Solicitation Amendment FA524025R00020004 SF 30.pdf

PDF 1 MB Posted

Attached to
AJJY 25-1072M Repair Palau Dorm B25016
Solicitation number
FA524025R0002
Issued by

About this file

This document is a Standard Form 30 (SF 30) Amendment of Solicitation/Modification of Contract for solicitation FA524025R0002, related to the AJJY 25-1072M project for repairing Palau Dorm B25016. The amendment, numbered 0004 with an effective date of 30 Jun 2025, updates Section J's list of attachments and extends the Past Performance Questionnaire (PPQ) due date to Monday, 07 July 2025.

The amendment includes multiple attachments such as the Statement of Work, contractor antiterrorism awareness documents, design drawings, seismic reports, asbestos reports, HVAC standardization guidance, fire alarm panel approval memorandum, project requirement price schedule, and wage determination documents. The solicitation is issued by the Department of the Air Force Pacific Air Forces and appears to be for construction or renovation services at Andersen Air Force Base in Guam, with various technical and administrative documents provided to support the bidding process.

View the file

Other files

File Type Posted
Solicitation Amendment - FA524025R00020004.pdf PDF
RFI_QA_AJJY 25-1072M Repair Palau Dorm B25016_30JUN25.pdf PDF
Att. 04_Past Performance Questionnaire (PPQ)_30June25.docx DOCX document
Solicitation Amendment - FA524025R00020003.pdf PDF
Solicitation Amendment FA524025R00020003 SF 30.pdf PDF
Att. 10_Pump Room Photos.zip ZIP file
Att. 09b As-Builts.zip ZIP file
Att. 09a As-Builts.zip ZIP file
RFI - QA AJJY 25-1072M Repair Palau Dorm B25016_18JUN25.pdf PDF
Solicitation Amendment FA524025R00020002 SF 30.pdf PDF
Solicitation Amendment - FA524025R00020002.pdf PDF
QA_AJJY 25-1072M Repair Palau Dorm B25016_05Jun25.pdf PDF
Solicitation Amendment - FA524025R00020001.pdf PDF
Att. 04_Past Performance Questionnaire (PPQ)_05June25.docx DOCX document
Solicitation Amendment FA524025R00020001 SF 30.pdf PDF
Att. 1A_AAFB Contractor Antiterrorism Awareness.pdf PDF
Att. 1B_36 CES Contractors BUILDER Inventory Sheet Template.xlsx XLSX spreadsheet
Att. 1H_AJJY 25-1072M ASCE7-16 Seismic.pdf PDF
Att. 03_Past Performance Fact Sheet.docx DOCX document
Att. 06_Wage Determination (GU20250001).pdf PDF
Att. 1F_AJJY 25-1072M_Jacobs Asbestos Report.pdf PDF
Att. 1J_Cat Management 4 - HVAC Standardization Policy Guidance Memorandums.pdf PDF
Att. 1K_USAF Fire Alarm Panel Approval Memorandum.pdf PDF
Att. 1L_3R (Recognize, Retreat, Report) and On-Call Construction Support Guidance.pdf PDF
Att. 05_AAFB IFS_27Feb24.pdf PDF
Att. 01_AJJY 25-1072M_Statement of Work (SOW)_15May25.pdf PDF
Att. 1G_AJJY 25-1072M_EMPSCO_APEC Asbestos & Lead Report.pdf PDF
Att. 1I_AJJY 25-1072M_ASCE41-17 Seismic.pdf PDF
Att. 07_Common Construction Prevailing Wage Rates_Guam.pdf PDF
Att. 1C_AJJY25-1072M B25016 Palau Dorm Map.pdf PDF
Att. 1D_AJJY 25-1072M_35pct Design Drawings.pdf PDF
Att. 1E_AJJY 25-1072M_35pct Concept Design.pdf PDF
Att. 02_Project Requirement Price Schedule.docx DOCX document
Att. 08_PIEE Proposal Manager Reference Guide.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Section J - List of Attachments

Header Miscellaneous Text (Modified):

Att. 01_AJJY 25-1072M_Statement of Work (SOW)_15May25

Att. 1A_AAFB Contractor Antiterrorism Awareness

Att. 1B_36 CES Contractor's BUILDER Inventory Sheet Template

Att. 1C_AJJY 25-1072M_B25016 Palau Dorm Map

Att. 1D_AJJY 25-1072M_35pct Design Drawings

Att. 1E_AJJY 25-1072M_35pct Concept Design

Att. 1F_AJJY 25-1072M_Jacobs Asbestos Report

Att. 1G_AJJY 25-1072M_EMPSCO_APEC Asbestos & Lead Report

Att. 1H_AJJY 25-1072M_ASCE7-16 Seismic

Att. 1I_AJJY 25-1072M_ASCE41-17 Seismic

Att. 1J_Cat Management 4 - HVAC Standardization Policy Guidance Memorandums

Att. 1K_USAF Fire Alarm Panel Approval Memorandum

Att. 1L_3R (Recognize, Retreat, Report) and On-Call Construction Support Guidance

Att. 02_Project Requirement Price Schedule

Att. 03_Past Performance Fact Sheet

Att. 04_Past Performance Questionnaire (PPQ)_30June25

Att. 05_AAFB IFS_27Feb24

Att. 06_Wage Determination (GU20250001)

Att. 07_Common Construction Prevailing Wage Rates Guam

Att. 08_PIEE Proposal Manager Reference Guide

Att. 09_As-Builts

Att. 10_Pump Room Photos

FA524025R00020004

SUMMARY OF CHANGES
List of Attachments
IDCode: J
Page: 1
Pages: 2
AmendNo: 0004
EffDate: 30 Jun 2025
ReqNo:
ProjNo: AJJY 25-1072M
IssCode: FA5240
AdmCode:
IssuedBy: FA5240 36 CONS LGC

APO AP 96543-4040, UNIT 14040

APO, AP 96543-4040

UNITED STATES

Adelino Cabanting, Email: adelino.cabanting@us.af.mil Telephone: 366-9481 AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: FA524025R0002
SolDate: 19 May 2025
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: Off
OffrNoEx: 1
NoCopies: 1
ApprData: See Section G - Contract Administration Data
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: Update Section J - Att. 04_Past Performance Questionnaire (PPQ) due date to Monday, 07 July 2025
ContNameTitle:
CoNameTitle: Katrina Pangelinan
ContDate:
CODate: 30 Jun 2025

File details come from the government source that posted it. Updated .