FA5205-16-R-0005_PreProposal_Conference_Minutes_ _Record_of_Site_Visit.pdf
PDF 1 MB Posted
- Attached to
- Renovation of Dorm, Bldg. 539, Misawa AB, Japan
- Solicitation number
- FA5205-16-R-0005
About this file
FA5205-16-R-0005_PreProposal Conference Minutes Record of Site Visit
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
35th FW Misawa Air Base
Pre-Proposal Conference / Site Visit Project No. QKKA 14-1050
Renovate Dorm 539 Misawa AB, Japan
RFP No. FA5205-16-R-0005
35 CONS/LGCP
35 CES/CENM
16 May 16
0900 hrs
Summary
Scope & Requirements General Requirement / Pricing Structure
RFP
CONS remarks for solicitation / filling instructions
CES tech briefing (Specs and Drwg)
Q&A Session
Site Visit to Dorm 539 (see next slide)
Summary
Attachment 1
Project Site
Scope & Requirements
Project Description (Sec B):
Renovate Dorm 539
Place: Dorm 539, Misawa AB, Japan
Contract Type: Firm-Fixed-Price
Performance Period: 430 CD (incl. 30 CD mobilization)
Scope & Requirements
Solicitation
RFPComplete block 14 thru 20.
Fill-in
RFP
RFP - Page 2
Proposal of CLIN Amounts
Solicitation
RFP - Page 3
Fill-in
Sub-CLIN 0001AA + 0001AB
Proposal of CLIN Amounts
Solicitation
RFP - Page 3
Fill-in
Proposal of CLIN Amounts
Solicitation
RFP - Page 4
Proposal of CLIN Amounts
Solicitation
RFP - Page 4
Fill-in
CLIN 0001 - 0003
Section F
52.211-12 Liquidated Damages @¥65,899 (1st day) & @¥41,119 (2nd day ~)
Solicitation
RFP - Page 6
Section I
52.223-3 Hazardous Material
Solicitation
Fill-in
RFP - Page 8 - 19
Section J
List of Documents, Exhibits & Other Attachments Atch 1: Specifications
Atch 2: Drawings
Atch 3: Other Contract Requirements
Atch 4: Past Performance Questionnaire (PPQ) Cover Letter
Atch 5: Past/Present Performance Questionnaire (PPQ)
Atch 6: Schedule of Material Submittals
Atch 7: Schedule for Contractor-Furnished U.S. Material (CFUSM)
Atch 8: Manufacturer’s Cut Sheet / Catalog Information
Solicitation
RFP - Page 20
Section K
FAR 52.204-8 Annual Reps & Certs
FAR 52.209-7 Responsibility Matters Info
DFARS 252.204-7007 Alt. A Annual Reps & Certs
DFARS 252.247-7022 Transportation by Sea
Fill-in
Fill-in
Fill-in
Solicitation
Fill-in
RFP - Page 21 - 27
Section L
L-100 Proposal Preparation Instructions
Offer required to meet all sol. requirements, terms & conditions, reps & certs, & tech requirements
Prepare & Submit:
Part I – Summary & Misc. Data (Submit Orig. + 2 copies)
Part II – Price Proposal (Submit Orig.)
Part III – Past Performance Proposal (Submit Orig. + 7 copies)
Solicitation
Submit
RFP - Page 28 - 33
Section M
M-900 Basis of Award & Evaluation
Weight of Importance:
Past Performance is approximately equal to price
Evaluation Process:
Price – Fairness and Reasonableness of price and price realism analysis
Past Performance – Recent and Relevant performance information
Solicitation
RFP - Page 34 - 35
Section M (Cont’d)
Past Performance Factor
Recency: Work within the last 3-Yr
Relevancy: Performance effort involved similar scope, magnitude of effort, and complexities to that required by this solicitation.
Integrated Assessment
The Gov’t reserves the right to award a contract to other than the lowest price offer if the difference in the PP Confidence Rating of another offeror justifies the higher price premium.
Solicitation
Special Cont. Req:
H002 Required Insurance Property Damage - ¥2,000,000
H003 Performance Bond Amount Required: 100% of awarded contract amt.
Submission: Within 30 CD after contract award
Required add’l if Mod >$10K
Japanese Yen or U.S. dollar equivalent to yen-based contract amount accompanying the surety’s separate certification
FAR 52.228-15 as modified, Sec. I, page 11
Other Contract Requirements
Attach. 3 - Page 3
Reps., Certs & Other Statements of Offerors
K001 Tax Exemption under SOFA
K002 Contractor’s Cert
K003 Construction Contractor License
Other Contract Requirements
Fill-in
Attach. 3 Page 4 - 6
Submit
Other Contract Requirements
Reps., Certs & Other Statements of Offerors (Cont’d)
K003 Construction Contractor License
Offeror shall submit 7 copies of “special construction license” under applicable law of Japan together with offer, to demonstrate compliance with FAR 52.236-7, as modified, and DFARS 252.225-7042.
Joint Venture or Partnership – the special construction license of each member of the JV or each partner of the partnership must be submitted together with the offer.
Such offer that fails in representation of the above required license will not be considered for award.
Let’s move on to Site Visit but please remind
RFP Closing Date / Time:
14 Jun 16 / 02:00 PM (JST)
Questions shall be submitted to 35 CONS/LGCP NLT 26 May 16 (JST)
Description of Work Requirement:
Replacement of existing infrastructure system to include plumbing, domestic hot water and electrical systems, address all fire deficiencies, including fire suppression and detection systems, replacement of existing exterior window (AT/FP) lighting fixtures with LED, doors and cabinetries, install energy efficient HVAC system, replace exterior concrete cracks/apply acrylic paint Renovate Dorm 539 (CLIN 0001)
Repair Dorm 539, except Fire Protection & HVAC (Sub-CLIN
0001AA)
Install Fire Protection & HVAC (Sub-CLIN 0001AB)
Concrete Crack Repair (CLIN 0002)
Mold Removal & Remediation (CLIN 0003)
QKKA 14-1050 RNVT DORM 539, Misawa AB, Japan
QKKA 14-1050 RNVT DORM 539, Misawa AB, Japan
Detailed Description of Work Requirement:
Sub-CLIN 0001AA - Civil
Site improvements to support new building systems; Anti Terrorism/Force Protection (AT/FP) setbacks at west parking lot
Site improvements to integrate with existing sidewalks, amenities and utilities
Sub-CLIN 0001AA - Architectural Interior demolition and new Architectural finishes including
Replace tile at unit bathrooms, replace unit bathroom toilet accessories, replace unit bathroom doors, replace unit closets, replace chase wall and tile at lounge kitchen
Replace AT/FP windows and exterior wall infill as required; New insulation assemblies
Attachment 2
Detailed Description of Work Requirement (Cont’d):
Sub-CLIN 0001AA - Mechanical Renovate Mechanical plumbing systems
Sub-CLIN 0001AA - Electrical Site utility and exterior distribution improvements to renovate Dorm
Interior distribution, lighting and power for renovate Dorm 539
Telephone system and data system
CATV system installation. EMCS system installation
QKKA 14-1050, RNVT DORM 539, Misawa AB, Japan
Detailed Description of Work Requirement (Cont’d):
Sub-CLIN 0001AB - Civil
Site improvements to extend Fire Lanes
Sub-CLIN 0001AB - Mechanical Fire Suppressions systems in accordance with drawings
Provide DDC for each heat pump and air handling unit
Sub-CLIN 0001AB - Electrical Site utility and exterior distribution to Fire lanes
Install new fire alarm, Mass Notification (MN)
CLIN 0002 Concrete Crack Repair Repair concrete cracks for the renovation of the dormitory 539
Provide a unit cost for repair of concrete cracks per the contract documents and include 1200m of work in the base bid.
Contractor to provide remediation as needed
QKKA 14-1050, RNVT DORM 539, Misawa AB, Japan
Detailed Description of Work Requirement (Cont’d):
CLIN 0003 Mold Removal and Remediation
Remediate mold for the renovation of the dormitory 539
Provide a unit cost for mold remediation per the contract documents and include 800sm of remediation in the base bid
Contractor to provide remediation as needed
QKKA 14-1050, RNVT DORM 539, Misawa AB, Japan
35 CES Personnel Key Personnel Mr. Kyle Hicks, 35 CES/CD
Maj. Lionel Lanuza, Chief, Engineering Flight
2d Lt Jacob McGill, Project Manager
Mr. Yasuhiro Yoniayama, Architectural Engineer
Mr. Jack Buchman, Housing Element Chief
MSgt Daniel Draper, Dorm Superintendent
Questions???
File details come from the government source that posted it. Updated .