JA-3_Appx_2_-_Photos_w_notes_v2.pdf

PDF 3 MB Posted

Attached to
Maintain Turbine-Generator #3
Solicitation number
FA5004-15-R-C008_FTQW_16-1026_Maintain_Turbine
Issued by

About this file

JA-3 Appx 2

View the file

Other files

File Type Posted
JA-1_Specifications_13_Jul_15.pdf PDF
FA5004-15-R-C008-0002.pdf PDF
Site_Visit_Attendance_Sheet_24_July_15.pdf PDF
0001_Q A__1.pdf PDF
JA-5_Appx_4_Tab_17 _Control_Panel.pdf PDF
JA-5_Appx_4_Tab_13 _Generator.pdf PDF
JA-5_Appx_4_Tab_08 _Diaphragms_Part_1.pdf PDF
JA-5_Appx_4_Tab_12 _Control_System.pdf PDF
JA-5_Appx_4_Tab_09 _Packing _Seals _Air_Ejection_ _Gland_Seal_Cond.pdf PDF
JA-5_Appx_4_Tab_08 _Diaphragms_Part_3.pdf PDF
JA-6_Past_Performance_Evaluation_Cover_Letter.pdf PDF
JA-11_AF_Form_66.pdf PDF
JA-5_Appx_4_Tab_10 _Oil_System.pdf PDF
JA-5_Appx_4_Tab_07 _Turbine_Rotor.pdf PDF
JA-12_AF_Form_3000.pdf PDF
JA-7_Past_Performance_Questionnaire.pdf PDF
JA-9_Financial_Reference_Sheet.pdf PDF
JA-2_Appx_1 _Inspections.pdf PDF
JA-13_AF_Form_3064.pdf PDF
JA-5_Appx_4_Tab_02 _Recommendations.pdf PDF
JA-10_Wage_Determination.pdf PDF
JA-5_Appx_4_Tab_06 _Case _Cond_Level_ _Atm_Relief.pdf PDF
JA-5_Appx_4_Tab_14 _Alignment.pdf PDF
JA-5_Appx_4_Tab_15 _Start-up.pdf PDF
JA-5_Appx_4_Tab_01 _cover_ _contents.pdf PDF
JA-5_Appx_4_Tab_04 _T T_ _Non-return_Valves.pdf PDF
JA-5_Appx_4_TG_3_READ_ME.pdf PDF
JA-5_Appx_4_Tab_11 _Bearings.pdf PDF
JA-1_Specifications_13_Jul_15.pdf PDF
FA5004-15-R-C008_13_July_15.pdf PDF
JA-4_Appx_3 _TG3_O M_Excerpts.pdf PDF
JA-5_Appx_4_Tab_05_V-1_ _V-2_Valves.pdf PDF
JA-5_Appx_4_Tab_03 _Vibration_ _Run-out.pdf PDF
JA-5_Appx_4_Tab_08 _Diaphragms_Part_2.pdf PDF
JA-5_Appx_4_Tab_16 _Hot_Well_Pumps.pdf PDF
JA-8_Past_Performance_Worksheet.pdf PDF
JA-14_AF_Form_3065.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MAINTAIN TURBINE-GENERATOR #3 APPENDIX 2

EIELSON AFB, ALASKA PHOTOGRAPHS

FTQW 16-1026

Appendix 2 - 1

PHOTOGRAPHS

APPENDIX 2

FTQW 16-1026

Appendix 2 - 2

Trip & Throttle Valve

Gland Seal Control Valves

FTQW 16-1026

Appendix 2 - 3

Bently-Nevada Monitor

TurboSentry

Woodward 505E Governor

FTQW 16-1026

Appendix 2 - 4

Appendix 2 - 5

Appendix 2 - 6

FTQW 16-1026

Appendix 2 - 7

Oil Cooler Control Valve

Tandem Valve

Appendix 2 - 8

FTQW 16-1026

Appendix 2 - 9

Level Controller

Recirc Valve

Back Pressure Valve

Appendix 2 - 10

FTQW 16-1026

Appendix 2 - 11

Existing 6" Alt.

Cooling Water Line, in Trench

New Oil Cooler Alt.

Cooling Water Line, under Grate

New Oil Cooler Alt.

Cooling Water Line

FTQW 16-1026

Appendix 2 - 12

Gland Seal Condenser

Alt. Cooling Water Supply for Gland Seal Condenser

New Alt. Cooling Water Supply Below Grate

Existing 6" Alt Cooling Water Line in Trench

Approx. Location of New Water Meter. Installed by Others Prior to Start of Turbine #3 Work.

6" Alt. Cooling Water Supply

Stator Cooler Cooling Water Supply

New Stator Cooler Alt. Cooling Water Supply

FTQW 16-1026

Appendix 2 - 13

Stator Cooler Supply

Gland Seal Condenser Cooling Water Supply

Oil Cooler

Existing 6" Alt.

Cooling Water Supply in Trench

Main Condenser

FTQW 16-1026

Appendix 2 - 14

Ground Resistor

File details come from the government source that posted it. Updated .