QA UH60L painting 19 Sep 2022 Avi Answered.pdf
PDF 319 KB Posted
- Solicitation number
- FA520922Q0070
About this file
This document contains a federal contract solicitation and related correspondence regarding aircraft painting services. The solicitation seeks a contractor to perform Chemical Agent Resistant Coating and painting of UH-60L Black Hawk helicopters for the U.S. Army Aviation Battalion Japan, located at Camp Zama, Japan. The contractor must have qualified paint technicians and spraying technicians certified by the Japanese government. The correspondence includes questions from a potential offeror regarding substituting a paint remover, conducting aircraft jacking, and obtaining thickness measurement tools and towing bars, with answers provided by the contracting office.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
No PWS para Question Answer
GFM List No.7 Paint Remover "Cee-Bee-R-256" contains harmful methylene chloride (dichloromethane), so I would like to use hydrogen peroxide type SPC-J909. Is it possible to change the list and provide it?
GFM List No7のPaint Remover "Cee-Bee-R- 256"には有害な塩化メチレン(ジクロロメタン)が含まれていることから過酸化水素タイ
プのSPC-J909を使用するようにしたいのですが、GFM
LISTを変更し提供はできるでしょうか。
Could you prepare the specific tools required to implement the requirements, such as the tools required for film thickness measurement after PAINT?
PAINT後の膜厚計測に必要なTOOL等、要求事項を実施するにあたって必要となるSpecific Toolは準備していただけますか。 As for the UH60 Jacking, we cannot do it, so we would like USAABJ to do it.
UH60のJackingについては、弊社では実施できないためUSAABJに実施するようにして欲し い。 Please add the towing bar used for UH-60 to PWS.
UH-60で使用するTowing barをPWSに追加をお願い致します。
3 1.1
USAABJ could perform jacking procedures for the aircraft. It would only require coordination for date and time.
4 1.1 The tow bar can be added to the PWS as government provided property
2 1.1
We do not have the tools to measure the paint thickness it is performed using Eddy Current and we have no NDT personnel assigned to us.
1 GFM
We have already procurred to original stripper and it would require changes to our HAZMAT program to gather chemicals at this time, Additionally we would require a Niin or federal stock number to see if we could obtain it.
MJP→YokotaAB20220919
File details come from the government source that posted it. Updated .