TETRAD Services Inc.
960 Diamond Ave. Red Bluff CA. 96080
Ph: (530)527-5889/(503)637-3340 Fax:(530)5278549
STEAM TURBINE REPORT
For
Eielson AFB
Eielson AFB, Alaska
Turbine Serial #: 7371 Equipment #: 3 Turbine Generator
P.O. #:
Req.#
Date: 4-10-2011 through - -2011
Prepared By;
Chris Coy
TETRAD Services Inc. 960 Diamond Ave. Red Bluff CA. 96080
TABLE OF CONTENTS
TAB
JOB SUMMARY 1
RECOMMENDATIONS 2
AS FOUND AND FINAL VIBRATION READINGS AND RUNOUT 3
TRIP AND THROTTLE VALVE & SAFETY VALVES 4
CONTROL VALVE 5
TURBINE SHELL 6
TURBINE ROTOR 7
DIAPHRAGMS 8
SHAFT & DIAPHRAGM PACKING 9
LUBRICATION SYSTEM 10
BEARINGS 11
CONTROL SYSTEM 12
GENERATOR 13
ALIGNMENT 14
START UP 15
CONDENSATE PUMPS 16
TABLE OF CONTENTS
CONTROL PANEL 17
JOB SUMMARY
Customer: Eielson AFB Station: Eielson AFB Alaska Unit: #3 Turbine Generator
Turbine Serial #:7371 Rating: 5 MW Type: Intlet Press.: 400 Steam Temp.: 650 F Extraction Press.: 100 Exhaust Press.:2 inches Hg Control System: Service Year:
Generator Serial #: 1S-9631 Type: KVA: 6200 RPM 3600 Form HL Volts: 7200 AMP ARM. 501 PF.8 KW: 5000 Phase 3 Cycle 60 Exc. Volts: 125 Field Amps: 250
Outage Start Date: 4-11-2011 Completion Date: 8-18-11
Outage Type: Major
JOB SUMMARY
The turbine generator major inspection was performed by Tetrad Services Inc. Tetrad Services performed all machine shop work needed ADA Generator Services performed the generator testing.
Mistras Inspection preformed the NDT work. Kenmar preformed the pre-shutdown and startup vibration recordings. The job was manned with two shifts working around the clock for the first week during the disassembly and discovery period. Starting the second week the job dropped the night shift and the day shift dropped back to ten hour days six days a week. The turbine and generator rotors were balanced on site by Tetrad Services prior to assembly.
The lube oil pumps, servomotors and actuators were sent out to the Hydraulic Center in Fairbanks for inspection and reconditioning. A new set of servos were installed and the reconditioned set returned for spares.