JA-2_Appx_1 _Inspections.pdf

PDF 10 KB Posted

Attached to
Maintain Turbine-Generator #3
Solicitation number
FA5004-15-R-C008_FTQW_16-1026_Maintain_Turbine
Issued by

About this file

JA-2 Appx 1

View the file

Other files

File Type Posted
JA-1_Specifications_13_Jul_15.pdf PDF
FA5004-15-R-C008-0002.pdf PDF
Site_Visit_Attendance_Sheet_24_July_15.pdf PDF
0001_Q A__1.pdf PDF
JA-5_Appx_4_Tab_17 _Control_Panel.pdf PDF
JA-5_Appx_4_Tab_13 _Generator.pdf PDF
JA-5_Appx_4_Tab_08 _Diaphragms_Part_1.pdf PDF
JA-5_Appx_4_Tab_12 _Control_System.pdf PDF
JA-5_Appx_4_Tab_09 _Packing _Seals _Air_Ejection_ _Gland_Seal_Cond.pdf PDF
JA-5_Appx_4_Tab_08 _Diaphragms_Part_3.pdf PDF
JA-6_Past_Performance_Evaluation_Cover_Letter.pdf PDF
JA-11_AF_Form_66.pdf PDF
JA-5_Appx_4_Tab_10 _Oil_System.pdf PDF
JA-5_Appx_4_Tab_07 _Turbine_Rotor.pdf PDF
JA-12_AF_Form_3000.pdf PDF
JA-7_Past_Performance_Questionnaire.pdf PDF
JA-9_Financial_Reference_Sheet.pdf PDF
JA-3_Appx_2_-_Photos_w_notes_v2.pdf PDF
JA-13_AF_Form_3064.pdf PDF
JA-5_Appx_4_Tab_02 _Recommendations.pdf PDF
JA-10_Wage_Determination.pdf PDF
JA-5_Appx_4_Tab_06 _Case _Cond_Level_ _Atm_Relief.pdf PDF
JA-5_Appx_4_Tab_14 _Alignment.pdf PDF
JA-5_Appx_4_Tab_15 _Start-up.pdf PDF
JA-5_Appx_4_Tab_01 _cover_ _contents.pdf PDF
JA-5_Appx_4_Tab_04 _T T_ _Non-return_Valves.pdf PDF
JA-5_Appx_4_TG_3_READ_ME.pdf PDF
JA-5_Appx_4_Tab_11 _Bearings.pdf PDF
JA-1_Specifications_13_Jul_15.pdf PDF
FA5004-15-R-C008_13_July_15.pdf PDF
JA-4_Appx_3 _TG3_O M_Excerpts.pdf PDF
JA-5_Appx_4_Tab_05_V-1_ _V-2_Valves.pdf PDF
JA-5_Appx_4_Tab_03 _Vibration_ _Run-out.pdf PDF
JA-5_Appx_4_Tab_08 _Diaphragms_Part_2.pdf PDF
JA-5_Appx_4_Tab_16 _Hot_Well_Pumps.pdf PDF
JA-8_Past_Performance_Worksheet.pdf PDF
JA-14_AF_Form_3065.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MAINTAIN TURBINE-GENERATOR #3 APPENDIX 1

EIELSON AFB, ALASKA TASK INSPECTION LIST

FTQW 16-1026

TASK INSPECTION LIST

APPENDIX 1

MAINTAIN TURBINE-GENERATOR #3 APPENDIX 1

EIELSON AFB, ALASKA TASK INSPECTION LIST

FTQW 16-1026

TASK INSPECTION LIST

TASK DATE

AUTHORIZED PLANT

REP SIGNATURE

AUTHORIZED

CONTRACTOR’S

REP SIGNATURE

Pre-Overhaul Vibration Test Non-Return Valve Inspect Steam Strainer Inspect Atmospheric Relief Valve Blue Check Primary Inlet Valves Blue Check Secondary Valves Hydraulic Cylinders (Primary & Secondary)

New Carbon Seals Labyrinth Seals Blue Check Primary Nozzle Ring Blue Check Secondary Nozzle Ring Inspect Trip & Throttle Valve Inspect Condensate Pumps Inspect Electric Oil Pumps Inspect Auxiliary Oil Pump & Valve Inspect Oil Coolers Cleaned Oil Tank Main Condenser Cleaning & Hydrostatic Test

Hydrotest Air Ejection Inter and After Condensers

Alternate Cooling Water Lines Generator Leads Cleaned Ground Resistor Generator Air Coolers Upper Diaphragm Alignment Lower Diaphragm Alignment Turbine Rotor Balance Generator Rotor Balance Proximitor Target Areas Centerline Alignment Generator Air Gap Vibration Probes & RTDs Start-Up and Testing Post-Overhaul Vibration Test