Att. 03_Past Performance Fact Sheet.docx

DOCX document 38 KB Posted

Attached to
AJJY 25-1072M Repair Palau Dorm B25016
Solicitation number
FA524025R0002
Issued by

About this file

The document is a Past Performance Fact Sheet template designed for contractors to provide detailed information about their previous contract work. The form requires comprehensive documentation of a contract, including contractor identification, contract details, performance specifics, and customer/agency information. Key sections include contract identification (with fields for contract number, type, program title, and performance period), contract dollar value, work description, and customer details.

While the template is currently blank and not completed, it is associated with a solicitation (FA524025R0002) from the Department of the Air Force Pacific Air Forces for a project titled "AJJY 25-1072M Repair Palau Dorm B25016". The form is marked as Controlled Unclassified Information and is intended to be used as part of a source selection process, allowing offerors to document their past performance credentials when responding to this solicitation. The template provides a structured approach for contractors to showcase their previous contract experience and relevance to the current opportunity.

View the file

Other files

File Type Posted
Solicitation Amendment FA524025R00020004 SF 30.pdf PDF
RFI_QA_AJJY 25-1072M Repair Palau Dorm B25016_30JUN25.pdf PDF
Att. 04_Past Performance Questionnaire (PPQ)_30June25.docx DOCX document
Solicitation Amendment - FA524025R00020004.pdf PDF
Solicitation Amendment FA524025R00020003 SF 30.pdf PDF
Solicitation Amendment - FA524025R00020003.pdf PDF
Att. 09a As-Builts.zip ZIP file
RFI - QA AJJY 25-1072M Repair Palau Dorm B25016_18JUN25.pdf PDF
Solicitation Amendment FA524025R00020002 SF 30.pdf PDF
Solicitation Amendment - FA524025R00020002.pdf PDF
Att. 10_Pump Room Photos.zip ZIP file
Att. 09b As-Builts.zip ZIP file
Solicitation Amendment - FA524025R00020001.pdf PDF
Att. 04_Past Performance Questionnaire (PPQ)_05June25.docx DOCX document
Solicitation Amendment FA524025R00020001 SF 30.pdf PDF
QA_AJJY 25-1072M Repair Palau Dorm B25016_05Jun25.pdf PDF
Att. 01_AJJY 25-1072M_Statement of Work (SOW)_15May25.pdf PDF
Att. 1G_AJJY 25-1072M_EMPSCO_APEC Asbestos & Lead Report.pdf PDF
Att. 1I_AJJY 25-1072M_ASCE41-17 Seismic.pdf PDF
Att. 07_Common Construction Prevailing Wage Rates_Guam.pdf PDF
Att. 1C_AJJY25-1072M B25016 Palau Dorm Map.pdf PDF
Att. 1D_AJJY 25-1072M_35pct Design Drawings.pdf PDF
Att. 1E_AJJY 25-1072M_35pct Concept Design.pdf PDF
Att. 02_Project Requirement Price Schedule.docx DOCX document
Att. 08_PIEE Proposal Manager Reference Guide.pdf PDF
Att. 1A_AAFB Contractor Antiterrorism Awareness.pdf PDF
Att. 1B_36 CES Contractors BUILDER Inventory Sheet Template.xlsx XLSX spreadsheet
Att. 1H_AJJY 25-1072M ASCE7-16 Seismic.pdf PDF
Att. 06_Wage Determination (GU20250001).pdf PDF
Att. 1F_AJJY 25-1072M_Jacobs Asbestos Report.pdf PDF
Att. 1J_Cat Management 4 - HVAC Standardization Policy Guidance Memorandums.pdf PDF
Att. 1K_USAF Fire Alarm Panel Approval Memorandum.pdf PDF
Att. 1L_3R (Recognize, Retreat, Report) and On-Call Construction Support Guidance.pdf PDF
Att. 05_AAFB IFS_27Feb24.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Controlled Unclassified Information When completed, this document is Source Selection Information IAW FAR 2.101 and 3.104.

Section L Attachment: Past Performance Fact Sheet

TO BE COMPLETED BY OFFEROR

Section 1: Contract Identification

A. Contractor (Company/Division):

B. Contractor Cage Code:

C. Contract Number:

D. Contract Type (e.g., FFP, FPIF, CPIF, CPFF, etc.):

E. Program Title:

F. Brief Program Description:

G. Period of Performance

1. Original Schedule (assuming all options exercised):

Beginning Date _________ through ____________

2. Current Schedule (assuming all options exercised):

Beginning Date _________ through ____________

3. Reason for difference (if applicable):

H. Contract Dollar Value

1. Original maximum contract dollar value (assuming all options exercised): $

2. Current maximum contract dollar value (assuming all options exercised): $

3. Reasons for difference between original and current contract dollar value (if applicable):

I. Description of work performed, including where it was performed:

J. How is this project relevant?

K. Was this a competitively awarded contract? ☐ Yes ☐ No

L. Contractor’s Role: ☐ Prime Contractor ☐ Subcontractor ☐ Key Personnel

Section 2: Customer or Agency Identification

A. Customer or agency name:

B. Customer or agency description (if applicable):

C. Geographic description of services under this contract (i.e., local, nationwide, worldwide, other Commands):

Section 3: Respondent Identification

A. Respondent’s name:

B. Respondent’s title:

C. Respondent’s phone number / fax number / e-mail address:

D. Respondent’s position (e.g., Program Manager, PCO/ACO, etc.):

E. Length of time (number of years/months) respondent worked on subject contract and description of responsibility/position/role:

F. Other suggested points of contact:

Signature of Offeror

Controlled Unclassified Information Page 1 of 2

File details come from the government source that posted it. Updated .