FA5205-16-R-0005_Atch._7_CFUSM.pdf
PDF 56 KB Posted
- Attached to
- Renovation of Dorm, Bldg. 539, Misawa AB, Japan
- Solicitation number
- FA5205-16-R-0005
About this file
FA5205-16-R-0005_Atch. 7_CFUSM
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCHEDULE FOR CONTRACTOR FURNISHED U.S. MATERIAL
(CFUSM)
Project No. & Title: QKKA 14-1050 RNVT DORM 539
Item No. Nomenclature Unit QTY
1 Sprinkler Riser With Alarms LOT 1
2 Fire Department Connection EA 1
3 Floor Control Valve Station EA 8
4 Fire Sprinkler Heads EA 491
5 EWC-1 Drinking Fountain, 2 Bowl EA 4
6 IM-1 Ice Maker EA 4
7 EWH-1 Electric Water Heater, 250L, 4.5kW EA 1
8 Fire Alarm Control Panel (FACP) EA 1
9 Local Operating Console (LOC) EA 4
10 Fire Alarm Transmitter (FTR) EA 1
11 Booster Power Supply (BPS) EA 4
12 Fire Alarm Pull Station EA 14
13 Smoke Detector EA 55
14 Smoke Detector w/ Sounder Base EA 129
15 Fire Alarm Speaker EA 294
16 Fire Alarm Horn, WP EA 4
17 Fire Alarm Horn/Strobe EA 39
18 Flow Switch EA 4
19 Tamper Switch EA 10
20 Magnetic Door Holder EA 24
21 Cable, Fire Alarm TSP LM 6,876
22 Rough-in for Future MN Horn/Strobe EA 39
23 Fire Expansion Panel (FEP) EA 1
24 Mass Notification Control Panel (MNCP) EA 1
25 Light Fixture Type E1, E2 EA 17
26 Light Fixture Type ER EA 3
27 Light Fixture Type X1, Exit Sign EA 11
28 Light Fixture Type X2, Exit Sign EA 1
29 Duplex Receptacle, 20A, GFCI EA 555
Attachment 7 to RFP No. FA5205-16-R-0005 Dated 22 Feb 16
REMARKS: This list of CFUSM provides approximate quantities only. In case of quantity disagreement between this list and the project drawings, if any, the project drawings shall govern. Offeror is responsible to examine and identify the quantity indicated on the drawings.
NOTE: a. Transportation of these items shall be in accordance with Section I, Contract Clause DFARS 252.247-7023, Transportation of Supplies by Sea (APR 2014).
b. Disposition of Surplus U.S. Materials, Supplies or Equipment:
In the event the U.S. Government and contractor agree that title to any surplus contractor-furnished U.S. Materials, supplies or equipments which have been exempted from Japanese Custom Duties or Taxes pursuant to Article XI of the Status of Forces Agreement will remain with the contractor, the disposition of such property accruing from the performance of this contract shall be the responsibility of the contractor. The contractor further agree to make a full disclosure of such settlement to the local Government customs authorities for the payment of applicable duties and taxes.
File details come from the government source that posted it. Updated .