10. Price Schedule - Exhibits (Rev 27NOV24).xlsx
XLSX spreadsheet 45 KB Posted
- Attached to
- Okinawa Interior/Exterior Paint IDIQ
- Solicitation number
- FA527023R0018
About this file
This is a pricing schedule template for an Okinawa Interior/Exterior Paint Program IDIQ contract (FA527023R0018) that spans a 5-year base period (February 1, 2025 - January 31, 2030) plus a 2-year option period (February 1, 2030 - January 31, 2032). The template is divided into six exhibits covering Military Family Housing (MFH), Operations & Maintenance (O&M), and Department of Public Works (DPW) facilities.
The pricing template requires unit prices per square meter in either JPY or USD (FY25 budget exchange rate of 1 USD = 145.7323 JPY) for various types of painting services including latex, enamel, epoxy, wood staining/varnish, anti-corrosive paint, and textured finishes for both interior and exterior applications. Surface preparation is included in most line items except for MFH work. The template also includes separate line items for scaffolding services. Each exhibit breaks down pricing by 12-month periods across the total potential 7-year contract duration.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUMMARY
Instruction to Offerors: Please insert prices in JPY (whole numbers only) or USD. FY25 Budget Exchange Rate $ 1 = JPY 145.7323.
| COMPANY NAME |
| POC |
| DATE |
OKINAWA INTERIOR/EXTERIOR PAINT PROGRAM
RFP: FA527023R0018
Amendment 0002 (Revised on 27 November 2024)
Exhibit A (MFH Base) Exhibit A: MFH - Interior Painting
| AA: Latex | ||||
| ITEM NO | PERIOD | ESTIMATED DATES | UNIT OF MEASURE | UNIT PRICE |
| AA01 | 0-12 MONTHS | 01FEB25-31JAN26 | SQUARE METER | |
| AA02 | 13-24 MONTHS | 01FEB26-31JAN27 | SQUARE METER | |
| AA03 | 25-36 MONTHS | 01FEB27-31JAN28 | SQUARE METER | |
| AA04 | 37-48 MONTHS | 01FEB28-31JAN29 | SQUARE METER | |
| AA05 | 49-60 MONTHS | 01FEB29-31JAN30 | SQUARE METER |
| AB: Enamel | ||||
| ITEM NO | PERIOD | ESTIMATED DATES | UNIT OF MEASURE | UNIT PRICE |
| AB01 | 0-12 MONTHS | 01FEB25-31JAN26 | SQUARE METER | |
| AB02 | 13-24 MONTHS | 01FEB26-31JAN27 | SQUARE METER | |
| AB03 | 25-36 MONTHS | 01FEB27-31JAN28 | SQUARE METER | |
| AB04 | 37-48 MONTHS | 01FEB28-31JAN29 | SQUARE METER | |
| AB05 | 49-60 MONTHS | 01FEB29-31JAN30 | SQUARE METER |
| AC: Wood Staining / Varnish | ||||
| ITEM NO | PERIOD | ESTIMATED DATES | UNIT OF MEASURE | UNIT PRICE |
| AC01 | 0-12 MONTHS | 01FEB25-31JAN26 | SQUARE METER | |
| AC02 | 13-24 MONTHS | 01FEB26-31JAN27 | SQUARE METER | |
| AC03 | 25-36 MONTHS | 01FEB27-31JAN28 | SQUARE METER | |
| AC04 | 37-48 MONTHS | 01FEB28-31JAN29 | SQUARE METER | |
| AC05 | 49-60 MONTHS | 01FEB29-31JAN30 | SQUARE METER |
&9RFP: FA527023R0018
Amendment 0002 Rev 27 November 2024 BASE - 5 YEAR ORDERING PERIOD
01 FEBRUARY 2025 - 31 JANUARY 2030
Exhibit B (O&M DPW Base) Exhibit B: O&M and DPW - Interior Painting
| BA: Latex (including surface prep) | ||||
| ITEM NO | PERIOD | ESTIMATED DATES | UNIT OF MEASURE | UNIT PRICE |
| BA01 | 0-12 MONTHS | 01FEB25-31JAN26 | SQUARE METER | |
| BA02 | 13-24 MONTHS | 01FEB26-31JAN27 | SQUARE METER | |
| BA03 | 25-36 MONTHS | 01FEB27-31JAN28 | SQUARE METER | |
| BA04 | 37-48 MONTHS | 01FEB28-31JAN29 | SQUARE METER | |
| BA05 | 49-60 MONTHS | 01FEB29-31JAN30 | SQUARE METER |
| BB: Epoxy (including surface prep) | ||||
| ITEM NO | PERIOD | ESTIMATED DATES | UNIT OF MEASURE | UNIT PRICE |
| BB01 | 0-12 MONTHS | 01FEB25-31JAN26 | SQUARE METER | |
| BB02 | 13-24 MONTHS | 01FEB26-31JAN27 | SQUARE METER | |
| BB03 | 25-36 MONTHS | 01FEB27-31JAN28 | SQUARE METER | |
| BB04 | 37-48 MONTHS | 01FEB28-31JAN29 | SQUARE METER | |
| BB05 | 49-60 MONTHS | 01FEB29-31JAN30 | SQUARE METER |
| BC: Enamel (included surface prep) | ||||
| ITEM NO | PERIOD | ESTIMATED DATES | UNIT OF MEASURE | UNIT PRICE |
| BC01 | 0-12 MONTHS | 01FEB25-31JAN26 | SQUARE METER | |
| BC02 | 13-24 MONTHS | 01FEB26-31JAN27 | SQUARE METER | |
| BC03 | 25-36 MONTHS | 01FEB27-31JAN28 | SQUARE METER | |
| BC04 | 37-48 MONTHS | 01FEB28-31JAN29 | SQUARE METER | |
| BC05 | 49-60 MONTHS | 01FEB29-31JAN30 | SQUARE METER |
| BD: Wood Staining/Varnish (including surface prep) | ||||
| ITEM NO | PERIOD | ESTIMATED DATES | UNIT OF MEASURE | UNIT PRICE |
| BD01 | 0-12 MONTHS | 01FEB25-31JAN26 | SQUARE METER | |
| BD02 | 13-24 MONTHS | 01FEB26-31JAN27 | SQUARE METER | |
| BD03 | 25-36 MONTHS | 01FEB27-31JAN28 | SQUARE METER | |
| BD04 | 37-48 MONTHS | 01FEB28-31JAN29 | SQUARE METER | |
| BD05 | 49-60 MONTHS | 01FEB29-31JAN30 | SQUARE METER |
| BE: Anti-Corrosive Paint (including surface prep) | ||||
| ITEM NO | PERIOD | ESTIMATED DATES | UNIT OF MEASURE | UNIT PRICE |
| BE01 | 0-12 MONTHS | 01FEB25-31JAN26 | SQUARE METER | |
| BE02 | 13-24 MONTHS | 01FEB26-31JAN27 | SQUARE METER | |
| BE03 | 25-36 MONTHS | 01FEB27-31JAN28 | SQUARE METER | |
| BE04 | 37-48 MONTHS | 01FEB28-31JAN29 | SQUARE METER | |
| BE05 | 49-60 MONTHS | 01FEB29-31JAN30 | SQUARE METER |
| BF: Scaffolding (rolling tower) | ||||
| ITEM NO | PERIOD | ESTIMATED DATES | UNIT OF MEASURE | UNIT PRICE |
| BF01 | 0-12 MONTHS | 01FEB25-31JAN26 | SQUARE METER | |
| BF02 | 13-24 MONTHS | 01FEB26-31JAN27 | SQUARE METER | |
| BF03 | 25-36 MONTHS | 01FEB27-31JAN28 | SQUARE METER | |
| BF04 | 37-48 MONTHS | 01FEB28-31JAN29 | SQUARE METER | |
| BF05 | 49-60 MONTHS | 01FEB29-31JAN30 | SQUARE METER |
27 November 2024
BASE - 5 YEAR ORDERING PERIOD
01 FEBRUARY 2025 - 31 JANUARY 2030
Exhibit C (All Exterior) Exhibit C: Exterior Painting - All Facilities
| CA: Latex (including surface prep) | ||||
| ITEM NO | PERIOD | ESTIMATED DATES | UNIT OF MEASURE | UNIT PRICE |
| CA01 | 0-12 MONTHS | 01FEB25-31JAN26 | SQUARE METER | |
| CA02 | 13-24 MONTHS | 01FEB26-31JAN27 | SQUARE METER | |
| CA03 | 25-36 MONTHS | 01FEB27-31JAN28 | SQUARE METER | |
| CA04 | 37-48 MONTHS | 01FEB28-31JAN29 | SQUARE METER | |
| CA05 | 49-60 MONTHS | 01FEB29-31JAN30 | SQUARE METER |
| CB: Latex with Textured Finish (including surface prep) | ||||
| ITEM NO | PERIOD | ESTIMATED DATES | UNIT OF MEASURE | UNIT PRICE |
| CB01 | 0-12 MONTHS | 01FEB25-31JAN26 | SQUARE METER | |
| CB02 | 13-24 MONTHS | 01FEB26-31JAN27 | SQUARE METER | |
| CB03 | 25-36 MONTHS | 01FEB27-31JAN28 | SQUARE METER | |
| CB04 | 37-48 MONTHS | 01FEB28-31JAN29 | SQUARE METER | |
| CB05 | 49-60 MONTHS | 01FEB29-31JAN30 | SQUARE METER |
| CC: Epoxy (Including surface prep) | ||||
| ITEM NO | PERIOD | ESTIMATED DATES | UNIT OF MEASURE | UNIT PRICE |
| CC01 | 0-12 MONTHS | 01FEB25-31JAN26 | SQUARE METER | |
| CC02 | 13-24 MONTHS | 01FEB26-31JAN27 | SQUARE METER | |
| CC03 | 25-36 MONTHS | 01FEB27-31JAN28 | SQUARE METER | |
| CC04 | 37-48 MONTHS | 01FEB28-31JAN29 | SQUARE METER | |
| CC05 | 49-60 MONTHS | 01FEB29-31JAN30 | SQUARE METER |
| CD: Enamel (including surface prep) | ||||
| ITEM NO | PERIOD | ESTIMATED DATES | UNIT OF MEASURE | UNIT PRICE |
| CD01 | 0-12 MONTHS | 01FEB25-31JAN26 | SQUARE METER | |
| CD02 | 13-24 MONTHS | 01FEB26-31JAN27 | SQUARE METER | |
| CD03 | 25-36 MONTHS | 01FEB27-31JAN28 | SQUARE METER | |
| CD04 | 37-48 MONTHS | 01FEB28-31JAN29 | SQUARE METER | |
| CD05 | 49-60 MONTHS | 01FEB29-31JAN30 | SQUARE METER |
| CE: Wood Staining/Varnish (including surface prep) | ||||
| ITEM NO | PERIOD | ESTIMATED DATES | UNIT OF MEASURE | UNIT PRICE |
| CE01 | 0-12 MONTHS | 01FEB25-31JAN26 | SQUARE METER | |
| CE02 | 13-24 MONTHS | 01FEB26-31JAN27 | SQUARE METER | |
| CE03 | 25-36 MONTHS | 01FEB27-31JAN28 | SQUARE METER | |
| CE04 | 37-48 MONTHS | 01FEB28-31JAN29 | SQUARE METER | |
| CE05 | 49-60 MONTHS | 01FEB29-31JAN30 | SQUARE METER |
| CF: Anti-Corrosive Paint (including surface prep) | ||||
| ITEM NO | PERIOD | ESTIMATED DATES | UNIT OF MEASURE | UNIT PRICE |
| CF01 | 0-12 MONTHS | 01FEB25-31JAN26 | SQUARE METER | |
| CF02 | 13-24 MONTHS | 01FEB26-31JAN27 | SQUARE METER | |
| CF03 | 25-36 MONTHS | 01FEB27-31JAN28 | SQUARE METER | |
| CF04 | 37-48 MONTHS | 01FEB28-31JAN29 | SQUARE METER | |
| CF05 | 49-60 MONTHS | 01FEB29-31JAN30 | SQUARE METER |
| CG: Scaffolding | ||||
| ITEM NO | PERIOD | ESTIMATED DATES | UNIT OF MEASURE | UNIT PRICE |
| CG01 | 0-12 MONTHS | 01FEB25-31JAN26 | SQUARE METER | |
| CG02 | 13-24 MONTHS | 01FEB26-31JAN27 | SQUARE METER | |
| CG03 | 25-36 MONTHS | 01FEB27-31JAN28 | SQUARE METER | |
| CG04 | 37-48 MONTHS | 01FEB28-31JAN29 | SQUARE METER | |
| CG05 | 49-60 MONTHS | 01FEB29-31JAN30 | SQUARE METER |
27 November 2024 BASE - 5 YEAR ORDERING PERIOD
01 FEBRUARY 2025 - 31 JANUARY 2030
Exhibit D (MFH OY1) Exhibit D: MFH - Interior Painting
| DA: Latex | ||||
| ITEM NO | PERIOD | ESTIMATED DATES | UNIT OF MEASURE | UNIT PRICE |
| DA01 | 61-72 MONTHS | 01FEB30-31JAN31 | SQUARE METER | |
| DA02 | 73-84 MONTHS | 01FEB31-31JAN32 | SQUARE METER |
| DB: Enamel | ||||
| ITEM NO | PERIOD | ESTIMATED DATES | UNIT OF MEASURE | UNIT PRICE |
| DB01 | 61-72 MONTHS | 01FEB30-31JAN31 | SQUARE METER | |
| DB02 | 73-84 MONTHS | 01FEB31-31JAN32 | SQUARE METER |
| DC: Wood Staining / Varnish | ||||
| ITEM NO | PERIOD | ESTIMATED DATES | UNIT OF MEASURE | UNIT PRICE |
| DC01 | 61-72 MONTHS | 01FEB30-31JAN31 | SQUARE METER | |
| DC02 | 73-84 MONTHS | 01FEB31-31JAN32 | SQUARE METER |
&7RFP: FA527023R0018
27 November 2024 OPTION YEAR 1 - 2 YEAR ORDERING PERIOD
01 FEBRUARY 2030 - 31 JANUARY 2032
Exhibit E (O&M DPW OY1) Exhibit E: O&M and DPW - Interior Painting
| EA: Latex (including surface prep) | ||||
| ITEM NO | PERIOD | ESTIMATED DATES | UNIT OF MEASURE | UNIT PRICE |
| EA01 | 61-72 MONTHS | 01FEB30-31JAN31 | SQUARE METER | |
| EA02 | 73-84 MONTHS | 01FEB31-31JAN32 | SQUARE METER |
| EB: Epoxy (including surface prep) | ||||
| ITEM NO | PERIOD | ESTIMATED DATES | UNIT OF MEASURE | UNIT PRICE |
| EB01 | 61-72 MONTHS | 01FEB30-31JAN31 | SQUARE METER | |
| EB02 | 73-84 MONTHS | 01FEB31-31JAN32 | SQUARE METER |
| EC: Enamel (included surface prep) | ||||
| ITEM NO | PERIOD | ESTIMATED DATES | UNIT OF MEASURE | UNIT PRICE |
| EC01 | 61-72 MONTHS | 01FEB30-31JAN31 | SQUARE METER | |
| EC02 | 73-84 MONTHS | 01FEB31-31JAN32 | SQUARE METER |
| ED: Wood Staining/Varnish (including surface prep) | ||||
| ITEM NO | PERIOD | ESTIMATED DATES | UNIT OF MEASURE | UNIT PRICE |
| ED01 | 61-72 MONTHS | 01FEB30-31JAN31 | SQUARE METER | |
| ED02 | 73-84 MONTHS | 01FEB31-31JAN32 | SQUARE METER |
| EE: Anti-Corrosive Paint (including surface prep) | ||||
| ITEM NO | PERIOD | ESTIMATED DATES | UNIT OF MEASURE | UNIT PRICE |
| EE01 | 61-72 MONTHS | 01FEB30-31JAN31 | SQUARE METER | |
| EE02 | 73-84 MONTHS | 01FEB31-31JAN32 | SQUARE METER |
| EF: Scaffolding (rolling tower) | ||||
| ITEM NO | PERIOD | ESTIMATED DATES | UNIT OF MEASURE | UNIT PRICE |
| EF01 | 61-72 MONTHS | 01FEB30-31JAN31 | SQUARE METER | |
| EF02 | 73-84 MONTHS | 01FEB31-31JAN32 | SQUARE METER |
&8RFP: FA527023R0018
27 November 2024 OPTION YEAR 1 - 2 YEAR ORDERING PERIOD
01 FEBRUARY 2030 - 31 JANUARY 2032
Exhibit F (All Exterior OY1) Exhibit F: Exterior Painting - All Facilities
| FA: Latex (including surface prep) | ||||
| ITEM NO | PERIOD | ESTIMATED DATES | UNIT OF MEASURE | UNIT PRICE |
| FA01 | 61-72 MONTHS | 01FEB30-31JAN31 | SQUARE METER | |
| FA02 | 73-84 MONTHS | 01FEB31-31JAN32 | SQUARE METER |
| FB: Latex with Textured Finish (including surface prep) | ||||
| ITEM NO | PERIOD | ESTIMATED DATES | UNIT OF MEASURE | UNIT PRICE |
| FB01 | 61-72 MONTHS | 01FEB30-31JAN31 | SQUARE METER | |
| FB02 | 73-84 MONTHS | 01FEB31-31JAN32 | SQUARE METER |
| FC: Epoxy (Including surface prep) | ||||
| ITEM NO | PERIOD | ESTIMATED DATES | UNIT OF MEASURE | UNIT PRICE |
| FC01 | 61-72 MONTHS | 01FEB30-31JAN31 | SQUARE METER | |
| FC02 | 73-84 MONTHS | 01FEB31-31JAN32 | SQUARE METER |
| FD: Enamel (including surface prep) | ||||
| ITEM NO | PERIOD | ESTIMATED DATES | UNIT OF MEASURE | UNIT PRICE |
| FD01 | 61-72 MONTHS | 01FEB30-31JAN31 | SQUARE METER | |
| FD02 | 73-84 MONTHS | 01FEB31-31JAN32 | SQUARE METER |
| FE: Wood Staining/Varnish (including surface prep) | ||||
| ITEM NO | PERIOD | ESTIMATED DATES | UNIT OF MEASURE | UNIT PRICE |
| FE01 | 61-72 MONTHS | 01FEB30-31JAN31 | SQUARE METER | |
| FE02 | 73-84 MONTHS | 01FEB31-31JAN32 | SQUARE METER |
| FF: Anti-Corrosive Paint (including surface prep) | ||||
| ITEM NO | PERIOD | ESTIMATED DATES | UNIT OF MEASURE | UNIT PRICE |
| FF01 | 61-72 MONTHS | 01FEB30-31JAN31 | SQUARE METER | |
| FF02 | 73-84 MONTHS | 01FEB31-31JAN32 | SQUARE METER |
| FG: Scaffolding | ||||
| ITEM NO | PERIOD | ESTIMATED DATES | UNIT OF MEASURE | UNIT PRICE |
| FG01 | 61-72 MONTHS | 01FEB30-31JAN31 | SQUARE METER | |
| FG02 | 73-84 MONTHS | 01FEB31-31JAN32 | SQUARE METER |
&9RFP: FA527023R0018
27 November 2024 OPTION YEAR 1 - 2 YEAR ORDERING PERIOD
01 FEBRUARY 2030 - 31 JANUARY 2032