FA5205-16-R-0005_Atch._8_Manufacturers_Cut_Sheet_Catalog_Info.pdf

PDF 24 MB Posted

Attached to
Renovation of Dorm, Bldg. 539, Misawa AB, Japan
Solicitation number
FA5205-16-R-0005
Issued by

About this file

FA5205-16-R-0005_Atch. 8_Manufacturers Cut Sheet_Catalog Info

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MANUFACTURER'S CUT SHEET/

CATALOG INFORMATION

FOR

QKKA 14-1050

RNVT Dorm 539

MISAWA AIR BASE, JAPAN

28 Oct 15

Attachment 8 to RFP No. FA5205-16-R-0005

Check website for most current information including other installation and hardware options: www.grahamwindows.com 1551 Mt. Rose Avenue, York, Pennsylvania 17403-2909 (800) 755-6274 (717) 849-8100

Our products are tested to the standards of and certified by the American Architectural Manufacturer’s Association and the National Fenestration Rating Council.

STANDARD FEATURES

•Double Hung Tilt windows for blast mitigation
•Trim & clip or receptor anchoring system
•1” insulating glass construction using industry standard

laminated technology

•Block & Tackle balances for superior operation
•Mulls to 4” frame fixed and operable products
•Tilt sash for ease of cleaning
•Steel pivot bar in Delrin® shoe
•Maintenance-operated tilt-release mechanism
•Full-length extruded lift handles
•White bronze sweep lock at meeting rail
•Patented integral anti-bow feature

MEETS UFC 4-010-01 2007 • THIRD PARTY CALCULATIONS • MANUFACTURED IN THE USA

•NominalFrame/SillWallThickness:0.062/0.093”
•TestSize:

36” x 84”

•Glazing:
¼”annealed,½”spacer,¼”laminated
•Muntins:GridsbetweenlitesofIGunit,orexterior-applied
•CurvedShapes:Radiustopsandarchesavailablewithmulledfixedunits
•MaximumSashWeight:80lbs.(dependsonwidth-to-heightratio.Ifover
65lbs.,pleasecontactfactory)

Window series: B3100 Double Hung (Tilt) — General Specifications & Details

B3100 SERIES DATA SHEET

B3100 Series 4” Frame Depth

Blast-Resistant Double Hung w/Tilt-In Sash

• Finish Options:

AAMA 2603 — Standard acyrlic or polyester AAMA 2604 — 2 coat 50% fluoropolymer AAMA 2605 — 2 coat fluoropolymer 70% kynar Powder Coat Anodized

• Hardware:

White bronze sweep lock at meeting rail

• Accessories:

Fixed Lite Option System: 1400 Frame Familiy: 4” Mullions: Stacking: Integral & fixed-stack mull Side: 3-piece mull Panning: Available Trims: Available Receptor Systems: Available

• Exceptions: Call Graham sales rep or see website for more information

Products comply with Unified Facilities Criteria UFC 4-010-01; DoD Minimum Antiterrorism Standards for Buildings

Meets Minimum UFC 4-010-01 As Per Engineering Analysis

WINDOW TYPE FRAME

DEPTH

(inches)

SERIES DESIGNED BLAST

PRESSURE

(psi)

WINDOW

SIZE

(inches)

GLAZING

COMPOSITION

(inches)

TESTING & CERTIFICATIONS

Test Methods Qualified Documentation

Aluminum Tilt Double Hung 4 B3100 Blast Evaluated Various ¼ annealed, ½ as, ¼ lami UFC & GSA Calculated Independent Calculation Report

USG Exterior Ceiling Applications

Systems Guide 2014

Introduction 2 Systems Overview

Exterior Ceiling Applications 5 Paraline Linear Metal Ceiling System

Paraline Plus Linear Metal Ceiling Systems

17 Celebration Metal Panel Ceiling System

25 ZXLA with sheetroCk Lay-In Ceiling Panel ClimaPlus

31 USG Drywall Suspension System

Other Considerations 42 Accessories

Seismic Perimeter Applications

For More Information Technical Service

800 USG.4YOU

Web Site usg.com

For decades USG exterior ceiling systems have been utilized in a wide variety of exterior applications. USG exterior ceiling systems satisfy stringent performance requirements and design criteria while providing beauty and durability.

Page

Systems Guide

2 USG Exterior Ceiling Applications

USG provides five exterior systems for use in exterior environments that are not directly exposed to the weather such as under a soffit, parking garages, covered entrance or drive-through. They include the:

– Paraline® II Linear Metal Ceiling System1

– Paraline® Plus™ Linear Metal Ceiling System

– Celebration™ Metal Panel Ceiling System

– ZXLA™ with sheetroCk™ Lay-In Ceiling Panel ClimaPlus™

– USG™ Drywall Suspension System

These ceiling systems combine traditional modules, elegant linear pans, or metal panels combined with a specially engineered suspension system to create dynamic ceilings with clean, contemporary planes.

These guidelines outline the design considerations, test results and construction details for the installation of each USG exterior ceiling system. USG exterior assemblies were tested per: UL 580, UL 1897, TAS 202 and TAS 203, and listed in PEI Evaluation Report, PER-12055.

For more information about UL Standards please visit www.UL.com. For more information about Florida Building Code Testing Application Standards (TAS) please visit www.floridabuilding.org.

Celebration

Systems Overview

USG Exterior Ceiling Applications

1 Paraline II closed-reveal linear metal ceiling is the Paraline system appropriate for exterior ceiling applications.

3 USG Exterior Ceiling Applications

Main Tee / Carrier System

Spacing Uplift Class Test Standard Maximum Load Rating¹ (w)

Equivalent Wind Speed² (v)Main Tee Cross Tee Compression

Post

Paraline II Linear Metal Ceiling System

Symmetrical Carrier

48 in N/A 24 in N/A UL1897 46 psf 134 mph

24 in N/A 24 in Class 90 UL580 90 psf 188 mph

Paraline Plus Linear Metal Ceiling System

Paralock Carrier 48 in 24 in 24 in Class 30 UL580 30 psf 108 mph

48 in 24 in 24 in N/A UL1897 55 psf 147 mph

24 in 24 in 30 in Class 60 UL580 60 psf 153 mph

24 in 24 in 24 in Class 90 UL580 90 psf 188 mph

24 in 24 in 24 in N/A UL1897 102 psf 200 mph

Fineline™ DXFEV with Celebration Metal Ceiling Panels

DXFEVH 2924 48 in 24 in 24 in Class 30 UL580 30 psf 108 mph

24 in 48 in 48 in Class 30³ Engineering Analysis

30 psf 108 mph

24 in 24 in 24 in Class 90 UL580 90 psf 188 mph

24 in 24 in 24 in N/A UL1897 102 psf 200 mph

DXFEVH 2930 30 in 30 in 30 in N/A UL1897 68 psf 163 mph

30 in 30 in 30 in Class 60 UL580 60 psf 153 mph

ZXLA with sheetroCk Lay-in Ceiling Panel ClimaPlus

ZXLA26 48 in 24 in 24 in N/A UL1897 26 psf 101 mph

24 in 48 in 24 in Class 30 UL580 30 psf 108 mph

24 in 48 in 24 in N/A UL1897 85 psf 182 mph

48 in 24 in 24 in N/A UL1897 21 psf 91 mph

USG Drywall Suspension System

DGLW26 48 in 24 in 24 in Class 15 UL580 15 psf 77 mph

48 in 16 in 30 in Class 15 UL580 15 psf 77 mph

48 in 24 in 30 in Class 15 UL580 15 psf 77 mph

24 in 24 in 30 in Class 30 UL580 30 psf 108 mph

24 in 24 in 42 in Class 60 UL580 30 psf 108 mph

24 in 24 in 30 in Class 90 UL580 90 psf 188 mph

24 in 16 in 24 in Class 90 UL580 90 psf 188 mph

24 in 16 in 24 in N/A Miami Dade

TAS202&203

75 psf 171 mph

¹ Ultimate loads per UL 1897 are 15% greater than the values presented. The values presented for UL 1897 have a 0.85 coefficient applied to account for possible installation deficiencies.

2 Calculated using simplified formula on page four.

3 Value derived through engineering calculation

Systems Overview

Performance Selector

An example of Pixels frame-mounted backlit installation with GE Tetra® PowerGrid is on display at GE Lighting & Electrical Institute at historic Nela Park, Cleveland, OH (photo above)

4 USG Exterior Ceiling Applications

Wind Design Notes Miles per hour (MPH) versus pounds per square foot (PSF)

ASCE 7-10, Minimum Design Loads for Buildings and Other Structures, American Society of Civil Engineers/

Structural Engineering Institute (ASCE/SEI), contains a formula that converts wind speed into static pressure.

The formula is a comprehensive approach to include factors such as height or location of the building, or directionality of wind loads affecting the structure expressed as:

q z = 0.00256 K z Kz t Kd V q z = velocity pressure evaluated at height z above the ground

K z = velocity pressure exposure coefficient

K z t = topographic factor

K d = wind directionality factor

V = basic wind speed

The approximate value of wind pressure (PSF) can be calculated without knowing all of the factors described above by utilizing the simplified formula shown below.

p = 0.00256 V 2 p is the pressure (measured in psf)

V is the wind speed (measured in mph)

Wind load provisions of ASCE 7-10, are recognized in the 2012 International Residential Code (IRC) and the

2012 International Building Code (IBC). The information presented is correct to the best of our knowledge at the date of issuance. Because codes continue to evolve, check with a local official prior to designing and installing a ceiling system. Other restrictions and exemptions may apply.

System Overview

USG Exterior Ceiling Applications

Note: All systems shall comply with local wind load requirements. The engineer of record shall determine the final recommendation for the design wind pressure

5 USG Exterior Ceiling Applications

Linear Metal Ceiling Systems

Technical Data Spacing Uplift Class Test Standard Maximum

Load Rating (w)

Equivalent Wind Speed (v)Main Tee Cross Tee Compression

Post

Paraline II Page 9 48 in N/A 24 in N/A UL1897 46 psf 134 mph

Page 10 24 in N/A 24 in Class 90 UL580 90 psf 188 mph

Paraline Plus Page 13 48 in 24 in 24 in Class 30 UL580 30 psf 108 mph

48 in 24 in 24 in N/A UL1897 55 psf 147 mph

Page 14 24 in 24 in 30 in Class 60 UL580 60 psf 153 mph

Page 15 24 in 24 in 24 in Class 90 UL580 90 psf 188 mph

24 in 24 in 24 in N/A UL1897 102 psf 200 mph

Paraline® II

Paraline® Plus

6 USG Exterior Ceiling Applications

Wind Resistance

Paraline II and Paraline Plus

Paraline ceiling systems may be used for sheltered exterior applications not directly exposed to the weather.

The Paraline II and Paraline Plus systems have been tested for wind load resistance. The two units of measure commonly used are miles per hour (mph) and pounds per square foot (psf), equated by the methods in ASCE 7, Minimum Design Loads for Buildings and Other Structures, American Society of Civil Engineers/ Structural Engineering Institute (ASCE/SEI).1

Limitations: Finish is not UV-resistant; Paraline should not be installed where direct exposure to sun or weather will occur, such as fascias or facades. Not suitable for areas subject to high concentrations of acid rain. Indirect exposure to severe environmental conditions may shorten the lifespan of the product. The specific design of exterior ceiling installations requires the review and approval of the architect or engineer of record. Please refer to IC463 for more information about Paraline ceiling systems.

Technical Data – Wind pressure presented in accordance with applicable test standards.

– Compression posts used for the tests were 3/49 EMT conduit with compression post adapters.

Guidelines – Building structure from which the Paraline system is suspended and spaced, as well as hanger wire and compression post attachment methods, must be capable of withstanding the loads applied during wind conditions.

– Compression post shall be positively attached to the structure. For further information on the USG Donn Brand Compression Post, see pages 42–44.

– Other materials can be used for compression posts, provided the compressive strength and attachment method are approved for use by a local structural engineer.

– Architect’s details must cover design and location of expansion joints in addition to meeting all applicable building code requirements.

Panel Size The Paraline and Paraline Plus systems presented in this guide can accommodate all available panel sizes.

The performance values are not limited to a particular panel size. All available panel sizes will meet the performance values presented.

¹ System is to comply with local wind load requirements. The engineer of record shall determine the final recommendation for the design wind pressure requirements of each project.

For more information about Paraline Linear Metal Ceiling System, visit www.USG.com www.USG.com

7 USG Exterior Ceiling Applications

Application Details

Paraline II

Layout

Symmetrical Carrier Run

Adjustable Post Detail carrier splice hanger wires

48" 48"

48" hanger reinforcement clip max. 12" from wall symmetrical carrier compression post adapter and EMT (4' o.c.)

PARALINE pan trim channel finished wall or soffit

PARALINE pan splice staggered compression post std. 3/4" dia.

EMT conduit compression post adapterhanger reinforcement clip structure symmetrical carrier hanger reinforcement clip top clip (mechanically fastened) top clip (mechanically fastened) spring clip spring clip compression post adapter symmetrical carrier maximum 48" o.c.

compression posts and hanger wires

12 ga. hanger wire hanger reinforcement clip

8 USG Exterior Ceiling Applications

Paraline II

Pans Perpendicular to Wall Pans Parallel to Wall

Wall Intersection compression post (3/4" EMT conduit with compression post adapter) hanger reinforcement clip

PARALINE II pan symmetrical carrier

12" maximum

U-2-3/32 perimeter molding and hold-down clip compression post (3/4" EMT conduit with compression post adapter) hanger reinforcement clip

PARALINE II pan symmetrical carrier

12" maximum

12 ga. hanger wire

U-2-3/32 perimeter molding and hold-down clip

Note: Pop rivets shall be suitable for exterior use.

9 USG Exterior Ceiling Applications

48" o.c.

24" o.c.

12" max.

12" max.

Main Tees: 48 in. o.c.

Compression Posts: 24 in. o.c.

Hanger & Compression Post

Paraline Symmetrical Carrier compression post (3/4" EMT conduit with compression post adapter)

PARALINE II pan

U-2-3/32 perimeter molding

12 ga. hanger wire symmetrical carrier

Paraline II Assembly

PARALINE II pan

12 ga.

hanger wire symmetrical carrier hanger rein-forcement clip compression post (3/4" EMT conduit with end plug)

UL 1897

46 psf

10 USG Exterior Ceiling Applications

24" o.c.

12" max.

12" max.

24" o.c.

Main Tees: 24 in. o.c.

Compression Posts: 24 in. o.c.

Hanger & Compression Post

Paraline Symmetrical Carrier

Paraline II Assembly compression post (3/4" EMT conduit with compression post adapter)

PARALINE II pan

12 ga. hanger wire symmetrical carrier

U-2-3/32 perimeter molding

PARALINE II pan

12 ga.

hanger wire symmetrical carrier hanger rein-forcement clip compression post (3/4" EMT conduit with end plug)

UL 580

Class 90

11 USG Exterior Ceiling Applications

Paraline Plus

Layout

Paralock Carrier Run

Post Detail

PARALINE PLUS

pan splice staggered hanger wires

48" 48"

48" max. 12" from wall

PARALINE PLUS

pan trim channel finished wall or soffit

PARALOCK main tee structure top clip (mechanically fastened) top clip (mechanically fastened) spring clip spring clip

PARALOCK main tee

PARALOCK main tee compression post (3/4" EMT conduit with end plug)

12 ga. hanger wire 12 ga. hanger wire maximum 48" o.c.

compression posts and hanger wires compression post (3/4" EMT conduit with end plug) compression post (3/4" EMT conduit with end plug)

PARALOCK Main tee

12 USG Exterior Ceiling Applications

Paraline Plus

Pans Perpendicular to Wall Pans Parallel to Wall

Wall Intersection snap-loc insert

PARALINE PLUS pan compression post (3/4" EMT conduit with end plug)

PARALOCK main tee

12" maximum

U-2-3/32 perimeter molding and hold-down clip cross tee MAC2 clip snap-loc insert

PARALINE PLUS pan

12 ga. hanger wire compression post (3/4" EMT conduit with end plug)

12" maximum

PARALOCK

main tee

U-2-3/32 perimeter molding and hold-down clip

MAC2 clip

Notes: Pop rivets shall be suitable for exterior use. Field notch top flange of molding at grid intersection.

13 USG Exterior Ceiling Applications

24" o.c.

12" max.

12" max.

48" o.c.

Main Tees: 48 in. o.c.

Compression Posts: 24 in. o.c.

Cross Tees: 24 in. o.c.

Hanger & Compression Post

Paralock Carrier

ZXLA424 (48 in. Cross Tee)

PARALINE PLUS pan

12 ga. hanger wire

PARALOCK main tee snap-loc insert ZXLA 4ft. cross tee compression post (3/4" EMT conduit) compression post (3/4" EMT conduit)

PARALINE II pan

12 ga.

hanger wire

PARALOCK

main tee snap-loc insert

Paraline Plus Assembly

Class 30

14 USG Exterior Ceiling Applications

30" o.c.

24" o.c.

12" max.

24" o.c.

12" max.

Main Tees: 24 in. o.c.

Compression Posts: 30 in. o.c.

Cross Tees: 24 in. o.c.

Hanger & Compression Post

Paralock Carrier

ZXLA224 (24 in. Cross Tee)

12 ga. hanger wire

PARALOCK main tee snap-loc insert ZXLA 2ft. cross tee compression post (3/4" EMT conduit)

PARALINE PLUS pan compression post (3/4" EMT conduit)

PARALINE II pan

12 ga.

hanger wire

PARALOCK

main tee snap-loc insert

Paraline Plus Assembly

Class 60

15 USG Exterior Ceiling Applications

24" o.c.

12" max.

12" max.

24" o.c.

Main Tees: 24 in. o.c.

Compression Posts: 24 in. o.c.

Cross Tees: 24 in. o.c.

Hanger & Compression Post

Paralock Carrier

ZXLA224 (24 in. Cross Tee)

12 ga. hanger wire

PARALOCK main tee snap-loc insert ZXLA 2ft. cross tee compression post (3/4" EMT conduit)

PARALINE PLUS pan compression post (3/4" EMT conduit)

PARALINE II pan

12 ga.

hanger wire

PARALOCK

main tee snap-loc insert

Paraline Plus Assembly

UL 580, UL 1897

90 psf, 102 psf jvann Rectangle

Machine Accepts the Following Compatible Payment Systems:

—Coin-Drop —Card Reader

— Non-Coin Payment

Configurations

• Single Payment System

• 3.2 Cu. Ft. Capacity–Washer/

6.7 Cu. Ft. Capacity Dryer

• Push-Button Controls

• Combination of 9 Cycle Wash Options

• Optional Pre-Wash/Extra Rinse

• Stainless Steel Wash Basket

• Automatic Load Balancing

• Built-In Over-Sudsing Protection

• Maximum Spin Speed Extracts

More Water

• Reversible Door, Dryer Only

• Front Control Panel 20° Angle

• Front Serviceable

• Washer is ADA Compliant

• 3-Year Limited Parts

Only Warranty*

* *Based on AHAM load sizes. Individual savings may vary.

*Call 1-800-NO-BELTS for warranty details

Featuring Microprocessor Controls

HIGH-EFFICIENCY

COMMERCIAL STACK WASHER/DRYER

SAVE SPACE AND CUT UTILITY COSTS

• Get a Full-Size High-Efficiency Washer and Super-Capacity Dryer in the Space of a Washer Alone

• Save Energy and Water with High Speed Spin Extraction

MICROPROCESSOR CONTROLS

• Easy To Program

• Simple One-Touch Cycle Selection

• Panel Displays Operating Instructions and Countdown of Remaining Cycle Time

• Front Control Panel 20° Angle

METERCASE

• Metercase Integrated Into Console

• Accepts Coin-Drop, Card Reader and

Non-Coin Payment Configurations

• Single Payment System

STYLISH DESIGN

• Large Concave Windows

• Porcelain Finish

AUTOMATIC DETERGENT, SOFTENER AND

BLEACH DISPENSER

HIGH-EFFICIENCY DESIGN OFFERS

SIGNIFICANT UTILITY SAVINGS

• Save up to 60% Every Year** on Energy, Water and Sewer Costs

• ENERGY STAR®-Qualified

• CEE Tier II

• Modified Energy Factor: 2.26

Water Factor: 4.4

CET8000XQ 27" Electric Stack Washer/Dryer with Metercase CGT8000XQ 27" Gas Stack Washer/Dryer with Metercase

®Registered trademark/™ Trademark of Whirlpool, U.S.A. ©2011 Whirlpool Corporation. All rights reserved.

Whirlpool Corporation • Benton Harbor, Michigan 49022 U.S.A. WL100343A 8/11

To Locate a Distributor Near You, Please Visit www.whirlpoolcommerciallaundry.com/distributor, or Call 1-800-NO-BELTS.

Whirlpool® High-Efficiency Commercial Stack Washer/Dryer Microprocessor Controls

Featuring Microprocessor Controls

HIGH-EFFICIENCY

COMMERCIAL STACK WASHER/DRYER

STACKED UNIT SPECIFICATIONS

MODELS CET8000XQ

CGT8000XQ

WASHER SPECIFICATIONS

MOTOR

120V, 60Hz, variable-speed, high-efficiency, switched reluctance Yes Wash — HP (kWh) .09 (.07) Extract — HP (kWh) .54 (.40) Average kilowatt hour per cycle 0.07

CAPACITY

Volume — (liters) 3.2 (91) Diameter — in. (mm) 21.6 (547) Depth — in. (mm) 13.4 (341) Drain hose length — ft. (m) 6 (1.83)

DRYER SPECIFICATIONS

MOTOR

Single-phase, thermoprotected against overload, auto-reset Yes HP (kw) 1/4 (.19) Capacity — cu. ft. (cu. m) 6.7 (.17)

AIRFLOW

Electric models — cfm (cmm) 220 (6.2) Gas models — cfm (cmm) 230 (6.5) Tumble speed — RPM 50± 1 EXHAUST DUCT DIAMETER — IN. (mm) 4 (101.6)*

ELECTRICAL REQUIREMENTS

CET model — Voltage 240V/60Hz CGT model — Voltage 120V/60Hz

BREAKER/FUSE REQUIREMENTS

CET model — Amps 30 CGT model — Amps 15

HEATING ELEMENT RATING

CET model — Electric heating element – watts 5,600 CGT model — BTU/hr. (kcal/hr.) 24,000 (6,048) ADJUSTABLE LEVELING LEGS Yes

COLOR

White Yes

APPROXIMATE WEIGHT

Crated — lbs. (kg) 383 (173) Uncrated — lbs. (kg) 372 (169)

DIMENSIONS

Width — in. (mm) 27 (686) Depth — in. (mm) 29.5 (749) Height — in. (mm) 74 (1880)

* Use a 4" (101.6mm) diameter rigid aluminum or galvanized steel duct. Never use plastic, nonmetal or combustible duct. Because of continuous product improvement, Whirlpool reserves the right to change specifications without notice.

3-YEAR LIMITED PARTS

ONLY WARRANTY

For a period from the date of original purchase through the time listed above, the designated parts that fail in normal commercial use will be repaired or replaced free of charge for the part itself, with the owner paying all other costs, including labor, transportation and customs duty. Chemical damage is excluded from all warranty coverage. See complete warranty for details.

MAXIMUM EXHAUST DUCT LENGTH

PER NUMBER OF TURNS

Number Of 90° Turns

Rigid Metal Vent Box Hood and Angled Hood Louvered Style Style 0 135 ft. (41.2 m) 129 ft. (39.3 m) 1 125 ft. (38.1 m) 119 ft. (36.3 m) 2 115 ft. (35.1 m) 109 ft. (33.2 m) 3 106 ft. (32.3 m) 100 ft. (30.5 m) 4 98 ft. (29.9 m) 92 ft. (28.0 m)

Flexible Metal Vent Box Hood and Angled Hood Louvered Style Style 0 76 ft. (23.2 m) 62 ft. (18.9 m) 1 71 ft. (21.6 m) 57 ft. (17.4 m) 2 67 ft. (20.4 m) 53 ft. (16.2 m) 3 65 ft. (19.8 m) 51 ft. (15.6 m) 4 63 ft. (19.2 m) 49 ft. (14.9 m)

OUTDOOR PEDESTAL HOSE BIBBS

7000-32

Misawa B539 Dorm Renovation HVAC Load Analysis for

Prepared By:

Coffman Engineers 800 F Street

Anchorage, AK

Tuesday, December 30, 2014

Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.

Coffman Engineers Inc. Misawa B539 Dorm Renovation Anchorage, AK 99501-3538 Page 2

Building Summary Loads Building peaks in August at 2pm.

Bldg Load Descriptions

Area Quan

Sen Loss

%Tot Loss

Lat Gain

Sen Gain

Net Gain

%Net Gain

Roof 15,089 115,621 7.85 0 39,620 39,620 2.11 Wall 23,634 223,419 15.17 0 56,442 56,442 3.00 Glass 4,654 112,820 7.66 0 301,069 301,069 16.00 Floor Slab 721 25,751 1.75 0 0 0 0.00

Skin Loads 477,610 32.44 0 397,131 397,131 21.10

Lighting 67,918 0 0.00 0 2,549 2,549 0.14 Equipment 30,872 0 0.00 0 2,317 2,317 0.12 Pool Latent 0 0 0.00 0 0 0 0.00 People 617 0 0.00 2,105 3,328 5,433 0.29 Partition 0 0 0.00 0 0 0 0.00 Cool. Pret. 0 0 0.00 0 0 0 0.00 Heat. Pret. 0 0 0.00 0 0 0 0.00 Cool. Vent. 20,581 0 0.00 764,729 338,144 1,102,873 58.61 Heat. Vent. 10,291 641,860 43.59 0 0 0 0.00 Cool. Infil. 5,145 0 0.00 213,278 90,014 303,292 16.12 Heat. Infil. 5,145 353,023 23.97 0 0 0 0.00 Draw-Thru Fan 0 0 0.00 0 4,910 4,910 0.26 Blow-Thru Fan 0 0 0.00 0 0 0 0.00 Reserve Cap. 0 0 0.00 0 63,300 63,300 3.36 Reheat Cap. 0 0 0.00 0 0 0 0.00 Supply Duct 0 0 0.00 0 0 0 0.00 Return Duct 0 0 0.00 0 0 0 0.00 Misc. Supply 0 0 0.00 0 0 0 0.00 Misc. Return 0 0 0.00 0 0 0 0.00

Building Totals 1,472,494 100.00 980,113 901,693 1,881,806 100.00

Building Summary

Sen Loss

%Tot Loss

Lat Gain

Sen Gain

Net Gain

%Net Gain

Ventilation 641,860 43.59 764,729 338,144 1,102,873 58.61 Infiltration 353,023 23.97 213,278 90,014 303,292 16.12 Pretreated Air 0 0.00 0 0 0 0.00 Room Loads 477,609 32.44 2,105 468,625 470,730 25.01 Plenum Loads 0 0.00 0 0 0 0.00 Fan/Duct/Misc Loads 0 0.00 0 4,910 4,910 0.26

Building Totals 1,472,492 100.00 980,112 901,693 1,881,805 100.00

Check Figures Total Building Supply Air (based on a 25° TD): 20,580 CFM Total Building Vent. Air (100.00% of Supply): 20,581 CFM

Total Conditioned Air Space: 61,744 Sq.ft Supply Air Per Unit Area: 0.3333 CFM/Sq.ft Area Per Cooling Capacity: 393.7 Sq.ft/Ton

P:\ ...\140543 Energy Model_upgraded windows.CH8 Tuesday, December 30, 2014, 02:05 PM

Anchorage, AK 99501-3538 Page 3

Building Summary Loads (cont'd)

Cooling Capacity Per Area: 0.0025 Tons/Sq.ft Heating Capacity Per Area: 23.85 Btuh/Sq.ft

Total Heating Required With Outside Air: 1,472,492 Btuh Total Cooling Required With Outside Air: 156.82 Tons

Anchorage, AK 99501-3538 Page 4

Building Summary Loads (Z) Building peaks in August at 2pm.

Bldg Load Descriptions

Area Quan

Sen Loss

%Tot Loss

Lat Gain

Sen Gain

Net Gain

%Net Gain

Roof 15,089 115,621 7.85 0 39,620 39,620 2.11 Wall 23,634 223,419 15.17 0 56,442 56,442 3.00 Glass 4,654 112,820 7.66 0 301,069 301,069 16.00 Floor Slab 721 25,751 1.75 0 0 0 0.00

Skin Loads 477,610 32.44 0 397,131 397,131 21.10

Lighting 67,918 0 0.00 0 2,549 2,549 0.14 Equipment 30,872 0 0.00 0 2,317 2,317 0.12 Pool Latent 0 0 0.00 0 0 0 0.00 People 617 0 0.00 2,105 3,328 5,433 0.29 Partition 0 0 0.00 0 0 0 0.00 Cool. Pret. 0 0 0.00 0 0 0 0.00 Heat. Pret. 0 0 0.00 0 0 0 0.00 Cool. Vent. 20,581 0 0.00 764,730 338,145 1,102,874 58.61 Heat. Vent. 10,291 641,860 43.59 0 0 0 0.00 Cool. Infil. 5,145 0 0.00 213,278 90,014 303,292 16.12 Heat. Infil. 5,145 353,023 23.97 0 0 0 0.00 Draw-Thru Fan 0 0 0.00 0 4,910 4,910 0.26 Blow-Thru Fan 0 0 0.00 0 0 0 0.00 Reserve Cap. 0 0 0.00 0 63,300 63,300 3.36 Reheat Cap. 0 0 0.00 0 0 0 0.00 Supply Duct 0 0 0.00 0 0 0 0.00 Return Duct 0 0 0.00 0 0 0 0.00 Misc. Supply 0 0 0.00 0 0 0 0.00 Misc. Return 0 0 0.00 0 0 0 0.00

Building Totals 1,472,493 100.00 980,113 901,694 1,881,807 100.00

Building Summary

Sen Loss

%Tot Loss

Lat Gain

Sen Gain

Net Gain

%Net Gain

Ventilation 641,860 43.59 764,730 338,145 1,102,874 58.61 Infiltration 353,023 23.97 213,278 90,014 303,292 16.12 Pretreated Air 0 0.00 0 0 0 0.00 Room Loads 477,610 32.44 2,105 468,625 470,731 25.01 Plenum Loads 0 0.00 0 0 0 0.00 Fan/Duct/Misc Loads 0 0.00 0 4,910 4,910 0.26

Building Totals 1,472,493 100.00 980,113 901,694 1,881,807 100.00

Total Building Supply Air (based on a 25° TD): 20,580 CFM Total Building Vent. Air (100.00% of Supply): 20,581 CFM

Total Conditioned Air Space: 61,744 Sq.ft Supply Air Per Unit Area: 0.3333 CFM/Sq.ft Area Per Cooling Capacity: 393.7 Sq.ft/Ton

Anchorage, AK 99501-3538 Page 5

Building Summary Loads (Z) (cont'd)

Cooling Capacity Per Area: 0.0025 Tons/Sq.ft Heating Capacity Per Area: 23.85 Btuh/Sq.ft

Total Heating Required With Outside Air: 1,472,492 Btuh Total Cooling Required With Outside Air: 156.82 Tons

Anchorage, AK 99501-3538 Page 6

Room Detailed Loads (At Room Peak Times)

Load Description

Unit Quan

-SC-

CFAC

CLTD

SHGF

U.Fac

-CLF-

Sen.

Gain

Lat.

Gain

Htg.

Mult.

Htg.

Loss

Room 1-SE Corner First Floor peaks (sensible) in September at 2pm, Air Handler 1 (AHU-1), Zone 0, 354.0 x 1.0, Construction Type: 1 (Light)

Wall-1-S-A-D 120 1 17.1 0.143 293 8.271 992 Wall-2-E-A-D 110 1 10.9 0.143 171 8.271 910 Gls-S-1-90-Tran 29.0 1.000 6 0.470 82 22.040 639 0%S-0-NS-Solar 29.0 0.760 206 0.650 2,951 Lights-Prof=1 389 0.010 13 Equipment-Prof=3 177 0.020 12 0 People-Prof=2 3.5 0.020 17 11 Floor slab 26 32.480 842 Cool. Infil.AC/hr 30 243 620 Heat. Infil.AC/hr 30 62.373 1,840

Sub-total 3,782 631 5,223 Safety factors: +10%

+10%

+10%

Total w/ safety factors: 4,160 694 5,746

Room 2-2 - First Floor peaks (sensible) in September at 2pm, Air Handler 1 (AHU-1), Zone 0, 346.7 x 1.0, Construction Type: 1 (Light)

Gls-S-1-90-Tran 29.0 1.000 6 0.470 82 22.040 639 0%S-0-NS-Solar 29.0 0.760 206 0.650 2,951 Lights-Prof=1 381 0.010 13 Equipment-Prof=3 173 0.020 12 0 People-Prof=2 3.5 0.020 17 11 Floor slab 26 32.480 842 Cool. Infil.AC/hr 29 238 607 Heat. Infil.AC/hr 29 62.373 1,802

Sub-total 3,606 618 4,276

+10%

+10%

Total w/ safety factors: 3,966 680 4,703

Room 3-NW Corner First Floor peaks (sensible) in August at 6pm, Air Handler 1 (AHU-1), Zone 0,

354.0 x 1.0, Construction Type: 1 (Light)

Wall-1-N-A-D 120 1 8.9 0.143 152 8.271 992 Wall-2-W-A-D 230 1 18.9 0.143 619 8.271 1,902 Gls-N-1-90-Tran 29.0 1.000 12 0.470 164 22.040 639 0%S-0-NS-Solar 29.0 0.760 39 0.840 722 Lights-Prof=1 389 0.050 66 Equipment-Prof=3 177 0.070 42 0 People-Prof=2 3.5 0.070 61 38

Anchorage, AK 99501-3538 Page 7

Room Detailed Loads (At Room Peak Times) (cont'd)

Unit Quan

-SC-

CFAC

CLTD

SHGF

U.Fac

-CLF-

Sen.

Gain

Lat.

Gain

Htg.

Mult.

Htg.

Loss

Floor slab 38 32.480 1,234 Cool. Infil.AC/hr 30 376 1,104

Sub-total 2,202 1,142 6,608

+10%

+10%

Total w/ safety factors: 2,422 1,257 7,269

Room 4-2 - First Floor peaks (sensible) in September at 2pm, Air Handler 1 (AHU-1), Zone 0, 346.7

0%S-0-NS-Solar 29.0 0.760 206 0.650 2,951 Lights-Prof=1 381 0.010 13 Equipment-Prof=3 173 0.020 12 0 People-Prof=2 3.5 0.020 17 11 Floor slab 15 32.480 476

Sub-total 3,606 618 3,910

+10%

+10%

Total w/ safety factors: 3,966 680 4,301

Room 5-2 - First Floor peaks (sensible) in September at 2pm, Air Handler 1 (AHU-1), Zone 0, 346.7

0%S-0-NS-Solar 29.0 0.760 206 0.650 2,951 Lights-Prof=1 381 0.010 13 Equipment-Prof=3 173 0.020 12 0 People-Prof=2 3.5 0.020 17 11 Floor slab 15 32.480 476

+10%

+10%

Anchorage, AK 99501-3538 Page 8

Unit Quan

-SC-

CFAC

CLTD

SHGF

U.Fac

-CLF-

Sen.

Gain

Lat.

Gain

Htg.

Mult.

Room 6-2 - First Floor peaks (sensible) in September at 2pm, Air Handler 1 (AHU-1), Zone 0, 346.7

0%S-0-NS-Solar 29.0 0.760 206 0.650 2,951 Lights-Prof=1 381 0.010 13 Equipment-Prof=3 173 0.020 12 0 People-Prof=2 3.5 0.020 17 11 Floor slab 15 32.480 476

+10%

+10%

Room 7-2 - First Floor peaks (sensible) in September at 2pm, Air Handler 1 (AHU-1), Zone 0, 346.7

0%S-0-NS-Solar 29.0 0.760 206 0.650 2,951 Lights-Prof=1 381 0.010 13 Equipment-Prof=3 173 0.020 12 0 People-Prof=2 3.5 0.020 17 11 Floor slab 15 32.480 476

+10%

+10%

Room 8-2 - First Floor peaks (sensible) in September at 2pm, Air Handler 1 (AHU-1), Zone 0, 346.7

0%S-0-NS-Solar 29.0 0.760 206 0.650 2,951 Lights-Prof=1 381 0.010 13 Equipment-Prof=3 173 0.020 12 0 People-Prof=2 3.5 0.020 17 11 Cool. Infil.AC/hr 29 238 607

Anchorage, AK 99501-3538 Page 9

Unit Quan

-SC-

CFAC

CLTD

SHGF

U.Fac

-CLF-

Sen.

Gain

Lat.

Gain

Htg.

Mult.

Sub-total 3,606 618 3,434

+10%

+10%

Total w/ safety factors: 3,966 680 3,777

Room 9-2 - First Floor peaks (sensible) in September at 2pm, Air Handler 1 (AHU-1), Zone 0, 346.7

0%S-0-NS-Solar 29.0 0.760 206 0.650 2,951 Lights-Prof=1 381 0.010 13 Equipment-Prof=3 173 0.020 12 0 People-Prof=2 3.5 0.020 17 11 Floor slab 15 32.480 476

+10%

+10%

Room 10-2 - First Floor peaks (sensible) in September at 2pm, Air Handler 1 (AHU-1), Zone 0,

346.7 x 1.0, Construction Type: 1 (Light)

0%S-0-NS-Solar 29.0 0.760 206 0.650 2,951 Lights-Prof=1 381 0.010 13 Equipment-Prof=3 173 0.020 12 0 People-Prof=2 3.5 0.020 17 11 Floor slab 15 32.480 476

+10%

+10%

Room 11-2 - First Floor peaks (sensible) in September at 2pm, Air Handler 1 (AHU-1), Zone 0, Anchorage, AK 99501-3538 Page 10

Unit Quan

-SC-

CFAC

CLTD

SHGF

U.Fac

-CLF-

Sen.

Gain

Lat.

Gain

Htg.

Mult.

Htg.

Loss

Gls-S-1-90-Tran 29.0 1.000 6 0.470 82 22.040 639 0%S-0-NS-Solar 29.0 0.760 206 0.650 2,951 Lights-Prof=1 381 0.010 13 Equipment-Prof=3 173 0.020 12 0 People-Prof=2 3.5 0.020 17 11 Floor slab 15 32.480 476

+10%

+10%

Room 12-2 - First Floor peaks (sensible) in September at 2pm, Air Handler 1 (AHU-1), Zone 0, 0%S-0-NS-Solar 29.0 0.760 206 0.650 2,951 Lights-Prof=1 381 0.010 13 Equipment-Prof=3 173 0.020 12 0 People-Prof=2 3.5 0.020 17 11 Floor slab 15 32.480 476

+10%

+10%

Room 13-2 - First Floor peaks (sensible) in September at 2pm, Air Handler 1 (AHU-1), Zone 0, 0%S-0-NS-Solar 29.0 0.760 206 0.650 2,951 Lights-Prof=1 381 0.010 13 Equipment-Prof=3 173 0.020 12 0 People-Prof=2 3.5 0.020 17 11 Floor slab 15 32.480 476

Anchorage, AK 99501-3538 Page 11

Unit Quan

-SC-

CFAC

CLTD

SHGF

U.Fac

-CLF-

Sen.

Gain

Lat.

Gain

Htg.

Mult.

Htg.

Loss

Safety factors: +10%

+10%

+10%

Room 14-2 - First Floor peaks (sensible) in September at 2pm, Air Handler 1 (AHU-1), Zone 0, 0%S-0-NS-Solar 29.0 0.760 206 0.650 2,951 Lights-Prof=1 381 0.010 13 Equipment-Prof=3 173 0.020 12 0 People-Prof=2 3.5 0.020 17 11 Floor slab 15 32.480 476

+10%

+10%

Room 15-2 - First Floor peaks (sensible) in September at 2pm, Air Handler 1 (AHU-1), Zone 0, 0%S-0-NS-Solar 29.0 0.760 206 0.650 2,951 Lights-Prof=1 381 0.010 13 Equipment-Prof=3 173 0.020 12 0 People-Prof=2 3.5 0.020 17 11 Floor slab 15 32.480 476

+10%

+10%

Room 16-2 - First Floor peaks (sensible) in September at 2pm, Air Handler 1 (AHU-1), Zone 0, 0%S-0-NS-Solar 29.0 0.760 206 0.650 2,951

Anchorage, AK 99501-3538 Page 12

Unit Quan

-SC-

CFAC

CLTD

SHGF

U.Fac

-CLF-

Sen.

Gain

Lat.

Gain

Htg.

Mult.

Htg.

Loss

Lights-Prof=1 381 0.010 13 Equipment-Prof=3 173 0.020 12 0 People-Prof=2 3.5 0.020 17 11 Floor slab 15 32.480 476

+10%

+10%

Room 17-2 - First Floor peaks (sensible) in September at 2pm, Air Handler 1 (AHU-1), Zone 0, 0%S-0-NS-Solar 29.0 0.760 206 0.650 2,951 Lights-Prof=1 381 0.010 13 Equipment-Prof=3 173 0.020 12 0 People-Prof=2 3.5 0.020 17 11 Floor slab 15 32.480 476

+10%

+10%

Room 18-N Dorm Interior 1st Floor peaks (sensible) in August at 6pm, Air Handler 1 (AHU-1), Zone 0, 346.7 x 1.0, Construction Type: 1 (Light)

Wall-1-N-A-D 118 1 8.9 0.143 149 8.271 973 Gls-N-1-90-Tran 29.0 1.000 12 0.470 164 22.040 639 0%S-0-NS-Solar 29.0 0.760 39 0.840 722 Lights-Prof=1 381 0.050 65 Equipment-Prof=3 173 0.070 41 0 People-Prof=2 3.5 0.070 59 38 Floor slab 15 32.480 476 Cool. Infil.AC/hr 29 368 1,081

Sub-total 1,569 1,119 3,890

+10%

+10%

Total w/ safety factors: 1,726 1,231 4,279

Anchorage, AK 99501-3538 Page 13

Unit Quan

-SC-

CFAC

CLTD

SHGF

U.Fac

-CLF-

Sen.

Gain

Lat.

Gain

Htg.

Mult.

Room 19-First Floor peaks (sensible) in August at 6pm, Air Handler 1 (AHU-1), Zone 0, 346.7 x 1.0, Construction Type: 1 (Light)

0%S-0-NS-Solar 29.0 0.760 39 0.840 722 Lights-Prof=1 381 0.050 65 Equipment-Prof=3 173 0.070 41 0 People-Prof=2 3.5 0.070 59 38 Floor slab 15 32.480 476

+10%

+10%

Room 20-First Floor peaks (sensible) in August at 6pm, Air Handler 1 (AHU-1), Zone 0, 346.7 x

0%S-0-NS-Solar 29.0 0.760 39 0.840 722 Lights-Prof=1 381 0.050 65 Equipment-Prof=3 173 0.070 41 0 People-Prof=2 3.5 0.070 59 38 Floor slab 15 32.480 476

+10%

+10%

Room 21-First Floor peaks (sensible) in August at 6pm, Air Handler 1 (AHU-1), Zone 0, 346.7 x

0%S-0-NS-Solar 29.0 0.760 39 0.840 722 Lights-Prof=1 381 0.050 65 Equipment-Prof=3 173 0.070 41 0 People-Prof=2 3.5 0.070 59 38 Floor slab 15 32.480 476

Anchorage, AK 99501-3538 Page 14

Unit Quan

-SC-

CFAC

CLTD

SHGF

U.Fac

-CLF-

Sen.

Gain

Lat.

Gain

Htg.

Mult.

Htg.

+10%

+10%

Room 22-First Floor peaks (sensible) in August at 6pm, Air Handler 1 (AHU-1), Zone 0, 346.7 x

0%S-0-NS-Solar 29.0 0.760 39 0.840 722 Lights-Prof=1 381 0.050 65 Equipment-Prof=3 173 0.070 41 0 People-Prof=2 3.5 0.070 59 38 Floor slab 15 32.480 476

+10%

+10%

Room 23-First Floor peaks (sensible) in August at 6pm, Air Handler 1 (AHU-1), Zone 0, 346.7 x

0%S-0-NS-Solar 29.0 0.760 39 0.840 722 Lights-Prof=1 381 0.050 65 Equipment-Prof=3 173 0.070 41 0 People-Prof=2 3.5 0.070 59 38 Floor slab 15 32.480 476

+10%

+10%

Anchorage, AK 99501-3538 Page 15

Unit Quan

-SC-

CFAC

CLTD

SHGF

U.Fac

-CLF-

Sen.

Gain

Lat.

Gain

Htg.

Mult.

Room 24-First Floor peaks (sensible) in August at 6pm, Air Handler 1 (AHU-1), Zone 0, 346.7 x

0%S-0-NS-Solar 29.0 0.760 39 0.840 722 Lights-Prof=1 381 0.050 65 Equipment-Prof=3 173 0.070 41 0 People-Prof=2 3.5 0.070 59 38 Floor slab 15 32.480 476

+10%

+10%

Room 25-First Floor peaks (sensible) in August at 6pm, Air Handler 1 (AHU-1), Zone 0, 346.7 x

0%S-0-NS-Solar 29.0 0.760 39 0.840 722 Lights-Prof=1 381 0.050 65 Equipment-Prof=3 173 0.070 41 0 People-Prof=2 3.5 0.070 59 38 Floor slab 15 32.480 476

+10%

+10%

Room 26-First Floor peaks (sensible) in August at 6pm, Air Handler 1 (AHU-1), Zone 0, 346.7 x

0%S-0-NS-Solar 29.0 0.760 39 0.840 722 Lights-Prof=1 381 0.050 65 Equipment-Prof=3 173 0.070 41 0 People-Prof=2 3.5 0.070 59 38 Floor slab 15 32.480 476

Anchorage, AK 99501-3538 Page 16

Unit Quan

-SC-

CFAC

CLTD

SHGF

U.Fac

-CLF-

Sen.

Gain

Lat.

Gain

Htg.

Mult.

Htg.

+10%

+10%

Room 27-First Floor peaks (sensible) in August at 6pm, Air Handler 1 (AHU-1), Zone 0, 346.7 x

0%S-0-NS-Solar 29.0 0.760 39 0.840 722 Lights-Prof=1 381 0.050 65 Equipment-Prof=3 173 0.070 41 0 People-Prof=2 3.5 0.070 59 38 Floor slab 15 32.480 476

+10%

+10%

Room 28-First Floor peaks (sensible) in August at 6pm, Air Handler 1 (AHU-1), Zone 0, 346.7 x

0%S-0-NS-Solar 29.0 0.760 39 0.840 722 Lights-Prof=1 381 0.050 65 Equipment-Prof=3 173 0.070 41 0 People-Prof=2 3.5 0.070 59 38 Floor slab 15 32.480 476

+10%

+10%

Anchorage, AK 99501-3538 Page 17

Unit Quan

-SC-

CFAC

CLTD

SHGF

U.Fac

-CLF-

Sen.

Gain

Lat.

Gain

Htg.

Mult.

Room 29-First Floor peaks (sensible) in August at 6pm, Air Handler 1 (AHU-1), Zone 0, 346.7 x

0%S-0-NS-Solar 29.0 0.760 39 0.840 722 Lights-Prof=1 381 0.050 65 Equipment-Prof=3 173 0.070 41 0 People-Prof=2 3.5 0.070 59 38 Floor slab 15 32.480 476

+10%

+10%

Room 30-First Floor peaks (sensible) in August at 6pm, Air Handler 1 (AHU-1), Zone 0, 346.7 x

0%S-0-NS-Solar 29.0 0.760 39 0.840 722 Lights-Prof=1 381 0.050 65 Equipment-Prof=3 173 0.070 41 0 People-Prof=2 3.5 0.070 59 38 Floor slab 15 32.480 476

+10%

+10%

Room 31-First Floor peaks (sensible) in August at 6pm, Air Handler 1 (AHU-1), Zone 0, 346.7 x

0%S-0-NS-Solar 29.0 0.760 39 0.840 722 Lights-Prof=1 381 0.050 65 Equipment-Prof=3 173 0.070 41 0 People-Prof=2 3.5 0.070 59 38 Floor slab 15 32.480 476

Anchorage, AK 99501-3538 Page 18

Unit Quan

-SC-

CFAC

CLTD

SHGF

U.Fac

-CLF-

Sen.

Gain

Lat.

Gain

Htg.

Mult.

Htg.

+10%

+10%

Room 32-First Floor peaks (sensible) in August at 6pm, Air Handler 1 (AHU-1), Zone 0, 346.7 x

0%S-0-NS-Solar 29.0 0.760 39 0.840 722 Lights-Prof=1 381 0.050 65 Equipment-Prof=3 173 0.070 41 0 People-Prof=2 3.5 0.070 59 38 Floor slab 15 32.480 476

+10%

+10%

Room 33-SW Corner First Floor peaks (sensible) in September at 2pm, Air Handler 1 (AHU-1), Zone 0, 354.0 x 1.0, Construction Type: 1 (Light)

Wall-2-W-A-D 110 1 7.9 0.143 124 8.271 910 Gls-S-1-90-Tran 29.0 1.000 6 0.470 82 22.040 639 0%S-0-NS-Solar 29.0 0.760 206 0.650 2,951 Lights-Prof=1 389 0.010 13 Equipment-Prof=3 177 0.020 12 0 People-Prof=2 3.5 0.020 17 11 Floor slab 26 32.480 842

Sub-total 3,735 631 5,223

+10%

+10%

Total w/ safety factors: 4,109 694 5,746

Anchorage, AK 99501-3538 Page 19

Unit Quan

-SC-

CFAC

CLTD

SHGF

U.Fac

-CLF-

Sen.

Gain

Lat.

Gain

Htg.

Mult.

Room 34-NE Corner First Floor peaks (sensible) in August at 6pm, Air Handler 1 (AHU-1), Zone 0, Wall-2-E-A-D 230 1 23.9 0.143 783 8.271 1,902 Gls-N-1-90-Tran 29.0 1.000 12 0.470 164 22.040 639 0%S-0-NS-Solar 29.0 0.760 39 0.840 722 Lights-Prof=1 389 0.050 66 Equipment-Prof=3 177 0.070 42 0 People-Prof=2 3.5 0.070 61 38 Floor slab 38 32.480 1,234

Sub-total 2,366 1,142 6,608

+10%

+10%

Total w/ safety factors: 2,603 1,257 7,269

Room 35-Corridor 1E peaks (sensible) in August at 5pm, Air Handler 1 (AHU-1), Zone 0, 758.0 x

Lights-Prof=1 834 0.020 57 Equipment-Prof=3 379 0.070 91 0 People-Prof=2 7.6 0.070 130 82 Cool. Infil.AC/hr 63 927 2,459 Heat. Infil.AC/hr 63 62.373 3,940

Sub-total 1,205 2,541 3,940

+10%

+10%

Total w/ safety factors: 1,325 2,795 4,334

Room 36-Corridor 1 peaks (sensible) in August at 5pm, Air Handler 1 (AHU-1), Zone 0, 157.0 x 1.0, Construction Type: 1 (Light)

Lights-Prof=1 173 0.020 12 Equipment-Prof=3 79 0.070 19 0 People-Prof=2 1.6 0.070 27 17 Cool. Infil.AC/hr 13 192 509 Heat. Infil.AC/hr 13 62.373 816

Sub-total 249 526 816

+10%

+10%

Total w/ safety factors: 274 579 898

Anchorage, AK 99501-3538 Page 20

Unit Quan

-SC-

CFAC

CLTD

SHGF

U.Fac

-CLF-

Sen.

Gain

Lat.

Gain

Htg.

Mult.

Room 37-Corridor 1W peaks (sensible) in August at 5pm, Air Handler 1 (AHU-1), Zone 0, 687.3 x

Lights-Prof=1 756 0.020 52 Equipment-Prof=3 344 0.070 82 0 People-Prof=2 6.9 0.070 118 75 Cool. Infil.AC/hr 57 841 2,229 Heat. Infil.AC/hr 57 62.373 3,572

Sub-total 1,092 2,304 3,572

+10%

+10%

Total w/ safety factors: 1,201 2,534 3,930

Room 38-Janitor 1 peaks (sensible) in August at 5pm, Air Handler 1 (AHU-1), Zone 0, 68.5 x 1.0, Lights-Prof=1 75 0.020 5 Equipment-Prof=3 34 0.070 8 0 People-Prof=2 0.7 0.070 12 7 Cool. Infil.AC/hr 6 84 222 Heat. Infil.AC/hr 6 62.373 356

Sub-total 109 230 356

+10%

+10%

Total w/ safety factors: 120 253 392

Room 39-Linen 1 peaks (sensible) in August at 5pm, Air Handler 1 (AHU-1), Zone 0, 67.0 x 1.0, Lights-Prof=1 74 0.020 5 Equipment-Prof=3 34 0.070 8 0 People-Prof=2 0.7 0.070 11 7 Cool. Infil.AC/hr 6 82 217 Heat. Infil.AC/hr 6 62.373 348

Sub-total 106 225 348

+10%

+10%

Total w/ safety factors: 117 247 383

Room 40-Stair 1 peaks (sensible) in August at 2pm, Air Handler 1 (AHU-1), Zone 0, 239.0 x 1.0, Wall-1-S-A-D 64 1 18.4 0.143 168 8.271 530 Door-2-S-G-L 38 0.65 32.7 1.000 1,257 58.000 2,227

Anchorage, AK 99501-3538 Page 21

Unit Quan

-SC-

CFAC

CLTD

SHGF

U.Fac

-CLF-

Sen.

Gain

Lat.

Gain

Htg.

Mult.

Htg.

Loss

Lights-Prof=1 263 0.010 9 Equipment-Prof=3 120 0.020 8 0 People-Prof=2 2.4 0.020 12 7 Floor slab 10 32.480 333 Cool. Infil.AC/hr 20 317 751 Heat. Infil.AC/hr 20 62.373 1,242

Sub-total 1,771 758 4,333

+10%

+10%

Total w/ safety factors: 1,948 834 4,766

Room 41-Laundry 1 peaks (sensible) in September at 2pm, Air Handler 1 (AHU-1), Zone 0, 257.8 x

Wall-1-S-A-D 119 1 17.1 0.143 289 8.271 980

0%S-0-NS-Solar 29.0 0.760 206 0.650 2,951 Lights-Prof=1 284 0.010 10 Equipment-Prof=3 129 0.020 9 0 People-Prof=2 2.6 0.020 13 8 Floor slab 15 32.480 471 Cool. Infil.AC/hr 21 177 452 Heat. Infil.AC/hr 21 62.373 1,340

Sub-total 3,530 460 3,430

+10%

+10%

Total w/ safety factors: 3,883 506 3,773

Room 42-Exercise Room peaks (sensible) in September at 2pm, Air Handler 1 (AHU-1), Zone 0,

288.0 x 1.0, Construction Type: 1 (Light)

0%S-0-NS-Solar 29.0 0.760 206 0.650 2,951 Lights-Prof=1 317 0.010 11 Equipment-Prof=3 144 0.020 10 0 People-Prof=2 2.9 0.020 14 9 Floor slab 15 32.480 479 Cool. Infil.AC/hr 24 198 505 Heat. Infil.AC/hr 24 62.373 1,497

Sub-total 3,555 513 3,595

+10%

+10%

Total w/ safety factors: 3,910 565 3,955

Anchorage, AK 99501-3538 Page 22

Unit Quan

-SC-

CFAC

CLTD

SHGF

U.Fac

-CLF-

Sen.

Gain

Lat.

Gain

Htg.

Mult.

Room 43-Lounge 1 peaks (sensible) in August at 6pm, Air Handler 1 (AHU-1), Zone 0, 697.0 x 1.0, Wall-1-N-A-D 249 1 8.9 0.143 315 8.271 2,059 Gls-N-1-90-Tran 43.5 1.000 12 0.470 245 22.040 959 0%S-0-NS-Solar 43.5 0.760 39 0.840 1,083 Lights-Prof=1 767 0.050 131 Equipment-Prof=3 349 0.070 83 0 People-Prof=2 7.0 0.070 120 76 Floor slab 29 32.480 950 Cool. Infil.AC/hr 58 741 2,174 Heat. Infil.AC/hr 58 62.373 3,623

Sub-total 2,718 2,249 7,591

+10%

+10%

Total w/ safety factors: 2,989 2,474 8,350

Room 44-Lobby peaks (sensible) in August at 5pm, Air Handler 1 (AHU-1), Zone 0, 697.0 x 1.0, Wall-1-N-A-D 64 1 8.9 0.143 81 8.271 530 Door-2-N-G-L 38 0.65 14.9 1.000 571 58.000 2,227 Lights-Prof=1 767 0.020 52 Equipment-Prof=3 349 0.070 83 0 People-Prof=2 7.0 0.070 120 76 Floor slab 10 32.480 333 Cool. Infil.AC/hr 58 853 2,261 Heat. Infil.AC/hr 58 62.373 3,623

Sub-total 1,760 2,337 6,713

+10%

+10%

Total w/ safety factors: 1,936 2,570 7,384

Room 45-Stair 2 peaks (sensible) in August at 6pm, Air Handler 1 (AHU-1), Zone 0, 185.8 x 1.0, Wall-1-N-A-D 62 1 8.9 0.143 78 8.271 509 Door-2-N-G-L 38 0.65 15.5 1.000 596 58.000 2,227 Wall-3-E-A-D 188 1 23.9 0.143 638 8.271 1,551 Wall-4-S-A-D 100 1 21.4 0.143 305 8.271 827 Lights-Prof=1 204 0.050 35 Equipment-Prof=3 93 0.070 22 0 People-Prof=2 1.9 0.070 32 20 Floor slab 39 32.480 1,259 Cool. Infil.AC/hr 15 197 579

Anchorage, AK 99501-3538 Page 23

Unit Quan

-SC-

CFAC

CLTD

SHGF

U.Fac

-CLF-

Sen.

Gain

Lat.

Gain

Htg.

Mult.

Htg.

Heat. Infil.AC/hr 15 62.373 965

Sub-total 1,903 599 7,339

+10%

+10%

Total w/ safety factors: 2,094 659 8,072

Room 46-Stair 3 peaks (sensible) in August at 6pm, Air Handler 1 (AHU-1), Zone 0, 202.0 x 1.0, Wall-1-N-A-D 62 1 8.9 0.143 78 8.271 509 Door-2-N-G-L 38 0.65 15.5 1.000 596 58.000 2,227 Wall-3-E-A-D 188 1 23.9 0.143 638 8.271 1,551 Wall-4-S-A-D 100 1 21.4 0.143 305 8.271 827 Lights-Prof=1 222 0.050 38 Equipment-Prof=3 101 0.070 24 0 People-Prof=2 2.0 0.070 35 22 Floor slab 39 32.480 1,259 Cool. Infil.AC/hr 17 215 630 Heat. Infil.AC/hr 17 62.373 1,050

Sub-total 1,928 652 7,423

+10%

+10%

Total w/ safety factors: 2,121 717 8,165

Room 47-SE Corner Second Floor peaks (sensible) in September at 2pm, Air Handler 1 (AHU-1), Zone 1, 354.0 x 1.0, Construction Type: 1 (Light)

Gls-S-1-90-Tran 29.0 1.000 6 0.470 82 22.040 639 0%S-0-NS-Solar 29.0 0.760 206 0.650 2,951 Lights-Prof=1 389 0.010 13 Equipment-Prof=3 177 0.020 12 0 People-Prof=2 3.5 0.020 17 11

Sub-total 3,782 631 4,381

+10%

+10%

Total w/ safety factors: 4,160 694 4,820

Anchorage, AK 99501-3538 Page 24

Unit Quan

-SC-

CFAC

CLTD

SHGF

U.Fac

-CLF-

Sen.

Gain

Lat.

Gain

Htg.

Mult.

Room 48-S Interior Dorm 2nd Floor peaks (sensible) in September at 2pm, Air Handler 1 (AHU-1), Zone 1, 346.7 x 1.0, Construction Type: 1 (Light)

0%S-0-NS-Solar 29.0 0.760 206 0.650 2,951 Lights-Prof=1 381 0.010 13 Equipment-Prof=3 173 0.020 12 0 People-Prof=2 3.5 0.020 17 11

Sub-total 3,602 618 3,421

+10%

+10%

Total w/ safety factors: 3,962 680 3,763

Room 49-S Interior Dorm 2nd Floor peaks (sensible) in September at 2pm, Air Handler 1 (AHU-1), 0%S-0-NS-Solar 29.0 0.760 206 0.650 2,951 Lights-Prof=1 381 0.010 13 Equipment-Prof=3 173 0.020 12 0 People-Prof=2 3.5 0.020 17 11

+10%

+10%

Room 50-S Interior Dorm 2nd Floor peaks (sensible) in September at 2pm, Air Handler 1 (AHU-1), 0%S-0-NS-Solar 29.0 0.760 206 0.650 2,951 Lights-Prof=1 381 0.010 13 Equipment-Prof=3 173 0.020 12 0 People-Prof=2 3.5 0.020 17 11

Anchorage, AK 99501-3538 Page 25

Unit Quan

-SC-

CFAC

CLTD

SHGF

U.Fac

-CLF-

Sen.

Gain

Lat.

Gain

Htg.

Mult.

Htg.

Loss

Safety factors: +10%

+10%

+10%

Room 51-S Interior Dorm 2nd Floor peaks (sensible) in September at 2pm, Air Handler 1 (AHU-1), 0%S-0-NS-Solar 29.0 0.760 206 0.650 2,951 Lights-Prof=1 381 0.010 13 Equipment-Prof=3 173 0.020 12 0 People-Prof=2 3.5 0.020 17 11

+10%

+10%

Room 52-S Interior Dorm 2nd Floor peaks (sensible) in September at 2pm, Air Handler 1 (AHU-1), 0%S-0-NS-Solar 29.0 0.760 206 0.650 2,951 Lights-Prof=1 381 0.010 13 Equipment-Prof=3 173 0.020 12 0 People-Prof=2 3.5 0.020 17 11

+10%

+10%

Room 53-S Interior Dorm 2nd Floor peaks (sensible) in September at 2pm, Air Handler 1 (AHU-1), 0%S-0-NS-Solar 29.0 0.760 206 0.650 2,951 Lights-Prof=1 381 0.010 13 Equipment-Prof=3 173 0.020 12 0

Anchorage, AK 99501-3538 Page 26

Unit Quan

-SC-

CFAC

CLTD

SHGF

U.Fac

-CLF-

Sen.

Gain

Lat.

Gain

Htg.

Mult.

Htg.

Loss

People-Prof=2 3.5 0.020 17 11

+10%

+10%

Room 54-S Interior Dorm 2nd Floor peaks (sensible) in September at 2pm, Air Handler 1 (AHU-1), 0%S-0-NS-Solar 29.0 0.760 206 0.650 2,951 Lights-Prof=1 381 0.010 13 Equipment-Prof=3 173 0.020 12 0 People-Prof=2 3.5 0.020 17 11

+10%

+10%

Room 55-S Interior Dorm 2nd Floor peaks (sensible) in September at 2pm, Air Handler 1 (AHU-1), 0%S-0-NS-Solar 29.0 0.760 206 0.650 2,951 Lights-Prof=1 381 0.010 13 Equipment-Prof=3 173 0.020 12 0 People-Prof=2 3.5 0.020 17 11

+10%

+10%

Anchorage, AK 99501-3538 Page 27

Unit Quan

-SC-

CFAC

CLTD

SHGF

U.Fac

-CLF-

Sen.

Gain

Lat.

Gain

Htg.

Mult.

Room 56-S Interior Dorm 2nd Floor peaks (sensible) in September at 2pm, Air Handler 1 (AHU-1), 0%S-0-NS-Solar 29.0 0.760 206 0.650 2,951 Lights-Prof=1 381 0.010 13 Equipment-Prof=3 173 0.020 12 0 People-Prof=2 3.5 0.020 17 11

+10%

+10%

Room 57-S Interior Dorm 2nd Floor peaks (sensible) in September at 2pm, Air Handler 1 (AHU-1), 0%S-0-NS-Solar 29.0 0.760 206 0.650 2,951 Lights-Prof=1 381 0.010 13 Equipment-Prof=3 173 0.020 12 0 People-Prof=2 3.5 0.020 17 11

+10%

+10%

Room 58-S Interior Dorm 2nd Floor peaks (sensible) in September at 2pm, Air Handler 1 (AHU-1), 0%S-0-NS-Solar 29.0 0.760 206 0.650 2,951 Lights-Prof=1 381 0.010 13 Equipment-Prof=3 173 0.020 12 0 People-Prof=2 3.5 0.020 17 11

Anchorage, AK 99501-3538 Page 28

Unit Quan

-SC-

CFAC

CLTD

SHGF

U.Fac

-CLF-

Sen.

Gain

Lat.

Gain

Htg.

Mult.

Htg.

Loss

Safety factors: +10%

+10%

+10%

Room 59-S Interior Dorm 2nd Floor peaks (sensible) in September at 2pm, Air Handler 1 (AHU-1), 0%S-0-NS-Solar 29.0 0.760 206 0.650 2,951 Lights-Prof=1 381 0.010 13 Equipment-Prof=3 173 0.020 12 0 People-Prof=2 3.5 0.020 17 11

+10%

+10%

Room 60-S Interior Dorm 2nd Floor peaks (sensible) in September at 2pm, Air Handler 1 (AHU-1), 0%S-0-NS-Solar 29.0 0.760 206 0.650 2,951 Lights-Prof=1 381 0.010 13 Equipment-Prof=3 173 0.020 12 0 People-Prof=2 3.5 0.020 17 11

+10%

+10%

Room 61-S Interior Dorm 2nd Floor peaks (sensible) in September at 2pm, Air Handler 1 (AHU-1), 0%S-0-NS-Solar 29.0 0.760 206 0.650 2,951 Lights-Prof=1 381 0.010 13 Equipment-Prof=3 173 0.020 12 0

Anchorage, AK 99501-3538 Page 29

Unit Quan

-SC-

CFAC

CLTD

SHGF

U.Fac

-CLF-

Sen.

Gain

Lat.

Gain

Htg.

Mult.

Htg.

Loss

People-Prof=2 3.5 0.020 17 11

+10%

+10%

Room 62-S Interior Dorm 2nd Floor peaks (sensible) in September at 2pm, Air Handler 1 (AHU-1), 0%S-0-NS-Solar 29.0 0.760 206 0.650 2,951 Lights-Prof=1 381 0.010 13 Equipment-Prof=3 173 0.020 12 0 People-Prof=2 3.5 0.020 17 11

+10%

+10%

Room 63-S Interior Dorm 2nd Floor peaks (sensible) in September at 2pm, Air Handler 1 (AHU-1), 0%S-0-NS-Solar 29.0 0.760 206 0.650 2,951 Lights-Prof=1 381 0.010 13 Equipment-Prof=3 173 0.020 12 0 People-Prof=2 3.5 0.020 17 11

+10%

+10%

Anchorage, AK 99501-3538 Page 30

Unit Quan

-SC-

CFAC

CLTD

SHGF

U.Fac

-CLF-

Sen.

Gain

Lat.

Gain

Htg.

Mult.

Room 64-Stair 1 2nd Floor peaks (sensible) in September at 2pm, Air Handler 1 (AHU-1), Zone 1,

235.5 x 1.0, Construction Type: 1 (Light)

Wall-1-S-A-D 81 1 17.1 0.143 199 8.271 672 Gls-S-1-90-Tran 21.2 1.000 6 0.470 60 22.040 467 0%S-0-NS-Solar 21.2 0.760 206 0.650 2,157 Lights-Prof=1 259 0.010 9 Equipment-Prof=3 118 0.020 8 0 People-Prof=2 2.4 0.020 12 7 Cool. Infil.AC/hr 20 162 413 Heat. Infil.AC/hr 20 62.373 1,224

Sub-total 2,606 420 2,364

+10%

+10%

Total w/ safety factors: 2,866 462 2,600

Room 65-Laundry 2 2nd Floor peaks (sensible) in September at 2pm, Air Handler 1 (AHU-1), Zone 1, 278.5 x 1.0, Construction Type: 1 (Light)

0%S-0-NS-Solar 29.0 0.760 206 0.650 2,951 Lights-Prof=1 306 0.010 10 Equipment-Prof=3 139 0.020 10 0 People-Prof=2 2.8 0.020 14 9 Cool. Infil.AC/hr 23 191 488 Heat. Infil.AC/hr 23 62.373 1,448

Sub-total 3,547 497 3,067

+10%

+10%

Total w/ safety factors: 3,902 546 3,374

Room 66-S Interior Dorm 2nd Floor peaks (sensible) in September at 2pm, Air Handler 1 (AHU-1), 0%S-0-NS-Solar 29.0 0.760 206 0.650 2,951 Lights-Prof=1 381 0.010 13 Equipment-Prof=3 173 0.020 12 0 People-Prof=2 3.5 0.020 17 11

Anchorage, AK 99501-3538 Page 31

Unit Quan

-SC-

CFAC

CLTD

SHGF

U.Fac

-CLF-

Sen.

Gain

Lat.

Gain

Htg.

Mult.

Htg.

Loss

Safety factors: +10%

+10%

+10%

Room 67-SW Corner 2nd Floor peaks (sensible) in September at 2pm, Air Handler 1 (AHU-1), Zone 1, 354.0 x 1.0, Construction Type: 1 (Light)

Wall-2-W-A-D 110 1 7.9 0.143 124 8.271 910 Gls-S-1-90-Tran 29.0 1.000 6 0.470 82 22.040 639 0%S-0-NS-Solar 29.0 0.760 206 0.650 2,951 Lights-Prof=1 389 0.010 13 Equipment-Prof=3 177 0.020 12 0 People-Prof=2 3.5 0.020 17 11

Sub-total 3,735 631 4,381

+10%

+10%

Total w/ safety factors: 4,109 694 4,820

Room 68-Stair 2 2nd Floor peaks (sensible) in August at 2pm, Air Handler 1 (AHU-1), Zone 1,

185.8 x 1.0, Construction Type: 1 (Light)

Wall-1-N-A-D 79 1 7.9 0.143 88 8.271 652 Wall-3-E-A-D 188 1 20.9 0.143 558 8.271 1,551 Wall-4-S-A-D 79 1 18.4 0.143 206 8.271 652 Gls-N-1-90-Tran 21.2 1.000 13 0.470 130 22.040 467 0%S-0-NS-Solar 21.2 0.760 39 0.820 515 Gls-S-1-90-Tran 21.2 1.000 13 0.470 130 22.040 467 0%S-0-NS-Solar 21.2 0.760 157 0.650 1,644 Lights-Prof=1 204 0.010 7 Equipment-Prof=3 93 0.020 6 0 People-Prof=2 1.9 0.020 9 6 Cool. Infil.AC/hr 15 246 583 Heat. Infil.AC/hr 15 62.373 965

Sub-total 3,540 589 4,754

+10%

+10%

Total w/ safety factors: 3,894 648 5,230

Anchorage, AK 99501-3538 Page 32

Unit Quan

-SC-

CFAC

CLTD

SHGF

U.Fac

-CLF-

Sen.

Gain

Lat.

Gain

Htg.

Mult.

Room 69-NE Corner 2ndFloor peaks (sensible) in August at 6pm, Air Handler 1 (AHU-1), Zone 1, Wall-2-E-A-D 230 1 23.9 0.143 783 8.271 1,902 Gls-N-1-90-Tran 29.0 1.000 12 0.470 164 22.040 639 0%S-0-NS-Solar 29.0 0.760 39 0.840 722 Lights-Prof=1 389 0.050 66 Equipment-Prof=3 177 0.070 42 0 People-Prof=2 3.5 0.070 61 38

Sub-total 2,366 1,142 5,374

+10%

+10%

Total w/…

This is the start of the file's text. The full file is on GovTribe.