About this file

This solicitation seeks quotations for inspection, maintenance, and repair services for underground storage tanks and auxiliary equipment at three locations in Japan. The contractor shall provide all necessary personnel, supervision, tools, transportation, materials and other items or services to perform work on underground gasoline tanks and associated spill containment boxes, leak detection systems, automatic tank gauges, vapor recovery devices and transfer pumps at Camp Zama, Sagamihara Family Housing Area, and Akasaka Press Center. The solicitation is set aside locally for Japan. The Department of the Air Force Pacific Air Forces is the contracting agency. Offerors must be licensed to work in Japan. Location maps and pricing templates are available from the point of contact by email request.

View the file

Other files

File Type Posted
9b. A1 2 UST Equipment Data_Amend 0001.pdf PDF
6a Attach 4 PWS_Amend 0001.pdf PDF
Amendment 0001.pdf PDF
Q and A_20200416.pdf PDF
10a. A2 Minimum work requirement_Amend 0001.pdf PDF
1 Business w US Government.pdf PDF
3 Attach 1 Pricing Schedule.pdf PDF
11. A3 Manufacturers instruction.pdf PDF
2 20Q017A Combined Synopsis.pdf PDF
4 Attach 2 Pricing Exhibit.pdf PDF
15. A3_4_Auto Tank Gauge (Showakiki - MS-RD).pdf PDF
14. A3_3_Auto Tank Gauge (Kohgiken Corp - DL-535).pdf PDF
10. A2_Minimum work requirement.pdf PDF
18. A3_7_Leak Detector (Kohgiken Corp - LKM-512-12).pdf PDF
21. A3_10_Fuel Management System (Franklin Fueling System - TS-550evo).pdf PDF
13. A3_2_Auto Tank Gauge (Kohgiken Corp - ELM Series).pdf PDF
5 Attach 3 Labor Rate.pdf PDF
17. A3_6_Auto Tank Gauge (Morrison Bros. Co - 918DP).pdf PDF
19. A3_8_Magnetostrictive Probe (Franklin Fueling System - TSP-LL2).pdf PDF
20. A3_9_Universal Liquid Sensor (Franklin Fueling Systems - TSP-ULS).pdf PDF
8 Site Photo.pdf PDF
6 Attach 4 PWS.pdf PDF
9. A1 2_UST Equipment Data_200319.pdf PDF
7 Attach 5 Notice to Offeror.pdf PDF
16. A3_5_Over Fill Alarm (Kohgiken Corp - DL-915).pdf PDF
12. A3_1_Auto Tank Gauge (Kohgiken Corp - ELR Series).pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

<<Akasaka Press Center Areas>>

Tank No. Installation Type of

Stored Oil Tank Cap.

Gallon

Installed Date Tank Pipe

Spill Containment

Box Automatic Shut‐

Off Device High Level Alarm Tank Pipe Fuel Truck Grounding

Automatic Tank Gauge Vapor Recovery Device Transfer Pump Manual Valve

Check Valve

Fuel Strainer

Water Separator

8‐H4‐1N APC Gasoline 1,980 Apr 2010

Not Required FRP Tank

Polyethylene Coating Pipe

O

Unknown

MS‐RD

(Showa‐Kiki

Kogyo)

Active Sensor OLM‐S Monitor OLM‐

MT2

(Showa‐Kiki

Kogyo)

/ O MS‐RD

(Showa‐Kiki Kogyo)

Device VR‐ST (50A) Hose VR‐HCNS (50A x 10m)

(Showa‐Kiki Kogyo) / / 1 / /

8‐H4‐2N APC Gasoline 1,980 Apr 2010

Not Required FRP Tank

Polyethylene Coating Pipe

O

Unknown

MS‐RD

(Showa‐Kiki

Kogyo)

Active Sensor OLM‐S Monitor OLM‐

MT2

(Showa‐Kiki

Kogyo)

/ O MS‐RD

(Showa‐Kiki Kogyo)

Device VR‐ST (50A) Hose VR‐HCNS (50A x 10m)

(Showa‐Kiki Kogyo) / / 1 / /

A1.2‐2

Corrosion Protection Spill/Overfill Protection Leak Detection System Other Auxiliary Systems

File details come from the government source that posted it. Updated .