ADDENDUM A
FOR
PROJECT NO. QKKA 14-1050
RNVT DORM 539
MISAWA AB, JAPAN
23 Jun 16
1. The following specification have been revised for the change of information as provided:
SPECIFICATION
Section Number Paragraph Description
1 Table of Contents 01 33 29 Removed LEED Specification 01 33 29
2 01 35 29 1.6.1.f Corrected reference from 02 83 13.00 20 to 01 57
20.00 10 ENVIRONMENTAL PROTECTION
3 01 35 29 1.6.1.j Corrected reference from 31 00 00 EARTHWORK to 31 23 00 EXCAVATION AND FILL
4 02 82 14.00 10 1.6.2.c Requirement for the Project and Other Supervisors is described.
5 02 82 14.00 10 1.6.2.d Requirement for the Designated Industrial
Hygienist is described.
6 02 82 14.00 10 1.6.2.f Word of “reserved” is deleted and paragraph “g” is re-numbered to “f”.
7 02 82 14.00 10 1.6.2.h Paragraph number of “h” is renumbered to “g”.
8 02 82 14.00 10 1.7 Corrected reference from 01 35 26 to 01 35 29
SAFETY AND OCCUPATIONAL HEALTH
REQUIREMENTS
9 02 85 00.00 20 1.3.1 7th paragraph
3rd row
SSHO is revised to Certified Industrial Hygienist.
10 02 85 00.00 20 1.3.1 7th paragraph
6th row
SSHO is revised to CIH.
11 02 85 00.00 20 1.3.1 8th paragraph deleted.
12 02 85 00.00 20 1.4 Remove reference to LEED Specification 01 33
29.
13 02 85 00.00 20 1.4, SD-01 CIH/IH qualifications submittal requirement is inserted.
14 02 85 00.00 20 1.4.1 Deleted first phrase of first sentence “Within ten
(10) days from the award of the contract and”
15 02 85 00.00 20 1.4.1.2 SSHO is revised to CIH.
16 02 85 00.00 20 1.5.1.c SSHO with reference is revised to IH.
17 02 85 00.00 20 3.3.1 2nd paragraph, 8th row
SSHO is revised to IH.
18 02 85 00.00 20 3.5.2 SSHO is revised to IH.
19 03 11 13.00 10 2.1 Corrected reference from 03 31 01.00 10 to 03 30
00 CAST IN-PLACE CONCRETE
20 09 30 13 2.5 Color, texture, and pattern submittal is changed to
“as indicated on drawings” of A-603.
21 09 30 13 3.4.4 Removed reference to 07 12 00 BUILT-UP
BITUMINOUS WATERPROOFING
22 09 65 00 2.8 Removed reference to 09 06 90 COLOR
SCHEDULE referred bidder to design documents
Atch. 1 to
FA5205-16-R-0005-0002
SPECIFICATION
Section Number Paragraph Description
23 09 68 00 2.5 Removed reference to 09 06 90 COLOR
SCHEDULE referred bidder to design documents
24 26 27 13.10 30 2.5 Deleted paragraph 2.5 Metering System Schedule
25 32 12 17 1.2 Corrected reference number to 01 33 00
SUBMITTAL PROCEDURES from 01 30 00
26 32 31 13 1.2 Corrected reference number to 01 33 00
SUBMITTAL PROCEDURES from 01 30 00
27 32 93 00 1.3 Corrected reference number to 01 33 00
SUBMITTAL PROCEDURES from 01 30 00
28 32 96 00 1.3 Corrected reference number to 01 33 00
SUBMITTAL PROCEDURES from 01 30 00
2. The following drawings have been revised for the change of information as provided:
DRAWING
Sheet Drawing Description
1 G-001 Location Plan revised to coordinate with and refer to Civil drawings for
Limits of Construction. (Query 98)
3 G-003 Scope of Work, Architectural, Paragraphs 1, 3, 14 and 15 – Removed references to Bid Additives.
Scope of Work, Architectural, Paragraph 8 – Clarified scope of concrete crack repair.
9 C-101 Added Limits of Construction to the drawing on Detail 1 Site Plan.
16 S-100 Detail 1/S100 Overall Framing Plan was updated.
Detail 2/S100 was updated to show the correct window configuration.
The piers have been indicated on the plans for clarity.
The window infills have been clarified on the plan.
19 A-002 Detail-4 – P-1 PARTITION ASS’Y – Gypsum board type is changed to
Moisture-Resistant type.
34 AD402 Detail 1 – DEMO PLAN – UNIT BATHROOM Removed references to additives.
35 AD420 Detail 1 – Added demolition depiction to the LINEN 1 room.
59 A-401 Detail 2 – ENLARGED CEILING PLAN – TYPICAL UNIT Detail 2/A-401 has been corrected to be consistent with AD401 and 1/A-401.
63 A-420 Detail 1 – Added new flooring depiction to the LINEN 1 room and keynote
N11 to call for resilient tile flooring to be installed.
86 A-453 Detail 10 – Changed balusters from horizontal to vertical and clarified description of material, finish and attachment.
88 A-502 Detail 8 – Added detail to depict typical location of floor number at stair
95 A-603 Room Finish Schedule – updated to include correct wall finishes for:
LOUNGE KITCHEN 2, 3 (from EXIST CT, CT1 to CT) and UNIT
BATHROOM TYP. (from EXIST CT to CT) Corrected wall paint for:
LOUNGE KITCHEN 2,3 (from MATCH EXIST to CT1) and UNIT
BATHROOM TYP (from – to CT3), and delete “Additive” spaces.
Material & Color Schedule – Changed CT1 from PORCELAIN CERAMIC
TILE to PORCELAIN CERAMIC WALL TILE. Changed CT2 from
PORCELAIN CERAMIC TILE to PORCELAIN CERAMIC FLOOR TILE.
Added remark to CT1 to provide matching sanitary cove base. Added
DRAWING
Sheet Drawing Description Ceramic Tile finishes CT3 and CT4
162 E-101 Added switches to lobby 001 and mechanical room 010.
163 E-102 Added switch to Laundry 2 LD2.
164 E-103 Added switches to Laundry 3 LD3, Lounge3 LG and Storage 3
165 E-104 Added switches to Day Room 4 LG4, Storage 4 ST4 & Landry 4 LD4
171 E-401 Detail 1. Show two new data outlets. A leader note directs to remove and replace the outlet and to re-use the data cabling if feasible.