FA5205-16-R-0005_Atch._7_CFUSM.pdf

PDF 56 KB Posted

Attached to
Renovation of Dorm, Bldg. 539, Misawa AB, Japan
Solicitation number
FA5205-16-R-0005
Issued by

About this file

FA5205-16-R-0005_Atch. 7_CFUSM

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE FOR CONTRACTOR FURNISHED U.S. MATERIAL

(CFUSM)

Project No. & Title: QKKA 14-1050 RNVT DORM 539

Item No. Nomenclature Unit QTY

1 Sprinkler Riser With Alarms LOT 1

2 Fire Department Connection EA 1

3 Floor Control Valve Station EA 8

4 Fire Sprinkler Heads EA 491

5 EWC-1 Drinking Fountain, 2 Bowl EA 4

6 IM-1 Ice Maker EA 4

7 EWH-1 Electric Water Heater, 250L, 4.5kW EA 1

8 Fire Alarm Control Panel (FACP) EA 1

9 Local Operating Console (LOC) EA 4

10 Fire Alarm Transmitter (FTR) EA 1

11 Booster Power Supply (BPS) EA 4

12 Fire Alarm Pull Station EA 14

13 Smoke Detector EA 55

14 Smoke Detector w/ Sounder Base EA 129

15 Fire Alarm Speaker EA 294

16 Fire Alarm Horn, WP EA 4

17 Fire Alarm Horn/Strobe EA 39

18 Flow Switch EA 4

19 Tamper Switch EA 10

20 Magnetic Door Holder EA 24

21 Cable, Fire Alarm TSP LM 6,876

22 Rough-in for Future MN Horn/Strobe EA 39

23 Fire Expansion Panel (FEP) EA 1

24 Mass Notification Control Panel (MNCP) EA 1

25 Light Fixture Type E1, E2 EA 17

26 Light Fixture Type ER EA 3

27 Light Fixture Type X1, Exit Sign EA 11

28 Light Fixture Type X2, Exit Sign EA 1

29 Duplex Receptacle, 20A, GFCI EA 555

Attachment 7 to RFP No. FA5205-16-R-0005 Dated 22 Feb 16

REMARKS: This list of CFUSM provides approximate quantities only. In case of quantity disagreement between this list and the project drawings, if any, the project drawings shall govern. Offeror is responsible to examine and identify the quantity indicated on the drawings.

NOTE: a. Transportation of these items shall be in accordance with Section I, Contract Clause DFARS 252.247-7023, Transportation of Supplies by Sea (APR 2014).

b. Disposition of Surplus U.S. Materials, Supplies or Equipment:

In the event the U.S. Government and contractor agree that title to any surplus contractor-furnished U.S. Materials, supplies or equipments which have been exempted from Japanese Custom Duties or Taxes pursuant to Article XI of the Status of Forces Agreement will remain with the contractor, the disposition of such property accruing from the performance of this contract shall be the responsibility of the contractor. The contractor further agree to make a full disclosure of such settlement to the local Government customs authorities for the payment of applicable duties and taxes.

File details come from the government source that posted it. Updated .