Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 52 PAGES
RNVT Dorm 539
01 32 01.00 10 SD-01 Preconstruction Submittals
3.4 GProject Schedule
01 33 00 SD-01 Preconstruction Submittals
1.10 GSubmittal Register
01 33 29 SD-01 Preconstruction Submittals
1.5 GLEED Implementation Plan
SD-11 Closeout Submittals
1.6 GLEED Documentation Notebook
01 35 29 SD-01 Preconstruction Submittals
1.6 G AAccident Prevention Plan (APP)
1.7 G AActivity Hazard Analysis (AHA)
1.6.1 G ACrane Critical Lift Plan
1.5.1.4 G ACrane Operators
SD-06 Test Reports
1.11Reports
1.11.1Accident Reports
1.11.3Monthly Exposure Reports
1.11.4Crane Reports
SD-07 Certificates
1.8Confined Space Entry Permit
1.8Hot work permit
1.11.5Certificate of Compliance
3.5.3Machinery & Mechanized
Equipment Certification Form
01 57 20.00 10 SD-01 Preconstruction Submittals
1.7 GEnvironmental Protection Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Attachment 6 to RFP No. FA5205-16-R-0005 Dated 25 Apr 16
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 52 PAGES
01 74 19 SD-01 Preconstruction Submittals
1.6 GWaste Management Plan
SD-11 Closeout Submittals
1.7Records
01 78 00 SD-10 Operation and Maintenance
Data
1.4.1 GEquipment/Product Warranty List
SD-11 Closeout Submittals
1.3.1 GAs-Built Drawings
1.3.3 GRecord Of Materials
1.3.2 GUtility As-Built Drawings
1.4.2 GEquipment/Product Warranty Tag
GHazardous Material Reporting
1.2 GCertification of EPA Designated
Items
1.6 GForm DD1354
1.6 GChecklist for Form DD1354
02 41 00 SD-01 Preconstruction Submittals
1.9 GExisting Conditions
SD-07 Certificates
1.2.1 GDemolition Plan
1.6 GNotification
SD-11 Closeout Submittals
Receipts
02 82 14.00 10 SD-02 Shop Drawings
1.4 GDetailed Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 52 PAGES
02 82 14.00 10 SD-03 Product Data
3.6.3.1 GAsbestos Waste Shipment
Records
1.1 GWeight Bills and Delivery Tickets
GEncapsulants
1.9.1 GRespiratory Protection Program
3.6 GCleanup and Disposal
1.6.1 GQualifications
1.11Training Program
1.8.1 GLicenses, Permits and
Notifications
3.6.3.2 GAsbestos Management Plan
SD-06 Test Reports
3.4 GExposure Assessment and Air
Monitoring
1.9Medical Surveillance
Requirements
02 84 33 SD-07 Certificates
1.7.1Training certification
1.7.2Qualifications of CIH
1.7.3PCB removal work plan
1.7.4PCB disposal plan
1.7.5Notification
3.8Transporter certification
3.8.1Certificate of disposal
02 85 00.00 20 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 52 PAGES
02 85 00.00 20 1.4.1.1 GPreliminary Visual Assessment
Report
1.4.1.2 GMicrobial Remediation Plan
1.4.1.4Worker Records
1.4.1.3 GRespiratory Protection Program
1.4.1.5 GCertified Industrial Hygienist
(CIH)/Industrial Hygienist (IH)
Qualifications
1.4.1.6 GMicrobial Remediation Supervisor
Qualifications
1.2.22 GVentilation System Mold
Remediator Qualifications
3.5.1 GVentilation System Mold
Remediator Qualifications
SD-03 Product Data
1.2.17 GPersonal Protective Equipment
(PPE)
3.1.5Air Filtration Units
3.1.4Dehumidifiers
1.2.20Pressure Differential Measuring
Instrument
1.2.10 GFungicidal Agents, (EPA)
1.2.8 GDisinfectants or Biocide
Sanitizing Solutions
SD-06 Test Reports
1.4.3 GDaily Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 52 PAGES
02 85 00.00 20 SD-11 Closeout Submittals
1.4.4 GSubmittals at Completion of
Remediation Work
03 01 30.71 SD-05 Design Data
1.4.1.1Job mix formula
SD-06 Test Reports
2.1.2aggregate
2.1.1.1Epoxy resin binder
2.1.1.2Epoxy grout
SD-07 Certificates
2.1.1.1Epoxy resin binder
2.1.1.2Epoxy grout
SD-08 Manufacturer’s Instructions
2.1.1Epoxy
03 11 13.00 10 SD-05 Design Data
2.1Calculations
SD-06 Test Reports
3.2Inspection
03 20 00.00 10 SD-02 Shop Drawings
3.1 GReinforcement
SD-07 Certificates
2.2Reinforcing Steel
03 30 00 SD-01 Preconstruction Submittals
Concrete Curing Plan
1.6.5 GQuality Control Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 52 PAGES
03 30 00 1.6.6 GQuality Control Personnel
Certifications
1.6.6Quality Control Organizational
Chart
SD-02 Shop Drawings
1.6.2.1 GReinforcing steel
SD-03 Product Data
Joint sealants
Joint filler
2.1Materials for Forms
Recycled Aggregate Materials
2.4.1Cementitious Materials
2.3.3Concrete Curing Materials
2.5Reinforcement
Liquid Chemical Floor Hardener
2.4.5Admixtures
SD-05 Design Data
2.3.1 Gmix design
SD-06 Test Reports
1.6.1.1 GConcrete mix design
1.6.4.1Fly ash
1.6.4.1Pozzolan
1.6.4.2Ground granulated blast-furnace slag
2.4.3Aggregates
3.10.2.3 GCompressive strength tests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 52 PAGES
03 30 00 3.10.2.4Air Content
3.10.2.1Slump Tests
2.4.2Water
SD-07 Certificates
2.5.1Reinforcing Bars
1.6.3.1Material Safety Data Sheets
Forest Stewardship Council
(FSC) Certification
1.6.6.2Field Testing Technician and
Testing Agency
05 50 13 SD-02 Shop Drawings
Gstructural steel door frames
2.3 GAccess doors and panels
SD-03 Product Data
2.3Access doors and panels
Structural steel door frames
05 72 00 SD-01 Preconstruction Submittals
1.3 GExisting Conditions
SD-02 Shop Drawings
Linear Ceiling; G
SD-03 Product Data
Linear Ceiling; G
SD-04 Samples
GManufacturer's Standard Color
Charts
GAluminum Finishes
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 52 PAGES
05 72 00 3.6 GAnchorage Devices and
Fasteners
SD-08 Manufacturer’s Instructions
GCleaning Materials
GPreventative Maintenance and
Inspection
3.11 GMaintenance Instructions
GApplication Methods
06 20 00 SD-02 Shop Drawings
1.3Detail Drawings
SD-03 Product Data
GWood
SD-07 Certificates
1.4Certificates of grade
1.4Certificates of compliance
06 61 16 SD-02 Shop Drawings
GDetail Drawings
3.1 GInstallation
SD-03 Product Data
2.1Solid polymer material
1.4.1Qualifications
2.3Fabrications
SD-04 Samples
2.1 GMaterial
2.3.4 GCounter and Vanity Tops
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 52 PAGES
06 61 16 2.1Solid polymer material
SD-07 Certificates
2.3Fabrications
1.4.1Qualifications
SD-10 Operation and Maintenance
Data
3.2Clean-up
07 14 00 SD-03 Product Data
2.1Fluid-applied membrane
2.2Membrane primer
2.8Elastomeric sheet
3.3Solvent
3.4.1Moisture meter
2.7Bond breaker
SD-11 Closeout Submittals
1.6Warranty
3.6Information Card
3.5Instructions To Government
Personnel
07 21 13 SD-03 Product Data
2.1 GBlock or board insulation
2.2Vapor retarder
2.3Pressure sensitive tape
Protection board or coating
2.4Accessories
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 52 PAGES
07 21 13 2.1Block or Board Insulation
2.4.1Adhesive
07 57 00 SD-06 Test Reports
GInstallation
URETHANE FOAM
PROTECTIVE COATING
07 60 00 SD-02 Shop Drawings
3.1.18 GCovering on flat, sloped, or
curved surfaces
3.1.15 GDownspouts
3.1.19 GExpansion joints
3.1.16 GFlashing for roof drains
3.1.11 GBase flashing
3.1.12 GCounterflashing
3.1.20 GFlashing at roof penetrations
GCopings
3.1.14 GDrip edge
3.1.17 GEave flashing
SD-11 Closeout Submittals
Quality Control Plan
07 84 00 SD-02 Shop Drawings
2.1 GFirestopping Materials
SD-06 Test Reports
3.3 GInspection
SD-07 Certificates
1.4.2Inspector Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 52 PAGES
07 84 00 2.1Firestopping Materials
1.4.1 GInstaller Qualifications
07 92 00 SD-03 Product Data
2.1Sealants
2.2Primers
2.3Bond breakers
2.4Backstops
SD-07 Certificates
3.3.6Sealant
08 11 13 SD-02 Shop Drawings
2.1 GDoors
2.1 GDoors
2.6 GFrames
2.6 GFrames
2.4Accessories
2.8Weatherstripping
SD-03 Product Data
2.1 GDoors
2.6 GFrames
2.4Accessories
2.8Weatherstripping
08 32 13 SD-02 Shop Drawings
2.1Aluminum sliding glass doors
SD-03 Product Data
2.1Aluminum sliding glass doors
2.1.4Hardware
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 52 PAGES
08 32 13 2.1.5Glazing
2.1.6Weatherstripping
Screens
2.1.7Finish
SD-04 Samples
2.1.7Finish
SD-10 Operation and Maintenance
Data
2.1 GAluminum sliding glass doors
08 51 13 SD-02 Shop Drawings
2.1 GWindows
1.9Fabrication Drawings
SD-03 Product Data
2.1 GWindows
2.2.7.1 GHardware
2.2.3 GFasteners
1.10 GWindow performance
2.4 GThermal-Barrier Windows
2.5 GMullions
2.6 GWindow Cleaners' Bolts
2.2.9 GScreens
2.2.2 GWeatherstripping
2.2.7 GAccessories
1.10.5Thermal performance
SD-04 Samples
1.4.2.1Finish Sample
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 52 PAGES
08 51 13 1.4.2.2Window Sample
SD-05 Design Data
2.1Structural calculations for deflection
1.4.3 GDesign Analysis
SD-06 Test Reports
1.4.4Minimum condensation resistance factor
SD-10 Operation and Maintenance
Data
2.1 GWindows
Plastic Identification
08 71 00 SD-02 Shop Drawings
1.3 GHardware schedule
2.3.5Keying system
SD-03 Product Data
2.3 GHardware items
SD-08 Manufacturer’s Instructions
3.1Installation
SD-10 Operation and Maintenance
Data
1.3 GHardware Schedule
SD-11 Closeout Submittals
1.4Key Bitting
08 81 00 SD-02 Shop Drawings
3.3.1Installation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 52 PAGES
08 81 00 SD-04 Samples
1.5.1Insulating Glass
3.2.7Plastic Sheet
Glazing Compound
2.3.3Tape
2.3.1.1Sealant
SD-07 Certificates
1.5.1Insulating Glass
SD-08 Manufacturer’s Instructions
2.3Setting and sealing materials
3.2Glass setting
09 22 00 SD-02 Shop Drawings
2.1 GMetal support systems
09 29 00 SD-03 Product Data
Gypsum Board Cementitious backer units
2.1.3Glass Mat Water-Resistant
Gypsum Tile Backing Board
2.1.7Accessories
SD-07 Certificates
2.1 GAsbestos Free Materials
SD-08 Manufacturer’s Instructions
Material Safety Data Sheets
SD-10 Operation and Maintenance
Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 52 PAGES
09 29 00 Manufacturer maintenance instructions
3.9Waste Management
09 30 13 SD-02 Shop Drawings
3.2 GDetail Drawings
SD-03 Product Data
2.1 GTile
2.3 GMortar, Grout, and Adhesive
SD-04 Samples
2.1 GTile
2.1 GAccessories
2.1.3 GAccessories
2.1 GTransition Strips
GGrout
SD-07 Certificates
2.1Tile
2.3Mortar, Grout, and Adhesive
SD-08 Manufacturer’s Instructions
3.6Maintenance Instructions
SD-10 Operation and Maintenance
Data
3.2 GInstallation
09 65 00 SD-02 Shop Drawings
2.8 GResilient Flooring and
Accessories
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 52 PAGES
09 65 00 2.8 GResilient Flooring and
Accessories
2.4Adhesives
SD-04 Samples
2.8 GResilient Flooring and
Accessories
SD-06 Test Reports
3.3 GMoisture, Alkalinity and Bond
Tests
SD-08 Manufacturer’s Instructions
3.2 GSurface Preparation
3.1 GInstallation
SD-10 Operation and Maintenance
Data
2.8 GResilient Flooring and
Accessories
09 68 00 SD-02 Shop Drawings
3.4 GInstallation Drawings
2.4 GMoldings
SD-03 Product Data
2.1 GCarpet
2.4 GMoldings
SD-04 Samples
2.1 GCarpet
2.4 GMoldings
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 52 PAGES
09 68 00 3.2 GMoisture and Alkalinity Tests
SD-07 Certificates
2.1Carpet
1.3Regulatory Requirements
SD-08 Manufacturer’s Instructions
3.1Surface Preparation
3.4Installation
SD-10 Operation and Maintenance
Data
2.1 GCarpet
3.5 GCleaning and Protection
Maintenance Service
09 90 00 SD-01 Preconstruction Submittals
2.1Paint
10 28 13 SD-03 Product Data
2.1.2 GFinishes
2.2 GAccessory Items
SD-04 Samples
2.1.2 GFinishes
2.2 GAccessory Items
SD-07 Certificates
2.2Accessory Items
SD-11 Closeout Submittals
LEED Documentation
10 44 16 SD-01 Preconstruction Submittals
2.1Manufacturer's Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 52 PAGES
10 44 16 SD-02 Shop Drawings
2.1Fire Extinguishers
1.3.1Accessories
Part 2Cabinets
1.3.1Wall Brackets
SD-03 Product Data
2.1Fire Extinguishers
1.3.1Accessories
Part 2Cabinets
1.3.1Wall Brackets
3.2.1Replacement Parts
SD-04 Samples
1.3.1Fire Extinguisher
1.3.1Cabinet
1.3.1Wall Brackets
1.3.1Accessories
SD-07 Certificates
2.1Fire Extinguishers
2.1Manufacturer's Warranty with
Inspection Tag
11 31 13 SD-03 Product Data
2.1Kitchen equipment
SD-08 Manufacturer’s Instructions
2.1Kitchen equipment
Exhaust hood
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 52 PAGES
11 31 13 SD-10 Operation and Maintenance
Data
2.1 GKitchen equipment
12 21 00 SD-02 Shop Drawings
3.3Installation
SD-03 Product Data
2.1 GWindow Blinds
3.3Installation
SD-04 Samples
2.1 GWindow Blinds
GValance
SD-06 Test Reports
2.1Window Blinds
SD-08 Manufacturer’s Instructions
2.1 GWindow Blinds
SD-10 Operation and Maintenance
Data
2.1 GWindow Blinds
SD-11 Closeout Submittals
LEED Documentation
12 32 00 SD-02 Shop Drawings
2.2 GFabrication
3.1.1 GInstallation Drawings
SD-03 Product Data
2.3.1 GCabinets
GPlywood
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 52 PAGES
12 32 00 GHardwood
2.4 GAdhesives
2.4 GFiller Material
2.4 GFasteners
GAccessories and Hardware
GSoftwoods
2.4 GPlastic Laminate
2.3.1 GCountertops
SD-04 Samples
GAccessories and Hardware
1.4 GManufacturer's Standard Color
Charts
SD-07 Certificates
GPlywood
GHardwood
2.4 GAdhesives
2.4 GFiller Material
GParticle Board
2.4 GFasteners
GAccessories and Hardware
SD-08 Manufacturer’s Instructions
1.3 GManufacturer's Instructions
12 36 00 SD-02 Shop Drawings
2.3 GFabrication
3.1 GInstallation Drawings
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 52 PAGES
12 36 00 GCorrosion-Resistant Steel
GPlywood
GSynthetic Resin
2.2 GAdhesives
2.2 GFasteners
2.4 GAccessories and Hardware
2.2 GPlastic Laminate
SD-04 Samples
2.3 GCountertop
2.3 GBacksplash
2.4 GAccessories and Hardware
2.1 GManufacturer's Standard Color
Charts
SD-07 Certificates
GPlywood
2.2 GFasteners
2.4 GAccessories and Hardware
SD-08 Manufacturer’s Instructions
2.1 GManufacturer's Instructions
12 48 13 SD-02 Shop Drawings
3.2 GInstallation Drawings
3.2 GDetail Drawings
SD-03 Product Data
2.1 GEntrance Floor Mats and Frames
2.2 GAdhesives and Concrete Primers
SD-04 Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 52 PAGES
12 48 13 2.1 GEntrance Floor Mats and Frames
SD-08 Manufacturer’s Instructions
3.2 GManufacturer's Instructions
SD-10 Operation and Maintenance
Data
3.2 GProtection, Maintenance, and
Repair Information
21 13 13.00 10 SD-02 Shop Drawings
1.4.3Shop Drawings
3.9As-Built Drawings
SD-03 Product Data
1.4.1Fire Protection Related
Submittals
2.3Materials and Equipment
1.6Spare Parts
3.8Preliminary Tests
3.9Final Acceptance Test
3.10Onsite Training
1.4.1Fire Protection Specialist
1.4.2Sprinkler System Installer
SD-05 Design Data
1.4.3Sway Bracing
1.2.1.3Hydraulic Calculations
SD-06 Test Reports
3.8Preliminary Test Report
3.9Final Acceptance Test Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 52 PAGES
21 13 13.00 10 SD-07 Certificates
3.3Inspection by Fire Protection
Specialist
SD-10 Operation and Maintenance
Data
3.10Operating and Maintenance
Manuals
22 00 00 SD-02 Shop Drawings
3.6.1 GPlumbing System
SD-03 Product Data
2.4Fixtures
2.4.2Flush tank water closets
2.4.3Wall hung lavatories
2.4.4Countertop lavatories
2.4.5Kitchen sinks
2.4.8Service sinks
2.4.9Plastic bathtubs
2.6.2Shower Faucets
3.6.1Plumbing System
SD-06 Test Reports
3.6Tests, Flushing and Disinfection
SD-10 Operation and Maintenance
Data
3.6.1 GPlumbing System
22 07 19.00 40 SD-02 Shop Drawings
3.1Installation Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 52 PAGES
22 07 19.00 40 SD-03 Product Data
Part 2Adhesives
Part 2Coatings
Part 2Insulation Materials
Part 2Jacketing
Part 2Tape
SD-07 Certificates
1.5Recycled Materials
1.5Recycled Materials
SD-08 Manufacturer’s Instructions
3.1Installation Manual
23 00 00 SD-02 Shop Drawings
1.4.5Detail Drawings
SD-03 Product Data
2.11.1.1Duct Connectors
2.11.2Duct Access Doors
2.11.3Manual Balancing Dampers
2.11.5Diffusers
2.11.5.1Registers and Grilles
2.12.1.1Ceiling Exhaust Fans
SD-06 Test Reports
3.10Performance Tests
SD-08 Manufacturer’s Instructions
3.2Manufacturer's Installation
Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 52 PAGES
23 00 00 3.12.2Operation and Maintenance
Training
SD-10 Operation and Maintenance
Data
2.11.3Manual Balancing Dampers
2.12.1.1Ceiling Exhaust Fans
SD-11 Closeout Submittals
2.3Energy Efficient Equipment
2.4Ozone Depleting Substances
23 05 15 SD-01 Preconstruction Submittals
1.2Material, Equipment, and Fixture
Lists
SD-02 Shop Drawings
1.2Record Drawings
1.2Connection Diagrams
1.2Coordination Drawings
3.1Installation Drawings
SD-03 Product Data
2.1Pipe and Fittings
2.1Pipe and Fittings
2.2Valves
2.3Miscellaneous Materials
2.4Supporting Elements
1.2Equipment Foundation Data
SD-06 Test Reports
3.1Hydrostatic Tests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 52 PAGES
23 05 15 3.1Air Tests
3.1Valve-Operating Tests
3.1Drainage Tests
SD-10 Operation and Maintenance
Data
3.9Operation and Maintenance
Manuals
23 05 48.00 40 SD-02 Shop Drawings
1.2Installation Drawings
SD-03 Product Data
1.2Equipment and Performance
Data
1.2Isolators
23 07 00 SD-03 Product Data
2.3 GPipe Insulation Systems
3.2 GPipe Insulation Systems
3.3 GEquipment Insulation Systems
SD-08 Manufacturer’s Instructions
2.3Pipe Insulation Systems
3.2Pipe Insulation Systems
3.3Equipment Insulation Systems
23 08 00.00 10 SD-02 Shop Drawings
1.5.2.2 GCommissioning Plan
SD-03 Product Data
3.2.1 GPre-Functional Performance Test
Checklists
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 52 PAGES
23 08 00.00 10 3.2.2 GFunctional Performance Tests
SD-06 Test Reports
3.3 GCommissioning Report
SD-07 Certificates
1.5.1 GCommissioning Firm
1.5.2 GCommissioning Specialist
23 09 23.13 20 SD-02 Shop Drawings
1.4.1.1 GControl system drawings title
sheet
1.4.1.2 GList of I/O Points
1.4.1.3 GControl System Components List
1.4.1.4 GControl system schematics
1.4.1.5 GHVAC Equipment Electrical
Ladder diagrams
1.4.1.6 GComponent wiring diagrams
1.4.1.7 GTerminal strip diagrams
1.4.1.8 GBACnet communication
architecture schematic
SD-03 Product Data
2.1.1 GDirect Digital Controllers
2.1.1.13 GBACnet Gateways
2.1.5 GBACnet Protocol Analyzer
2.1.2 GDDC Software
2.2 GSensors and Input Hardware
2.6.2 GSurge and transient protection
2.7 GIndicators
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 52 PAGES
23 09 23.13 20 SD-05 Design Data
3.3.2 GPerformance Verification Testing
Plan
3.3.4 GPre-Performance Verification
Testing Checklist
SD-06 Test Reports
3.3.11 GPerformance Verification Testing
Report
SD-07 Certificates
1.6.6 GContractor's Qualifications
SD-09 Manufacturer’s Field
Reports
3.3.1 GPre-PVT Checklist
SD-10 Operation and Maintenance
Data
1.4 GBACnet Direct Digital Control
Systems
3.2 GControls System Operators
Manuals
SD-11 Closeout Submittals
3.4.1 GTraining documentation
23 09 33.00 40 SD-01 Preconstruction Submittals
1.2.1Material, Equipment, and Fixture
Lists
1.2.1Records of Existing Conditions
SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 52 PAGES
23 09 33.00 40 1.2.2Fabrication Drawings
3.1Installation Drawings
SD-03 Product Data
2.1Control Components
1.6Valves
1.6Dampers
2.1.1Thermostats
2.2BACNET Controller
SD-08 Manufacturer’s Instructions
1.2.2Operating Instructions
23 21 13.00 20 SD-03 Product Data
2.2.1Pumps
SD-06 Test Reports
3.3.1Hydrostatic test of piping system
SD-10 Operation and Maintenance
Data
2.2.1Pumps
23 23 00 SD-02 Shop Drawings
2.3 GRefrigerant Piping System
SD-03 Product Data
2.3Refrigerant Piping System
1.5.2Spare Parts
1.3.1 GQualifications
3.5 GRefrigerant Piping Tests
3.4 GDemonstrations
3.1Verification of Dimensions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 52 PAGES
23 23 00 SD-06 Test Reports
3.5Refrigerant Piping Tests
SD-10 Operation and Maintenance
Data
1.5Maintenance
3.4Operation and Maintenance
Manuals
23 31 13.00 40 SD-01 Preconstruction Submittals
1.5Material, Equipment, and Fixture
Lists
1.5Records of Existing Conditions
SD-02 Shop Drawings
1.3Connection Diagrams
1.6Record Drawings
SD-03 Product Data
2.1.1Galvanized Steel Ductwork
Materials
2.1.2Mill-Rolled Reinforcing and
Supporting Materials
2.2.1Round Sheet Metal Duct Fittings
2.2.5Flexible Connectors
2.2.10Power Operated Dampers
2.2.11Fire Dampers and Wall Collars
2.2.9Gravity Backdraft and Relief
Dampers
2.2.8Manual Volume Dampers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 52 PAGES
23 31 13.00 40 SD-10 Operation and Maintenance
Data
3.6Operation and Maintenance
Manuals
2.2.10Power Operated Dampers
2.2.11Fire Dampers and Wall Collars
23 82 00.00 20 SD-03 Product Data
2.1Unit heaters
SD-10 Operation and Maintenance
Data
2.1Unit heaters
23 82 02.00 10 SD-02 Shop Drawings
1.4 GDrawings
SD-03 Product Data
2.1.1Materials and Equipment
1.6Spare Parts
3.1Verification of Dimensions
3.7System Performance Tests
SD-06 Test Reports
3.6 GRefrigerant Tests, Charging, and
Start-Up
3.7 GSystem Performance Tests
SD-10 Operation and Maintenance
Data
3.4Operation and Maintenance
Manuals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 52 PAGES
26 05 48.00 10 SD-02 Shop Drawings
3.2Lighting Fixtures in Buildings
1.3Equipment Requirements
SD-03 Product Data
3.2Lighting Fixtures in Buildings
1.3Equipment Requirements
1.2.3Contractor Designed Bracing
26 05 71.00 40 SD-01 Preconstruction Submittals
2.5Fuses
SD-02 Shop Drawings
1.3Connection Diagrams
1.3Fabrication Drawings
3.1Control Devices
3.1Protective Devices
SD-03 Product Data
2.1Motor Control
2.2Instrument Transformers
2.3Enclosures
2.4Circuit Breakers
3.1Control Devices
2.7Time Switches
2.8Protective Relays
2.9Indicating Instruments
2.11Indicating Lights
SD-07 Certificates
2.10Circuit Tests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 52 PAGES
26 05 71.00 40 3.2dielectric tests
SD-08 Manufacturer’s Instructions
3.1Control Devices
3.1Protective Devices
SD-10 Operation and Maintenance
Data
2.1.1Manual Motor Controllers
2.1.2Magnetic Motor Controllers
2.1.3Combination Motor Controllers
2.4Circuit Breakers
2.7Time Switches
2.8Protective Relays
2.9Indicating Instruments
26 08 00 SD-06 Test Reports
3.1 GAcceptance tests and inspections
SD-07 Certificates
1.4.1 GQualifications
1.4.3 GAcceptance test and inspections
procedure
26 09 23.00 40 SD-03 Product Data
2.1Photoconductive Control Devices
1.2Installation Drawings
2.1Light-Sensitive Control Devices
2.4 GLight Level Sensor
2.5 GLighting Contactor
2.6 GTime Switch
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 52 PAGES
26 09 23.00 40 2.7 GPhotocell Switch
SD-06 Test Reports
3.2System Operation Tests
SD-08 Manufacturer’s Instructions
2.1Light-Sensitive Control Devices
SD-10 Operation and Maintenance
Data
2.1 GLighting Control System, Data
Package 5
26 11 16 SD-02 Shop Drawings
1.5.1.1 GUnit Substation Drawings
1.5.1.2Transformer drawings
SD-03 Product Data
1.5.1.1 GFuse curves
2.2Secondary unit substation
2.2.2 Gtransformer (liquid-filled)
SD-06 Test Reports
3.6.1 GAcceptance checks and tests
SD-07 Certificates
1.5.2 GPaint coating system
1.5.3 GTransformer Losses
SD-09 Manufacturer’s Field
Reports
2.6.2 GLoad Interrupter Switch
production tests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 52 PAGES
26 11 16 2.6.3 Gtransformer design tests
(liquid-filled)
2.6.4 Gtransformer routine and other
tests (liquid-filled)
SD-10 Operation and Maintenance
Data
2.2 GUnit substations
SD-11 Closeout Submittals
1.6.1 GAssembled Operation and
Maintenance Manuals
2.6.1 GEquipment test schedule
26 18 23.00 40 SD-02 Shop Drawings
2.2Fabrication Drawings
3.1.2Installation Drawings
SD-03 Product Data
1.2Equipment and Performance
Data
2.3Surge Arresters
2.4Mounting Brackets
SD-08 Manufacturer’s Instructions
3.1.1Installation Instructions
2.3Surge Arresters
SD-10 Operation and Maintenance
Data
2.3.1O & M Manuals
2.3Surge Arresters
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 52 PAGES
26 20 00 SD-02 Shop Drawings
2.11 GPanelboards
SD-03 Product Data
2.10 GReceptacles
2.11.2 GCircuit breakers
2.11.3 GCircuit breakers
2.9 GSwitches
2.14.2 GCATV outlets
SD-06 Test Reports
3.5.2 G600-volt wiring test
3.5.4 GGrounding system test
3.5.3 GGround-fault receptacle test
SD-10 Operation and Maintenance
Data
1.5.1 GElectrical Systems
26 23 00 SD-02 Shop Drawings
1.5.2Switchgear Drawings
SD-03 Product Data
2.2 GSwitchgear
SD-06 Test Reports
2.5.2Switchgear design tests
2.5.3Switchgear production tests
3.5.1Acceptance checks and tests
SD-10 Operation and Maintenance
Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 52 PAGES
26 23 00 1.6.1 GSwitchgear Operation and
Maintenance
SD-11 Closeout Submittals
1.6.2Assembled Operation and
Maintenance Manuals
2.5.1Equipment Test Schedule
3.5Request for Settings
26 27 13.10 30 SD-03 Product Data
2.1 GPower meters
2.1.3 GCurrent
2.1.2 GPotential transformer
2.2.2 GCommunications module
1.6.1 GProtocol modules
1.6.2 GData recorder
1.6.2 GModem
SD-06 Test Reports
3.2.1 GAcceptance checks and tests
SD-10 Operation and Maintenance
Data
2.1 GPower meters
2.2.2 GCommunications module
1.6.1 GProtocol modules
1.6.2 GData recorder
1.6.2 GModem
SD-11 Closeout Submittals
3.2.2 GSystem function verification
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 52 PAGES
26 51 00 SD-03 Product Data
2.2 GLED Lighting Fixtures
2.1 GFluorescent Lighting Fixtures
1.6.1 GFluorescent Electronic Ballasts
2.1.2 GFluorescent Lamps
2.5 GPhotocell Switch
2.6 GOccupancy Sensors
1.6.3.3Energy Efficiency
SD-06 Test Reports
3.3Operating test
SD-10 Operation and Maintenance
Data
1.4.1Lighting Control System
26 52 00.00 40 SD-01 Preconstruction Submittals
1.2Material, Equipment, and Fixture
Lists
SD-03 Product Data
2.2Emergency Lighting Egress Units
2.3Emergency LED Lighting
SD-06 Test Reports
3.2System Operational Tests
SD-07 Certificates
2.2Emergency Lighting Egress Units
2.3Emergency LED Lighting
26 53 00.00 40 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 52 PAGES
26 53 00.00 40 1.2Material, Equipment, and Fixture
Lists
SD-06 Test Reports
3.2Operational Tests
SD-07 Certificates
2.1.1Efficiencies
26 56 00 SD-02 Shop Drawings
1.4.1.1 GLuminaire drawings
1.4.1.2 GPoles
SD-03 Product Data
1.6.1Local/Regional Materials
1.6.2Energy Efficiency
2.2 GLuminaires
2.2.1 GInduction Luminaires
2.8.2 GBallasts
2.3 GLighting contactor
2.4 GTime switch
3.1.2 GPhotocell switch
1.4.1.2 GPoles
2.5.1 GSteel poles
2.6 GBrackets
SD-05 Design Data
1.4.2 GDesign Data for luminaires
SD-06 Test Reports
3.2Operating test
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 52 PAGES
26 56 00 1.4.1.2Poles
SD-10 Operation and Maintenance
Data
1.8Operational Service
28 05 26.00 40 SD-01 Preconstruction Submittals
3.7.2Grounding Systems
SD-02 Shop Drawings
1.3Record Drawings
SD-03 Product Data
2.1Ground Rods
2.2Ground Wires
2.3Connectors and Fasteners
3.6Bonding
SD-06 Test Reports
3.7.1Bond Resistance Test
3.7.2Ground Resistance Tests
3.7.3Ground Isolation Test
3.7.4Continuity Isolation Test
SD-08 Manufacturer’s Instructions
3.7.2Grounding Systems
28 31 49 SD-03 Product Data
2.1Carbon monoxide detector
SD-06 Test Reports
3.2.1Carbon monoxide detector test
SD-10 Operation and Maintenance
Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 52 PAGES
28 31 49 2.1Carbon monoxide detector
28 31 76 SD-02 Shop Drawings
2.1.2Nameplates
2.5.1Instructions
3.2.1Wiring Diagrams
1.2.1System Layout
2.3System Operation
2.18Notification Appliances
2.15Amplifiers
SD-03 Product Data
1.6Technical Data And Computer
Software
2.14Fire Alarm Control Unit and Mass
Notification Control Unit (FMCP)
1.4.3LED Display Unit
3.2.2Terminal cabinets
2.17Manual stations
2.21Transmitters
2.13.1Batteries
2.13.2Battery chargers
2.10Smoke sensors
2.11Heat detectors
2.18Notification appliances
2.7Addressable interface devices
2.15Amplifiers
2.15Tone generators
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 42 OF 52 PAGES
28 31 76 2.15Digitalized voice generators
2.21.1Radio transmitter and interface panels
1.4.4Local Operating Console (LOC)
SD-05 Design Data
2.13.1.2Battery power
2.13.2Battery chargers
SD-06 Test Reports
3.7Field Quality Control
3.7.1Testing Procedures
2.10.3Smoke sensor testing
SD-07 Certificates
1.7.1.4Installer
3.7.2.2Formal Inspection and Tests
3.7.2.3Final Testing
SD-09 Manufacturer’s Field
Reports
2.3System Operation
1.7.2.2Fire Alarm/Mass Notification
System
SD-10 Operation and Maintenance
Data
3.10Operation and Maintenance
(O&M) Instructions
3.8Instruction of Government
Employees
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 43 OF 52 PAGES
28 31 76 SD-11 Closeout Submittals
3.7.2.4As-Built Drawings
31 11 00 SD-03 Product Data
3.4.1 GNonsaleable Materials
SD-04 Samples
2.1Tree wound paint
2.2Herbicide
31 23 00 SD-01 Preconstruction Submittals
1.7.1Shoring and Sheeting Plan
1.7.2 GDewatering work plan
SD-02 Shop Drawings
Installation of Geogrid
SD-03 Product Data
2.8 GBuried Warning and Identification
Tape
2.9 GDetection Wire for Non-Metallic
Piping
SD-04 Samples
2.6 GFilter Fabric
2.7 GGeogrid Reinforcement
SD-05 Design Data
2.3 GFlowable Fill
SD-06 Test Reports
1.6 GBorrow Site Testing
3.12.2.1 GFill and backfill
3.12.2.2 GSelect material
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 44 OF 52 PAGES
31 23 00 3.12.2.3 GDensity tests
2.2 GUtility Bedding Material
2.3 GFlowable Fill
2.5 GStructural Fill
2.6 GFilter Fabric
2.7 GGeogrid Reinforcement
SD-07 Certificates
GGeogrid Certificate of Compliance
32 05 33 SD-01 Preconstruction Submittals
2.4 GIntegrated Pest Management
Plan
SD-03 Product Data
2.1 GFertilizer
2.2.1Hose
2.3Mulches Topdressing
2.3.2Organic Mulch Materials
SD-07 Certificates
3.4.1Maintenance inspection report
SD-10 Operation and Maintenance
Data
Maintenance
SD-11 Closeout Submittals
3.4.3Tree, staking and guying removal
32 11 16.16 SD-03 Product Data
2.1 GMaterials
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 45 OF 52 PAGES
32 11 16.16 2.1 GBearing ratio
2.1 GLiquid limit
2.1 GPlasticity index
2.1 GDry weight
2.1 GPercentage of wear
3.4.2.1 GGradation tests
3.4.2.3 GDensity tests
SD-07 Certificates
2.2 GSource
32 11 24 SD-06 Test Reports
3.5.2.1Gradation
3.5.2.1Gradation
2.1.1Bearing ratio
2.1.1Liquid limit
2.1.1Plasticity index
2.1.1Percentage of wear
2.1.1Dry weight
3.5.2.3Density
3.5…