SPECIFICATIONS
FOR
QKKA 14-1050
RNVT Dorm 539
MISAWA AIR BASE, JAPAN
25 Apr 16
Attachment 1 to RFP No. FA5205-16-R-0005
RNVT Dorm 539 Misawa AB, Misawa, Japan
QKKA141050
PROJECT TABLE OF CONTENTS Page 1
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 00 10 LIST OF ACRONYMS
00 01 15 LIST OF DRAWINGS
00 31 10 METRIC MEASUREMENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 33 29 LEED(TM) DOCUMENTATION
01 35 29 SAFETY AND OCCUPATIONAL HEALTH REQUIREMENTS
01 42 00.00 33 JIS ACCEPTABLE ALTERNATIVES
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 42 15 METRIC MEASUREMENTS
01 45 00.00 10 CONTRACTOR QUALITY CONTROL
01 57 20.00 10 ENVIRONMENTAL PROTECTION
01 62 35 RECYCLED / RECOVERED MATERIALS
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
02 82 14.00 10 ASBESTOS HAZARD CONTROL ACTIVITIES
02 84 33 REMOVAL AND DISPOSAL OF POLYCHLORINATED BIPHENYLS (PCBs)
02 85 00.00 20 MOLD REMEDIATION
DIVISION 03 - CONCRETE
03 01 30.71 CONCRETE REHABILITATION
03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING
03 20 00.00 10 CONCRETE REINFORCING
03 30 00 CAST-IN-PLACE CONCRETE
DIVISION 05 - METALS
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 72 00 DECORATIVE METAL SPECIALTIES
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 20 00 FINISH CARPENTRY
06 61 16 SOLID POLYMER (SOLID SURFACING) FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 14 00 FLUID-APPLIED WATERPROOFING
07 21 13 BOARD AND BLOCK INSULATION
07 57 00 URETHANE SPRAYED ELASTOMERIC ROOF COATINGS OVERLAY SYSTEM
07 60 00 FLASHING AND SHEET METAL
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
PROJECT TABLE OF CONTENTS Page 2
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 32 13 ALUMINUM SLIDING GLASS DOORS
08 51 13 ALUMINUM WINDOWS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
DIVISION 09 - FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 13 CERAMIC TILING
09 65 00 RESILIENT FLOORING
09 68 00 CARPETING
09 90 00 PAINTING, GENERAL
DIVISION 10 - SPECIALTIES
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
DIVISION 12 - FURNISHINGS
12 21 00 WINDOW BLINDS
12 32 00 MANUFACTURED WOOD CASEWORK
12 36 00 COUNTERTOPS
12 48 13 ENTRANCE FLOOR MATS AND FRAMES
DIVISION 21 - FIRE SUPPRESSION
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
22 07 19.00 40 PLUMBING PIPING INSULATION
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS
23 05 15 COMMON PIPING FOR HVAC
23 05 48.00 40 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND
EQUIPMENT
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 08 00.00 10 COMMISSIONING OF HVAC SYSTEMS
23 09 23.13 20 BACnet DIRECT DIGITAL CONTROL SYSTEMS FOR HVAC
23 09 33.00 40 ELECTRIC AND ELECTRONIC CONTROL SYSTEM FOR HVAC
23 21 13.00 20 LOW TEMPERATURE WATER HEATING SYSTEM
23 23 00 REFRIGERANT PIPING
23 31 13.00 40 METAL DUCTS
23 82 00.00 20 TERMINAL HEATING AND COOLING UNITS
23 82 02.00 10 UNITARY HEATING AND COOLING EQUIPMENT
PROJECT TABLE OF CONTENTS Page 3
DIVISION 26 - ELECTRICAL
26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT
26 05 71.00 40 LOW VOLTAGE OVERCURRENT PROTECTIVE DEVICES
26 08 00 APPARATUS INSPECTION AND TESTING
26 09 23.00 40 LIGHTING CONTROL DEVICES
26 11 16 SECONDARY UNIT SUBSTATIONS
26 18 23.00 40 MEDIUM-VOLTAGE SURGE ARRESTERS
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 23 00 SWITCHBOARDS AND SWITCHGEAR
26 27 13.10 30 ELECTRIC METERS
26 51 00 INTERIOR LIGHTING
26 52 00.00 40 EMERGENCY LIGHTING
26 53 00.00 40 EXIT SIGNS
26 56 00 EXTERIOR LIGHTING
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 05 26.00 40 GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY
28 31 49 CARBON MONOXIDE DETECTORS
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 - EARTHWORK
31 11 00 CLEARING AND GRUBBING
31 23 00 EXCAVATION AND FILL
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 05 33 LANDSCAPE ESTABLISHMENT
32 11 16.16 BASE COURSE FOR RIGID AND SUBBASE COURSE FOR FLEXIBLE
PAVING
32 11 24 GRADED CRUSHED AGGREGATE BASE COURSE FOR FLEXIBLE PAVEMENT
32 12 10 BITUMINOUS TACK AND PRIME COATS
32 12 17 HOT MIX BITUMINOUS PAVEMENT
32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS
32 17 23 PAVEMENT MARKINGS
32 31 13 CHAIN LINK FENCES AND GATES
32 92 23 SODDING
32 93 00 EXTERIOR PLANTS
32 96 00 TRANSPLANTING EXTERIOR PLANTS
DIVISION 33 - UTILITIES
33 11 00 WATER DISTRIBUTION
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
-- End of Project Table of Contents --
RNVT Dorm 539 QKKA141050
SECTION 00 00 10
LIST OF ACRONYMS
PART 1 GENERAL
1.1 SUMMARY
This document provides a listing of acronyms used in this specifications document
A2LA American Association for Laboratory Accreditation AASHTO American Association of State Highway and Transportation Officials AB Air Base ABC Aggregate Base Course ABS Acrylonitrile-Butadiene-Styrene ACI American Concrete Institute ACM(s) Asbestos-containing Material(s) AEIC Association of Edison Illuminating Companies AF Air Force / Actual Finish AFOHA Air Force Occupational Safety and Health Standard(s) AHA(s) Activity Hazard Analysis(es) / American Hardboard Association AHAP Asbestos Hazard Abatement Plan AI Asphalt Institute AIHA American Industrial Hygiene Association AMRL AASHTO Materials Reference Laboratory ANSI American National Standards Institute APP(s) Accident Prevention Plan(s) AS Actual Start Asbestos f/cc Asbestos Fiber Concentrations ASME American Society of Mechanical Engineers ASSE American Society of Sanitary Engineering ASTM American Society for Testing Materials AWG American Wire Gauge AWS American Welding Society AWWA American Water Works Association (AWWA)
Base Misawa AB, Misawa, Japan bhp Brake Horsepower BICSI Building Industry Consulting Services International BIDI Bid Item BMEP Brake Mean Effective Pressure BMP(s) Best Management Practices BPE Base Project Engineer
CATV Community Antenna Television CATW Category of Work CCE Calcium Carbonate Equivalent CD Compact Disk CES 35th Civil Engineering Squadron CGPM General Conference on Weights and Measures CIH Certified Industrial Hygienist CIPP Cured In Place Pipe CLIN Contract Line Item Number cm centimeter(s) CMU Concrete Masonry Unit(s)
DOCUMENT 00 00 10 Page 1
CO Contracting Officer COC Chain-of-Custody CONS 35th Contracting Squadron COR Contracting Officers Representative COTR Contracting Officer's Technical Representative CP Competent Person CPG(s) Comprehensive Procurement Guideline(s) CPM Critical Path Method CPP Containment Prevention Plan CQC Contractor Quality Control CRR Corrosion Resistance Ratio CS 35th Communications Squadron CSEP Confined Space Entry Plan CSP Certified Safety Professional CWA Constant Wattage Autotransformer
DALT Duct Air Leak Test dBmV decibel millivolts DGA Dissolved Gas Analysis DLA Defense Logistics Agency DOD Department of Defense DOR Designer of Record DOT U.S. Department of Transportation
ELEC Electrical ELLAP Environmental Lead Laboratory Accreditation Program ELPAT Environmental Lead Proficiency Analytical Testing EMCS Energy Monitoring and Control System EPA U.S. Environmental Protection Agency EPP Environmental Protection Plan EPR Ethylene-Propylene-Rubber ES Early Start EXTR Exterior
FAR Federal Acquisition Regulations f'c Compressive Strength FEMP Federal Energy Management Program
FIFRA Federal Insecticide, Fungicide, and Rodenticide Act FM Factory Mutual f'm Strength FOW Feature of Work FP&P Fall Protection and Prevention g gram(s) G Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for Contractor Quality Control approval. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.
g/L gram(s) per Liter(s) GCA Graded-crushed Aggregate GFCI Ground-fault Circuit Interrupter GFE Government furnished equipment GOJ Government of Japan GOVT Government GSA U.S. General Services Administration
DOCUMENT 00 00 10 Page 2
HEPA High-Efficiency Particulate Air HIC Head Injury Criteria HID High-intensity Discharge HM Hazardous Material HPS High-pressure Sodium HSCOR Heavy Snow Conditions of Readiness HVAC Heating, Ventilating, Air Conditioning
ICC International Code Council ICRI International Concrete Repair Institute IDC Initiating Device Circuits IDC Insulation Displacement Connection IEEE Institute of Electrical and Electronics Engineers IH Industrial Hygienist IHT(a) Industrial Hygiene Technician(s) IMPC Installation Pest Management Coordinator I-P Inch-Pounds
JEGS Japan Environmental Governing Standards JIS Japanese Industrial Standard(s) JMF Job Mix Formula JMOE Japanese Ministry of the Environment kg kilogram(s) kg/m^3 kilogram(s) per cubic meter km kilometer(s) km/h kilometer(s)/hour kPa kilopascal(s)
L Liter(s) L/s Liter(s) per second LBP Lead-based Paint LBP/R/CP Lead-based Paint/Removal/Control Plan LED/LCD Light Emitting Diode/Liquid Crystal Diode LEED Leadership in Energy and Environmental Design LF Late Finish LL Load Losses LM Linear Meter m meter(s) m/s meter(s) per second MAP Model Accreditation Plan MCL/PWL Material Containing Lead/Paint with Lead MCOV Maximum Continuous Operating Voltage MDI Methylene Diphenel Isocyanate MECH Mechanical MEP Master Entry Plan MFH Military Family Housing mm millimeter(s) mm/s millimeter(s) per second MODF Modification MPa Megapascal MSDS Material Safety Data Sheet(s)
NAC Notification Appliance Circuits NARA National Archives and Records Administration NAS Network Analysis Schedule NBR Nitrile Butadeine Rubber
DOCUMENT 00 00 10 Page 3
NEMA National Electrical Manufacturers Association NESHAP "National Emission Standards for Hazardous Air Pollutants" NEXT Near End Cross Talk NICET "National Institute for Certification in Engineering
Technologies" NLL No-load Losses NLLAP National Lead Laboratory Accreditation Program Nm Newton meter(s) NPE Negative Pressure Enclosure NTP Notice To Proceed NTT Nippon Telephone Telegraph
O&M Operation(ing) and Maintenance o.c. on center OD Outside Diameter / Original Duration ODS Ozone Depleting Substances OSHA Occupational Safety and Health Administration OS&Y Outside Screw and Yoke
P&T Pressure and Temperature PAT Proficiency Analytical Testing PCB(s) Polychlorinated Biphenyl(s) PCM Phase Contrast Microscopy PDM Precedence Diagram Method PE Professional Engineer PELs Permissible Exposure Limit(s) PHAS Phase of Work PILC Paper Insulated Lead Covered PLM Polarized Light Microscopy PMG Permanent Magnet Generator PPC Project Pesticide Coordinator PPE Personal Protective Equipment ppm parts per million PRV Pressure Reducing Valve PVC Polyvinyl Chloride PVDC Polyvinylidene Chloride
QA Quality Assurance QAP Quality Assurance Plan QC Quality Control QCS Quality Control System
R Thermal Resistance RAP Recycled Asphalt Pavement RD Remaining Duration REA Request for Equitable adjustment REFL Reflected REP Rescue and Evacuation Plan RESP Responsible Party RF Radio Frequency RFI Request for Information RLC(s) Residential Load Center(s) RMS Root Mean Square / Resident Management System RSO Radiation Safety Officer
S/mm Structures per square millimeters SBR Styrene Butadeine Rubber SD Submittal Description SF Start to Finish
DOCUMENT 00 00 10 Page 4
SHP Safety and Health Program SI International System of Units SLC Signal Line Circuits SOFA Status of Forces Agreement SPDT Single-pole Double-throw SSHO Site Safety and Health Officer
TDI Toluene Diphenel Isocyanate TEM Transmission Electron Microscopy THD Total Harmonic Distortion TNR Tensile Strength Ratio TPH Total Petroleum Hydrocarbons TSI Thermal System Insulation TSR Tensile Strength Ratio TV Television TWA Time Weighted Average
UL Underwriter's Laboratories USACE U.S. Army Corps of Engineers USG United States Government USGBC U.S. Green Building Council UV Ultraviolet
V Volt(s) Vac Volts a.c.
VECP Value Engineering Change Proposal VMA Voids in Mineral Aggregate VOC(s) Volatile Organic Compound(s)
W Watt(s) WBS Work Breakdown Structure WHE Weight Handling Equipment WIFI Wireless Internet WMP Waste Management Plan WPS Welding Procedure Specifications
XLP Cross-linked-thermosetting XRF X-ray Fluorescence
-- End of Document --
DOCUMENT 00 00 10 Page 5
Document 00 01 15 Page 1
SECTION 00 01 15
LIST OF DRAWINGS
PART 1 GENERAL
1.1 SUMMARY
This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings and Specifications."
1.2 CONTRACT DRAWINGS
Contract drawings are as follows:
DRAWING SHEET SHEET
NO. NO. NAME
1 G-001 Vicinity/Location Map, Team Listing
2 G-002 Sheet Index and General Notes
3 G-003 Scope of Work
4 G-004 LIFE SAFETY CODE SUMMARY
5 G-005 LIFE SAFETY PLAN - FIRST FLOOR
6 G-006 LIFE SAFETY PLAN - SECOND FLOOR (3RD & 4TH FLOOR
SIMILAR)
CIVIL
7 C-001 Civil Notes and Information
8 C-100 Site Demolition Plan
9 C-101 Site Plan
10 C-102 Water Service Plan and Profile
11 C-501 Water Piping Details
12 C-502 Water Details
13 C-503 Paving Details
14 C-504 Paving Details
STRUCTURAL
15 S-001 Structural Notes and Information
16 S-100 Framing Plan and Sections
17 S-200 Entry Ramp Plans and Details
ARCHITECTURAL
18 A-001 Abbreviations and Symbols Legend
19 A-002 Partition Types
20 A-003 Accessibility Compliance and Mounting Heights
21 AD101 Demolition First Floor Plan
22 AD102 Demolition Second Floor Plan
Document 00 01 15 Page 2
23 AD103 Demolition Third Floor Plan
24 AD104 Demolition Fourth Floor Plan
25 AD105 DEMOLITION UTILIDOR PLAN
26 AD121 Demolition First Floor Reflected Ceiling Plan
27 AD122 Demolition Second Floor Reflected Ceiling Plan
28 AD123 Demolition Third Floor Reflected Ceiling Plan
29 AD124 Demolition Fourth Floor Reflected Ceiling Plan
30 AD201 Demolition Exterior Elevations
31 AD202 Demolition Exterior Elevations
32 AD203 Demolition Exterior Elevations
33 AD401 Enlarged Demolition Plans - Typical Unit
34 AD402 Enlarged Demolition Plans - Typical Unit 35 AD420 Enlarged Demolition Plans - Mechanical Room & Typical
Storage
36 AD421 Enlarged Demolition First Floor Plans - Laundry & Exercise Room
37 AD422 Enlarged Demolition First Floor Plans - Lounge & Main Entry
38 AD423 Enlarged Demolition Second Floor Plans - Lounge & Laundry
39 AD424 Enlarged Demolition Third Floor Plans - Lounge & Laundry
40 AD425 Enlarged Demolition Fourth Floor Plans - Lounge & Laundry
41 AD430 Enlarged Demolition Plans - Central Stair 1
42 AD431 Enlarged Demolition Plans - East Stair 2
43 AD432 Enlarged Demolition Plans - West Stair 3
44 A-101 Overall First Floor Plan
45 A-102 Overall Second Floor Plan
46 A-103 Overall Third Floor Plan
47 A-104 Overall Fourth Floor Plan
48 A-111 Roof Plan
49 A-121 First Floor Ceiling Plan
50 A-122 Second Floor Ceiling Plan
51 A-123 Third Floor Ceiling Plan
52 A-124 Fourth Floor Ceiling Plan
53 A-201 Exterior Elevations
54 A-202 Exterior Elevations
55 A-203 Exterior Elevations
56 A-301 Building Sections
57 A-302 Building Sections
58 A-303 Wall Sections
59 A-401 Enlarged Plan, Enlarged RCP - Typical Unit
Document 00 01 15 Page 3
60 A-402 Interior Elevations - Typical Unit Bedroom
61 A-403 Intr. Elevs - Typ Unit Bathroom - Entry Ramp
62 A-404 Intr. Elevs - Typ Unit Closet
63 A-420 Interior Elevs, Enlarged Plans & RCP - Mechanical & Exercise RMS
64 A-421 Interior Elevations, Enlarged Plans & RCP - First Floor Lounge
65 A-422 Interior Elevs, Enlarged Plans & RCP - 1st FL Laundry & Typ Storage
66 A-423 Interior Elevs, Enlarged Plans & RCP - Second Floor Lounge & Laundry
67 A-424 Interior Elevs, Second Floor Lounge
68 A-425 Interior Elevs, Enlarged Plans & RCP - Fourth Floor Lounge & Laundry
69 A-426 Interior Elevs, Third Floor
70 A-427 Interior Elevs, Enlarged Plans & RCP - Fourth Floor Lounge & Laundry
71 A-430 ENLARGED CORRIDOR PLANS - 1ST FLOOR
72 A-431 ENLARGED CORRIDOR PLANS - 1ST FLOOR
73 A-432 ENLARGED CORRIDOR PLANS - 1ST FLOOR
74 A-433 ENLARGED CORRIDOR PLANS - 2ND FLOOR
75 A-434 ENLARGED CORRIDOR PLANS - 2ND FLOOR
76 A-435 ENLARGED CORRIDOR PLANS - 2ND FLOOR
77 A-436 ENLARGED CORRIDOR PLANS - 3RD FLOOR
78 A-437 ENLARGED CORRIDOR PLANS - 3RD FLOOR
79 A-438 ENLARGED CORRIDOR PLANS - 3RD FLOOR
80 A-439 ENLARGED CORRIDOR PLANS - 4TH FLOOR
81 A-440 ENLARGED CORRIDOR PLANS - 4TH FLOOR
82 A-441 ENLARGED CORRIDOR PLANS - 4TH FLOOR
83 A-450 Interior Elevations & Enlarged Plans - Central Stair 1
84 A-451 Interior Elevations & Enlarged Plans - East Stair 2
85 A-452 Interior Elevations & Enlarged Plans - West Stair 3
86 A-453 ENTRY RAMP ENLARGED PLAN, SECTIONS
87 A-501 Exterior Details
88 A-502 Interior Details
89 A-503 Door Details
90 A-504 Window Details
91 A-505 Window Details
92 A-506 Casework Details
93 A-601 Door Schedule and Legend
94 A-602 Window Schedule and Legend
95 A-603 Finish Schedule
Document 00 01 15 Page 4
MECHANICAL AND PLUMBING
96 M-001 MECHANICAL SYMBOLS, LEGEND & ABBREVIATIONS
97 MS101 MECHANICAL SITE PLAN
98 MS401 ENLARGED MECHANICAL SITE PLANS
99 MS402 ENLARGED MECHANICAL SITE PLANS
100 PD101 DEMOLITION PLUMBING PLAN - FIRST FLOOR
101 PD102 DEMOLITION PLUMBING PLAN - SECOND FLOOR
102 PD103 DEMOLITION PLUMBING PLAN - THIRD FLOOR
103 PD104 DEMOLITION PLUMBING PLAN - FOURTH FLOOR
104 MD101 DEMOLITION HEATING & VENTILATION PLAN - FIRST FLOOR
105 MD102 DEMOLITION HEATING & VENTILATION PLAN - SECOND FLOOR
106 MD103 DEMOLITION HEATING & VENTILATION PLAN - THIRD FLOOR
107 MD104 DEMOLITION HEATING & VENTILATION PLAN - FOURTH FLOOR
108 MD401 ENLARGED DEMOLITION PLAN - TYPICAL UNITS
109 MD402 ENLARGED MECHANICAL ROOM DEMOLITION PLAN
110 MD601 PLUMBING PIPING RISER DEMOLITION DIAGRAM
111 MD602 MECHANICAL DEMOLITION HEATING DIAGRAM
112 P-101 PLUMBING PLAN - FIRST FLOOR
113 P-102 PLUMBING PLAN - SECOND FLOOR
114 P-103 PLUMBING PLAN - THIRD FLOOR
115 P-104 PLUMBING PLAN - FOURTH FLOOR
116 P-401 ENLARGED PLUMBING PLAN
117 P-402 ENLARGED MECHANICAL ROOM PLANS
118 P-501 MECHANICAL DETAILS
119 P-601 PLUMBING PIPING RISER DIAGRAM
120 M-101 HEATING & VENTILATION PLAN - FIRST FLOOR
121 M-102 HEATING & VENTILATION PLAN - SECOND FLOOR
122 M-103 HEATING & VENTILATION PLAN - THIRD FLOOR
123 M-104 HEATING & VENTILATION PLAN - FOURTH FLOOR
124 M-401 ENLARGED HEATING & VENTILATION PLAN - TYPICAL UNITS
125 M-501 MECHANICAL DETAILS
126 M-502 MECHANICAL DETAILS
127 M-601 MECHANICAL PIPING DIAGRAM & DETAILS
128 M-611 MECHANICAL SCHEDULES
129 M-612 MECHANICAL SCHEDULES
FIRE PROTECTION
130 FS001 FIRE PROTECTION SITE PLAN
131 FA001 FIRE ALARM LEGEND, NOTES, ABBREVIATIONS AND EQUIPMENT
INSTALLATION DIAGRAMS
132 FA101 FIRE ALARM DEMO PLAN - FIRST FLOOR
Document 00 01 15 Page 5
133 FA102 FIRE ALARM DEMO PLAN - SECOND FLOOR
134 FA103 FIRE ALARM DEMO PLAN - THIRD FLOOR
135 FA104 FIRE ALARM DEMO PLAN - FOURTH FLOOR
136 FA105 FIRE ALARM PLAN - FIRST FLOOR
137 FA106 FIRE ALARM PLAN - SECOND FLOOR
138 FA107 FIRE ALARM PLAN - THIRD FLOOR
139 FA108 FIRE ALARM PLAN - FOURTH FLOOR
140 FA501 RISER DIAGRAM, MATRIX, FA TRANSMITTER ZONES
141 FA601 FIRE ALARM RISER DIAGRAM
142 FA602 FIRE ALARM RISER DIAGRAM
143 FX001 FIRE SPRINKLER LEGEND AND NOTES
144 FX101 FIRE SPRINKLER DEMO PLAN - FIRST FLOOR
145 FX102 FIRE SPRINKLER DEMO PLAN - SECOND FLOOR
146 FX103 FIRE SPRINKLER DEMO PLAN - THIRD FLOOR
147 FX104 FIRE SPRINKLER DEMO PLAN - FOURTH FLOOR
148 FX105 FIRE SPRINKLER PLAN - FIRST FLOOR
149 FX106 FIRE SPRINKLER PLAN - SECOND FLOOR
150 FX107 FIRE SPRINKLER PLAN - THIRD FLOOR
151 FX108 FIRE SPRINKLER PLAN - FOURTH FLOOR
152 FX501 FIRE SPRINKLER DETAILS
153 FX601 WET STANDPIPE / FIRE SPRINKLER RISER PIPING DIAGRAM
ELECTRICAL
154 E-001 ELECTRICAL ABBREVIATIONS, LEGEND, AND NOTES
155 ES100 ELECTRICAL SITE DEMOLITION PLAN
156 ES101 ELECTRICAL SITE PLAN
157 ED101 ELECTRICAL DEMOLITION PLAN - FIRST FLOOR
158 ED102 ELECTRICAL DEMOLITION PLAN - SECOND FLOOR
159 ED103 ELECTRICAL DEMOLITION PLAN - THIRD FLOOR
160 ED104 ELECTRICAL DEMOLITION PLAN - FOURTH FLOOR
161 ED601 ELECTRICAL ONE-LINE DIAGRAM DEMOLITION & TEMPORARY
POWER PLAN
162 E-101 LIGHTING PLAN - FIRST FLOOR
163 E-102 LIGHTING PLAN - SECOND FLOOR
164 E-103 LIGHTING PLAN - THIRD FLOOR
165 E-104 LIGHTING PLAN - FOURTH FLOOR
166 E-111 POWER & COMMUNICATIONS PLAN - FIRST FLOOR
167 E-112 POWER & COMMUNICATIONS PLAN - SECOND FLOOR
168 E-113 POWER & COMMUNICATIONS PLAN - THIRD FLOOR
169 E-114 POWER & COMMUNICATIONS PLAN - FOURTH FLOOR
170 E-121 GROUNDING RISER DIAGRAM
171 E-401 ENLARGED ELECTRICAL PLANS
172 E-402 ENLARGED ELECTRICAL PLANS
Document 00 01 15 Page 6
173 E-403 ENLARGED ELECTRICAL PLANS
174 E-501 ELECTRICAL DETAILS
175 E-502 ELECTRICAL DETAILS
176 E-601 ELECTRICAL ONE-LINE DIAGRAM
177 E-602 ELECTRICAL ONE-LINE DIAGRAM
178 E-603 EMCS RISER DIAGRAM
179 E-604 CATV RISER DIAGRAM
180 E-605 TELECOM RISER DIAGRAM
181 E-606 CONDUIT ROUTING RISER DIAGRAM
182 E-610 TYPICAL UNIT CIRCUITING SCHEDULE
183 E-611 ELECTRICAL SCHEDULES
184 E-612 ELECTRICAL SCHEDULES
185 E-613 ELECTRICAL SCHEDULES
186 E-614 ELECTRICAL SCHEDULES
187 E-615 ELECTRICAL PANEL SCHEDULES
188 E-616 ELECTRICAL PANEL SCHEDULES
189 E-617 ELECTRICAL PANEL SCHEDULES
190 E-618 ELECTRICAL PANEL SCHEDULES
191 E-619 ELECTRICAL PANEL SCHEDULES
192 E-620 ELECTRICAL PANEL SCHEDULES
193 E-621 ELECTRICAL PANEL SCHEDULES
FIRE VEHICLE ACCESS
S1 C-601 SITE DEMOLITION PLAN FOR FIRE LANE
S2 C-602 SITE PLAN FOR FIRE LANE
DOCUMENT 00 31 10
METRIC MEASUREMENTS
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
IEEE/ASTM SI 10 (2010) American National Standard for Use of the International System of Units (SI):
The Modern Metric System
1.2 GENERAL
This project includes metric units of measurements. The metric units used are the International System of Units (SI) developed and maintained by the General Conference on Weights and Measures (CGPM); the name International System of Units and the international abbreviation SI were adopted by the 11th CGPM in 1960. A number of circumstances require that both metric SI units and English inch-pound (I-P) units be included in a section of the specifications. When both metric and I-P measurements are included, the section may contain measurements for products that are manufactured to I-P dimensions and then expressed in mathematically converted metric value (soft metric) or, it may contain measurements for products that are manufactured to an industry recognized rounded metric (hard metric) dimensions but are allowed to be substituted by I-P products to comply with the law. Dual measurements are also included to indicate industry and/or Government standards, test values or other controlling factors, such as the code requirements where I-P values are needed for clarity or to trace back to the referenced standards, test values or codes.
1.3 USE OF MEASUREMENTS IN SPECIFICATIONS
Measurements in specifications shall be either in SI or I-P units as indicated, except for soft metric measurements or as otherwise authorized. When only SI or I-P measurements are specified for a product, the product shall be procured in the specified units (SI or I-P) unless otherwise authorized by the Contracting Officer. The Contractor is responsible for all associated labor and materials when authorized to substitute one system of units for another and for the final assembly and performance of the specified work and/or products.
1.3.1 Hard Metric
A hard metric measurement is indicated by an SI value with no expressed correlation to an I-P value. Hard metric measurements are often used for field data such as distance from one point to another or distance above the floor. Products are considered to be hard metric when they are manufactured to metric dimensions or have an industry recognized metric designation.
DOCUMENT 00 31 10 Page 1
1.3.2 Soft Metric
a. A soft metric measurement is indicated by an SI value which is a mathematical conversion of the I-P value shown in parentheses (e.g. 38.1 mm (1-1/2 inches)). Soft metric measurements are used for measurements pertaining to products, test values, and other situations where the I-P units are the standard for manufacture, verification, or other controlling factor. The I-P value shall govern while the metric measurement is provided for information.
b. A soft metric measurement is also indicated for products that are manufactured in industry designated metric dimensions but are required by law to allow substitute I-P products. These measurements are indicated by a manufacturing hard metric product dimension followed by the substitute I-P equivalent value in parentheses (e.g., 190 x 190 x 390 mm (7-5/8 x 7-5/8 x 15-5/8 inches)).
1.3.3 Neutral
A neutral measurement is indicated by an identifier which has no expressed relation to either an SI or an I-P value (e.g., American Wire Gage (AWG) which indicates thickness but in itself is neither SI nor I-P).
1.4 COORDINATION
Discrepancies, such as mismatches or product unavailability, arising from use of both metric and non-metric measurements and discrepancies between the measurements in the specifications and the measurements in the drawings shall be brought to the attention of the Contracting Officer for resolution.
1.5 RELATIONSHIP TO SUBMITTALS
Submittals for Government approval or for information only shall cover the SI or I-P products actually being furnished for the project. Submit the required drawings and calculations in the same units used in the contract documents describing the product or requirement unless otherwise instructed or approved. Use IEEE/ASTM SI 10 as the basis for establishing metric measurements required to be used in submittals.
DOCUMENT 00 31 10 Page 2
Section 01 11 00 Page 1
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 STATEMENT OF WORK
1.1.1 Project Description
The work shall consist of, but is not limited to, providing all supervision, management, quality control, labor, materials, equipment, transportation and performing all work necessary for improvements to dormitory 539. Scope of work Includes military dormitory repair and associated infrastructure and site improvements. Scope of work shall include the following:
Base bid item no. CLIN 0001
SubCLIN 0001AA
CIVIL
Site Improvements to support new building systems; Anti-Terrorism / Force Protection (AT/FP) setbacks at west parking lot.
Site improvements to integrate with existing sidewalks, amenities and utilities;
ARCHITECTURAL
Interior demolition and new Architectural finishes including;
Replace tile at unit bathrooms, replace unit bathroom toilet accessories, replace unit bathroom doors, replace unit closets, replace chase wall and tile at lounge kitchen.
Replace AT/FP windows and exterior wall infill as required;
New insulation assemblies;
MECHANICAL
Renovate Mechanical plumbing systems;
ELECTRICAL;
Site utility and exterior distribution improvements to renovate Dorm Interior distribution, lighting and power for renovate Dorm 539.
Telephone system and data system CATV system installation.
EMCS system installation.
SubCLIN 0001AB
CIVIL
Site improvements to extend Fire Lanes.
MECHANICAL
Fire Suppressions systems in accordance with drawings.
Provide DDC for each heat pump and air handling unit
Section 01 11 00 Page 2
ELECTRICAL
Site utility and exterior distribution to Fire lanes.
Install new fire alarm, Mass Notification (MN).
Base bid item no. CLIN 0002 Concrete crack repair
Repair concrete cracks for the renovation of the dormitory 539. Provide a unit cost for repair of concrete cracks per the contract documents and include 1200m of work in the base bid. Contractor to provide remediation as needed.
Base bid item no. CLIN 0003 Mold removal and remediation
Remediate mold for the renovation of the dormitory 539. Provide a unit cost for mold remediation per the contract documents and include 800sm of remediation in the base bid. Contractor to provide remediation as needed.
1.1.1.1 Project Engineer Qualifications
The Contractor shall appoint a skilled Licensed Construction Engineer or Architectural Engineer in accordance with paragraphs 1 and 2 of Article 4, Contract Handling Regulations of the Prime Minister's Office of the Government of Japan, as the Project Engineer for this contract. A First Grade Construction Engineer or Architectural Engineer is required.
1.1.2 Location
The work shall be located at Misawa Air Base, Japan (Base).
1.1.3 Definitions
The term "United States" is assumed to appear before the word "Government" whenever the latter word appears in this contract, except where the word "Government" refers to a different named Government.
1.2 AUTHORITY
Except as noted below, the term "Contracting Officer" (CO) as used in this specification includes the authorized representative of the CO acting within the limits of his/her authority. With respect to all paragraphs of the specifications citing "approval by the CO" and all paragraphs cited in Material Approval Submittals, of the solicitation, the term "Contracting Officer" means only those individuals properly appointed as a Contracting Officer within the Contracting Squadron; no other Government personnel has the authority to grant such approval. This includes the Contracting Officer's Representative (COR). The COR has authority to review Material Submittal packages and recommend approval by the CO. At the Final Acceptance Inspection, the COR will perform the inspection and recommend acceptance or conditional acceptance to the CO.
1.3 EXISTING WORK
In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements:"
Section 01 11 00 Page 3
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work as approved by the CO. At the completion of operations, existing work shall be in a condition equal to or better than that which existed before new work started.
1.4 WORK AREA
The Contractor's personnel are restricted to the area of construction only.
Transiting of areas not in the contract is not permitted except as required in the performance of this contract. Contractor shall secure work site(s) during non-working hours.
Adequate outside security lighting shall be provided at the Contractor's temporary facilities. The Contractor shall be responsible for the security of its own equipment; in addition, the Contractor shall notify the appropriate law enforcement agency requesting periodic security checks of the temporary project field office. Provide warning signs, hazardous communications, and other safety information in both Japanese and English, when non-English speaking personnel are in the area.
1.5 LOCATION OF UNDERGROUND FACILITIES
The Contractor shall obtain an Air Force (AF) Form 103 from Base Civil Engineering. This form will be approved/signed and utilities will be marked one time by the Government. The Contractor shall be responsible for maintaining these markings.
1.5.1 Notification Prior to Excavation
Notify the CO at least 48 hours prior to starting excavation work.
1.5.2 Excavation
a. Permits: The Contractor shall obtain an excavation permit before any excavation is started. The form(s) and the offices to be contacted will be provided by 35 CES/CENM project inspectors and the Contractor is responsible for obtaining the required coordination. Those areas which are known to contain underground utility lines will be designated as caution areas. The Contractor must exercise extreme caution when accomplishing the required excavation work. Hand excavation is required within 914.4 millimeters (mm) of existing utility lines. The Government reserves the right to repair all utility lines damaged by the Contractor at the expense of the Contractor.
b. Open Trenches: The Contractor shall rope off/barricade all open trenches in accordance with standard construction procedures, to include hazardous/warning signs.
c. Restoration: The Contractor shall restore all excavated areas to their original condition, to include backfill, original compaction, Section 01 11 00 Page 4 sodding, and scrubbings. New/replacement sod shall be placed edge-to-edge and staggered, unless otherwise shown or indicated.
1.6 WORKMANSHIP
a. Materials shall be installed in accordance with the approved recommendations of the manufacturer. The installation shall be accomplished by workmen skilled in this type of work.
b. Sufficient precautions shall be taken during the construction to protect all personnel from injury and to prevent damage of the Government-owned materials and equipment. The Contractor shall replace damaged Government properties caused by this project with new materials or equipment without additional cost to the Government. The work shall proceed in such a manner as to minimize the spread of dust and flying particles.
c. Demolition and Salvage: Materials to be removed shall be removed carefully so as not to damage material which is to remain or material which is deemed salvageable material. Sufficient safety precautions shall be taken to protect all personnel from injury.
All items to be removed shall be disposed of off base by the Contractor in an approved dumping area in accordance with local laws and regulations. Contractor shall restore all damaged surfaces and openings as a result of work under this contract to match new and/or existing adjacent surfaces unless otherwise specified or shown.
1.7 DELIVERY AND STORAGE
Equipment and materials shall be properly stored, adequately protected, and carefully handled to prevent damage before and during installation.
Equipment and materials shall be handled, stored, and protected in accordance with the manufacturer's recommendations and as approved by the CO. Damaged or defective materials and equipment shall be replaced with new materials and equipment at no cost to the Government.
1.8 STANDARD PRODUCTS
Materials and equipment shall be essentially the standard cataloged products of manufacturers regularly engaged in production design that complies with the specification requirements. Materials and equipment shall essentially duplicate items that have been in satisfactory commercial or industrial use at least two years prior to the date for receipt of proposals. Where two or more units of the same type and class are required, these units shall be products of a single manufacturer.
1.9 MANUFACTURER'S RECOMMENDATIONS
Where installation procedures or any part thereof are required to be in accordance with the recommendations of the manufacturer of the material being installed, printed copies of these recommendations shall be furnished to the CO prior to installation. Installation of the item(s) will not be allowed to proceed until the recommendations are received and approved by the CO. Failure to furnish these recommendations can be cause for rejection of the material.
Section 01 11 00 Page 5
1.10 WELDING
Welding shall be in accordance with qualified procedures using performance-qualified welders and welding operators. Welders shall be qualified using procedures in accordance with AWS D1.1 - 1998, JIS Z 3801 (1997), STANDARD
QUALIFICATIONS PROCEDURE FOR MANUAL WELDING TECHNIQUE.
1.11 COMMUNICATIONS
The Contractor shall work through the Base project manager and must notify CS/SCSP through the Contracting Officer's Representative at least 72 hours in advance to have communication lines staked. Any properly identified communication lines damaged by the Contractor's work shall be repaired by Japanese Government licensed communication lineman at the Contractor's expense. The repair action must meet USG or local Nippon Telephone Telegraph (NTT) standards. The Government reserves the right to repair all Contractor-damaged communications lines and deduct the repair cost from the contract.
Existing cables shall be uncovered by hand digging. Extreme care shall be used during digging to avoid penetrating or otherwise damaging the cable insulation. Power digging equipment shall be used for extensions only in the direction away from buried cables. Communication utilities will be identified electrically by the 35th Communications Squadron, Cable Maintenance Work Center. Utilities will be identified in accordance with acquisition of the building permit. In the event that changed conditions result, it is incumbent upon the Contractor to seek changed conditions through the Contract Office, 35 CONS/LGCC (Base Contracting Officer).
If a communications cable must be moved, it shall be coordinated through the COR and a government cable technician will advise on the best way to relocate it. The Contractor shall relocate the cable as directed. If the required relocation is not indicated in the contract drawings and specifications, relocation is subject to approval via changed conditions to the basic contract.
Refer to drawings for required action for Cable TV Equipment attached to exterior.
1.12 INTERPRETER
The Contractor shall have an English-speaking representative on the job site (Site) at all times during the performance of work under this contract.
Failure to provide such representative could result in the Contractor's work being stopped at his/her expense until such time as one is provided.
1.13 FINAL INSPECTION
Final inspection will be conducted during the period of Monday through Friday between 0800 hours and 1615 hours. The Government will perform the inspection after (a) written notification by the Contractor to the CO; or
(b) the contract completion dates, whichever comes first. Final inspections falling on weekends or U.S. legal holidays will be postponed to the following workday. The Contractor shall notify the Using Agency (35 CES/CENM) through the COR 14 days prior to the final inspection.
Section 01 11 00 Page 6
1.14 NOTIFICATION BEFORE STARTING ON-SITE WORK
The Contractor shall notify the CO a minimum of seven calendar days prior to starting on-site work.
1.15 PREPARATION OF MATERIAL APPROVAL SUBMITTALS
See Submittal Register after Section 01 33 00 SUBMITTAL PROCEDURES for listing of submittals. Copies of manufacturer data sheets and catalog cuts shall accompany each submittal.
1.16 JAPANESE INDUSTRIAL STANDARDS
Where materials or equipment are specified to conform to U.S. Standards from organizations such as the American National Standards Institute (ANSI), American Society for Testing Materials (ASTM), National Electrical Manufacturers Association (NEMA), Underwriters laboratory Inc. (UL) or other U.S. Standards and organizations, material or equipment that meets an equivalent Japanese Industrial Standard (JIS) may be substituted. It is the responsibility of the Contractor to provide all documentation required to prove the Japanese Industrial Standard is equivalent or more stringent than the U.S. Standard. All substituted material or equipment meeting an equivalent Japanese Industrial Standard (JIS) shall be submitted by the Contractor to the Contracting Officer for review and approval for compliance to the U.S. Standards prior to its use on the Project. If the Government requires, the Contractor shall provide an English language copy of the referenced standard to the Government for its consideration.
1.17 DRAWINGS AND SPECIFICATIONS AT THE SITE
The Contractor shall maintain in good condition one copy of all drawings, specifications, addenda, modifications, approved shop drawings, Material Safety Data Sheets (MSDS), and other related documents affecting the work at this site. Drawings and specifications shall be marked daily to record all changes during construction. These documents shall be made available to the COR during construction and shall be made available on request and be delivered to the CO upon completion of the work.
1.18 USE OF EXPLOSIVES
The use of explosives is not permitted on Government installations.
1.19 BARRICADES
The Contractor shall provide barriers/signs to keep unauthorized persons from entering working area(s). Such barricades shall be required whenever safe public access to paved areas, such as roads, parking areas, or sidewalks, is prevented by construction activities or as otherwise necessary to ensure the safety of both pedestrian and vehicular traffic.
Necessary bilingual warning signs shall be provided by the Contractor and shall be used in the area where construction is undertaken. The Contractor shall protect open excavations with barricades and battery-powered lights at night as warning lights and shall assure that these lights are continuously operated. Warning signs and battery-powered lights shall be removed only after the affected area(s) has been inspected and accepted as directed by the CO.
Section 01 11 00 Page 7
1.20 CLEANUP OF AREA
All Contractor-generated debris and rubbish shall be collected daily in a container that can be covered at the end of the day once the container is filled with trash.
1.21 DEBRIS AND RUBBISH CONTROL
For removal and transport of debris and rubbish, use only roadway(s) and/or street(s) designated by the COR. Remove and transport debris and rubbish in a manner so as to prevent spillage on streets or adjacent area(s).
Contractor shall be responsible for cleanup for any spills on roadways, streets, and other areas. Burning of debris and rubbish on Government installations is prohibited. Concrete, masonry, and other materials, other than concrete permitted to remain in place, shall be disposed of outside the limits of Government-controlled land by the Contractor.
1.22 DISPOSITION OF EXCESS CONTRACTOR-FURNISHED MATERIALS
The disposition of excess Contractor-furnished materials that has been exempt from Japanese Customs duties and taxes pursuant to Status of Forces Agreement (SOFA) shall be the Contractor's responsibility. If the Government and Contractor agree that the Contractor is to retain such excess materials, they shall be reported to the Prefectural Government Customs office authorities for payment of applicable duties and tax fees.
1.23 TRAFFIC CONTROL
Whenever construction activities will interfere with vehicular traffic, the Contractor shall always provide an open lane for vehicular traffic. The Contractor shall provide a flag man when a two-way lane is reduced to one lane traffic.
The Contractor shall provide, erect, and maintain adequate barriers, warning signs, rubber cones, lights, traffic control guards for night warning signals, and any other essential safety devices for the protection of the general public at all closures, excavations, detours, and points of danger at all times. If the Contractor fails to provide required traffic and safety measure and they have to be provided by the Government, the Contractor shall be held liable for all incurred cost. Such cost shall be deducted from the contract.
1.24 STORAGE OF MATERIAL AND FIELD OFFICE
1.24.1 Site Plan
The Contractor shall prepare a site plan indicating the proposed location and dimensions of any area to be fenced and used by the Contractor, the number of trailers to be used, avenues of ingress/egress to the fenced area, and details of the fence installation. Any areas which may have to be graveled to prevent the tracking of mud shall also be identified. The Contractor shall also indicate if the use of a supplemental or other staging area is desired.
1.24.2 Administrative Field Office
Section 01 11 00 Page 8
Title II Office will be provided by the government. The Contractor shall not include the cost of the Title II Office in his bid.
1.24.3 Storage Area
The Contractor shall construct a temporary 1.8-meter (m) high chain-link fence around trailers and materials. The fence shall include plastic strip inserts, colored green, so that visibility through the fence is obstructed.
Fence posts may be driven, in lieu of concrete bases, where soil conditions permit. Trailers, materials, or equipment shall not be placed or stored outside the fenced area unless such trailers, materials, or equipment are assigned a separate and distinct storage area by the CO away from the vicinity of the construction site but within the military boundaries.
Trailers, equipment, or materials shall not be open to public view with the exception of those items, which are in support of ongoing work on any given day. Materials shall not be stockpiled outside the fence in preparation for the next day's work. Mobile equipment, such as tractors, wheeled lifting equipment, cranes, trucks, and like equipment, shall be parked within the fenced area at the end of each work day.
1.24.4 Supplemental Storage Area
Upon Contractor's request, the CO will designate another or supplemental area for the Contractor's use and storage of trailers, equipment, and materials. This area may not be in close proximity of the construction site but shall be within the military boundaries. Fencing of materials or equipment will not be required at this site; however, the Contractor shall be responsible for cleanliness and orderliness of the area used and for the security of any material or equipment stored in this area. Utilities will not be provided to this area by the Government.
1.24.5 Appearance of Trailers
Trailers utilized by the Contractor for administrative or material storage purposes shall present a clean and neat exterior appearance and shall be in a state of good repair. Trailers, which in the opinion of the CO, that require exterior painting or maintenance, will not be allowed on military property.
1.24.6 Maintenance of Storage Area
Fencing shall be kept in a state of good repair and proper alignment.
Should the Contractor elect to traverse, with construction equipment or other vehicles, grassed or unpaved areas which are not established roadways, such areas shall be covered with a layer of gravel as necessary to prevent rutting and tracking of mud onto paved or established roadways; gravel gradation shall be at the Contractor's discretion.
1.24.7 Restoration of Storage Area
Upon completion of the project and after removal of trailers, materials, and equipment from within the fenced area, the fence shall be removed and will become the property of the Contractor. Areas used by the Contractor for the storage of equipment or material, or other use, shall be restored to the original or better condition. Gravel used to traverse grassed areas shall be removed and the area restored to its original condition, including top soil and seeding as necessary.
Section 01 11 00 Page 9
1.25 WRITTEN COMMUNICATIONS IN ENGLISH
All documents required under this contract, including but not limited to, safety hazard analysis plans, all correspondence of any nature whatsoever, and all other written communications, documents, drawings, reports, etc., of every description, shall be written in English or translated into English before being provided to the Government by the Contractor. Delays encountered because a translated copy was not submitted shall be at the Contractor's expense and are not grounds for delay.
1.26 AVAILABILITY OF BUILDING/FACILITY
Contractor is expected to have to enter existing buildings. When entry is required, contractor shall contact the COR for direction.
1.27 INTERFERENCE WITH GOVERNMENT OPERATIONS
The Contractor shall establish work procedures and methods to avoid interference with existing operations within or adjacent to the construction area. Free passage into adjoining or adjacent buildings/areas not in the contract will not be permitted except as approved by the CO. Procedures and methods shall also provide for safe conduct of work and protection of property which is to remain undisturbed.
1.28 MANAGING RADIOACTIVE MATERIALS
a. In all contracts where radioactive materials will be used, such as earthwork using a nuclear densometer, paint testing with an XRF, etc., Contractor must obtain approval from the Base Radiation Safety Officer (RSO) at least 30 calendar days before bringing the materials to the Base. The Base RSO is the 35th Medical Group's Bioenvironmental Engineer (DSN 226-6107 35 AMDS/SGPB), located at Building 96.
b. The Contractor must submit to the RSO the following:
(1) A brief description of the proposed activities.
(2) A copy of a valid U.S. Nuclear Regulatory Commission License/Permit or similar approval from the Government of Japan (GOJ) to possess and use radioactive materials.
(3) Japanese contractors will comply with the following GOJ regulation: The Law Concerning Prevention of Radiation Hazards Due to Radio-Isotopes, etc., Law No. 167, June 10, 1957, and subsequent revisions.
(4) The name, local address, and telephone number for the responsible local representative and the name, address, and telephone number of the RSO named on their license/permit.
(5) A copy of that part of the AF contract describing work to be done at the Base and the inclusive dates of the work.
(6) An acknowledgment that the Base RSO can make periodic checks to ensure that Contractor personnel follow radiation safety practices
Section 01 11 00 Page 10 to prevent exposures to AF personnel and avoid contamination of government property. Contractor operations believed to be unsafe due to radiation hazards can be grounds for suspension of work.
1.29 ASBESTOS-CONTAINING MATERIALS (ACMS)
The Contractor shall not use materials that contain asbestos.
1.30 POLYCHLORINATED BIPHENYLS (PCBS)
All electrical devices such as ballasts, transformers, etc., shall be PCB free.
1.31 CONFINED SPACES
a. A portion of the work required in this contract may be performed in a confined space. Depending on the location, areas are classified as permit-required or non-permit-required confined spaces. Before entering a designated permit-required confined space, the Contractor shall accomplish the following:
(1) Appoint an entry supervisor who is a fully qualified Operations Chief of Hazardous Work in Oxygen-Deficient Air in accordance with Japanese laws or in accordance with provisions established in AFOSH Standard 91-25 dated 1 February 1998. The Contractor shall submit certificate(s) of the entry supervisor during the material submittal stage.
(2) Develop a Master Entry Plan (MEP), which complies with Air Force Occupational Safety and Health Standard (AFOSH) Standard 91- 25 and obtain approved from 35 AMDS/SGPB (Bioenvironmental Engineering), and 35 CES/CEF (Base…