SUMMARY
| CONSTRUCTION COST ESTIMATE BREAKDOWN | | | | | | | |
| CONTRACTOR | | | | ADDRESS | | | |
| | | | MORÓN AIR BASE, SPAIN | | | |
| CONTRACT FOR (Work to be performed) | | | | | PROPOSED TOTAL CONTRACT PRICE | | |
| CNS ALT SUBSTATION | | SUMMARY | | | EUROS | 0.00 € | |
| | | | | US$ DOLLARS | $0.00 | |
| PURCHASE REQUEST NUMBER | | PROJECT NUMBER | | | WORK LOCATION | | |
| | QUUG 10-1049 | | | MORÓN AIR BASE, SPAIN | | |
| | TOTAL EUROS | TOTAL EUROS | | TOTAL USD $ | TOTAL USD $ | |
| LIN | ITEM | | | | | | |
| NO. | | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL |
| | (3) | (4) | (5) | (6) | (7) | (8) |
| SUMMARY | | | | | | |
| RESUMEN | | | | | | |
| 1 | BASIC PACKAGE | 0.00 € | | | $0.00 | | |
| PAQUETE BÁSICO | | | | | | |
| 2 | ADDITIVE #1 | 0.00 € | | | $0.00 | | |
| ADICIONAL #1 | | | | | | |
| 3 | ADDITIVE #2 | 0.00 € | | | $0.00 | | |
| ADICIONAL #2 | | | | | | |
FY2025 $1 0.9249 euros
DATE: FIRM NAME:
These costs and overhead and profit percentages will be applied in any possible future modifications
&"Times New Roman,Regular"&9 CONSTRUCTION COST ESTIMATE BREAKDOWN &"Times New Roman,Regular"&9Page &P of &N
BASIC PACKAGE
| CONSTRUCTION COST ESTIMATE BREAKDOWN | incluso carga sobre camión de residuos, transporte y entrega a gestor autorizado de vertidos. | | | | | | | | | |
| CONTRACTOR | | | | | ADDRESS | | | | | |
| | | | | MORÓN AIR BASE, SPAIN | | | | | |
| CONTRACT FOR (Work to be performed) | | | | | | PROPOSED TOTAL CONTRACT PRICE | | | | |
| CNS ALT SUBSTATION | | | BASIC PACKAGE | | | | 0.00 € | | $0.00 | |
| PURCHASE REQUEST NUMBER | | | PROJECT NUMBER | | | WORK LOCATION | | | | |
| | | QUUG 10-1049 | | | MORÓN AIR BASE, SPAIN | | | | |
| | UNIT | | MATERIAL COST | | | LABOR COSTS | | OTHER | |
| LIN | ITEM | OF | | | | | | | DIRECT | LINE |
| NO. | | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) |
| DEMOLITION WORKS | | | | | | | | | |
| TRABAJOS DE DEMOLICIÓN | | | | | | | | | |
| 1 | Exterior pavements demolition. | | | | | | | | | |
| Demolición de pavimentos exteriores. | m2 | | | 0.00 | | | 0.00 | | 0.00 |
| 2 | Building #1280 security fence demolition. | | | | | | | | | |
| Demolición de vallado de seguridad de edificio #1280. | m | | | 0.00 | | | 0.00 | | 0.00 |
| 3 | High voltage yard security fence demolition. | | | | | | | | | |
| Demolición de vallado de seguridad de parque de alta tensión. | m | | | 0.00 | | | 0.00 | | 0.00 |
| 4 | Removal of MV underground cabling. | | | | | | | | | |
| Retirada de cableado MT soterrado. | m | | | 0.00 | | | 0.00 | | 0.00 |
| 5 | Demolition of existing drainage conduit in its final section, including mahole reconstruction.. | | | | | | | | | |
| Demolición de canalización de drenaje existente en su tramo final, incluso reconstrucción de arqueta. | m | | | 0.00 | | | 0.00 | | 0.00 |
| 6 | Olive tree transplant. | | | | | | | | | |
| Transplante de olivo. | ea | | | 0.00 | | | 0.00 | | 0.00 |
| TOTAL DEMOLITION WORKS | | | | | | | | | |
| TOTAL TRABAJOS DE DEMOLICIÓN | | | | 0.00 | | | 0.00 | 0.00 | 0.00 |
| CIVIL WORKS | | | | | |
| TRABAJOS DE CIVIL | | | | | |
| 7 | Site clearing & grading. | | | | | |
| Desbroce y nivelación del terreno. | m2 | 0.00 | 0.00 | | 0.00 |
| 8 | Excavations and subgrade compaction. | | | | | |
| Excavaciones y compactación de fondo de excavación. | m3 | 0.00 | 0.00 | | 0.00 |
| 9 | Ground improvements. | | | | | |
| Mejoras del terreno. | m3 | 0.00 | 0.00 | | 0.00 |
| 10 | Service corridors concrete slab (Sidewalk). | | | | | |
| Solera de hormigón de pasillos de servicio (Acerado). | m2 | 0.00 | 0.00 | | 0.00 |
| 11 | Crushed stone surface finish, anti weed mesh, artificial ballast ZA 0/20 and geotextile. | | | | | |
| Acabado superficial de piedra machacada, malla anti-hierba, zahorra artificial ZA 0/20 y geotextil. | m2 | 0.00 | 0.00 | | 0.00 |
| 12 | Transformer drainage system, including manhole, steel piping, mortar slope and earthworks. | | | | | |
| Sistema de drenaje de transformador, incluso arqueta, canalizaciones de acero, formación de pendientes de mortero y movimiento de tierras. | JOB | 0.00 | 0.00 | | 0.00 |
| 13 | Site drainage system, including handholes, stormwater manhole, HDPE pipe, precast concrete headwall, linning ditch, riprap and related accesories. | | | | | |
| Sistema de drenaje del terreno, incluso arquetas, pozo de registro, cunata revestida, rip-rap, embocadira de hormigón prefabricado, colector PEAD y accesorios relacionados. | JOB | 0.00 | 0.00 | | 0.00 |
| 14 | 25 cm reinforded concrete access slab with steel rails. | | | | | |
| Solera de acceso de hormigón armado de 25 cm con railes de acero. | m2 | 0.00 | 0.00 | | 0.00 |
| 15 | Transformer foundation, including steel rails, gratings and crushed stone. | | | | | |
| Cimentación de transformador, incluso railes de acero, rejillas y piedra machacada. | m3 | 0.00 | 0.00 | | 0.00 |
| 16 | Manholes. Including cover, cable racks, excavation, compaction, backfill and miscellaneous. | | | | | |
| Arquetas, incluyendo tapas, soportes para cables, excavaciones, rellenos, y demás accesorios. | JOB | 0.00 | 0.00 | | 0.00 |
| 17 | HV Ductbank Z1 2 x Ø200 mm. | | | | | |
| Banco de canalizaciones de AT Z1 2xØ200 mm. | m | 0.00 | 0.00 | | 0.00 |
| 18 | HV Ductbank Z2 2 x Ø200 mm. | | | | | |
| Banco de canalizaciones de AT Z2 2xØ200 mm. | m | 0.00 | 0.00 | | 0.00 |
| 19 | HV Ductbank Z3 3 x Ø200 mm. | | | | | |
| Banco de canalizaciones de AT Z3 3xØ200 mm. | m | 0.00 | 0.00 | | 0.00 |
| 20 | HV Ductbank Z4 2 x Ø200 mm. | | | | | |
| Banco de canalizaciones de AT Z4 2xØ200 mm. | m | 0.00 | 0.00 | | 0.00 |
| 21 | Precast cables trenches. | | | | | |
| Canales de hormigón prefabricado revisables para cables. | m | 0.00 | 0.00 | | 0.00 |
| 22 | Security fence with concrete wall and access doors. | | | | | |
| Vallado de seguridad con muro de hormigón y puertas de acceso. | m | 0.00 | 0.00 | | 0.00 |
| 23 | Security fence and access doors. | | | | | |
| Vallado de seguridad y puertas de acceso. | m | 0.00 | 0.00 | | 0.00 |
| TOTAL CIVIL WORKS | | | | | |
| TOTAL TRABAJOS DE CIVIL | | 0.00 | 0.00 | 0.00 | 0.00 |
| HV SWITCHGEAR STEEL SUPPORTS. | | | | | |
| SOPORTES DE APARAMENTA DE AT DE ACERO. | | | | | |
| 24 | Hot dip galvanized steelwork structures. | | | | | |
| Estructuras de acero galvanizado. | kg | 0.00 | 0.00 | | 0.00 |
| 25 | Plain concrete foundation. | | | | | |
| Cimentación de hormigón en masa. | m3 | 0.00 | 0.00 | | 0.00 |
| 26 | Pre-engineered transformer wiring steel support. | | | | | |
| Soporte prefabricado de acero de cableado del transformador. | ea | 0.00 | 0.00 | | 0.00 |
| TOTAL HV SWITCHGEAR STEEL SUPPORTS | | | | | |
| TOTAL SOPORTES DE APARAMENTA DE AT DE ACERO | | 0.00 | 0.00 | 0.00 | 0.00 |
| ARCHITECTURAL WORKS | | | | | |
| TRABAJOS DE ARQUITECTURA | | | | | |
| 27 | Concrete slab foundation. | | | | | |
| Cimentación de losa de hormigón. | m3 | 0.00 | 0.00 | | 0.00 |
| 28 | Concrete masonry units (CMU) bearing walls includin concrete beams. | | | | | |
| Muros de carga de bloques de hormigón (CMU) incluso vigas de hormigón. | m2 | 0.00 | 0.00 | | 0.00 |
| 29 | Concrete slab roof deck. | | | | | |
| Forjado de cubierta de losa maciza. | m2 | 0.00 | 0.00 | | 0.00 |
| 30 | Facade thermal insulation. | | | | | |
| Aislamiento térmico de fachada. | m2 | 0.00 | 0.00 | | 0.00 |
| 31 | Perforated brick wall facade interior leaf and partitions. | | | | | |
| Hoja interior de fachada y particiones de ladrillo perforado. | m2 | 0.00 | 0.00 | | 0.00 |
| 32 | Exterior openings. | | | | | |
| Carpinterías exteriores. | ea | 0.00 | 0.00 | | 0.00 |
| 33 | AASS Transformer access door. | | | | | |
| Puerta de acceso a transformador de SSAA. | ea | 0.00 | 0.00 | | 0.00 |
| 34 | Cement mortar coating (exterior walls). | | | | | |
| Revestimiento de mortero de cemento (muros exteriores). | m2 | 0.00 | 0.00 | | 0.00 |
| 35 | Cement mortar coating (interior walls). | | | | | |
| Revestimiento de mortero de cemento (muros interior) | m2 | 0.00 | 0.00 | | 0.00 |
| 36 | Exterior painting. | | | | | |
| Pintura exterior. | m2 | 0.00 | 0.00 | | 0.00 |
| 37 | Interior painting. | | | | | |
| Pintura interior. | m2 | 0.00 | 0.00 | | 0.00 |
| 38 | Equipment skids made of masonry, steel profiles and patterned steel sheet. | | | | | |
| Bancadas para equipamiento realizadas con albañilería, perfiles metálicos y chapa lagrimada de acero. | JOB | 0.00 | 0.00 | | 0.00 |
| 39 | Terrazo interior pavement and pit finish, base layers included. | | | | | |
| Pavimento interior de terrazo y acabado de foso capas base incluidas. | m2 | 0.00 | 0.00 | | 0.00 |
| 40 | Low slope roofing system finished with insulated filtering tiles. | | | | | |
| Sistema de cubierta de baja pendiente acabado con losas filtrantes aisladas. | m2 | 0.00 | 0.00 | | 0.00 |
| 41 | Fall arrest system. | | | | | |
| Sistema anticaidas. | ea | 0.00 | 0.00 | | 0.00 |
| TOTAL ARCHITECTURAL WORKS | | | | | |
| TOTAL TRABAJOS DE ARQUITECTURA | | 0.00 | 0.00 | 0.00 | 0.00 |
| PLUMBING WORKS. | | | | | |
| TRABAJOS DE FONTANERÍA. | | | | | |
| 42 | Gutter & Downspout. | | | | | |
| Canalón y bajante. | m | 0.00 | 0.00 | | 0.00 |
| TOTAL PLUMBING WORKS | | | | | |
| TOTAL TRABAJOS DE FONTANERÍA | | 0.00 | 0.00 | 0.00 | 0.00 |
| MECHANICAL WORKS | | | | | |
| TRABAJOS DE MECÁNICA | | | | | |
| 43 | HVAC System. | | | | | |
| Sistema HVAC. | ea | 0.00 | 0.00 | | 0.00 |
| TOTAL MECHANICAL WORKS | | | | | |
| TOTAL TRABAJOS DE MECÁNICA | | 0.00 | 0.00 | 0.00 | 0.00 |
| ELECTRICAL WORKS | | | | | |
| TRABAJOS DE ELECTRICIDAD | | | | | |
| Power Transformer | | | | | |
| Transformador de Potencia | | | | | |
| 44 | 5MVA Power transformer. | | | | | |
| Transformador de potencia 5MVA. | ea | 0.00 | 0.00 | | 0.00 |
| 45 | Neutral grounding resistor (NGR). | | | | | |
| Resistencia de puesta a tierra del neutro (NGR) | ea | 0.00 | 0.00 | | 0.00 |
| Total Power Transformer | | | | | |
| Transformador de Potencia Total | | 0.00 | 0.00 | 0.00 | 0.00 |
| HV Switchgear and accesories. | | | | | |
| Aparamenta de AT y accesorios. | | | | | |
| 46 | HV Switchgear Circuit breaker 66kV/2000A/31.5kA, SF6-FREE. Including installation accessories. | | | | | |
| Celda de Interruptor automático de AT de 66kV/2000A/31.5kA, libre de SF6. Incluso accesorios de instalación. | ea | 0.00 | 0.00 | | 0.00 |
| 47 | HV Current transformer 66kV. Including instllation accessories. | | | | | |
| Transformador de Corriente de AT de 66kV. Incluso accesorios de instalación. | ea | 0.00 | 0.00 | | 0.00 |
| 48 | HV Voltage transformer 66kV. Including instllation accessories. | | | | | |
| Transformador de tensión de AT de 66kV. Incluso accesorios de instalación. | ea | 0.00 | 0.00 | | 0.00 |
| 49 | HV 3-phase disconnector with earthing blades, 66kV GD 72,5/2000-PAT-GE + PR 304/3-M + CCA6-R + PR. Including instllation accessories. | | | | | |
| Interruptor de AT de 3 fases con cuchillas de conexión a tierra, 66kV GD 72,5/2000-PAT-GE + PR 304/3-M + CCA6-R + PR. Incluso accesorios de instalación. | ea | 0.00 | 0.00 | | 0.00 |
| 50 | HV 1-phase surge arrester, 66kV. Including instllation accessories. | | | | | |
| Pararrayos de AT monofásico, 66kV. Incluso accesorios de instalación. | ea | 0.00 | 0.00 | | 0.00 |
| Total HV Switchgear and accesories. | | | | | |
| Aparamenta de AT y accesorios. | | 0.00 | 0.00 | 0.00 | 0.00 |
| MV Switchgear and accesories. | | | | | |
| Aparamenta de MT y accesorios. | | | | | |
| 51 | MV Cabinets. | | | | | |
| Celdas de MT. | ea | 0.00 | 0.00 | | 0.00 |
| Total MV Switchgear and accesories. | | | | | |
| Aparamenta de Mt y accesorios. | | 0.00 | 0.00 | 0.00 | 0.00 |
| HV Overhead Wiring. | | | | | |
| Cableado Aéreo de AT. | | | | | |
| 52 | Cable C2 Supply and installation of Al pipe, diameter 100/84 mm. | | | | | |
| Cable C2 Suministro y montaje de tubo de Al, de diámetro 100/84 mm. | m | 0.00 | 0.00 | | 0.00 |
| 53 | Supply and assembly of pipe plug Al 100 mm fittings and connection. | | | | | |
| Suministro y montaje tapón tubo Al 100 mm de conectores y accesorios. | JOB | 0.00 | 0.00 | | 0.00 |
| Total HV Overhead Wiring | | | | | |
| Total Cableado Aéreo de AT | | 0.00 | 0.00 | 0.00 | 0.00 |
| MV underground distribution wiring | | | | | |
| Cableado distribución soterrada en MT | | | | | |
| 54 | C3 HV Wiring. 3c-1x240 mm² HEPRZ1 Al. Including connectors, terminators, cable cleats and related accesories. | | | | | |
| Cable AT C3 3c-1x240 mm² HEPRZ1 Al. Incluso conectores, terminales, grapas y accesorios relacionados. | | 0.00 | 0.00 | | 0.00 |
| 55 | C4 HV Wiring. 3c-1x185 mm² / 1x16 mm² RHZ1-OL H16 Al. Including connectors, terminators, cable cleats and related accesories. | | | | | |
| Cableado AT C4. 3c-1x185 mm² / 1x16 mm² RHZ1-OL H16 Al. Incluso conectores, terminales, grapas y accesorios relacionados. | m | 0.00 | 0.00 | | 0.00 |
| 56 | C5 HV Wiring. 3c-1x185 mm² / 1x16 mm² RHZ1-OL H16 Al. Including connectors, terminators, cable cleats and related accesories. | | | | | |
| Cableado AT C5. 3c-1x185 mm² / 1x16 mm² RHZ1-OL H16 Al. Incluso conectores, terminales, grapas y accesorios relacionados. | m | 0.00 | 0.00 | | 0.00 |
| 57 | C7 HV Wiring. 3c-1x95 mm² / 1x16 mm² RHZ1-OL H16 Al. Including connectors, terminators, clamps and accesories. | | | | | |
| Cableado AT C7. 3c-1x95 mm² / 1x16 mm² RHZ1-OL H16 Al. Incluso conectores, terminales, grapas y accesorios relacionados. | m | 0.00 | 0.00 | | 0.00 |
| Total MV underground distribution | | | | | |
| Total Distribución soterrada en MT | | 0.00 | 0.00 | 0.00 | 0.00 |
| LV and signal main wiring | | | | | |
| Cableado principal de BT y señal | | | | | |
| 58 | Wiring RC4Z1-K(AS) 0.6/1 kV, 1c-2x10 mm². | | | | | |
| Cableado RC4Z1-K(AS) 0.6/1 kV, 1c-2x10 mm². | m | 0.00 | 0.00 | | 0.00 |
| 59 | Wiring RC4Z1-K(AS) 0.6/1 kV, 1c-2x6. | | | | | |
| Cableado RC4Z1-K(AS) 0.6/1 kV, 1c-2x6. | m | 0.00 | 0.00 | | 0.00 |
| 60 | Wiring RC4Z1-K(AS) 0.6/1 kV, 1c-4x10. | | | | | |
| Cableado RC4Z1-K(AS) 0.6/1 kV, 1c-4x10. | m | 0.00 | 0.00 | | 0.00 |
| 61 | Wiring RC4Z1-K(AS) 0.6/1 kV, 1c-4x6 mm². | | | | | |
| Cableado RC4Z1-K(AS) 0.6/1 kV, 1c-4x6 mm². | m | 0.00 | 0.00 | | 0.00 |
| 62 | Wiring RZ1MZ1-K(AS) 0.6/1 kV, 1c-4x2.5 mm². | | | | | |
| Cableado RZ1MZ1-K(AS) 0.6/1 kV, 1c-4x2.5 mm². | m | 0.00 | 0.00 | | 0.00 |
| 63 | Wiring RZ1MZ1-K(AS) 0.6/1 kV, 1c-3x6 mm². | | | | | |
| Cableado RZ1MZ1-K(AS) 0.6/1 kV, 1c-3x6 mm². | m | 0.00 | 0.00 | | 0.00 |
| 64 | Wiring RZ1MZ1-K(AS) 0.6/1 kV, 1c-3x16 mm². | | | | | |
| Cableado RZ1MZ1-K(AS) 0.6/1 kV, 1c-3x16 mm². | m | 0.00 | 0.00 | | 0.00 |
| 65 | Wiring RZ1MZ1-K(AS) 0.6/1 kV, 1c-7x2.5 mm². | | | | | |
| Cable RZ1MZ1-K(AS) 0.6/1 kV, 1c-7x2.5 mm². | m | 0.00 | 0.00 | | 0.00 |
| 66 | Wiring RZ1MZ1-K(AS) 0.6/1 kV, 1c-10x2.5 mm². | | | | | |
| Cable RZ1MZ1-K(AS) 0.6/1 kV, 1c-10x2.5 mm². | m | 0.00 | 0.00 | | 0.00 |
| 67 | Wiring RZ1MZ1-K(AS) 0.6/1 kV, 1c-12x2.5 mm². | | | | | |
| Cable RZ1MZ1-K(AS) 0.6/1 kV, 1c-12x2.5 mm². | m | 0.00 | 0.00 | | 0.00 |
| 68 | Wiring RZ1MZ1-K(AS) 0.6/1 kV, 1c-5x10 mm². | | | | | |
| Cable RZ1MZ1-K(AS) 0.6/1 kV, 1c-5x10 mm². | m | 0.00 | 0.00 | | 0.00 |
| 69 | Wiring RZ1MAZ1-K(AS) 0.6/1 kV, 4c-1x35 mm². | | | | | |
| Cable RZ1MAZ1-K(AS) 0.6/1 kV, 4c-1x35 mm². | m | 0.00 | 0.00 | | 0.00 |
| 70 | Wiring RZ1-K(AS) 0.6/1 kV, 3c-1x2.5 mm². | | | | | |
| Cable RZ1-K(AS) 0.6/1 kV, 3c-1x2.5 mm². | m | 0.00 | 0.00 | | 0.00 |
| 71 | Wiring RZ1-K(AS) 0.6/1 kV, 3c-1x4 mm². | | | | | |
| Cable RZ1-K(AS) 0.6/1 kV, 3c-1x4 mm². | m | 0.00 | 0.00 | | 0.00 |
| 72 | Wiring RZ1-K(AS) 0.6/1 kV, 3c-1x6 mm². | | | | | |
| Cable RZ1-K(AS) 0.6/1 kV, 3c-1x6 mm². | m | 0.00 | 0.00 | | 0.00 |
| 73 | Wiring RZ1-K(AS) 0.6/1 kV, 3c-1x10 mm². | | | | | |
| Cable RZ1-K(AS) 0.6/1 kV, 3c-1x10 mm². | m | 0.00 | 0.00 | | 0.00 |
| 74 | Wiring RZ1-K(AS) 0.6/1 kV, 3c-1x16 mm². | | | | | |
| Cable RZ1-K(AS) 0.6/1 kV, 3c-1x16 mm². | m | 0.00 | 0.00 | | 0.00 |
| 75 | Wiring RZ1-K(AS) 0.6/1 kV, 5c-1x6 mm². | | | | | |
| Cable RZ1-K(AS) 0.6/1 kV, 5c-1x6 mm². | m | 0.00 | 0.00 | | 0.00 |
| 76 | Wiring RZ1-K(AS) 0.6/1 kV, 4c-1x35 mm². | | | | | |
| Cable RZ1-K(AS) 0.6/1 kV, 4c-1x35 mm². | m | 0.00 | 0.00 | | 0.00 |
| Total AASS Equipment, LV wiring, conduits and accesories | | | | | |
| Total Equipamiento SSAA, cableado de BT, canalizaciones y accesorios | | 0.00 | 0.00 | 0.00 | 0.00 |
| BLDG1282 Raceways, devices, interior distribution, miscellaneous | | | | | |
| Edif1282 Canalizaciones, mecanismos, distribución interior BT y varios. | | | | | |
| 77 | BLDG1282 Raceways, devices, interior distribution, miscellaneous. | | | | | |
| Edif1282 Canalizaciones, mecanismos, distribución interior BT y varios. | JOB | 0.00 | 0.00 | | 0.00 |
| Total BLDG1282 Raceways, devices, interior distribution, miscellaneous | | | | | |
| Total Edif1282 Canalizaciones, mecanismos, distribución interior BT y varios. | | 0.00 | 0.00 | 0.00 | 0.00 |
| Bldg1282 Interior grounding system | | | | | |
| Edif 1282 Puesta a tierra interior | | | | | |
| 78 | Bldg1282 Interior grounding system. | | | | | |
| Edif 1282 Puesta a tierra interior. | JOB | 0.00 | 0.00 | | 0.00 |
| Total Bldg1282 Interior grounding system | | | | | |
| Total Edif 1282 Puesta a tierra interior | | 0.00 | 0.00 | 0.00 | 0.00 |
| Interior and Exterior Lighting System | | | | | |
| Sistema de Iluminación Interior y Exterior | | | | | |
| 79 | L1 luminaries. Including wring, conduits, control devices and accesories. | | | | | |
| Luminarias L1. Incluso cableado, canalizaciones, dispositivos de control y accesorios. | ea | 0.00 | 0.00 | | 0.00 |
| 80 | L2 luminaries. Including wring, conduits, control devices and accesories. | | | | | |
| Luminarias L2. Incluso cableado, canalizaciones, dispositivos de control y accesorios. | ea | 0.00 | 0.00 | | 0.00 |
| 81 | L2 luminaries (emergency). Including wring, conduits, control devices and accesories. | | | | | |
| Luminarias L2 (emergencia). Incluso cableado, canalizaciones, dispositivos de control y accesorios. | ea | 0.00 | 0.00 | | 0.00 |
| Total Interior and Exterior Lighting System | | | | | |
| Total Sistema de Iluminación Interior y Exterior | | 0.00 | 0.00 | 0.00 | 0.00 |
| Emergency generator connection receptacle | | | | | |
| Base de corriente para conexión de generador de emergencia | | | | | |
| 82 | Emergency generator connection receptacle. | | | | | |
| Base de corriente para conexión de generador de emergencia. | ea | 0.00 | 0.00 | | 0.00 |
| Total Emergency generator connection receptacle | | | | | |
| Total Base de corriente para conexión de generador de emergencia | | 0.00 | 0.00 | 0.00 | 0.00 |
| B1282 AASS transformer | | | | | |
| Transformador SSAA EDIF 1282 | | | | | |
| 83 | B1282 AASS 25 kVA transformer. | | | | | |
| Transformador de 25kVA. | ea | 0.00 | 0.00 | | 0.00 |
| Total B1282 AASS transformer | | | | | |
| Total Transformador SSAA EDIF 1282 | | 0.00 | 0.00 | 0.00 | 0.00 |
| AASS LV Panelboards | | | | | |
| Cuadros BT SSAA | | | | | |
| 84 | Transfer load panel. | | | | | |
| Panel de transferencia. | ea | 0.00 | 0.00 | | 0.00 |
| 85 | 125 DC Panel. | | | | | |
| Panel 125 DC. | ea | 0.00 | 0.00 | | 0.00 |
| 86 | 24 DC Panel. | | | | | |
| Panel 24 DC. | ea | 0.00 | 0.00 | | 0.00 |
| 87 | AASS panelboard. | | | | | |
| Panel SSAA. | ea | 0.00 | 0.00 | | 0.00 |
| Tota Panelboards | | | | | |
| Total Cuadros de mando | | 0.00 | 0.00 | 0.00 | 0.00 |
| Rectifier-Batteries System | | | | | |
| Sistema Rectificador-Baterías | | | | | |
| 88 | 125Vdc Battery Rectifier. | | | | | |
| Rectificador de Baterías 125Vcc. | ea | 0.00 | 0.00 | | 0.00 |
| Tota Rectifier-Batteries System | | | | | |
| Total Sistema Rectificador-Baterías | | 0.00 | 0.00 | 0.00 | 0.00 |
| Energy metering and cabinet | | | | | |
| Medidores de energía y armario | | | | | |
| 89 | Energy company's metering cabinet and equipment. | | | | | |
| Armario y equipos de medida de compañía comercializadora. | ea | 0.00 | 0.00 | | 0.00 |
| Tota Energy metering and cabinet | | | | | |
| Total Medidores de energía y armario | | 0.00 | 0.00 | 0.00 | 0.00 |
| Transformer assembly box | | | | | |
| Caja de formación del transformador | | | | | |
| 90 | Transformer assembly box. | | | | | |
| Caja de formación del transformador. | ea | 0.00 | 0.00 | | 0.00 |
| Tota Transformer assembly box | | | | | |
| Total Caja de formación del transformador | | 0.00 | 0.00 | 0.00 | 0.00 |
| AVR current transformers T3CT3x | | | | | |
| Caja de formación del transformador | | | | | |
| 91 | Three ring-type current transformers for AVR (T3CT3x). | | | | | |
| Juaego de transformador de intensidad tipo toroidal para AVR (T3CT3x). | ea | 0.00 | 0.00 | | 0.00 |
| Total AASS Equipment, LV wiring, conduits and accesories | | | | | |
| Total Equipamiento SSAA, cableado de BT, canalizaciones y accesorios | | 0.00 | 0.00 | 0.00 | 0.00 |
| Exterior Grounding System | | | | | |
| Puesta a Tierra Exteriror | | | | | |
| 92 | Exterior Grounding System. | | | | | |
| Puesta a Tierra Exteriror. | JOB | 0.00 | 0.00 | | 0.00 |
| Total Exterior Grounding System | | | | | |
| Total Puesta a Tierra Exteriror | | 0.00 | 0.00 | 0.00 | 0.00 |
| Lightning protection system | | | | | |
| Sistema de protección contra el rayo | | | | | |
| 93 | Lightning protection system. | | | | | |
| Sistema de protección contra el rayo. | JOB | 0.00 | 0.00 | | 0.00 |
| Total Lightning protection system | | | | | |
| Total Sistema de protección contra el rayo | | 0.00 | 0.00 | 0.00 | 0.00 |
| Integrated Control and Protection System | | | | | |
| Sistema de Protección y Control Integrado | | | | | |
| 94 | Substation Control Unit (SCU). | | | | | |
| Unidad de Control de Subestación (SCU). | JOB | 0.00 | 0.00 | | 0.00 |
| 95 | Bay Control Unit (BCU-A2). | | | | | |
| Unidad de Control de Posición (BCU-A2). | JOB | 0.00 | 0.00 | | 0.00 |
| 96 | Bay Control Unit (BCU-A3). | | | | | |
| Unidad de Control de Posición (BCU-A3). | JOB | 0.00 | 0.00 | | 0.00 |
| 97 | Bay Control Unit (BCU-Mx). | | | | | |
| Unidad de Control de Posición (BCU-Mx). | JOB | 0.00 | 0.00 | | 0.00 |
| Total Integrated Control and Protection System | | | | | |
| Total Sistema de Protección y Control Integrado | | 0.00 | 0.00 | 0.00 | 0.00 |
| Telecomunication wiring system | | | | | |
| Sistema de cableado de Telecomunicaciones | | | | | |
| 98 | Telecomunication wiring system. | | | | | |
| Sistema de cableado de Telecomunicaciones. | JOB | 0.00 | 0.00 | | 0.00 |
| Total Telecomunication wiring system | | | | | |
| Total Sistema de cableado de Telecomunicaciones | | 0.00 | 0.00 | 0.00 | 0.00 |
| HV safety equipment and signaling | | | | | |
| Equipo de protección de AT y señalización | | | | | |
| 99 | HV safety equipment and signaling. | | | | | |
| Equipo de protección de AT y señalización. | JOB | 0.00 | 0.00 | | 0.00 |
| Total HV safety equipment and signaling | | | | | |
| Total Equipo de protección de AT y señalización | | 0.00 | 0.00 | 0.00 | 0.00 |
| Testing and verifications | | | | | |
| Verificaciones y ensayos | | | | | |
| 100 | Testing and verifications. | | | | | |
| Verificaciones y ensayos. | JOB | 0.00 | 0.00 | | 0.00 |
| Total Testing and verifications | | | | | |
| Total Verificaciones y ensayos | | 0.00 | 0.00 | 0.00 | 0.00 |
| Technical Direction & Commissioning Services | | | | | |
| Dirección Técnica y Servicios de puesta en marcha | | | | | |
| 101 | Technical Direction, commissioning and legalization services for the utilities. | | | | | |
| Dirección Técnica, servicios de puesta en marcha y legalización de las instalaciones. | JOB | 0.00 | 0.00 | | 0.00 |
| Total Technical Direction & Commissioning Services | | | | | |
| Total Dirección Técnica y Servicios de puesta en marcha | | 0.00 | 0.00 | 0.00 | 0.00 |
| Protection Devices Selectivity Studies Services | | | | | |
| Servicios de estudio de coordinación de protecciones | | | | | |
| 102 | Protection devices selectivity studies services. | | | | | |
| Servicios de estudio de coordinación de protecciones. | JOB | 0.00 | 0.00 | | 0.00 |
| Total Protection Devices Selectivity Studies Services | | | | | |
| Total Servicios de estudio de coordinación de protecciones | | 0.00 | 0.00 | 0.00 | 0.00 |
| Endesa's Technical and Economic Conditions | | | | | |
| Condiciones Técnicas y Económicas de Endesa | | | | | |
| 103 | Endesa works and fees. | | | | | |
| Trabajos y tasas de Endesa. | JOB | 0.00 | 0.00 | | 0.00 |
| Total Endesa's Technical and Economic Conditions | | | | | |
| Total Condiciones Técnicas y Económicas de Endesa | | 0.00 | 0.00 | 0.00 | 0.00 |
| TOTAL ELECTRICAL WORKS | | | | | |
| TOTAL TRABAJOS ELÉCTRICOS | | 0.00 | 0.00 | 0.00 | 0.00 |
| WORK SUMMARY | | | | |
| RESUMEN TRABAJOS | | | | |
| TOTAL DEMOLITION WORKS | | | | |
| TOTAL TRABAJOS DE DEMOLICIÓN | 0.00 | 0.00 | 0.00 | 0.00 |
| TOTAL CIVIL WORKS | | | | |
| TOTAL TRABAJOS DE CIVIL | 0.00 | 0.00 | 0.00 | 0.00 |
| TOTAL HV SWITCHGEAR STEEL SUPPORTS | | | | |
| TOTAL SOPORTES DE APARAMENTA DE AT DE ACERO | 0.00 | 0.00 | 0.00 | 0.00 |
| TOTAL ARCHITECTURAL WORKS | | | | |
| TOTAL TRABAJOS DE ARQUITECTURA | 0.00 | 0.00 | 0.00 | 0.00 |
| TOTAL PLUMBING WORKS | | | | |
| TOTAL TRABAJOS DE FONTANERÍA | 0.00 | 0.00 | 0.00 | 0.00 |
| TOTAL MECHANICAL WORKS | | | | |
| TOTAL TRABAJOS DE MECÁNICA | 0.00 | 0.00 | 0.00 | 0.00 |
| TOTAL ELECTRICAL WORKS | | | | |
| TOTAL TRABAJOS DE ELECTRICIDAD | 0.00 | 0.00 | 0.00 | 0.00 |
| TOTAL | | | | |
| TOTAL | 0.00 | 0.00 | 0.00 | 0.00 |
TOTAL MATERIAL COSTS 0.00
TOTAL LABOR COSTS 0.00
TOTAL OTHER DIRECT COSTS 0.00
TOTAL DIRECT COSTS 0.00
OVERHEAD 0.00 % 0.00
PROFIT 0.00 % 0.00
| TOTAL PROJECT EUROS | | | 0.00 |
| FY2025 | $1 | 0.9249 | euros | |
| TOTAL PROJECT US$ | | | 0.00 |
DATE: FIRM NAME:
These costs and overhead and profit percentages will be applied in any possible future modifications
&"Times New Roman,Regular"&9 CONSTRUCTION COST ESTIMATE BREAKDOWN &"Times New Roman,Regular"&9Page &P of &N
ADDITIVE 1
| CONSTRUCTION COST ESTIMATE BREAKDOWN | incluso carga sobre camión de residuos, transporte y entrega a gestor autorizado de vertidos. | | | | | | | | | |
| CONTRACTOR | | | | | ADDRESS | | | | | |
| | | | | MORÓN AIR BASE, SPAIN | | | | | |
| CONTRACT FOR (Work to be performed) | | | | | | PROPOSED TOTAL CONTRACT PRICE | | | | |
| CNS ALT SUBSTATION | | | ADDITIVE #1 | | | | ERROR:#REF! | | ERROR:#REF! | |
| PURCHASE REQUEST NUMBER | | | PROJECT NUMBER | | | WORK LOCATION | | | | |
| | | QUUG 10-1049 | | | MORÓN AIR BASE, SPAIN | | | | |
| | UNIT | | MATERIAL COST | | | LABOR COSTS | | OTHER | |
| LIN | ITEM | OF | | | | | | | DIRECT | LINE |
| NO. | ADDITIVE 1 | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) |
| Electrical Works | | | | | | | | | |
| Trabajos de Electricidad | | | | | | | | | |
| 1 | ICPS emergency direct current (DC) power supply. | | | | | | | | | |
| Alimentación de corriente continua de emergencia para ICPS. | EA | 1.00 | | 0.00 | | | 0.00 | | 0.00 |
| Total Electrical Works | | | | | | | | | |
| Total Trabajos de Electricidad | | | | 0.00 | | | 0.00 | 0.00 | 0.00 |
| WORK SUMMARY | | | | |
| RESUMEN TRABAJOS | | | | |
| TOTAL ELECTRICAL WORKS | | | | |
| TOTAL TRABAJOS DE ELECTRICIDAD | 0.00 | 0.00 | 0.00 | 0.00 |
| TOTAL | | | | |
| TOTAL | 0.00 | 0.00 | 0.00 | 0.00 |
TOTAL MATERIAL COSTS 0.00
TOTAL LABOR COSTS 0.00
TOTAL OTHER DIRECT COSTS 0.00
TOTAL DIRECT COSTS 0.00
OVERHEAD 0.00 % 0.00
PROFIT 0.00 % 0.00
| TOTAL PROJECT EUROS | | | 0.00 |
| FY2025 | $1 | 0.9249 | euros | |
| TOTAL PROJECT US$ | | | 0.00 |
FIRM NAME: GABINETE DE INGENIERÍA Y SISTEMAS ANDALUZ, S.L.
These costs and overhead and profit percentages will be applied in any possible future modifications
&"Times New Roman,Regular"&9 CONSTRUCTION COST ESTIMATE BREAKDOWN &"Times New Roman,Regular"&9Page &P of &N
ADDITIVE 2
| CONSTRUCTION COST ESTIMATE BREAKDOWN | incluso carga sobre camión de residuos, transporte y entrega a gestor autorizado de vertidos. | | | | | | | | | |
| CONTRACTOR | | | | | ADDRESS | | | | | |
| | | | | MORÓN AIR BASE, SPAIN | | | | | |
| CONTRACT FOR (Work to be performed) | | | | | | PROPOSED TOTAL CONTRACT PRICE | | | | |
| CNS ALT SUBSTATION | | | ADDITIVE #2 | | | | 0.00 € | | $0.00 | |
| PURCHASE REQUEST NUMBER | | | PROJECT NUMBER | | | WORK LOCATION | | | | |
| | | QUUG 10-1049 | | | MORÓN AIR BASE, SPAIN | | | | |
| | UNIT | | MATERIAL COST | | | LABOR COSTS | | OTHER | |
| LIN | ITEM | OF | | | | | | | DIRECT | LINE |
| NO. | ADDITIVE 2 | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) |
| Demolition Works | | | | | | | | | |
| Trabajos de Demolición | | | | | | | | | |
| 1 | High voltage yard security fence demolition. | | | | | | | | | |
| Demolición de vallado de seguridad de parque de alta tensión. | m | | | 0.00 | | 26.00 | 0.00 | | 0.00 |
| Total Demolition Works | | | | | | | | | |
| Total Trabajos de Demolición | | | | 0.00 | | | 0.00 | 0.00 | 0.00 |
| Civil Works | | | | | | |
| Trabajos de Civil | | | | | | |
| 2 | Excavations and subgrade compaction. | | | | | | |
| Excavaciones y compactación de fondo de excavación. | m3 | 0.00 | 26.00 | 0.00 | | 0.00 |
| 3 | Security fence with concrete wall and access door. | | | | | | |
| Vallado de seguridad con muro de hormigón y puerta de acceso. | m | 0.00 | 26.00 | 0.00 | | 0.00 |
| Total Civil Works | | | | | | |
| Total Trabajos de Civil | | 0.00 | | 0.00 | 0.00 | 0.00 |
| WORK SUMMARY | | | | |
| RESUMEN TRABAJOS | | | | |
| TOTAL DEMOLITION WORKS | | | | |
| TOTAL TRABAJOS DE DEMOLICIÓN | 0.00 | 0.00 | 0.00 | 0.00 |
| TOTAL CIVIL WORKS | | | | |
| TOTAL TRABAJOS DE CIVIL | 0.00 | 0.00 | 0.00 | 0.00 |
| TOTAL | | | | |
| TOTAL | 0.00 | 0.00 | 0.00 | 0.00 |
TOTAL MATERIAL COSTS 0.00
TOTAL LABOR COSTS 0.00
TOTAL OTHER DIRECT COSTS 0.00
TOTAL DIRECT COSTS 0.00
OVERHEAD 0.00 % 0.00
PROFIT 0.00 % 0.00
| TOTAL PROJECT EUROS | | | 0.00 |
| FY2025 | $1 | 0.9249 | euros | |
| TOTAL PROJECT US$ | | | 0.00 |
FIRM NAME: GABINETE DE INGENIERÍA Y SISTEMAS ANDALUZ, S.L.
These costs and overhead and profit percentages will be applied in any possible future modifications
&"Times New Roman,Regular"&9 CONSTRUCTION COST ESTIMATE BREAKDOWN &"Times New Roman,Regular"&9Page &P of &N