JA-5_Appx_4_Tab_15 _Start-up.pdf

PDF 8 KB Posted

Attached to
Maintain Turbine-Generator #3
Solicitation number
FA5004-15-R-C008_FTQW_16-1026_Maintain_Turbine
Issued by

About this file

JA-5 Appx 4 Tab 15

View the file

Other files

File Type Posted
JA-1_Specifications_13_Jul_15.pdf PDF
FA5004-15-R-C008-0002.pdf PDF
Site_Visit_Attendance_Sheet_24_July_15.pdf PDF
0001_Q A__1.pdf PDF
JA-5_Appx_4_Tab_17 _Control_Panel.pdf PDF
JA-5_Appx_4_Tab_13 _Generator.pdf PDF
JA-5_Appx_4_Tab_08 _Diaphragms_Part_1.pdf PDF
JA-5_Appx_4_Tab_12 _Control_System.pdf PDF
JA-5_Appx_4_Tab_09 _Packing _Seals _Air_Ejection_ _Gland_Seal_Cond.pdf PDF
JA-5_Appx_4_Tab_08 _Diaphragms_Part_3.pdf PDF
JA-6_Past_Performance_Evaluation_Cover_Letter.pdf PDF
JA-11_AF_Form_66.pdf PDF
JA-5_Appx_4_Tab_10 _Oil_System.pdf PDF
JA-5_Appx_4_Tab_07 _Turbine_Rotor.pdf PDF
JA-12_AF_Form_3000.pdf PDF
JA-7_Past_Performance_Questionnaire.pdf PDF
JA-9_Financial_Reference_Sheet.pdf PDF
JA-2_Appx_1 _Inspections.pdf PDF
JA-3_Appx_2_-_Photos_w_notes_v2.pdf PDF
JA-13_AF_Form_3064.pdf PDF
JA-5_Appx_4_Tab_02 _Recommendations.pdf PDF
JA-10_Wage_Determination.pdf PDF
JA-5_Appx_4_Tab_06 _Case _Cond_Level_ _Atm_Relief.pdf PDF
JA-5_Appx_4_Tab_14 _Alignment.pdf PDF
JA-5_Appx_4_Tab_01 _cover_ _contents.pdf PDF
JA-5_Appx_4_Tab_04 _T T_ _Non-return_Valves.pdf PDF
JA-5_Appx_4_TG_3_READ_ME.pdf PDF
JA-5_Appx_4_Tab_11 _Bearings.pdf PDF
JA-1_Specifications_13_Jul_15.pdf PDF
FA5004-15-R-C008_13_July_15.pdf PDF
JA-4_Appx_3 _TG3_O M_Excerpts.pdf PDF
JA-5_Appx_4_Tab_05_V-1_ _V-2_Valves.pdf PDF
JA-5_Appx_4_Tab_03 _Vibration_ _Run-out.pdf PDF
JA-5_Appx_4_Tab_08 _Diaphragms_Part_2.pdf PDF
JA-5_Appx_4_Tab_16 _Hot_Well_Pumps.pdf PDF
JA-8_Past_Performance_Worksheet.pdf PDF
JA-14_AF_Form_3065.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TETRAD Services Inc. 960 Diamond Ave Red Bluff CA, 96080

START UP

During start up the turbine was slow rolled at 500 RPM for 40 minutes while the vibration readings and oil temps were watched. After the bearing temps and vibration readings leveled the turbine was rolled to 1000 RPM for 20 minutes while all readings were watched. The turbine was then rolled to 3600 RPM and then ran up to over speed. The first trip was at 3950 RPM and the second was at 3958 RPM. The turbine was brought back to speed and put on line with 0.5 MW for 3 hours then brought up in load to 1, 3 and 5 MW for a minimum of 15 minutes for the vibration readings to be taken. After the vibration testing the turbine was backed down to 4 MW and ran over night because the plant had cooling water problems and could not start the extraction testing. On Tuesday the 16th the extraction control testing was started and ran for 24 hours with no problems. On Wednesday the 17th the turbine was put in to load share control for 24 hours to finish the acceptance testing. After the acceptance testing the turbine and generator was turned over to the plant.

During the start up the turbine and generator bearing oil temps were watched and found to stay between 125°F and 135° F. The vibration on the turbine out board was found to stay between 3 and 4.5 mils. The turbine inboard and generator bearings were found to stay around 1.5 and 2.5 mils.

File details come from the government source that posted it. Updated .