SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 52 PAGES

RNVT Dorm 539

01 32 01.00 10 SD-01 Preconstruction Submittals

3.4 GProject Schedule

01 33 00 SD-01 Preconstruction Submittals

1.10 GSubmittal Register

01 33 29 SD-01 Preconstruction Submittals

1.5 GLEED Implementation Plan

SD-11 Closeout Submittals

1.6 GLEED Documentation Notebook

01 35 29 SD-01 Preconstruction Submittals

1.6 G AAccident Prevention Plan (APP)

1.7 G AActivity Hazard Analysis (AHA)

1.6.1 G ACrane Critical Lift Plan

1.5.1.4 G ACrane Operators

SD-06 Test Reports

1.11Reports

1.11.1Accident Reports

1.11.3Monthly Exposure Reports

1.11.4Crane Reports

SD-07 Certificates

1.8Confined Space Entry Permit

1.8Hot work permit

1.11.5Certificate of Compliance

3.5.3Machinery & Mechanized

Equipment Certification Form

01 57 20.00 10 SD-01 Preconstruction Submittals

1.7 GEnvironmental Protection Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

Attachment 6 to RFP No. FA5205-16-R-0005 Dated 25 Apr 16

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 52 PAGES

01 74 19 SD-01 Preconstruction Submittals

1.6 GWaste Management Plan

SD-11 Closeout Submittals

1.7Records

01 78 00 SD-10 Operation and Maintenance

Data

1.4.1 GEquipment/Product Warranty List

SD-11 Closeout Submittals

1.3.1 GAs-Built Drawings

1.3.3 GRecord Of Materials

1.3.2 GUtility As-Built Drawings

1.4.2 GEquipment/Product Warranty Tag

GHazardous Material Reporting

1.2 GCertification of EPA Designated

Items

1.6 GForm DD1354

1.6 GChecklist for Form DD1354

02 41 00 SD-01 Preconstruction Submittals

1.9 GExisting Conditions

SD-07 Certificates

1.2.1 GDemolition Plan

1.6 GNotification

SD-11 Closeout Submittals

Receipts

02 82 14.00 10 SD-02 Shop Drawings

1.4 GDetailed Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 52 PAGES

02 82 14.00 10 SD-03 Product Data

3.6.3.1 GAsbestos Waste Shipment

Records

1.1 GWeight Bills and Delivery Tickets

GEncapsulants

1.9.1 GRespiratory Protection Program

3.6 GCleanup and Disposal

1.6.1 GQualifications

1.11Training Program

1.8.1 GLicenses, Permits and

Notifications

3.6.3.2 GAsbestos Management Plan

SD-06 Test Reports

3.4 GExposure Assessment and Air

Monitoring

1.9Medical Surveillance

Requirements

02 84 33 SD-07 Certificates

1.7.1Training certification

1.7.2Qualifications of CIH

1.7.3PCB removal work plan

1.7.4PCB disposal plan

1.7.5Notification

3.8Transporter certification

3.8.1Certificate of disposal

02 85 00.00 20 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 52 PAGES

02 85 00.00 20 1.4.1.1 GPreliminary Visual Assessment

Report

1.4.1.2 GMicrobial Remediation Plan

1.4.1.4Worker Records

1.4.1.3 GRespiratory Protection Program

1.4.1.5 GCertified Industrial Hygienist

(CIH)/Industrial Hygienist (IH)

Qualifications

1.4.1.6 GMicrobial Remediation Supervisor

Qualifications

1.2.22 GVentilation System Mold

Remediator Qualifications

3.5.1 GVentilation System Mold

Remediator Qualifications

SD-03 Product Data

1.2.17 GPersonal Protective Equipment

(PPE)

3.1.5Air Filtration Units

3.1.4Dehumidifiers

1.2.20Pressure Differential Measuring

Instrument

1.2.10 GFungicidal Agents, (EPA)

1.2.8 GDisinfectants or Biocide

Sanitizing Solutions

SD-06 Test Reports

1.4.3 GDaily Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 52 PAGES

02 85 00.00 20 SD-11 Closeout Submittals

1.4.4 GSubmittals at Completion of

Remediation Work

03 01 30.71 SD-05 Design Data

1.4.1.1Job mix formula

SD-06 Test Reports

2.1.2aggregate

2.1.1.1Epoxy resin binder

2.1.1.2Epoxy grout

SD-07 Certificates

2.1.1.1Epoxy resin binder

2.1.1.2Epoxy grout

SD-08 Manufacturer’s Instructions

2.1.1Epoxy

03 11 13.00 10 SD-05 Design Data

2.1Calculations

SD-06 Test Reports

3.2Inspection

03 20 00.00 10 SD-02 Shop Drawings

3.1 GReinforcement

SD-07 Certificates

2.2Reinforcing Steel

03 30 00 SD-01 Preconstruction Submittals

Concrete Curing Plan

1.6.5 GQuality Control Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 52 PAGES

03 30 00 1.6.6 GQuality Control Personnel

Certifications

1.6.6Quality Control Organizational

Chart

SD-02 Shop Drawings

1.6.2.1 GReinforcing steel

SD-03 Product Data

Joint sealants

Joint filler

2.1Materials for Forms

Recycled Aggregate Materials

2.4.1Cementitious Materials

2.3.3Concrete Curing Materials

2.5Reinforcement

Liquid Chemical Floor Hardener

2.4.5Admixtures

SD-05 Design Data

2.3.1 Gmix design

SD-06 Test Reports

1.6.1.1 GConcrete mix design

1.6.4.1Fly ash

1.6.4.1Pozzolan

1.6.4.2Ground granulated blast-furnace slag

2.4.3Aggregates

3.10.2.3 GCompressive strength tests

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 52 PAGES

03 30 00 3.10.2.4Air Content

3.10.2.1Slump Tests

2.4.2Water

SD-07 Certificates

2.5.1Reinforcing Bars

1.6.3.1Material Safety Data Sheets

Forest Stewardship Council

(FSC) Certification

1.6.6.2Field Testing Technician and

Testing Agency

05 50 13 SD-02 Shop Drawings

Gstructural steel door frames

2.3 GAccess doors and panels

SD-03 Product Data

2.3Access doors and panels

Structural steel door frames

05 72 00 SD-01 Preconstruction Submittals

1.3 GExisting Conditions

SD-02 Shop Drawings

Linear Ceiling; G

SD-03 Product Data

Linear Ceiling; G

SD-04 Samples

GManufacturer's Standard Color

Charts

GAluminum Finishes

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 52 PAGES

05 72 00 3.6 GAnchorage Devices and

Fasteners

SD-08 Manufacturer’s Instructions

GCleaning Materials

GPreventative Maintenance and

Inspection

3.11 GMaintenance Instructions

GApplication Methods

06 20 00 SD-02 Shop Drawings

1.3Detail Drawings

SD-03 Product Data

GWood

SD-07 Certificates

1.4Certificates of grade

1.4Certificates of compliance

06 61 16 SD-02 Shop Drawings

GDetail Drawings

3.1 GInstallation

SD-03 Product Data

2.1Solid polymer material

1.4.1Qualifications

2.3Fabrications

SD-04 Samples

2.1 GMaterial

2.3.4 GCounter and Vanity Tops

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 52 PAGES

06 61 16 2.1Solid polymer material

SD-07 Certificates

2.3Fabrications

1.4.1Qualifications

SD-10 Operation and Maintenance

Data

3.2Clean-up

07 14 00 SD-03 Product Data

2.1Fluid-applied membrane

2.2Membrane primer

2.8Elastomeric sheet

3.3Solvent

3.4.1Moisture meter

2.7Bond breaker

SD-11 Closeout Submittals

1.6Warranty

3.6Information Card

3.5Instructions To Government

Personnel

07 21 13 SD-03 Product Data

2.1 GBlock or board insulation

2.2Vapor retarder

2.3Pressure sensitive tape

Protection board or coating

2.4Accessories

SD-08 Manufacturer’s Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 52 PAGES

07 21 13 2.1Block or Board Insulation

2.4.1Adhesive

07 57 00 SD-06 Test Reports

GInstallation

URETHANE FOAM

PROTECTIVE COATING

07 60 00 SD-02 Shop Drawings

3.1.18 GCovering on flat, sloped, or

curved surfaces

3.1.15 GDownspouts

3.1.19 GExpansion joints

3.1.16 GFlashing for roof drains

3.1.11 GBase flashing

3.1.12 GCounterflashing

3.1.20 GFlashing at roof penetrations

GCopings

3.1.14 GDrip edge

3.1.17 GEave flashing

SD-11 Closeout Submittals

Quality Control Plan

07 84 00 SD-02 Shop Drawings

2.1 GFirestopping Materials

SD-06 Test Reports

3.3 GInspection

SD-07 Certificates

1.4.2Inspector Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 52 PAGES

07 84 00 2.1Firestopping Materials

1.4.1 GInstaller Qualifications

07 92 00 SD-03 Product Data

2.1Sealants

2.2Primers

2.3Bond breakers

2.4Backstops

SD-07 Certificates

3.3.6Sealant

08 11 13 SD-02 Shop Drawings

2.1 GDoors

2.1 GDoors

2.6 GFrames

2.6 GFrames

2.4Accessories

2.8Weatherstripping

SD-03 Product Data

2.1 GDoors

2.6 GFrames

2.4Accessories

2.8Weatherstripping

08 32 13 SD-02 Shop Drawings

2.1Aluminum sliding glass doors

SD-03 Product Data

2.1Aluminum sliding glass doors

2.1.4Hardware

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 52 PAGES

08 32 13 2.1.5Glazing

2.1.6Weatherstripping

Screens

2.1.7Finish

SD-04 Samples

2.1.7Finish

SD-10 Operation and Maintenance

Data

2.1 GAluminum sliding glass doors

08 51 13 SD-02 Shop Drawings

2.1 GWindows

1.9Fabrication Drawings

SD-03 Product Data

2.1 GWindows

2.2.7.1 GHardware

2.2.3 GFasteners

1.10 GWindow performance

2.4 GThermal-Barrier Windows

2.5 GMullions

2.6 GWindow Cleaners' Bolts

2.2.9 GScreens

2.2.2 GWeatherstripping

2.2.7 GAccessories

1.10.5Thermal performance

SD-04 Samples

1.4.2.1Finish Sample

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 52 PAGES

08 51 13 1.4.2.2Window Sample

SD-05 Design Data

2.1Structural calculations for deflection

1.4.3 GDesign Analysis

SD-06 Test Reports

1.4.4Minimum condensation resistance factor

SD-10 Operation and Maintenance

Data

2.1 GWindows

Plastic Identification

08 71 00 SD-02 Shop Drawings

1.3 GHardware schedule

2.3.5Keying system

SD-03 Product Data

2.3 GHardware items

SD-08 Manufacturer’s Instructions

3.1Installation

SD-10 Operation and Maintenance

Data

1.3 GHardware Schedule

SD-11 Closeout Submittals

1.4Key Bitting

08 81 00 SD-02 Shop Drawings

3.3.1Installation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 52 PAGES

08 81 00 SD-04 Samples

1.5.1Insulating Glass

3.2.7Plastic Sheet

Glazing Compound

2.3.3Tape

2.3.1.1Sealant

SD-07 Certificates

1.5.1Insulating Glass

SD-08 Manufacturer’s Instructions

2.3Setting and sealing materials

3.2Glass setting

09 22 00 SD-02 Shop Drawings

2.1 GMetal support systems

09 29 00 SD-03 Product Data

Gypsum Board Cementitious backer units

2.1.3Glass Mat Water-Resistant

Gypsum Tile Backing Board

2.1.7Accessories

SD-07 Certificates

2.1 GAsbestos Free Materials

SD-08 Manufacturer’s Instructions

Material Safety Data Sheets

SD-10 Operation and Maintenance

Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 52 PAGES

09 29 00 Manufacturer maintenance instructions

3.9Waste Management

09 30 13 SD-02 Shop Drawings

3.2 GDetail Drawings

SD-03 Product Data

2.1 GTile

2.3 GMortar, Grout, and Adhesive

SD-04 Samples

2.1 GTile

2.1 GAccessories

2.1.3 GAccessories

2.1 GTransition Strips

GGrout

SD-07 Certificates

2.1Tile

2.3Mortar, Grout, and Adhesive

SD-08 Manufacturer’s Instructions

3.6Maintenance Instructions

SD-10 Operation and Maintenance

Data

3.2 GInstallation

09 65 00 SD-02 Shop Drawings

2.8 GResilient Flooring and

Accessories

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 52 PAGES

09 65 00 2.8 GResilient Flooring and

Accessories

2.4Adhesives

SD-04 Samples

2.8 GResilient Flooring and

Accessories

SD-06 Test Reports

3.3 GMoisture, Alkalinity and Bond

Tests

SD-08 Manufacturer’s Instructions

3.2 GSurface Preparation

3.1 GInstallation

SD-10 Operation and Maintenance

Data

2.8 GResilient Flooring and

Accessories

09 68 00 SD-02 Shop Drawings

3.4 GInstallation Drawings

2.4 GMoldings

SD-03 Product Data

2.1 GCarpet

2.4 GMoldings

SD-04 Samples

2.1 GCarpet

2.4 GMoldings

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 52 PAGES

09 68 00 3.2 GMoisture and Alkalinity Tests

SD-07 Certificates

2.1Carpet

1.3Regulatory Requirements

SD-08 Manufacturer’s Instructions

3.1Surface Preparation

3.4Installation

SD-10 Operation and Maintenance

Data

2.1 GCarpet

3.5 GCleaning and Protection

Maintenance Service

09 90 00 SD-01 Preconstruction Submittals

2.1Paint

10 28 13 SD-03 Product Data

2.1.2 GFinishes

2.2 GAccessory Items

SD-04 Samples

2.1.2 GFinishes

2.2 GAccessory Items

SD-07 Certificates

2.2Accessory Items

SD-11 Closeout Submittals

LEED Documentation

10 44 16 SD-01 Preconstruction Submittals

2.1Manufacturer's Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 52 PAGES

10 44 16 SD-02 Shop Drawings

2.1Fire Extinguishers

1.3.1Accessories

Part 2Cabinets

1.3.1Wall Brackets

SD-03 Product Data

2.1Fire Extinguishers

1.3.1Accessories

Part 2Cabinets

1.3.1Wall Brackets

3.2.1Replacement Parts

SD-04 Samples

1.3.1Fire Extinguisher

1.3.1Cabinet

1.3.1Wall Brackets

1.3.1Accessories

SD-07 Certificates

2.1Fire Extinguishers

2.1Manufacturer's Warranty with

Inspection Tag

11 31 13 SD-03 Product Data

2.1Kitchen equipment

SD-08 Manufacturer’s Instructions

2.1Kitchen equipment

Exhaust hood

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 52 PAGES

11 31 13 SD-10 Operation and Maintenance

Data

2.1 GKitchen equipment

12 21 00 SD-02 Shop Drawings

3.3Installation

SD-03 Product Data

2.1 GWindow Blinds

3.3Installation

SD-04 Samples

2.1 GWindow Blinds

GValance

SD-06 Test Reports

2.1Window Blinds

SD-08 Manufacturer’s Instructions

2.1 GWindow Blinds

SD-10 Operation and Maintenance

Data

2.1 GWindow Blinds

SD-11 Closeout Submittals

LEED Documentation

12 32 00 SD-02 Shop Drawings

2.2 GFabrication

3.1.1 GInstallation Drawings

SD-03 Product Data

2.3.1 GCabinets

GPlywood

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 52 PAGES

12 32 00 GHardwood

2.4 GAdhesives

2.4 GFiller Material

2.4 GFasteners

GAccessories and Hardware

GSoftwoods

2.4 GPlastic Laminate

2.3.1 GCountertops

SD-04 Samples

GAccessories and Hardware

1.4 GManufacturer's Standard Color

Charts

SD-07 Certificates

GPlywood

GHardwood

2.4 GAdhesives

2.4 GFiller Material

GParticle Board

2.4 GFasteners

GAccessories and Hardware

SD-08 Manufacturer’s Instructions

1.3 GManufacturer's Instructions

12 36 00 SD-02 Shop Drawings

2.3 GFabrication

3.1 GInstallation Drawings

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 52 PAGES

12 36 00 GCorrosion-Resistant Steel

GPlywood

GSynthetic Resin

2.2 GAdhesives

2.2 GFasteners

2.4 GAccessories and Hardware

2.2 GPlastic Laminate

SD-04 Samples

2.3 GCountertop

2.3 GBacksplash

2.4 GAccessories and Hardware

2.1 GManufacturer's Standard Color

Charts

SD-07 Certificates

GPlywood

2.2 GFasteners

2.4 GAccessories and Hardware

SD-08 Manufacturer’s Instructions

2.1 GManufacturer's Instructions

12 48 13 SD-02 Shop Drawings

3.2 GInstallation Drawings

3.2 GDetail Drawings

SD-03 Product Data

2.1 GEntrance Floor Mats and Frames

2.2 GAdhesives and Concrete Primers

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 52 PAGES

12 48 13 2.1 GEntrance Floor Mats and Frames

SD-08 Manufacturer’s Instructions

3.2 GManufacturer's Instructions

SD-10 Operation and Maintenance

Data

3.2 GProtection, Maintenance, and

Repair Information

21 13 13.00 10 SD-02 Shop Drawings

1.4.3Shop Drawings

3.9As-Built Drawings

SD-03 Product Data

1.4.1Fire Protection Related

Submittals

2.3Materials and Equipment

1.6Spare Parts

3.8Preliminary Tests

3.9Final Acceptance Test

3.10Onsite Training

1.4.1Fire Protection Specialist

1.4.2Sprinkler System Installer

SD-05 Design Data

1.4.3Sway Bracing

1.2.1.3Hydraulic Calculations

SD-06 Test Reports

3.8Preliminary Test Report

3.9Final Acceptance Test Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 52 PAGES

21 13 13.00 10 SD-07 Certificates

3.3Inspection by Fire Protection

Specialist

SD-10 Operation and Maintenance

Data

3.10Operating and Maintenance

Manuals

22 00 00 SD-02 Shop Drawings

3.6.1 GPlumbing System

SD-03 Product Data

2.4Fixtures

2.4.2Flush tank water closets

2.4.3Wall hung lavatories

2.4.4Countertop lavatories

2.4.5Kitchen sinks

2.4.8Service sinks

2.4.9Plastic bathtubs

2.6.2Shower Faucets

3.6.1Plumbing System

SD-06 Test Reports

3.6Tests, Flushing and Disinfection

SD-10 Operation and Maintenance

Data

3.6.1 GPlumbing System

22 07 19.00 40 SD-02 Shop Drawings

3.1Installation Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 52 PAGES

22 07 19.00 40 SD-03 Product Data

Part 2Adhesives

Part 2Coatings

Part 2Insulation Materials

Part 2Jacketing

Part 2Tape

SD-07 Certificates

1.5Recycled Materials

1.5Recycled Materials

SD-08 Manufacturer’s Instructions

3.1Installation Manual

23 00 00 SD-02 Shop Drawings

1.4.5Detail Drawings

SD-03 Product Data

2.11.1.1Duct Connectors

2.11.2Duct Access Doors

2.11.3Manual Balancing Dampers

2.11.5Diffusers

2.11.5.1Registers and Grilles

2.12.1.1Ceiling Exhaust Fans

SD-06 Test Reports

3.10Performance Tests

SD-08 Manufacturer’s Instructions

3.2Manufacturer's Installation

Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 52 PAGES

23 00 00 3.12.2Operation and Maintenance

Training

SD-10 Operation and Maintenance

Data

2.11.3Manual Balancing Dampers

2.12.1.1Ceiling Exhaust Fans

SD-11 Closeout Submittals

2.3Energy Efficient Equipment

2.4Ozone Depleting Substances

23 05 15 SD-01 Preconstruction Submittals

1.2Material, Equipment, and Fixture

Lists

SD-02 Shop Drawings

1.2Record Drawings

1.2Connection Diagrams

1.2Coordination Drawings

3.1Installation Drawings

SD-03 Product Data

2.1Pipe and Fittings

2.1Pipe and Fittings

2.2Valves

2.3Miscellaneous Materials

2.4Supporting Elements

1.2Equipment Foundation Data

SD-06 Test Reports

3.1Hydrostatic Tests

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 52 PAGES

23 05 15 3.1Air Tests

3.1Valve-Operating Tests

3.1Drainage Tests

SD-10 Operation and Maintenance

Data

3.9Operation and Maintenance

Manuals

23 05 48.00 40 SD-02 Shop Drawings

1.2Installation Drawings

SD-03 Product Data

1.2Equipment and Performance

Data

1.2Isolators

23 07 00 SD-03 Product Data

2.3 GPipe Insulation Systems

3.2 GPipe Insulation Systems

3.3 GEquipment Insulation Systems

SD-08 Manufacturer’s Instructions

2.3Pipe Insulation Systems

3.2Pipe Insulation Systems

3.3Equipment Insulation Systems

23 08 00.00 10 SD-02 Shop Drawings

1.5.2.2 GCommissioning Plan

SD-03 Product Data

3.2.1 GPre-Functional Performance Test

Checklists

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 52 PAGES

23 08 00.00 10 3.2.2 GFunctional Performance Tests

SD-06 Test Reports

3.3 GCommissioning Report

SD-07 Certificates

1.5.1 GCommissioning Firm

1.5.2 GCommissioning Specialist

23 09 23.13 20 SD-02 Shop Drawings

1.4.1.1 GControl system drawings title

sheet

1.4.1.2 GList of I/O Points

1.4.1.3 GControl System Components List

1.4.1.4 GControl system schematics

1.4.1.5 GHVAC Equipment Electrical

Ladder diagrams

1.4.1.6 GComponent wiring diagrams

1.4.1.7 GTerminal strip diagrams

1.4.1.8 GBACnet communication

architecture schematic

SD-03 Product Data

2.1.1 GDirect Digital Controllers

2.1.1.13 GBACnet Gateways

2.1.5 GBACnet Protocol Analyzer

2.1.2 GDDC Software

2.2 GSensors and Input Hardware

2.6.2 GSurge and transient protection

2.7 GIndicators

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 52 PAGES

23 09 23.13 20 SD-05 Design Data

3.3.2 GPerformance Verification Testing

Plan

3.3.4 GPre-Performance Verification

Testing Checklist

SD-06 Test Reports

3.3.11 GPerformance Verification Testing

Report

SD-07 Certificates

1.6.6 GContractor's Qualifications

SD-09 Manufacturer’s Field

Reports

3.3.1 GPre-PVT Checklist

SD-10 Operation and Maintenance

Data

1.4 GBACnet Direct Digital Control

Systems

3.2 GControls System Operators

Manuals

SD-11 Closeout Submittals

3.4.1 GTraining documentation

23 09 33.00 40 SD-01 Preconstruction Submittals

1.2.1Material, Equipment, and Fixture

Lists

1.2.1Records of Existing Conditions

SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 52 PAGES

23 09 33.00 40 1.2.2Fabrication Drawings

3.1Installation Drawings

SD-03 Product Data

2.1Control Components

1.6Valves

1.6Dampers

2.1.1Thermostats

2.2BACNET Controller

SD-08 Manufacturer’s Instructions

1.2.2Operating Instructions

23 21 13.00 20 SD-03 Product Data

2.2.1Pumps

SD-06 Test Reports

3.3.1Hydrostatic test of piping system

SD-10 Operation and Maintenance

Data

2.2.1Pumps

23 23 00 SD-02 Shop Drawings

2.3 GRefrigerant Piping System

SD-03 Product Data

2.3Refrigerant Piping System

1.5.2Spare Parts

1.3.1 GQualifications

3.5 GRefrigerant Piping Tests

3.4 GDemonstrations

3.1Verification of Dimensions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 52 PAGES

23 23 00 SD-06 Test Reports

3.5Refrigerant Piping Tests

SD-10 Operation and Maintenance

Data

1.5Maintenance

3.4Operation and Maintenance

Manuals

23 31 13.00 40 SD-01 Preconstruction Submittals

1.5Material, Equipment, and Fixture

Lists

1.5Records of Existing Conditions

SD-02 Shop Drawings

1.3Connection Diagrams

1.6Record Drawings

SD-03 Product Data

2.1.1Galvanized Steel Ductwork

Materials

2.1.2Mill-Rolled Reinforcing and

Supporting Materials

2.2.1Round Sheet Metal Duct Fittings

2.2.5Flexible Connectors

2.2.10Power Operated Dampers

2.2.11Fire Dampers and Wall Collars

2.2.9Gravity Backdraft and Relief

Dampers

2.2.8Manual Volume Dampers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 52 PAGES

23 31 13.00 40 SD-10 Operation and Maintenance

Data

3.6Operation and Maintenance

Manuals

2.2.10Power Operated Dampers

2.2.11Fire Dampers and Wall Collars

23 82 00.00 20 SD-03 Product Data

2.1Unit heaters

SD-10 Operation and Maintenance

Data

2.1Unit heaters

23 82 02.00 10 SD-02 Shop Drawings

1.4 GDrawings

SD-03 Product Data

2.1.1Materials and Equipment

1.6Spare Parts

3.1Verification of Dimensions

3.7System Performance Tests

SD-06 Test Reports

3.6 GRefrigerant Tests, Charging, and

Start-Up

3.7 GSystem Performance Tests

SD-10 Operation and Maintenance

Data

3.4Operation and Maintenance

Manuals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 52 PAGES

26 05 48.00 10 SD-02 Shop Drawings

3.2Lighting Fixtures in Buildings

1.3Equipment Requirements

SD-03 Product Data

3.2Lighting Fixtures in Buildings

1.3Equipment Requirements

1.2.3Contractor Designed Bracing

26 05 71.00 40 SD-01 Preconstruction Submittals

2.5Fuses

SD-02 Shop Drawings

1.3Connection Diagrams

1.3Fabrication Drawings

3.1Control Devices

3.1Protective Devices

SD-03 Product Data

2.1Motor Control

2.2Instrument Transformers

2.3Enclosures

2.4Circuit Breakers

3.1Control Devices

2.7Time Switches

2.8Protective Relays

2.9Indicating Instruments

2.11Indicating Lights

SD-07 Certificates

2.10Circuit Tests

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 52 PAGES

26 05 71.00 40 3.2dielectric tests

SD-08 Manufacturer’s Instructions

3.1Control Devices

3.1Protective Devices

SD-10 Operation and Maintenance

Data

2.1.1Manual Motor Controllers

2.1.2Magnetic Motor Controllers

2.1.3Combination Motor Controllers

2.4Circuit Breakers

2.7Time Switches

2.8Protective Relays

2.9Indicating Instruments

26 08 00 SD-06 Test Reports

3.1 GAcceptance tests and inspections

SD-07 Certificates

1.4.1 GQualifications

1.4.3 GAcceptance test and inspections

procedure

26 09 23.00 40 SD-03 Product Data

2.1Photoconductive Control Devices

1.2Installation Drawings

2.1Light-Sensitive Control Devices

2.4 GLight Level Sensor

2.5 GLighting Contactor

2.6 GTime Switch

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 52 PAGES

26 09 23.00 40 2.7 GPhotocell Switch

SD-06 Test Reports

3.2System Operation Tests

SD-08 Manufacturer’s Instructions

2.1Light-Sensitive Control Devices

SD-10 Operation and Maintenance

Data

2.1 GLighting Control System, Data

Package 5

26 11 16 SD-02 Shop Drawings

1.5.1.1 GUnit Substation Drawings

1.5.1.2Transformer drawings

SD-03 Product Data

1.5.1.1 GFuse curves

2.2Secondary unit substation

2.2.2 Gtransformer (liquid-filled)

SD-06 Test Reports

3.6.1 GAcceptance checks and tests

SD-07 Certificates

1.5.2 GPaint coating system

1.5.3 GTransformer Losses

SD-09 Manufacturer’s Field

Reports

2.6.2 GLoad Interrupter Switch

production tests

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 52 PAGES

26 11 16 2.6.3 Gtransformer design tests

(liquid-filled)

2.6.4 Gtransformer routine and other

tests (liquid-filled)

SD-10 Operation and Maintenance

Data

2.2 GUnit substations

SD-11 Closeout Submittals

1.6.1 GAssembled Operation and

Maintenance Manuals

2.6.1 GEquipment test schedule

26 18 23.00 40 SD-02 Shop Drawings

2.2Fabrication Drawings

3.1.2Installation Drawings

SD-03 Product Data

1.2Equipment and Performance

Data

2.3Surge Arresters

2.4Mounting Brackets

SD-08 Manufacturer’s Instructions

3.1.1Installation Instructions

2.3Surge Arresters

SD-10 Operation and Maintenance

Data

2.3.1O & M Manuals

2.3Surge Arresters

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 52 PAGES

26 20 00 SD-02 Shop Drawings

2.11 GPanelboards

SD-03 Product Data

2.10 GReceptacles

2.11.2 GCircuit breakers

2.11.3 GCircuit breakers

2.9 GSwitches

2.14.2 GCATV outlets

SD-06 Test Reports

3.5.2 G600-volt wiring test

3.5.4 GGrounding system test

3.5.3 GGround-fault receptacle test

SD-10 Operation and Maintenance

Data

1.5.1 GElectrical Systems

26 23 00 SD-02 Shop Drawings

1.5.2Switchgear Drawings

SD-03 Product Data

2.2 GSwitchgear

SD-06 Test Reports

2.5.2Switchgear design tests

2.5.3Switchgear production tests

3.5.1Acceptance checks and tests

SD-10 Operation and Maintenance

Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 52 PAGES

26 23 00 1.6.1 GSwitchgear Operation and

Maintenance

SD-11 Closeout Submittals

1.6.2Assembled Operation and

Maintenance Manuals

2.5.1Equipment Test Schedule

3.5Request for Settings

26 27 13.10 30 SD-03 Product Data

2.1 GPower meters

2.1.3 GCurrent

2.1.2 GPotential transformer

2.2.2 GCommunications module

1.6.1 GProtocol modules

1.6.2 GData recorder

1.6.2 GModem

SD-06 Test Reports

3.2.1 GAcceptance checks and tests

SD-10 Operation and Maintenance

Data

2.1 GPower meters

2.2.2 GCommunications module

1.6.1 GProtocol modules

1.6.2 GData recorder

1.6.2 GModem

SD-11 Closeout Submittals

3.2.2 GSystem function verification

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 52 PAGES

26 51 00 SD-03 Product Data

2.2 GLED Lighting Fixtures

2.1 GFluorescent Lighting Fixtures

1.6.1 GFluorescent Electronic Ballasts

2.1.2 GFluorescent Lamps

2.5 GPhotocell Switch

2.6 GOccupancy Sensors

1.6.3.3Energy Efficiency

SD-06 Test Reports

3.3Operating test

SD-10 Operation and Maintenance

Data

1.4.1Lighting Control System

26 52 00.00 40 SD-01 Preconstruction Submittals

1.2Material, Equipment, and Fixture

Lists

SD-03 Product Data

2.2Emergency Lighting Egress Units

2.3Emergency LED Lighting

SD-06 Test Reports

3.2System Operational Tests

SD-07 Certificates

2.2Emergency Lighting Egress Units

2.3Emergency LED Lighting

26 53 00.00 40 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 52 PAGES

26 53 00.00 40 1.2Material, Equipment, and Fixture

Lists

SD-06 Test Reports

3.2Operational Tests

SD-07 Certificates

2.1.1Efficiencies

26 56 00 SD-02 Shop Drawings

1.4.1.1 GLuminaire drawings

1.4.1.2 GPoles

SD-03 Product Data

1.6.1Local/Regional Materials

1.6.2Energy Efficiency

2.2 GLuminaires

2.2.1 GInduction Luminaires

2.8.2 GBallasts

2.3 GLighting contactor

2.4 GTime switch

3.1.2 GPhotocell switch

1.4.1.2 GPoles

2.5.1 GSteel poles

2.6 GBrackets

SD-05 Design Data

1.4.2 GDesign Data for luminaires

SD-06 Test Reports

3.2Operating test

SD-08 Manufacturer’s Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 52 PAGES

26 56 00 1.4.1.2Poles

SD-10 Operation and Maintenance

Data

1.8Operational Service

28 05 26.00 40 SD-01 Preconstruction Submittals

3.7.2Grounding Systems

SD-02 Shop Drawings

1.3Record Drawings

SD-03 Product Data

2.1Ground Rods

2.2Ground Wires

2.3Connectors and Fasteners

3.6Bonding

SD-06 Test Reports

3.7.1Bond Resistance Test

3.7.2Ground Resistance Tests

3.7.3Ground Isolation Test

3.7.4Continuity Isolation Test

SD-08 Manufacturer’s Instructions

3.7.2Grounding Systems

28 31 49 SD-03 Product Data

2.1Carbon monoxide detector

SD-06 Test Reports

3.2.1Carbon monoxide detector test

SD-10 Operation and Maintenance

Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 52 PAGES

28 31 49 2.1Carbon monoxide detector

28 31 76 SD-02 Shop Drawings

2.1.2Nameplates

2.5.1Instructions

3.2.1Wiring Diagrams

1.2.1System Layout

2.3System Operation

2.18Notification Appliances

2.15Amplifiers

SD-03 Product Data

1.6Technical Data And Computer

Software

2.14Fire Alarm Control Unit and Mass

Notification Control Unit (FMCP)

1.4.3LED Display Unit

3.2.2Terminal cabinets

2.17Manual stations

2.21Transmitters

2.13.1Batteries

2.13.2Battery chargers

2.10Smoke sensors

2.11Heat detectors

2.18Notification appliances

2.7Addressable interface devices

2.15Amplifiers

2.15Tone generators

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 42 OF 52 PAGES

28 31 76 2.15Digitalized voice generators

2.21.1Radio transmitter and interface panels

1.4.4Local Operating Console (LOC)

SD-05 Design Data

2.13.1.2Battery power

2.13.2Battery chargers

SD-06 Test Reports

3.7Field Quality Control

3.7.1Testing Procedures

2.10.3Smoke sensor testing

SD-07 Certificates

1.7.1.4Installer

3.7.2.2Formal Inspection and Tests

3.7.2.3Final Testing

SD-09 Manufacturer’s Field

Reports

2.3System Operation

1.7.2.2Fire Alarm/Mass Notification

System

SD-10 Operation and Maintenance

Data

3.10Operation and Maintenance

(O&M) Instructions

3.8Instruction of Government

Employees

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 43 OF 52 PAGES

28 31 76 SD-11 Closeout Submittals

3.7.2.4As-Built Drawings

31 11 00 SD-03 Product Data

3.4.1 GNonsaleable Materials

SD-04 Samples

2.1Tree wound paint

2.2Herbicide

31 23 00 SD-01 Preconstruction Submittals

1.7.1Shoring and Sheeting Plan

1.7.2 GDewatering work plan

SD-02 Shop Drawings

Installation of Geogrid

SD-03 Product Data

2.8 GBuried Warning and Identification

Tape

2.9 GDetection Wire for Non-Metallic

Piping

SD-04 Samples

2.6 GFilter Fabric

2.7 GGeogrid Reinforcement

SD-05 Design Data

2.3 GFlowable Fill

SD-06 Test Reports

1.6 GBorrow Site Testing

3.12.2.1 GFill and backfill

3.12.2.2 GSelect material

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 44 OF 52 PAGES

31 23 00 3.12.2.3 GDensity tests

2.2 GUtility Bedding Material

2.3 GFlowable Fill

2.5 GStructural Fill

2.6 GFilter Fabric

2.7 GGeogrid Reinforcement

SD-07 Certificates

GGeogrid Certificate of Compliance

32 05 33 SD-01 Preconstruction Submittals

2.4 GIntegrated Pest Management

Plan

SD-03 Product Data

2.1 GFertilizer

2.2.1Hose

2.3Mulches Topdressing

2.3.2Organic Mulch Materials

SD-07 Certificates

3.4.1Maintenance inspection report

SD-10 Operation and Maintenance

Data

Maintenance

SD-11 Closeout Submittals

3.4.3Tree, staking and guying removal

32 11 16.16 SD-03 Product Data

2.1 GMaterials

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 45 OF 52 PAGES

32 11 16.16 2.1 GBearing ratio

2.1 GLiquid limit

2.1 GPlasticity index

2.1 GDry weight

2.1 GPercentage of wear

3.4.2.1 GGradation tests

3.4.2.3 GDensity tests

SD-07 Certificates

2.2 GSource

32 11 24 SD-06 Test Reports

3.5.2.1Gradation

3.5.2.1Gradation

2.1.1Bearing ratio

2.1.1Liquid limit

2.1.1Plasticity index

2.1.1Percentage of wear

2.1.1Dry weight

3.5.2.3Density

3.5…