT COORDINATION

APPROVED BY:

CHIEF OF ENGINEERING &

CONSTRUCTION MANAGEMENT

BASE CIVIL ENGINEER OR

REPRESENTATIVE

WE PROJ ECT AIR POW ER

6T

H AIR BASE SQUADRON

JO

SÉ

M

AN

U

EL

R O

D R

ÍG

U

EZ

G O

N

ZA

LO

T

EJ

ED

O R

A.

PE

R

EZ

J.

C

U R

TI

D

O

JJ

. T

EJ

ED

O R

R

.IZ

Q U

IE

R

D O

SHEET NUMBER:

D A

TE

R E

VI

S

IO

N

FA

C

IL

TY

S C

AL

E:

D R

A W

IN

G

N O

O R

IG

IN

A L

FO

R

M

AT

D O

R

EN

G

IN

EE

R /A

R C

H

IT

E.

D R

AW

N

B Y:

JM

R

M

G

TP

A

B

C

D

EE

F

G

H

2 3 4 5

2 3 4 5

6 7 8 9

6 7 8 9

A

C

D

E

F

G

H

B

SHEET OF

A-

G .D

O R

TA

AD

IC

IO

N

AL

/ A

D D

IT

IV

E #1

M A

R K

D E

SC

R

IP

TI

O N

D A

TE

AP

PR

11520 ROTA (CÁDIZ)

TLF.956 813 939 - ingenieria@gisasl.es www.gisasl.es

PLAZA DEL TRIUNFO, Nº 6, ESC. 2, BAJO, LOCAL 3

: 1

GI001

R -7

-1

G

I0

PR

O

JE

C

T Q

U U

G

0-

P O

R

TA

D A

C O

VE

R

S H

EE

T

0%

A

PR

IL

0T H

, 2

C O

N S

TR

U

IR

S

U B

E

ST

A C

IÓ

N

D E

T R

A N

S

FO

R M

A D

O R

E S

C N

S

TR

AN

SF

O R

M

ER

S U

BS

TA

TI

O

N

AI

R

B

AS

E

SQ

U

AD

R O

N (U

SA

FE

BA

SE

C

IV

IL

E N

G

IN

EE

R

IN

G

M O

R Ó

N A

IR

B

AS

E

-S

PA

IN

#1

1 7

PROJECT QUUG 10-1049

CONSTRUIR SUBESTACIÓN DE TRANSFORMADORES

CNS TRANSFORMER SUBSTATION

NIVEL DISEÑO 100%

100% DESIGN LEVEL

ADICIONAL #1

ADDITIVE #1

WE PROJ ECT AIR POW ER

6T

H AIR BASE SQUADRON

JO

SÉ

M

AN

U

EL

R O

D R

ÍG

U

EZ

G O

N

ZA

LO

T

EJ

ED

O R

A.

PE

R

EZ

J.

C

U R

TI

D

O

JJ

. T

EJ

ED

O R

R

.IZ

Q U

IE

R

D O

SHEET NUMBER:

D A

TE

R E

VI

S

IO

N

FA

C

IL

TY

S C

AL

E:

D R

A W

IN

G

N O

O R

IG

IN

A L

FO

R

M

AT

D O

R

EN

G

IN

EE

R /A

R C

H

IT

E.

D R

AW

N

B Y:

JM

R

M

G

TP

A

B

C

D

EE

F

G

H

2 3 4 5

2 3 4 5

6 7 8 9

6 7 8 9

A

C

D

E

F

G

H

B

SHEET OF

A-

G .D

O R

TA

AD

IC

IO

N

AL

/ A

D D

IT

IV

E #1

M A

R K

D E

SC

R

IP

TI

O N

D A

TE

AP

PR

11520 ROTA (CÁDIZ)

TLF.956 813 939 - ingenieria@gisasl.es www.gisasl.es

PLAZA DEL TRIUNFO, Nº 6, ESC. 2, BAJO, LOCAL 3

GI002

R -7

-1

G

I0

PR

O

JE

C

T Q

U U

G

0-

R E

LA

C

IÓ

N

D E

P

LA

N O

S

D R

AW

IN

G S

C H

ED

U

LE

0%

A

PR

IL

0T H

, 2

C O

N S

TR

U

IR

S

U B

E

ST

A C

IÓ

N

D E

T R

A N

S

FO

R M

A D

O R

E S

C N

S

TR

AN

SF

O R

M

ER

S U

BS

TA

TI

O

N

AI

R

B

AS

E

SQ

U

AD

R O

N (U

SA

FE

BA

SE

C

IV

IL

E N

G

IN

EE

R

IN

G

M O

R Ó

N A

IR

B

AS

E

-S

PA

IN

#1

2 7

Nº PLANO

DRAWING NOº

Nº HOJA

SHEET NOº

HOJA ID

SHEET ID

RELACIÓN DE PLANOS DRAWING SCHEDULE

TÍTULO DE HOJA SHEET TITLE

R-786-118 GI001 1 OF 7 GI001 PORTADA COVER SHEET

R-786-119 GI002 2 OF 7 GI002 RELACIÓN DE PLANOS DRAWING SCHEDULE

R-786-120 GI003 3 OF 7 GI003 PLANO DE SITUACIÓN LOCATION PLAN

R-786-121 GI004 4 OF 7 GI004 NOTAS GENERALES GENERAL NOTES

R-786-122 GI005 5 OF 7 GI005 LEYENDA Y ABREVIATURAS LEGEND AND ABBREVIATIONS

R-786-123 EP101 6 OF 7 EP101 ELECTRICIDAD. SERVICIOS AUXILIARES Y COMUNICACIONES. ESTADO PROYECTADO ELECTRICAL. AUXILIARY SERVICES AND COMMUNICATIONS. PROJECTED CONDITION R-786-124 EP601 7 OF 7 EP601 ELECTRICIDAD. DIAGRAMA DE SSAA ELECTRICAL. AASS DIAGRAM

6T

H AIR BASE SQUADRON

JO

SÉ

M

AN

U

EL

R O

D R

ÍG

U

EZ

G O

N

ZA

LO

T

EJ

ED

O R

A.

PE

R

EZ

J.

C

U R

TI

D

O

JJ

. T

EJ

ED

O R

R

.IZ

Q U

IE

R

D O

SHEET NUMBER:

D A

TE

R E

VI

S

IO

N

FA

C

IL

TY

S C

AL

E:

D R

A W

IN

G

N O

O R

IG

IN

A L

FO

R

M

AT

D O

R

EN

G

IN

EE

R /A

R C

H

IT

E.

D R

AW

N

B Y:

JM

R

M

G

TP

A

B

C

D

EE

F

G

H

2 3 4 5

2 3 4 5

6 7 8 9

6 7 8 9

A

C

D

E

F

G

H

B

SHEET OF

A-

G .D

O R

TA

AD

IC

IO

N

AL

/ A

D D

IT

IV

E #1

M A

R K

D E

SC

R

IP

TI

O N

D A

TE

AP

PR

11520 ROTA (CÁDIZ)

TLF.956 813 939 - ingenieria@gisasl.es www.gisasl.es

PLAZA DEL TRIUNFO, Nº 6, ESC. 2, BAJO, LOCAL 3

A s in di ca te d

GI003

R -7

-1

G

I0

PR

O

JE

C

T Q

U U

G

0-

P

LA

N O

D E

S

IT

U A

C

IÓ

N

LO

C

A

TI

O N

P

LA

N

0%

A

PR

IL

0T H

, 2

C O

N S

TR

U

IR

S

U B

E

ST

A C

IÓ

N

D E

T R

A N

S

FO

R M

A D

O R

E S

C N

S

TR

AN

SF

O R

M

ER

S U

BS

TA

TI

O

N

AI

R

B

AS

E

SQ

U

AD

R O

N (U

SA

FE

BA

SE

C

IV

IL

E N

G

IN

EE

R

IN

G

M O

R Ó

N A

IR

B

AS

E

-S

PA

IN

#1

3 7

ESCALA

SCALE 1 : 15000

PLANO DE SITUACIÓN

LOCATION PLAN

ESCALA

SCALE 1 : 1000

PLANO DE EMPLAZAMIENTO

SITE PLAN

409 1003

29127

CL

U

1st STREET

VAZQUEZ SAGASTIZABAL

LA MARCHENILLA - M

ORON ROAD A-360

CONNECTING ROAD

"G " A

VE

NU

E

"F " A

VE

NU

E

1st STREET

4th STREET

2nd STREET

"E " A

VE

NU

E

2nd STREET

"D " A

VE

NU

E

"C " A

VE

NU

E

CA

M

P.

R

O

AD

"B

CA

M

P.

R

O

AD

"A

4th STREET

"D " A

VE

NU

E

"C " A

VE

NU

E

RA

IL

R O

AD

A

VE

NU

E

"B " A

VE

NU

E

APRON

ST I

"A

A

VE

NU

E

3rd STREET

APRON

ST II

APRON

ST III

"B " A

VE

NU

E

G U

AD

AI

R A

R

IV

ER

6th STREET

"C " A

VE

NU

E

AMMO ACCESS ROAD

6th STREET

7th STREET

11th STREET

Sp

AF

S

ER

VI

CE

R O

AD

FI

RI

NG

IN

B

UT

T

RO

AD

12th STREET

G U

AD

AI

R A

R

IV

ER

"V " R

O

AD

"V" ROAD

GLIDE SLOPE

4th STREET

6th STREET

"C " A

VE

NU

E

"C " A

VE

NU

E

"B " A

VE

NU

E

"C " A

VE

NU

E

"D " A

VE

NU

E

"D " A

VE

NU

E

"C " A

VE

NU

E

"C " A

VE

NU

E

"C " A

VE

NU

E

"C " A

VE

NU

E

"D " A

VE

NU

E

"D " A

VE

NU

E

2nd STREET

1st STREET

1st STREET

2nd STREET

4th STREET

6th STREET

6th STREET

7th STREET

7th STREET

AMMO ACCESS ROAD

RA

IL

R O

AD

A

VE

NU

E

RA

IL

R O

AD

A

VE

NU

E

CA

M

P.

R

O

AD

"A

CA

M

P.

R

O

AD

"A

"D " A

VE

NU

E

"D " A

VE

NU

E

"D " A

VE

NU

E

"D " A

VE

N

U E

"D " A

VE

N

U E

BUS STOP

SUPPLY PARKING

350 ft.250150 300200100500

100 m.0 10 20 30 40 50 60 70 80 90

1:1000

ESCALA GRÁFICA

GRAPHIC SCALE

ESCALA GRÁFICA

GRAPHIC SCALE

450040003500 5000 ft.300025002000150010005000

1500m.1400120010009008007006005004003002001000

1:15000

6T

H AIR BASE SQUADRON

JO

SÉ

M

AN

U

EL

R O

D R

ÍG

U

EZ

G O

N

ZA

LO

T

EJ

ED

O R

A.

PE

R

EZ

J.

C

U R

TI

D

O

JJ

. T

EJ

ED

O R

R

.IZ

Q U

IE

R

D O

SHEET NUMBER:

D A

TE

R E

VI

S

IO

N

FA

C

IL

TY

S C

AL

E:

D R

A W

IN

G

N O

O R

IG

IN

A L

FO

R

M

AT

D O

R

EN

G

IN

EE

R /A

R C

H

IT

E.

D R

AW

N

B Y:

JM

R

M

G

TP

A

B

C

D

EE

F

G

H

2 3 4 5

2 3 4 5

6 7 8 9

6 7 8 9

A

C

D

E

F

G

H

B

SHEET OF

A-

G .D

O R

TA

AD

IC

IO

N

AL

/ A

D D

IT

IV

E #1

M A

R K

D E

SC

R

IP

TI

O N

D A

TE

AP

PR

11520 ROTA (CÁDIZ)

TLF.956 813 939 - ingenieria@gisasl.es www.gisasl.es

PLAZA DEL TRIUNFO, Nº 6, ESC. 2, BAJO, LOCAL 3

GI004

R -7

-1

G

I0

PR

O

JE

C

T Q

U U

G

0-

N O

TA

S

G

EN

E R

A

LE

S

G

EN

ER

AL

N O

TE

S

0%

A

PR

IL

0T H

, 2

C O

N S

TR

U

IR

S

U B

E

ST

A C

IÓ

N

D E

T R

A N

S

FO

R M

A D

O R

E S

C N

S

TR

AN

SF

O R

M

ER

S U

BS

TA

TI

O

N

AI

R

B

AS

E

SQ

U

AD

R O

N (U

SA

FE

BA

SE

C

IV

IL

E N

G

IN

EE

R

IN

G

M O

R Ó

N A

IR

B

AS

E

-S

PA

IN

#1

4 7

NOTAS GENERALES

GENERAL NOTES

EL CONTRATISTA REVISARÁ TODOS LOS PLANOS Y ESPECIFICACIONES E

INFORMARÁ AL OFICIAL DE CONTRATACIÓN DE CUALQUIER CONFLICTO ENTRE

PLANOS Y/O ESPECIFICACIONES ANTES DE COMENZAR LA CONSTRUCCIÓN.

THE CONTRACTOR SHALL REVIEW ALL DRAWINGS AND SPECIFICATIONS AND ADVISE

THE CONTRACTING OFFICER OF ANY CONFLICTS BETWEEN DRAWINGS AND/OR

SPECIFICATIONS PRIOR TO COMMENCING WITH CONSTRUCTION.

1.

LAS NOTAS SE NUMERAN CONSECUTIVAMENTE EN CADA PLANO,

INDEPENDIENTEMENTE DE QUE SEAN NOTAS DE ELEMENTOS EXISTENTES,

ELEMENTOS A DEMOLER O ELEMENTOS O TRABAJOS A SUMINISTRAR.

KEYNOTES ARE NUMBERED CONSECUTIVELY ON EACH DRAWING, REGARDLESS OF

WHETHER THEY ARE NOTES OF EXISTING ELEMENTS, ELEMENTS TO BE DEMOLISHED

OR ELEMENTS OR WORKS TO BE PROVIDED.

17.

LOS PLANOS MUESTRAN LOS SERVICIOS PÚBLICOS, EDIFICACIONES,

INFRAESTRUCTURAS E INSTALACIONES EXISTENTES DE ACUERDO AL GRP

REALIZADO, LAS INVESTIGACIONES DE CAMPO REALIZADAS Y A LA INFORMACIÓN

DISPONIBLE Y FACILITADA POR EL CLIENTE DURANTE LA FASE DE DISEÑO. SERÁ

RESPONSABILIDAD DEL CONTRATISTA VERIFICAR DICHA INFORMACIÓN E

IDENTIFICAR LAS DISCREPANCIAS QUE PUEDAN AFECTAR A LOS TRABAJOS A

LLEVAR A CABO.

THE DRAWINGS SHOW THE EXISTING UTILITIES, BUILDINGS, INFRASTRUCTURE AND

SERVICES ACCORDING TO THE GRP PERFORMED, THE SITE SURVEYS CARRIED OUT

AND THE INFORMATION AVAILABLE AND PROVIDED BY THE CLIENT DURING THE

DESIGN PHASE. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY SUCH

INFORMATION AND IDENTIFY ANY DISCREPANCIES THAT MAY AFFECT THE WORK TO

BE PERFORMED.

2.

LAS DESVIACIONES DE LOS PLANOS DE DISEÑO O DE LAS ESPECIFICACIONES SÓLO

SE EFECTUARÁN CON LA APROBACIÓN POR ESCRITO DEL DEPARTAMENTO DE

INGENIERÍA CIVIL.

DEVIATIONS FROM THE DESIGN DRAWINGS OR SPECIFICATIONS SHALL BE MADE

ONLY WITH THE WRITTEN APPROVAL OF THE CIVIL ENGINEERING DEPARTMENT.

3.

EL CONTRATISTA DEBERÁ INFORMAR Y COORDINAR CON EL DEPARTAMENTO DE

INGENIERÍA CIVIL LOS CORTES NECESARIOS EN LOS SERVICIOS PÚBLICOS

AFECTADOS.

THE CONTRACTOR SHALL INFORM AND COORDINATE WITH THE CIVIL ENGINEERING

DEPARTMENT THE NECESSARY OUTAGES OF THE AFFECTED UTILITIES.

4.

EL CONTRATISTA ES RESPONSABLE DE LA REPARACIÓN, DAÑO Y/O INTERRUPCIÓN

DE CUALQUIER SERVICIO PÚBLICO, YA SEA AÉREO O SUBTERRÁNEO, QUE RESULTE

DE LAS OPERACIONES DE CONSTRUCCIÓN.

THE CONTRACTOR IS RESPONSIBLE FOR THE REPAIR OF, DAMAGE TO, AND/OR

INTERRUPTION OF ANY UTILITY, EITHER ABOVE OR BELOW GROUND RESULTING

FROM CONSTRUCTION OPERATIONS.

5.

TODOS LOS MATERIALES EMPLEADOS EN ESTE PROYECTO DEBERÁN SER NUEVOS

Y SUMINISTRADOS POR EL CONTRATISTA A MENOS QUE SE INDIQUE

ESPECÍFICAMENTE LO CONTRARIO.

ALL MATERIALS USED IN THIS PROJECT SHALL BE NEW AND PROVIDED BY THE

CONTRACTOR UNLESS SPECIFICALLY NOTED OTHERWISE.

6.

SALVO QUE SE INDIQUE LO CONTRARIO, TODOS LOS TRABAJOS O EQUIPOS

INDICADOS CON UNA NOTA CLAVE EN LOS PLANOS, SERÁN NUEVOS Y

SUMINISTRADOS POR EL CONTRATISTA JUNTO CON LA INSTALACIÓN, MATERIALES

Y MEDIOS AUXILIARES Y PUESTA EN SERVICIO DEL EQUIPO O SISTEMA, PARA UN

PRODUCTO TOTALMENTE MONTADO, CONECTADO Y PUESTO EN SERVICIO POR EL

CONTRATISTA O SUBCONTRATISTAS PARA LA COMPROBACIÓN DE SU CORRECTO

FUNCIONAMIENTO.

UNLESS OTHERWISE INDICATED, ALL WORK OR EQUIPMENT INDICATED WITH A

KEYNOTE ON DRAWINGS, SHALL BE NEW AND SUPPLIED BY THE CONTRACTOR

TOGETHER WITH INSTALLATION, MATERIALS AND ANCILLARY MEANS AND

COMMISSIONING OF THE EQUIPMENT OR SYSTEM, FOR A PRODUCT FULLY

ASSEMBLED, CONNECTED AND COMMISSIONED BY THE CONTRACTOR OR

SUBCONTRACTORS FOR TESTING OF PROPER OPERATION.

7.

EL CONTRATISTA DEBERÁ PROPORCIONAR TODOS LOS MEDIOS AUXILIARES

NECESARIOS PARA LA CONSTRUCCIÓN, INCLUYENDO PERO NO LIMITADOS A

EQUIPOS DE PROTECCIÓN INDIVIDUAL Y COLECTIVOS, VALLADO, MEDIOS DE

ELEVACIÓN, ANDAMIOS, GRÚAS, ETC.

THE CONTRACTOR SHALL PROVIDE ALL AUXILIARY MEANS NECESSARY FOR THE

CONSTRUCTION, INCLUDING BUT NOT LIMITED TO INDIVIDUAL AND COLLECTIVE

PROTECTION EQUIPMENT, FENCING, LIFTING MEANS, SCAFFOLDING, CRANES, ETC.

8.

LOS MEDIOS, MÉTODOS, TÉCNICAS, SECUENCIAS Y SUPERVISIÓN DE LA

CONSTRUCCIÓN SON RESPONSABILIDAD EXCLUSIVA DEL CONTRATISTA.

CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES AND SUPERVISION OF

THE CONSTRUCTION ARE THE SOLE RESPONSABILITY OF THE CONTRACTOR.

9.

ES RESPONSABILIDAD EXCLUSIVA DEL CONTRATISTA DETERMINAR EL

PROCEDIMIENTO Y LA SECUENCIA DE MONTAJE PARA GARANTIZAR LA SEGURIDAD

DEL EDIFICIO Y DE SUS COMPONENTES DURANTE EL MONTAJE. ESTO INCLUYE,

PERO NO SE LIMITA A, LA ADICIÓN DE CUALQUIER APUNTALAMIENTO TEMPORAL,

TIRANTES O AMARRES QUE PUEDAN SER NECESARIOS.

IT IS SOLELY THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THE ERECTION

PROCEDURE AND SEQUENCE TO INSURE THE SAFETY OF THE BUILDING AND ITS

COMPONENT PARTS DURING ERECTION. THIS INCLUDES, BUT IS NOT LIMITED TO, THE

ADDITION OF WHATEVER TEMPORARY BRACING, GUYS OR TIE-DOWNS MAY BE

NECESSARY.

10.

TODOS LOS TRABAJOS DEBERÁN SER LLEVADOS A CABO EN ESTRICTO

CUMPLIMIENTO DEL “RD 1627/1997, DE 24 DE OCTUBRE, POR EL QUE SE

ESTABLECEN DISPOSICIONES MÍNIMAS DE SEGURIDAD Y DE SALUD EN LAS OBRAS

DE CONSTRUCCIÓN” Y DE LA “LEY 31/1995, DE 8 DE NOVIEMBRE, DE PREVENCIÓN

DE RIESGOS LABORALES”.

ALL WORKS SHALL BE PERFORMED IN STRICT COMPLIANCE WITH “RD 1627/1997, DE

24 DE OCTUBRE, POR EL QUE SE ESTABLECEN DISPOSICIONES MÍNIMAS DE

SEGURIDAD Y DE SALUD EN LAS OBRAS DE CONSTRUCCIÓN” AND “LEY 31/1995, DE 8

DE NOVIEMBRE, DE PREVENCIÓN DE RIESGOS LABORALES”.

11.

LAS NOTAS DE LOS PLANOS Y LAS COTAS SE INDICAN EN METROS, A MENOS QUE

SE INDIQUE LO CONTRARIO.

DRAWINGS NOTES AND DIMENSIONS ARE SHOWN IN METERS, UNLESS NOTED

OTHERWISE.

12.

LAS DIMENSIONES ESTÁN GENERALMENTE A ESCALA, PERO NO DEBEN

ESCALARSE. UTILIZAR LAS MEDIDAS INDICADAS. NTS (NO A ESCALA) SE MUESTRA

SÓLO CUANDO LA DIMENSIÓN OBVIAMENTE NO ESTÁ A ESCALA.

DIMENSIONS ARE GENERALLY TO SCALE, BUT SHALL NOT BE SCALED. USE

DIMENSIONS SHOWN. NTS (NOT TO SCALE) IS SHOWN ONLY WHERE DIMENSION

OBVIOUSLY OUT OF SCALE.

13.

LAS DIMENSIONES Y/O ELEVACIONES MARCADAS COMO (+/-) DEBERÁN SER

VERIFICADAS IN SITU POR EL CONTRATISTA.

DIMENSIONS AND/OR ELEVATIONS MARKED THUS (+/-) SHALL BE VERIFIED IN THE

FIELD BY THE CONTRACTOR.

14.

EL CONTRATISTA DEBERÁ RETIRAR DIARIAMENTE LA BASURA Y LOS RESIDUOS DE

LA PROPIEDAD GUBERNAMENTAL Y MANTENER EL LUGAR DE TRABAJO LIMPIO Y

ORGANIZADO.

THE CONTRACTOR SHALL REMOVE RUBBISH AND DEBRIS FROM THE GOVERNMENT

PROPERTY DAILY AND KEEP THE JOB SITE CLEAN AND ORGANIZED.

15.

UNA VEZ FINALIZADA LA OBRA, EL CONTRATISTA DEBERÁ REALIZAR UNA LIMPIEZA

FINAL DE TODOS LOS ESPACIOS Y RUTAS, DENTRO O FUERA DEL EDIFICIO, QUE SE

HAYAN VISTO AFECTADAS POR LOS TRABAJOS.

UPON COMPLETION OF THE WORK, THE CONTRACTOR SHALL PERFORM A FINAL

CLEANUP OF ALL SPACES AND ROUTES, INSIDE OR OUTSIDE THE BUILDING, THAT

HAVE BEEN AFFECTED BY THE WORK.

16.

NOTAS DE ELECTRICIDAD

ELECTRICAL NOTES

TODOS LOS TRABAJOS DE ELECTRICIDAD SERÁN LLEVADOS A CABO DE ACUERDO

CON LAS NORMAS DE SEGURIDAD ELÉCTRICAS DE EEUU Y ESPAÑA Y POR

PERSONAL CUALIFICADO.

ALL ELECTRICAL WORKS SHALL BE CARRIED OUT ACCORDING TO ELECTRICAL

SAFETY REGULATIONS OF USA AND SPAIN AND BY QUALIFIED PERSONNEL.

1.

EL CONTRATISTA DEBERÁ REPARAR TODAS LAS INSTALACIONES Y COMPONENTES

ELÉCTRICOS DAÑADOS DURANTE LA CONSTRUCCIÓN.

THE CONTRACTOR SHALL REPAIR ALL INSTALLATIONS AND ELECTRICAL

COMPONENTS DAMAGED DURING THE CONSTRUCTION.

2.

EL CONTRATISTA DEBERÁ COORDINAR LOS TRABAJOS, INCLUYENDO LAS

CONEXIONES DE LOS NUEVOS EQUIPOS Y CORTES DE SUMINISTRO, CON EL

CLIENTE (DEPARTAMENTO DE INGENIERÍA CIVIL), PARA MINIMIZAR EL IMPACTO DE

LAS OPERACIONES.

THE CONTRACTOR SHALL COORDINATE THE WORK, INCLUDING NEW EQUIPMENT

CONNECTIONS AND POWER OUTAGES, WITH THE CLIENT (CIVIL ENGINEERING

DEPARTMENT) TO MINIMIZE THE IMPACT OF THE CLIENT'S OPERATIONS.

3.

DONDE SE INDICA QUE HABRÁ UNA CONEXIÓN DE NUEVO A EXISTENTE, EL

CONTRATISTA DEBERÁ PROVEER LA MANO DE OBRA Y LOS MATERIALES

NECESARIOS PARA REALIZAR LA CONEXIÓN.

WHERE A NEW-TO-EXISTING CONNECTION IS INDICATED, PROVIDE MATERIALS AND

LABOR NECESSARY TO MAKE THE CONNECTION.

4.

SUMINISTRAR ETIQUETAS DE RIESGO DE GENERACIÓN DE ARCO EN LOS EQUIPOS

QUE PROBABLEMENTE DEBAN SER EXAMINADOS TALES COMO CUADROS,

PANELES, TRANSFORMADORES, INTERRUPTORES AUTOMÁTICOS,

DESCONECTADORES Y ELEMENTOS DE MANIOBRA.

PROVIDE ARC FLASH LABELS TO ELECTRICAL EQUIPMENT THAT ARE LIKELY TO

RECEIVE EXAMINATIONS, SUCH AS LOAD CENTERS, PANELBOARDS, TRANSFORMERS,

AUTOMATIC TRANSFER SWITCHES, DISCONNECT SWITCHES, AND SWITCHGEAR.

5.

LA RUTA DE LAS CANALIZACIONES SE PROPORCIONA PARA EL PROPOSITO DEL

DISEÑO, A MENOS QUE SE INDIQUE LO CONTRARIO. COORDINAR LA RUTA FINAL

CON LAS CONDICIONES DE CAMPO Y EL TRABAJO DE OTRAS DISCIPLINAS. LA RUTA

DE LOS CONDUCTOS EN EL EDIFICIO SERA PARALELA Y PERPENDICULAR A LAS

LINEAS DE LA EDIFICACIÓN.

CONDUIT ROUTING IS PROVIDED FOR DESIGN INTENT UNLESS INDICATED

OTHERWISE. COORDINATE ROUTE WITH FIELD CONDITIONS AND WORK OF OTHER

TRADES. ROUTE CONDUIT WITHIN BUILDING PARALLEL AND PERPENDICULAR TO THE

BUILDING LINES.

6.

PROPORCIONAR PLACAS DE IDENTIFICACIÓN EN EL EXTERIOR DE TODOS LOS

PANELES Y ARMARIOS ELÉCTRICOS.

PROVIDE NAMEPLATES ON THE EXTERIOR OF ALL ELECTRICAL PANELS AND

ENCLOSURES.

7.

ANTES DE LA INSTALACIÓN, VERIFICAR LAS DISTANCIAS LIBRES REQUERIDAS

RESPECTO A COLUMNAS, FALSO TECHO, TABIQUES, ETC.

BEFORE INSTALLATION, VERIFY REQUIRED CLEARANCES TO COLUMNS, SUSPENDED

CEILING, PARTITIONS, ETC.

8.

VERIFICAR LOS REQUISITOS PARA LA CONEXIÓN FINAL DE TODOS LOS EQUIPOS

CON EL PROVEEDOR Y PROPORCIONAR CAJAS DE CONEXIONES, ENCHUFES O

INTERRUPTORES DE DESCONEXIÓN COMO SEA NECESARIO. REALIZAR TODAS LAS

CONEXIONES SEGÚN SEA NECESARIO.

VERIFY THE FINAL CONNECTION REQUIREMENTS FOR ALL EQUIPMENT WITH THE

SUPPLIER AND PROVIDE JUNCTION BOXES, RECEPTACLES OR DISCONNECT

SWITCHES AS REQUIRED. MAKE ALL CONNECTIONS AS REQUIRED.

9.

SE MINIMIZARÁ EL NÚMERO DE EMPALMES EN LOS CABLES. EN CASO DE TENER

QUE REALIZARSE SE LLEVARÁN A CABO EN ARQUETAS O CAJAS DE EMPALME. LA

UBICACIÓN DE TODOS LOS EMPALMES DEBERÁ REFLEJARSE EN LOS PLANOS

“AS-BUILT”

THE NUMBER OF SPLICES IN THE CABLES SHALL BE MINIMIZED. IF SPLICES ARE TO

BE MADE, THEY SHALL BE MADE IN MANHOLES OR JUNCTION BOXES. THE LOCATION

OF ALL SPLICES SHALL BE SHOWN ON THE AS-BUILT DRAWINGS.

10.

PRESENTAR UN PROGRAMA DE CORTES DEL SUMINISTRO ELÉCTRICO AL

COMIENZO DE LOS TRABAJOS DE CONSTRUCCIÓN, INDICANDO Y JUSTIFICANDO

LOS CORTES PROPUESTOS. PRESENTAR LAS SOLICITUDES DE CORTES Y

CONEXIONES DE SERVICIOS PÚBLICOS POR ESCRITO AL OFICIAL DE

CONTRATACIÓN PARA SU APROBACIÓN CON AL MENOS 30 DÍAS NATURALES DE

ANTELACIÓN AL MOMENTO REQUERIDO. EN CADA SOLICITUD SE INDICARÁ EL

SISTEMA, LA ZONA, LA DURACIÓN APROXIMADA DEL CORTE Y LA NATURALEZA DEL

TRABAJO.

SUBMIT A POWER OUTAGE SCHEDULE AT THE BEGINNING OF THE CONSTRUCTION

WORK, INDICATING AND JUSTIFYING THE PROPOSED OUTAGES. SUBMIT REQUESTS

FOR UTILITY OUTAGES AND CONNECTIONS IN WRITING TO THE CONTRACTING

OFFICER FOR APPROVAL AT LEAST 30 CALENDAR DAYS IN ADVANCE OF THE TIME

REQUIRED. IN EACH REQUEST, STATE THE SYSTEM INVOLVED, AREA INVOLVED,

APPROXIMATE DURATION OF OUTAGE, AND THE NATURE OF WORK INVOLVED.

11.

UNA VEZ INSTALADOS LOS CABLES, TODAS LAS CANALIZACIONES DEBERÁN

QUEDAR DEBIDAMENTE SELLADAS.

ONCE THE CABLES HAVE BEEN INSTALLED, ALL CONDUITS SHALL BE PROPERLY

SEALED.

12.

ENCLAVAMIENTO POR CERRADURA

MECHANICAL INTERLOCKING

SECCIONADOR

DISCONNECTING SWITCH

TRANSFORMADOR DE TENSION

VOLTAGE TRANSFORMER

TRANSFORMADOR DE INTENSIDAD

CURRENT TRANSFORMER

TRANSFORMADOR DE POTENCIA

POWER TRANSFORMER

TERMINAL INTERIOR UNIPOLAR

INTERIOR SINGLE CABLE TERMINAL

TERMINAL EXTERIOR

EXTERIOR SINGLE CABLE TERMINAL

APOYO METÁLICO

METALLIC POLE

SECCIONADOR CON PUESTA A TIERRA

DISCONNECTING SWITCH WITH EARTHING BLADES

INTERRUPTOR AUTOMATICO TRIFASICO SF6

3-POLE SF6 CIRCUIT BREAKER

PARARRAYOS AT

HV SURGE ARRESTER

PUESTA A TIERRA

GROUNDING

CONTADOR ELÉCTRICO

ELECTRIC METER

M

T

SIMBOLO

SYMBOL

DESCRIPCIÓN

DESCRIPTION

M

M

CELDA INTERRUPTOR AUTOMÁTICO. FUNCIÓN PROTECCIÓN

CIRCUIT BREAKER. PROTECTION FUNCTION

CELDA AT INTERRUPTOR SECCIONADOR

HV DISCONNECTING SWITCH CABINET

CELDA INTERRUPTOR RUPTOFUSIBLES COMBINADOS. FUNCIÓN PROTECCIÓN

SWITCH-FUSE COMBINATION UNIT. PROTECTION FUNCTION

CELDA DE MEDIDA

METERING CABINET

FUSIBLE

FUSE

CONTACTO AUXILIAR PARA INDICAR SI EL DISPOSITIVO DE PROTECCIÓN ESTÁ

ABIERTO O CERRADO (OF)Y SI EL DISPOSITIVO DE PROTECCIÓN SE HA DISPARADO

(SD).

AUXILIARY CONTACT TO INDICATE WHETHER THE PROTECTION DEVICE IS OPEN OR

CLOSED (OF) AND IF THE PROTECTION DEVICE HAS TRIPPED (SD).

AC

WE PROJ ECT AIR POW ER

6T

H AIR BASE SQUADRON

JO

SÉ

M

AN

U

EL

R O

D R

ÍG

U

EZ

G O

N

ZA

LO

T

EJ

ED

O R

A.

PE

R

EZ

J.

C

U R

TI

D

O

JJ

. T

EJ

ED

O R

R

.IZ

Q U

IE

R

D O

SHEET NUMBER:

D A

TE

R E

VI

S

IO

N

FA

C

IL

TY

S C

AL

E:

D R

A W

IN

G

N O

O R

IG

IN

A L

FO

R

M

AT

D O

R

EN

G

IN

EE

R /A

R C

H

IT

E.

D R

AW

N

B Y:

JM

R

M

G

TP

A

B

C

D

EE

F

G

H

2 3 4 5

2 3 4 5

6 7 8 9

6 7 8 9

A

C

D

E

F

G

H

B

SHEET OF

A-

G .D

O R

TA

AD

IC

IO

N

AL

/ A

D D

IT

IV

E #1

M A

R K

D E

SC

R

IP

TI

O N

D A

TE

AP

PR

11520 ROTA (CÁDIZ)

TLF.956 813 939 - ingenieria@gisasl.es www.gisasl.es

PLAZA DEL TRIUNFO, Nº 6, ESC. 2, BAJO, LOCAL 3

: 2

GI005

R -7

-1

G

I0

PR

O

JE

C

T Q

U U

G

0-

LE

Y

E N

D A

Y A

B R

EV

IA

TU

R

A S

LE

G

EN

D

A N

D A

B

BR

E V

IA

TI

O N

S

0%

A

PR

IL

0T H

, 2

C O

N S

TR

U

IR

S

U B

E

ST

A C

IÓ

N

D E

T R

A N

S

FO

R M

A D

O R

E S

C N

S

TR

AN

SF

O R

M

ER

S U

BS

TA

TI

O

N

AI

R

B

AS

E

SQ

U

AD

R O

N (U

SA

FE

BA

SE

C

IV

IL

E N

G

IN

EE

R

IN

G

M O

R Ó

N A

IR

B

AS

E

-S

PA

IN

#1

5 7

ABREVIATURAS

ABBREVIATIONS

AI ENTRADA DE AIRE

AIR INTAKE

AT/HV ALTA TENSIÓN

HIGH VOLTAGE

AVR REGULADOR AUTOMATICO DE VOLTAJE

AUTOMATIC VOLTAGE REGULATOR

B.B.R REFUERZO BASE INFERIOR

BOTTOM BASE REINFORCEMENT

BLDG EDIFICIO

BUILDING

BM PUNTO DE REFERENCIA TOPOGRÁFICO

TOPOGRAPHIC BENCH MARK

BT/LV BAJA TENSIÓN

LOW VOLTAGE

CA/AC CORRIENTE ALTERNA

ALTERNATING CURRENT

CB INTERRUPTOR AUTOMATICO MAGNETOTÉRMICO

CIRCUIT BREAKER

CC/DC CORRIENTE CONTINUA

DIRECT CURRENT

CCI IDENTIFICADOR DE CORRELACIÓN DE CONTROL

CONTROL CORRELATION IDENTIFIER

DB INTERRUPTOR DIFERENCIAL

DIFFERENTIAL BREAKER

DPSH PRUEBA DE PENETRACIÓN DINÁMICA SUPERPESADA

DYNAMIC PROBING SUPER HEAVY

EDE EMPRESA DISTRIBUIDORA DE ELECTRICIDAD. "ENDESA DISTRIBUCIÓN ELÉCTRICA SLU".

ELECTRICAL DISTRIBUTION COMPANY. "ENDESA DISTRIBUCIÓN ELECTRICA SLU".

EF VENTILADOR DE EXTRACCIÓN

EXHAUST FAN

EU UNIDAD EXTERIOR

EXTERIOR UNIT

FD LÍNEA DE ALIMENTACIÓN ELÉCTRICA

ELECTRICAL FEEDER

FFE COTA DE SUELO ACABADO

FINISH FLOOR ELEVATION

GFM MATERIAL SUMINISTRADO POR EL GOBIERNO

GOVERMENT FURNISHED MATERIAL

GPR GEORADAR DE PENETRACIÓN TERRESTRE

GROUND-PENETRATING RADAR

H.R REFUERZO HORIZONTAL

HORIZONTAL REINFORCEMENT

HVAC CALEFACCIÓN, VENTILACIÓN Y AIRE ACONDICIONADO

HEATING VENTILATION AIR CONDITIONING

I.E COTA HIDRÁULICA

INVERT ELEVATION

ICPS SISTEMA INTEGRADO DE CONTROL Y PROTECCIÓN

INTEGRATED CONTROL AND PROTECTION SYSTEM

IU UNIDAD INTERIOR

INTERIOR UNIT

MDU UNIDAD DE CONTROL DE MOTOR (OLTC)

MOTOR DRIVE UNIT (OLTC)

MIN MÍNIMO

MINIMUM

MT/MV MEDIA TENSIÓN

MEDIUM VOLTAGE

NGR RESISTENCIA DE PUESTA A TIERRA DE NEUTRO

NEUTRAL GROUNDING RESISTOR

NTS SIN ESCALA

NOT TO SCALE

OLTC CAMBIADOR DE TOMAS EN CARGA DEL TRANSFORMADOR DE POTENCIA

POWER TRANSFORMER ON-LOAD TAP CHANGER

PM PROCTOR MODIFICADO

MODIFIED PROCTOR

SCU UNIDAD DE CONTROL DE SUBESTACIÓN

SUBSTATION CONTROL UNIT

SpAF FUERZA AÉREA ESPAÑOLA

SPANISH AIR FORCE

SPD DISPOSITIVO DE PROTECCIÓN CONTRA SOBRETENSIONES

SURGE PROTECTION DEVICE

SPT SONDEO ROTATORIO + ENSAYO DE PENETRACIÓN ESTANDAR

BORING DRILL + STANDARD PENETRATION TEST

SSAA/AASS SERVICIOS AUXILIARES

AUXILIARY SERVICES

T.B.R REFUERZO BASE SUPERIOR

TOP BASE REINFORCEMENT

UCP/BCU UNIDAD DE CONTROL DE POSICIÓN

BAY CONTROL UNIT

USAF FUERZA AÉREA ESTADOS UNIDOS

US AIR FORCE

LEYENDA DE ESQUEMA UNIFILAR

SINGLE-LINE DIAGRAM LEGEND

LEYENDA GENERAL

GENERAL LEGEND

SÍMBOLO

SYMBOL

DESCRIPCIÓN

DESCRIPTION

XX

XX

XX

XX

NOTA DE ELEMENTO EXISTENTE

EXISTING ITEM KEYNOTE

NOTA DE DEMOLICIÓN

DEMOLITION ITEM KEYNOTE

NOTA DE NUEVO TRABAJO O ELEMENTO A SUMINISTRAR E INSTALAR

NEW TASK OR ELEMENT TO BE PROVIDED KEYNOTE

NOTA DE DETALLE

DETAIL KEYNOTE

PUNTO DE DESCONEXIÓN

DISCONNECTION POINT

PUNTO DE CONEXIÓN

CONNECTION POINT

COTA DE ELEVACIÓN (PLANTA)

SPOT ELEVATION (FLOOR PLAN)

COTA DE ELEVACIÓN (SECCIÓN)

SPOT ELEVATION (SECTION)

+0.00

+0.00

LEYENDA DE PAVIMENTOS

PAVEMENT LEGEND

SIMBOLO

SYMBOL

DESCRIPCIÓN

DESCRIPTION

ASFALTO

ASPHALT

HORMIGÓN

CONCRETE

SUELO DE REJILLA

GRATING FLOOR

GRAVA

GRAVEL

TERRENO NATURAL

NATURAL SOIL

VEGETACIÓN

VEGETATION

XXXXXXXXXXXX

XXXXXXXXXX

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

TSA1

125VDC

24VDC

AA

SS

52-3B1

52-3B2

52-3B3

89-3B

MET-3B

SCU BCU-A3

T3CT31

T3CT32

T3CT33

TSA 1

TRANSFORMER

10/0.4kV

MT

MANUAL

TRANSFER SWITCH

400 V

CUADRO SSAA 1

AASS PANELBOARD 1

BLDG# 1282 BLDG# 1280

MT

CUADRO SSAA 2

AASS PANELBOARD 2

G

TSA 2

TRANSFORMER

10/0.4kV

PUNTO DE CONEXIÓN PARA GENERADOR

PORTÁTIL DE EMERGENCIA

CONNECTION POINT FOR PORTABLE

EMERGENCY GENERATOR

1 2

3 4

SPD FUSES MAIN PANEL BUSBAR

C1 INTERIOR

LIGHTING

C2 EXTERIOR

LIGHTING

C3

RECEPTACLES

C5 HVAC

EXTERIOR

C6 FAN C7 HV CB

HEATER-P12

C8 DISCONN.

HEATER PD1

C9 CF3- PF1

C4 HVAC

INTERIOR

C9 POWER

TRANSORMER

PT1

C12

RECTIFIER 1

C13 ENERGY

METERS

C14 INTERIOR

PANELS. HEATING

& LIGHTING

C15

RECTIFIER 2

WE PROJ ECT AIR POW ER

6T

H AIR BASE SQUADRON

JO

SÉ

M

AN

U

EL

R O

D R

ÍG

U

EZ

G O

N

ZA

LO

T

EJ

ED

O R

A.

PE

R

EZ

J.

C

U R

TI

D

O

JJ

. T

EJ

ED

O R

R

.IZ

Q U

IE

R

D O

SHEET NUMBER:

D A

TE

R E

VI

S

IO

N

FA

C

IL

TY

S C

AL

E:

D R

A W

IN

G

N O

O R

IG

IN

A L

FO

R

M

AT

D O

R

EN

G

IN

EE

R /A

R C

H

IT

E.

D R

AW

N

B Y:

JM

R

M

G

TP

A

B

C

D

EE

F

G

H

2 3 4 5

2 3 4 5

6 7 8 9

6 7 8 9

A

C

D

E

F

G

H

B

SHEET OF

A-

G .D

O R

TA

AD

IC

IO

N

AL

/ A

D D

IT

IV

E #1

M A

R K

D E

SC

R

IP

TI

O N

D A

TE

AP

PR

11520 ROTA (CÁDIZ)

TLF.956 813 939 - ingenieria@gisasl.es www.gisasl.es

PLAZA DEL TRIUNFO, Nº 6, ESC. 2, BAJO, LOCAL 3

A s in di ca te d

EP101

R -7

-1

E

P

PR

O

JE

C

T Q

U U

G

0-

E

LE

C

TR

IC

ID

A D

. S E

R V

IC

IO

S A

U X

IL

IA

R E

S Y

C O

M U

N

IC

A C

IO

N

ES

. E

S

TA

D O

P R

O Y

E C

TA

D

O

EL

EC

TR

IC

AL

. A U

XI

LI

AR

Y

SE

R

VI

C

ES

A

N D

C O

M M

U N

IC

AT

IO

N

S.

PR

O

JE

C

TE

D C

O N

D

IT

IO

N

0%

A

PR

IL

0T H

, 2

C O

N S

TR

U

IR

S

U B

E

ST

A C

IÓ

N

D E

T R

A N

S

FO

R M

A D

O R

E S

C N

S

TR

AN

SF

O R

M

ER

S U

BS

TA

TI

O

N

AI

R

B

AS

E

SQ

U

AD

R O

N (U

SA

FE

BA

SE

C

IV

IL

E N

G

IN

EE

R

IN

G

M O

R Ó

N A

IR

B

AS

E

-S

PA

IN

#1

6 7

ESCALA

SCALE 1 : 50

EDIFICIO #1282. PLANO DE PLANTA

BUILDING #1282. FLOOR PLAN

ESCALA GRÁFICA

GRAPHIC SCALE

0 1 2 3 4 5m

2.50 5 7.5 10 12.5 15

1:50

17.5ft.

ESCALA

SCALE NTS

DIAGRAMA DE BLOQUES DE SSAA

AASS RISER DIAGRAM

EXISTING ITEMS

ELEMENTOS EXISTENTES

1 TRANSFORMADOR DE SSAA, 25 kVA, 10kV/0,4kV, 50Hz AASS TRANSFORMER, 25KVA, 10kV/0.4kV, 50Hz.

2 TRANSFORMADOR DE SSAA DE 25KVA 10KV/0,4KV, 50Hz.

25KVA 10KV/0,4KV, 50Hz AASS TRANSFORMER.

3 CUADRO ELÉCTRICO SSAA 1.

AASS ELECTRICAL PANELBOARD 1.

4 CUADRO ELÉCTRICO SSAA 2.

AASS ELECTRICAL PANELBOARD 2.

5 NUEVO CUADRO ELÉCTRICO “TRANSFER LOAD PANEL”.

NEW “TRANSFER LOAD PANEL” ELECTRICAL PANELBOARD.

6 ARMARIO DE SISTEMAS DE BATERÍAS DE 125V CC.

CABINET FOR 125V DC BATTERIES SYSTEM.

7 ARMARIO DE SISTEMA RECTIFICADOR-BATERÍAS 125V CC Y CONVERTIDOR 125-24V CC.

CABINET FOR SYSTEM OF RECTIFIER-BATTERY 125V DC AND 125-24V DC CONVERTER.

PROJECTED WORK DESCRIPTION

DESCRIPCIÓN DE TRABAJOS PROYECTADOS

N

ESCALA

SCALE NTS

CUADRO AASS 1

AASS 1 PANELBOARD

NOTAS ESPECÍFICAS

SPECIFIC NOTES

EL ESQUEMA UNIFILAR INCLUYE LA CONDICIÓN PROYECTADA DEL QUUG 15-1000.

THE SINGLE-LINE DIAGRAM INCLUDES THE QUUG 15-1000 PROJECTED CONDITION.

1.

ESTE PLANO NO REPRESENTA DE FORMA EXHAUSTIVA EL CABLEADO, PARTES Y

DISPOSITIVOS INTERNOS O EXTERNOS DE LOS EQUIPOS REPRESENTADOS.

EL CONTRATISTA SERÁ RESPONSABLE DE SUMINISTRAR E INSTALAR TODO EL

CABLEADO, PARTES Y DISPOSITIVOS NECESARIOS PARA EL CORRECTO

FUNCIONAMIENTO DE LOS EQUIPOS Y EL SISTEMA DE CONTROL, AUNQUE NO

HAYAN SIDO IDENTIFICADOS EXPLÍCITAMENTE EN LOS PLANOS.

THIS DRAWING DOES NOT REPRESENT EXHAUSTIVELY THE WIRING, PARTS AND

DEVICES INSIDE OR OUTSIDE THE EQUIPMENT DEPICTED.

THE CONTRACTOR SHALL BE RESPONSIBLE FOR SUPPLYING AND INSTALLING ALL

WIRING, PARTS AND DEVICES NECESSARY FOR THE PROPER OPERATION OF THE

EQUIPMENT AND CONTROL SYSTEM, EVEN IF NOT EXPLICITLY IDENTIFIED ON THE

DRAWINGS.

2.

M M M

A3

A4

TIMER

SEÑALIZACIÓN DE DISPARO

TRIPPING ALARM

2x 6+

TT

x6 mm 2C u

0.6 /1 kV ,X

LP

E+

Po l

RZ

1-

K(

AS

) C ca

-s1 b,d

1,a

CB.II

20 A 10 kA

CURVE C

DB.II

40A,30 mA

AC

AC

AC

C1 5 R

EC

TI

FI

ER

W ;3

0m ;0

.36

CB.IV

50 A 10 kA

CURVE C

Cont.50A,IV

CB.IV

40 A; U> 10 kA

CURVE C

4x

+T Tx mm

2C u

0.6 /1 kV ,X

LP

E+

Po l

RZ

1-

K(

AS

) C ca

-s1 b,d

1,a

CB.IV

40 A; U> 10 kA

CURVE C

CB.II

16 A 10 kA

CURVE C

DB.II

25A,30 mA

AC

2x 2.5

+T Tx

2.5 mm

2C u

0.6 /1 kV ,X

LP

E+

Po l

RZ

1-

K(

AS

) C ca

-s1 b,d

1,a

C1 INT.

LIGHTING

240W;40m;0.35%

PHASE R

C2 EXT.

LIGHTING

900W;20m;0.91%

PHASE S

CUADRO SSAA 1

AASS PANELBOARD 1

80 A,C 10 kA

SDP TYPE

Up: 1,5 kV Imax: 40 kA

CB.IV

40 A; U> 10 kA

CURVE C

CB.IV

50 A 10 kA

CURVE C

MANUAL

TRANSFER SWITCH Cont.50A,IV

TSA2

25 kVA 10 kV/0.4 50Hz

TSA1

25 kVA 10 kV/0.4 50Hz

4x35mm2Cu

0.6/1 kV,XLPE+Pol , RZ1-K(AS) Cca-s1b,d1,a1

CUADRO SSAA 2

AASS PANELBOARD 2

EDIFICIO 1280

BUILDING 1280

MANUAL

TRANSFER SWITCH

CB.IV

40 A; U> 10 kA

CURVE C

CGR-GENERATOR

RECEPTACLE

EDIFICIO 1282

BUILDING 1282

TRANSFER LOAD PANEL

4x

+T Tx mm

2C u

0.6 /1 kV ,X

LP

E+

Po l

RZ

1-

K(

AS

) C ca

-s1 b,d

1,a

CB.II

16 A 10 kA

CURVE C

DB.II

25A,30 mA

AC

2x 4+

TT

x4 mm 2C u

0.6 /1 kV ,X

LP

E+

Po l

RZ

1-

K(

AS

) C ca

-s1 b,d

1,a

CB.II

20 A 10 kA

CURVE C

DB.II

40A,30 mA

AC

4x 6+

TT

x6 mm 2C u

0.6 /1 kV ,X

LP

E+

Po l

RZ

1-

K(

AS

) C ca

-s1 b,d

1,a

CB.IV

40 A 10 kA

CURVE C

DB.IV

40A,30 mA

AC

2x 4+

TT

x4 mm 2C u

0.6 /1 kV ,X

LP

E+

Po l

RZ

1-

K(

AS

) C ca

-s1 b,d

1,a

CB.II

20 A 10 kA

CURVE C

DB.II

40A,30 mA

AC

2x 4+

TT

x4 mm 2C u

0.6 /1 kV ,X

LP

E+

Po l

RZ

1-

K(

AS

) C ca

-s1 b,d

1,a

CB.II

20 A 10 kA

CURVE C

DB.II

40A,30 mA

AC

2x 6+

TT

x6 mm 2C u

0.6 /1 kV ,X

LP

E+

Po l,A rm ad o

RZ

1M Z1

-K (A

S) C ca -s1 b,d 1,a

CB.II

20 A 10 kA

CURVE C

DB.II

40A,30 mA

AC

2x 6+

TT

x6 mm 2C u

0.6 /1 kV ,X

LP

E+

Po l,A rm ad o

RZ

1M Z1

-K (A

S) C ca -s1 b,d 1,a

CB.II

20 A 10 kA

CURVE C

DB.II

40A,30 mA

AC

2x 6+

TT

x6 mm 2C u

0.6 /1 kV ,X

LP

E+

Po l,A rm ad o

RZ

1M Z1

-K (A

S) C ca -s1 b,d 1,a

CB.II

20 A 10 kA

CURVE C

DB.II

40A,30 mA

AC

4x

+T Tx mm

2C u

0.6 /1 kV ,X

LP

E+

Po l,A rm ad o

RZ

1M Z1

-K (A

S) C ca -s1 b,d 1,a

CB.IV

25 A 10 kA

CURVE C

4x 6+

TT

x6 mm 2C u

0.6 /1 kV ,X

LP

E+

Po l,A rm ad o

RZ

1- K(

AS

) C ca -s1 b,d 1,a

CB.IV

25 A 10 kA

CURVE C

DB.IV

40A,30 mA

AC

24VDC

PANEL

125VDC

PANEL

2x 6+

TT

x6 mm 2C u

0.6 /1 kV ,X

LP

E+

Po l

RZ

1-

K(

AS

) C ca

-s1 b,d

1,a

CB.II

20 A 10 kA

CURVE C

DB.II

40A,30 mA

AC

C3

RECEPTACLES

1200W;35m;0.85%

PHASE T

C4 HVAC-INT

4040W;20m;0.27%

C5 HVAC-EXT

330W;20m;0.2%

PHASE R

C6 FAN

330W;20m;0.25%

PHASE R

C7 HV CB

HEATER-PI2

230W;55m;0.22%

PHASE R

C8 D.-HEATER-

PD1

230W;60m;0.26%

PHASE S

C9 CF3-PF1

230W;42m;0.19%

PHASE R

C10 P.TRX-PT1

1600W;40m;0.18%

C1 2 R

EC

TI

FI

ER

W ;3

0m ;0

.36

C13-ENERGY-METERS

200W;15m;0.14%

PHASE S

2x 6+

TT

x6 mm 2C u

0.6 /1 kV ,X

LP

E+

Po l

RZ

1-

K(

AS

) C ca

-s1 b,d

1,a

CB.II

20 A 10 kA

CURVE C

DB.II

40A,30 mA

AC

C14-ICPS PANELS AC POWER

SUPPLY

2000W;15m;0.44%

PHASE T

CONTROLADOR SCU

SCU CONTROLLER

2x2.5mm2Cu

450/750 V,Poliolef.

H07Z1-K(AS) Cca-s1b,d1,a1

2x2.5mm2Cu 450/750 V,Poliolef.

H07Z1-K(AS) Cca-s1b,d1,a1

AC

AC

AC

AC

AC

AC

AC

AC

AC

AC

AC

AC

AC

AC

AC

AC

AC

AC

AC AC

AC

AC

AC

AC

AC

AC

2x 2.5

+T Tx

2.5 mm

2C u

0.6 /1 kV ,X

LP

E+

Po l

RZ

1-

K(

AS

) C ca

-s1 b,d

1,a

2x

+T Tx mm

2C u

0/7

V

,P

OL

IO

LE

F.

RZ

1- K(

AS

) C ca -s1 b,d 1,a

2x

+T Tx mm

2C u

0/7

V

,P

OL

IO

LE

F.

RZ

1- K(

AS

) C ca -s1 b,d 1,a

WE PROJ ECT AIR POW ER

6T

H AIR BASE SQUADRON

JO

SÉ

M

AN

U

EL

R O

D R

ÍG

U

EZ

G O

N

ZA

LO

T

EJ

ED

O R

A.

PE

R

EZ

J.

C

U R

TI

D

O

JJ

. T

EJ

ED

O R

R

.IZ

Q U

IE

R

D O

SHEET NUMBER:

D A

TE

R E

VI

S

IO

N

FA

C

IL

TY

S C

AL

E:

D R

A W

IN

G

N O

O R

IG

IN

A L

FO

R

M

AT

D O

R

EN

G

IN

EE

R /A

R C

H

IT

E.

D R

AW

N

B Y:

JM

R

M

G

TP

A

B

C

D

EE

F

G

H

2 3 4 5

2 3 4 5

6 7 8 9

6 7 8 9

A

C

D

E

F

G

H

B

SHEET OF

A-

G .D

O R

TA

AD

IC

IO

N

AL

/ A

D D

IT

IV

E #1

M A

R K

D E

SC

R

IP

TI

O N

D A

TE

AP

PR

11520 ROTA (CÁDIZ)

TLF.956 813 939 - ingenieria@gisasl.es www.gisasl.es

PLAZA DEL TRIUNFO, Nº 6, ESC. 2, BAJO, LOCAL 3

: 1

EP601

R -7

-1

E

P

PR

O

JE

C

T Q

U U

G

0-

E

LE

C

TR

IC

ID

A D

. D

IA

G R

A M

A D

E S

S A

A

E

LE

C

TR

IC

AL

. A

AS

S D

IA

G

R A

M

0%

A

PR

IL

0T H

, 2

C O

N S

TR

U

IR

S

U B

E

ST

A C

IÓ

N

D E

T R

A N

S

FO

R M

A D

O R

E S

C N

S

TR

AN

SF

O R

M

ER

S U

BS

TA

TI

O

N

AI

R

B

AS

E

SQ

U

AD

R O

N (U

SA

FE

BA

SE

C

IV

IL

E N

G

IN

EE

R

IN

G

M O

R Ó

N A

IR

B

AS

E

-S

PA

IN

#1

7 7

NOTAS ESPECÍFICAS

SPECIFIC NOTES

EL ESQUEMA UNIFILAR INCLUYE LA CONDICIÓN PROYECTADA DEL QUUG 15-1000.

THE SINGLE-LINE DIAGRAM INCLUDES THE QUUG 15-1000 PROJECTED CONDITION.

1.

ESTE PLANO NO REPRESENTA DE FORMA EXHAUSTIVA EL CABLEADO, PARTES Y

DISPOSITIVOS INTERNOS O EXTERNOS DE LOS EQUIPOS REPRESENTADOS.

EL CONTRATISTA SERÁ RESPONSABLE DE SUMINISTRAR E INSTALAR TODO EL

CABLEADO, PARTES Y DISPOSITIVOS NECESARIOS PARA EL CORRECTO

FUNCIONAMIENTO DE LOS EQUIPOS Y EL SISTEMA DE CONTROL, AUNQUE NO

HAYAN SIDO IDENTIFICADOS EXPLÍCITAMENTE EN LOS PLANOS.

THIS DRAWING DOES NOT REPRESENT EXHAUSTIVELY THE WIRING, PARTS AND

DEVICES INSIDE OR OUTSIDE THE EQUIPMENT DEPICTED.

THE CONTRACTOR SHALL BE RESPONSIBLE FOR SUPPLYING AND INSTALLING ALL

WIRING, PARTS AND DEVICES NECESSARY FOR THE PROPER OPERATION OF THE

EQUIPMENT AND CONTROL SYSTEM, EVEN IF NOT EXPLICITLY IDENTIFIED ON THE

DRAWINGS.

2.

R-786-118 GI001
R-786-119 GI002
R-786-120 GI003
R-786-121 GI004
R-786-122 GI005
R-786-123 EP101
R-786-124 EP601
2025-05-20T12:55:27+0200
MATOS.JOSE.RAFAEL.1510704971
2025-05-20T15:35:48+0200
DIXON.TERELL.J.1061850305