Att. 04_Past Performance Questionnaire (PPQ)_05June25.docx

DOCX document 48 KB Posted

Attached to
AJJY 25-1072M Repair Palau Dorm B25016
Solicitation number
FA524025R0002
Issued by

About this file

The document is a Past Performance Questionnaire (PPQ) for a design-build contract to comprehensively repair Palau Dorm B25016 at Andersen Air Force Base in Guam. The project involves extensive renovation and system replacements, including interior and exterior repairs, full restroom renovation, HVAC and plumbing system updates, electrical distribution system replacement, and fire protection improvements. Specific technical requirements include replacing the chilled water and central chiller plant with Dunham Bush or Odyne chillers, updating electrical and plumbing utilities, installing a new fire alarm system (Monaco or EST brands), and re-grading the site for proper drainage.

The solicitation (FA524025R0002) is issued by the Department of the Air Force Pacific Air Forces, with a contract value between $25 million and $100 million. The PPQ is part of the source selection process, requesting past performance information from previous contractors. Respondents are required to complete the questionnaire electronically and submit it by Monday, 23 June 2025 at 1600 hours (ChST) to three specified email addresses. The evaluation will focus on technical performance, schedule adherence, and management capabilities, with ratings ranging from Exceptional to Unsatisfactory.

View the file

Other files

File Type Posted
RFI_QA_AJJY 25-1072M Repair Palau Dorm B25016_30JUN25.pdf PDF
Att. 04_Past Performance Questionnaire (PPQ)_30June25.docx DOCX document
Solicitation Amendment FA524025R00020004 SF 30.pdf PDF
Solicitation Amendment - FA524025R00020004.pdf PDF
Solicitation Amendment - FA524025R00020003.pdf PDF
Solicitation Amendment FA524025R00020003 SF 30.pdf PDF
Att. 10_Pump Room Photos.zip ZIP file
RFI - QA AJJY 25-1072M Repair Palau Dorm B25016_18JUN25.pdf PDF
Solicitation Amendment FA524025R00020002 SF 30.pdf PDF
Solicitation Amendment - FA524025R00020002.pdf PDF
Att. 09a As-Builts.zip ZIP file
Att. 09b As-Builts.zip ZIP file
QA_AJJY 25-1072M Repair Palau Dorm B25016_05Jun25.pdf PDF
Solicitation Amendment FA524025R00020001 SF 30.pdf PDF
Solicitation Amendment - FA524025R00020001.pdf PDF
Att. 1A_AAFB Contractor Antiterrorism Awareness.pdf PDF
Att. 1B_36 CES Contractors BUILDER Inventory Sheet Template.xlsx XLSX spreadsheet
Att. 1H_AJJY 25-1072M ASCE7-16 Seismic.pdf PDF
Att. 03_Past Performance Fact Sheet.docx DOCX document
Att. 06_Wage Determination (GU20250001).pdf PDF
Att. 1C_AJJY25-1072M B25016 Palau Dorm Map.pdf PDF
Att. 1D_AJJY 25-1072M_35pct Design Drawings.pdf PDF
Att. 1E_AJJY 25-1072M_35pct Concept Design.pdf PDF
Att. 02_Project Requirement Price Schedule.docx DOCX document
Att. 08_PIEE Proposal Manager Reference Guide.pdf PDF
Att. 01_AJJY 25-1072M_Statement of Work (SOW)_15May25.pdf PDF
Att. 1G_AJJY 25-1072M_EMPSCO_APEC Asbestos & Lead Report.pdf PDF
Att. 1I_AJJY 25-1072M_ASCE41-17 Seismic.pdf PDF
Att. 07_Common Construction Prevailing Wage Rates_Guam.pdf PDF
Att. 1F_AJJY 25-1072M_Jacobs Asbestos Report.pdf PDF
Att. 1J_Cat Management 4 - HVAC Standardization Policy Guidance Memorandums.pdf PDF
Att. 1K_USAF Fire Alarm Panel Approval Memorandum.pdf PDF
Att. 1L_3R (Recognize, Retreat, Report) and On-Call Construction Support Guidance.pdf PDF
Att. 05_AAFB IFS_27Feb24.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Controlled Unclassified Information When completed, this document is Source Selection Information IAW FAR 2.101 and 3.104.

Section L Attachment: Past Performance Questionnaire (PPQ) The 36th Contracting Squadron is in the process of competitively selecting a source for a project to design and fully repair Palau Dorm B25016 AAFB, GU. The contractor shall include renovation of interiors including floors, walls, ceiling, finishes, full restroom renovation, updating code for Energy and Life Safety, exterior renovations resulting from recent storm damage. Walkway slabs and spandrel beams will be repaired. Repairs will also include a complete update to the HVAC and Plumbing systems in the Palau dorm. Palau is conditioned by a chilled water and a central chiller plant - both will be replaced. A complete replacement of air handlers, ductwork, grilles, variable air volume boxes, and chilled water piping will be replaced. AAFB Justification and Approval (J&A) specifies Dunham Bush as the preferred chiller. Odyne Chillers are also acceptable. The chilled water pump will be replaced. All existing plumbing utilities will be replaced and updated. The existing heat pump water heaters will be replaced with standard electric water heaters with large storage tanks. Electrical updates include an update to the entire electrical distribution system. The system updates will include a complete replacement of electrical distribution from the pad mount transformer secondary conductors to the entire downstream building distribution system. Fire protection updates include sprinkler protection throughout, installation of a mass notification system, and a wet-pipe sprinkler system throughout the dorm. AAFB J&A for the Fire Alarm Panel specifies either Monaco or EST brands. The Palau dorm must be re-graded to maintain positive drainage away from the building. Existing storm sewer inlets are buried with debris, dirt, and grass- these are to be cleared. The design-build contractor will design and construct the above repairs in accordance with the requirements of this contract.

In accordance with FAR 36.204(h) and DFARS 236.204(ii) the magnitude of this project is between $25,000,000.00 and $100,000,000.00.

One of the considerations in the proposal evaluation is the verification of the offerors' past performance on contracts or other work efforts which reflect the offeror's ability to perform on the proposed effort. We depend on information received from organizations such as yours, which have had first-hand experience with the offeror, for the evaluation of the offeror's performance on those contracts or work efforts.

Our areas of interest regarding the offeror are summarized in the enclosed questionnaire. To meet the acquisition milestones, we request your written response no later than Monday, 23 June 2025 by 1600 hours (ChST).

To assist you in preparing your response and expediting your reply, the questionnaire may be filled out electronically and e-mailed to all of the following: katrina.pangelinan@us.af.mil, eddie.pelkey@us.af.mil, and adelino.cabanting@us.af.mil. Your completed questionnaire will become a part of the official Source Selection records. Please title the email: PPQ – FA524025R0002 – Contractor Name Your assistance is greatly appreciated, and your prompt response will be one of the keys to the successful and timely completion of this Source Selection.

Katrina J. Pangelinan Contracting Officer

Attachments:

1. Past Performance Questionnaire (PPQ)

Section 1: Contract Identification

A. Contractor (Company/Division):

B. Contractor Cage Code:

C. Contract Number and/or Task Order Number:

D. Contract Type (e.g., FFP, FPIF, CPIF, CPFF, etc.):

E. Program Title:

F. Brief Program Description:

G. Program Phase (e.g., Engineering & Manufacturing Development (EMD)):

H. Period of Performance

1. Original Schedule (assuming all options exercised):

Beginning Date __________ through __________

2. Current Schedule (assuming all options exercised):

Beginning Date _________ through ____________

3. Reason for difference (if applicable):

I. Contract Dollar Value

1. Original maximum contract dollar value (assuming all options exercised): $

2. Current maximum contract dollar value (assuming all options exercised): $

3. Reasons for difference between original and current contract dollar value (if applicable):

J. Description of work performed. *Please describe design requirements and any facets of construction associated with the project, if possible:

K. Was this a competitively awarded contract? ☐ Yes ☐ No

L. Contractor’s Role: ☐ Prime Contractor ☐ Subcontractor ☐ Key Personnel

Section 2: Customer or Agency Identification

A. Customer or agency name:

B. Customer or agency description (if applicable):

C. Geographic description of services under this contract (i.e., local, nationwide, worldwide, other Commands):

Section 3: Respondent Identification

A. Respondent’s name:

B. Respondent’s title:

C. Respondent’s phone number / fax number / e-mail address:

D. Respondent’s position (e.g., Program Manager, PCO/ACO, etc.):

E. Length of time (number of years/months) respondent worked on subject contract and description of responsibility/position/role:

F. Other suggested points of contact:

Section 4: Performance Information

In the tables below, indicate your rating for the contractor’s performance by placing an “X” in the appropriate block to the right of each question. Provide supporting information for each response in the space provided. Attach additional pages if more space is needed. The performance rating scale is defined as follows:

Code Performance Rating

E EXCEPTIONAL – Performance meets contractual requirements and exceeds many requirements to the Government’s benefit. The contractual performance being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.

V VERY GOOD – Performance meets contractual requirements and exceeds some requirements to the Government’s benefit. The contractual performance being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

S SATISFACTORY – Performance meets contractual requirements. The contractual performance being assessed contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

M MARGINAL – Performance does not meet some contractual requirements. The contractual performance being assessed reflects a serious problem for which the contractor has not yet identified corrective actions or the contractor’s proposed actions appear only marginally effective or were not fully implemented.

U UNSATISFACTORY – Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance being assessed contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

N/A NOT APPLICABLE – Unable to provide a rating. Contract did not include performance for this aspect, performance was not observed, or information was not available. Do not know.

Technical Performance
E
V
S
M
U
N/A

How well did the contractor meet the technical requirements of the project?

COMMENTS:

Schedule/Timeliness
E
V
S
M
U
N/A

How well did the contractor adhere to the schedule?

Management
E
V
S
M
U
N/A

How well did the contractor integrate and coordinate activities to execute the project?

Government Contracts Only: Was this contract partially or completely terminated for default or convenience, or are there any pending terminations?

☐ Yes ☐ Default ☐ Convenience ☐ Pending Terminations ☐ No

If yes, please explain (e.g., inability to meet cost, performance, or delivery schedules).

SECTION 5: GENERAL COMMENT

Given what I know today about the contractor’s ability to execute what they promised in their proposal, I [ click and select an item ] award to them today given that I had a choice.

REMARKS:

[click and pick the date]

Respondent’s Signature Date

Thank you for your prompt response and assistance!

Please return to: katrina.pangelinan@us.af.mil, eddie.pelkey@us.af.mil, adelino.cabanting@us.af.mil

Controlled Unclassified Information Page 4 of 4

File details come from the government source that posted it. Updated .