JA-5_Appx_4_Tab_16 _Hot_Well_Pumps.pdf

PDF 77 KB Posted

Attached to
Maintain Turbine-Generator #3
Solicitation number
FA5004-15-R-C008_FTQW_16-1026_Maintain_Turbine
Issued by

About this file

JA-5 Appx 4 Tab 16

View the file

Other files

File Type Posted
JA-1_Specifications_13_Jul_15.pdf PDF
FA5004-15-R-C008-0002.pdf PDF
Site_Visit_Attendance_Sheet_24_July_15.pdf PDF
0001_Q A__1.pdf PDF
JA-5_Appx_4_Tab_17 _Control_Panel.pdf PDF
JA-5_Appx_4_Tab_13 _Generator.pdf PDF
JA-5_Appx_4_Tab_08 _Diaphragms_Part_1.pdf PDF
JA-5_Appx_4_Tab_12 _Control_System.pdf PDF
JA-5_Appx_4_Tab_09 _Packing _Seals _Air_Ejection_ _Gland_Seal_Cond.pdf PDF
JA-5_Appx_4_Tab_08 _Diaphragms_Part_3.pdf PDF
JA-6_Past_Performance_Evaluation_Cover_Letter.pdf PDF
JA-11_AF_Form_66.pdf PDF
JA-5_Appx_4_Tab_10 _Oil_System.pdf PDF
JA-5_Appx_4_Tab_07 _Turbine_Rotor.pdf PDF
JA-12_AF_Form_3000.pdf PDF
JA-7_Past_Performance_Questionnaire.pdf PDF
JA-9_Financial_Reference_Sheet.pdf PDF
JA-2_Appx_1 _Inspections.pdf PDF
JA-3_Appx_2_-_Photos_w_notes_v2.pdf PDF
JA-13_AF_Form_3064.pdf PDF
JA-5_Appx_4_Tab_02 _Recommendations.pdf PDF
JA-10_Wage_Determination.pdf PDF
JA-5_Appx_4_Tab_06 _Case _Cond_Level_ _Atm_Relief.pdf PDF
JA-5_Appx_4_Tab_14 _Alignment.pdf PDF
JA-5_Appx_4_Tab_15 _Start-up.pdf PDF
JA-5_Appx_4_Tab_01 _cover_ _contents.pdf PDF
JA-5_Appx_4_Tab_04 _T T_ _Non-return_Valves.pdf PDF
JA-5_Appx_4_TG_3_READ_ME.pdf PDF
JA-5_Appx_4_Tab_11 _Bearings.pdf PDF
JA-1_Specifications_13_Jul_15.pdf PDF
FA5004-15-R-C008_13_July_15.pdf PDF
JA-4_Appx_3 _TG3_O M_Excerpts.pdf PDF
JA-5_Appx_4_Tab_05_V-1_ _V-2_Valves.pdf PDF
JA-5_Appx_4_Tab_03 _Vibration_ _Run-out.pdf PDF
JA-5_Appx_4_Tab_08 _Diaphragms_Part_2.pdf PDF
JA-8_Past_Performance_Worksheet.pdf PDF
JA-14_AF_Form_3065.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONDENSATE PUMPS

The condensate pumps were removed disassembled cleaned and inspected. The motors were sent out to a local motor shop for repairs. During the disassembly it was noted that the impellers were worn on the case ring area. It was recommended in a LRR that the impellers be skim cut and the bowls be bored and sleeved to achieve proper clearance. All the bearings and shafts were replaced. New mechanical seals were provided and installed along with spare sets.

The LRR for the repairs of the condensate pumps was approved and the pumps were sent to Tetrads shop for repairs. After skim cutting the impellers they were stacked on the shaft and balanced. The pumps were assembled and installed. The pump lifts were set at 0.125” off the bottom and released for service.

The following is the as found shaft to bearing and impeller to bowl clearances.

PUMP #1

#1 Case Ring: 3.500

#1 Impeller: 3.480

Clearance: 0.020

#2 Case Ring: 3.499

#2 impeller: 3.480

Clearance: 0.019

#3 Case Ring: 3.500

#3 Impeller: 3.480

Clearance: 0.020

#4 Case Ring: 3.498

#4 Impeller: 3.479

#1 Bearing:1.198

#1 Journal: 1.187

Clearance:0.011

#2 Bearing: 1.196

#2 Journal: 1.187

Clearance: 0.009

#3 Bearing: 1.196

#3 Journal: 1.196

#4 Bearing: 1.196

#4 Journal: 1.187

#5 Bearing: 1.197

#5 Journal: 1.187

Clearance: 0.010

#6 Bearing: 1.196

#6 Journal: 1.187

Clearance:0.009

#7 Bearing: 1.007

#7 Journal: 1.000

Clearance: 0.007

#8 Bearing: 1.010

#8 Journal: 1.000

PUMP #2

#1 Case Ring: 3.500

#1 Impeller: 3.479

Clearance: 0.021

#2 Case Ring: 3.500

#2 Impeller: 3.479

#3 Case Ring: 3.498

#3 Impeller: 3.479

#4 Case Ring: 3.499

#4 Impeller: 3.479

Clearance:0.020

#1 Bearing: 1.198

#1 Journal: 1.187

Clearance: 0.011

#2 Bearing: 1.197

#2 Journal:1.187

#3 Bearing: 1.197

#3 Journal:1.187

#4 Bearing: 1.198

#4 Journal:1.187

Clearance:0.011

#5 Bearing: 1.197

#5 Journal: 1.187

#6 Bearing: 1.198

#6 Journal: 1.187

Clearance: 0.011

#7 Bearing: 1.021

#7 Journal: 1.000

#8 Bearing: 1.012

#8 Journal: 1.000

Clearance: 0.012