Draft based on: FA5004-06-R-C006
ROOFING IDIQ EIELSON AFB, AK
REPAIR, MAINTAIN AND REPLACE
BASE ROOFING INFRASTRUCTRE
INDEFINITE DELIVERY,
INDEFINITE QUANTITY
(IDIQ)
354TH CIVIL ENGINEERING SQUADRON
EIELSON AIR FORCE BASE
ALASKA
TABLE OF CONTENTS
SECTION
TITLE
PAGE NUMBERS
STATEMENT OF WORK
DIVISION 1 – PERFORMANCE REQUIREMENTES
3-14
01000 Summary of Work 3-4
01020 Environmental Protection 5-13
01400 Warranty Requirements 13-14
DIVISION 2 – SITE WORK
15-22 02070 Demolition 15-17
02080 Asbestos Abatement 18-22
DIVISION 5 – METALS
23-25 05090 Basic Materials and Methods
05514 Ladders 24-25
DIVISION 6 – WOOD AND PLASTICS
26-32 06100 Rough Carpentry 26-32
DIVISION 7 – THERMAL AND MOISTURE PROTECTION
33-72
07311 Asphalt Shingles 33-38
07530 Single-Ply Membrane Roofing 39-44
07610 Sheet Metal Roofing 45-48
07650 Flexible Flashing 49-58
07710 Manufactured Roof Specialties 59-65
07720 Roof Accessories 66-72
DIVISION 9 – FINISHES
73-77
09900 Painting 73-77
Appendix A - Eielson AFB Waste Disposal/Borrow Pit 78-80
Worksheet
Appendix B - Eielson AFB Waste Disposal/Borrow Pit Map
Appendix C – Gravel Borrow Pit Typical Cross Section
Appendix D – Mullins Pit Gravel Borrow Pit
Appendix E – Typical Cross Section of Complete Pit
SECTION 01000 - SUMMARY OF WORK
1. Scope:
1.1. Work under this contract consists of furnishing all materials, plant and labor to inspect, restore, repair or replace roofs on Eielson Air Force Base, Alaska and any other facility under the jurisdiction of the 354th Fighter Wing. These roofs are comprised of composite shingles, Insulated Roof Membrane Assemblies (IRMA), Exposed Membrane roofs (EPDM), built-up-roofing, corrugated metal, and standing-seam metal. This is an indefinite delivery, indefinite quantity contract. At any time during the contract period a task order can be issued to the contractor to perform repairs or replacement of roofs on Eielson Air Force Base or other locations. The cost of each task order will be determined by selecting work items that are pre-priced on the bid schedule. This is a performance specification. As such, the intent is to not dictate methods as much as to require performance, which is guaranteed by extended warranties.
2. Occupancy:
2.1. Buildings included in the scope of this contract will likely be occupied. The contractor will schedule and perform work under this contract in such a manner as to allow the occupants of the building to continue their normal activities with the least amount of interference.
3. Scheduling:
3.1. The contractor will schedule work with the Contracting Officer. No work will be performed prior to the Contracting Officer’s approval of the work schedule.
4. Concurrent Work with Other Contractors:
4.1. Other contractors may be performing work in the general area of work required under this contract. All contractors will be required to cooperate and schedule work in such a way to permit others to perform. If for any reason a dispute arises between contractor personnel or between contractor and government personnel, the Contracting Officer will have the final say as to access and work schedule.
5. Workmanship:
5.1. All work will be performed by certified personnel, as applicable. The contractor or any sub-contractor they employ will adhere to the standards in the National Roofing Contractors Association (NRCA) Roofing and Waterproofing manual, fourth edition or later, local and national building codes, and manufacture’s specifications. Some work items on this project will require training that is certified by the roofing manufacturer. All required training and certification costs will be paid for by the Contractor.
6. Quality Control:
6.1. The contractor will provide Quality Control functions. Also, the Contracting Officer, in consultation with the 354th Civil Engineer Squadron, will accomplish contract inspections.
7. Safety:
7.1. Job Safety: The Corp of Engineers Safety and Health Requirements Manual, EM 385-1-1 and Occupational Safety and Health Act (OSHA) Standards for Construction (Title 29, Code of Federal Regulations Part 1926 and Part 1910 as revised from time to time) requirements will be used for all on the job safety procedures and requirements. When the standards conflict, the strictest one will govern.
7.2. Fire Safety: The Eielson Fire Chief will conduct a fire safety briefing prior to any work on this project. Eielson fire safety regulations will be strictly adhered to. The Contractor shall be responsible for furnishing adequate and proper fire protection for all phases of the contract work. The Contractor shall immediately notify the Base Fire Department for all emergencies (Dial 911 from any Base phone).
7.3. Smoking:
7.4. Smoking is prohibited in all Air Force facilities. Any smoking materials must be disposed of in an approved manner. At no time will smoking debris be left on the job site.
8. Work Clearance and Welding Permits:
8.1. The contractor will obtain work clearance permits through the Eielson Civil Engineer Squadron prior to initiation of any work. Welding permits will be obtained by the contractor from the Eielson fire protection flight prior to initiation of any welding or work with open flame.
END OF SECTION 1000
SECTION 01020 – ENVIRONMENTAL PROTECTION
1. Applicable Laws and Directives:
1.1 It is the Contractor's responsibility to assure all work to be accomplished will be in compliance with federal, state, and local environmental regulations. Contractor shall perform work in strict accordance with all conditions specified in the environmental permits. The required permits shall be obtained prior to start of construction and posted at the jobsite. The Contractor shall ensure all notification required by any permits or regulations have been made to the applicable regulatory agency through 354 CES/CEV.
1.2 Technical Assistance: Technical assistance for complex environmental problems will be coordinated with:
1.2.1 The Base Environmental Planner, 354 CES/CEV.
1.2.2 Bioenvironmental Engineering (Located at Eielson AFB).
2. Hazardous Material: Ref: Title 29, Part 1910, Code of Federal Regulations, Alaska Statutes Section 18.60-010, and Air Force Occupational Safety and Health Standard 161-21.
2.1 All materials used by the Contractor, or removed or handled as a part of Contractor operations will be stored, handled, utilized and disposed of in a manner designed to prevent any reasonable possibility of exposures to both Contractor and non-contractor personnel, pollution or damage to Government property or facilities, or to the environment. "Exposure" is defined as levels exceeding 1/2 of the most stringent Federal, State, Air Force or recommended industry standards.
2.2 Hazardous Materials and Petroleum Product Containers shall be stored on an impervious surface with proper containment. Incompatible materials shall be segregated and have separate containment systems
2.3 Materials Safety Data Sheets: Any and all known or potentially toxic or hazardous materials to be brought by the Contractor onto the military installation and or job site will require the submission of a properly completed Material Safety Data Sheet (MSDS, OSHA Form 174 or equivalent) as directed by 29 CFR 1910.1200 (Hazard Communications), Federal Standard 313B (Reference DAR7-104.98), Alaska Statutes Section 18.60.010 Subchapter 15, and AFOSH Standard 161-21 (Hazard Communications). Guidance as to what constitutes a potentially toxic or hazardous material may be found in these references. These listings are for guidance only, and do not release the Contractor from their responsibility for identification, proper handling, use, storage and disposal of these materials.
2.4 A copy of each completed MSDS will be provided to the Contracting Officer a minimum of 5 working days prior materials being brought onto the installation. A second complete copy will be maintained on the Job site at all times for employee and inspector reference IAW 29 CFR 1910.1200, Alaska Statutes Section 18.60-010 Subchapter 15, and AFOSH Standard 161-21.
2.5 MSDSs must contain complete information. MSDSs must be available for review by the Bioenvironmental Engineering function and other authorized Medical Authorities IAW 29 CFR 1910.1200, Alaska Statutes Section 18.60.010 Subchapter 15 and AFOSH Standard 161-21. Bioenvironmental Engineering is authorized to review MSDSs containing proprietary information. All MSDSs must be clearly marked to indicate the installation on which the project is being performed, the title of the project and the contract number for the project.
2.6 Hazardous Materials Listing: A listing of all known or potentially toxic materials under the Contractor's control and currently on the installation will be maintained at the job site. The listing will include the item description and the manufacturer's name as it appears on the MSDS, the quantity on hand, and where the material is stored/located. This listing will be updated daily to account for usage and receipt of new or replacement materials. An initial listing must be submitted to the contracting officer prior to the notice to proceed and a final listing will be submitted once again after completion of construction.
2.7 Labeling of Products: All known or potentially hazardous materials as described in paragraphs 5.1 through 5.3 above will be transported and stored in the original manufacturer's containers. These containers shall be provided with manufacturer's labels meeting the information requirements of 29 CFR 1910.1200, Alaska Statues Section 18.60.010 and AFOSH Standard 161-21. Bulk materials and materials that must be re-packaged or placed into different containers at the job site will be clearly labeled by the Contractor with durable labels, meeting the above requirements. Final-use containers, such as paint pots, vats, solvent tanks, etc. , shall be appropriately labeled with their contents. Materials without appropriate MSDSs and proper, legible labeling will not be allowed on the installation. Any materials/containers belonging to or under the control of the Contractor found not meeting these requirements will have all deficiencies corrected within 24 hours or the materials will be removed from the installation by the Contractor within the same 24-hour limit. This time limit applies regardless of time of day or day of week, and includes holidays and weekends. All corrective action costs and/or removal costs will be borne by the Contractor.
2.8 Material Safety Data Sheets relating to Government supplied materials, and hazards presented by Government operations at or in the Contractor's job site may be obtained through the Contracting Officer. Requests for information must be provided to the Contracting Officer a minimum of 20 working days prior to the date this information is required.
3. Spill Prevention Plan:
3.1 Equipment fueling operations shall, at all times, be observed. Fueling equipment shall be operated in accordance with manufacturer guidance and accepted industry standards. If hazardous materials, to include petroleum products, are on site they shall be stored in a safe manner to prevent spills to the surrounding environment and positioned away from the immediate work area.
4. Spill Cleanup Plan:
4.1 If a hazardous substance or petroleum product is spilled immediately call 377-SPIL (7745), which is the spill line, or 377-4156 (Fire Department) if it is an emergency. Report the circumstances of the incident. If during excavation contaminated soil or debris is encountered call the spill line and notify the contracting officer.
4.2 Petroleum leaks from equipment (tanks, hoses, valves, etc.) shall be contained by placing an impermeable container or membrane beneath the equipment to collect the product and prevent it from contaminating the surrounding environment. Leaks shall be sealed at the source and repaired to prevent further leaks. Any petroleum spilled on the ground will need to be cleaned up immediately as well as all contaminated soil. Contractor will have spill response materials (absorbents, drums, containment dikes, etc.) on site at all times hazardous materials are stored or used.
4.3 Contaminated materials collected during cleanup shall be placed on an impermeable membrane and covered by an impervious membrane to prevent migration of contamination. Placement of these membranes shall be such that surface water run-off and rain shall not come in contact with the contaminated soil/materials. Liquid product collected during spill cleanup shall be placed in DOT approved drums or containers pending transport to storage/disposal facility.
5. Hazardous Communication: Reference 20 CFR 1910.1200, Alaska Statutes Section 8.60.010, and Air Force Occupational Safety and Health Standard 161-21.
5.1 The Contractor shall establish and implement a written hazard communication program meeting the requirement of 29 CFR 1910.1200 and Alaska Statutes Section 18.60.010 Subchapter 15. This program shall be complete and fully implemented prior to start of work and shall be updated as necessary to reflect changes in working conditions or materials used. A complete copy of the Contractor's program shall be submitted to the Contracting Officer for approval a minimum of 20 working days prior to the start of work.
5.2 The Contractor shall, at no cost to the Government, provide workplace hazard training to all non-contractor personnel, including Government inspectors who will be working at or on the Contractor's job site where known or potentially toxic or hazardous materials are to be used by the Contractor. This training shall meet the requirements of 29 CFR 1910.1200 and AFOSH Std 161-21. This training program shall be complete, and all affected personnel fully trained prior to the start of work. Training shall be updated or re-accomplished as necessary to reflect changes in working conditions, materials used or new personnel requiring training. This training shall be separately documented for each individual in writing, and signed by the individual and the person providing the training. One copy will be provided to the individual, one to the individual's supervisor, one to the Contracting Officer and one maintained on-site for review by both Contracting and outside agency inspectors.
5.3 Hazard Communications information relating to Government supplied materials and hazards presented by Government operations at or in the Contractor's job site may be obtained through the Contracting Officer. The Contracting Officer may obtain this information from Bioenvironmental Engineering. Requests for information must be made in writing to the Contracting Officer with Sufficient lead time to allow Bioenvironmental Engineering a minimum of 20 working days to process the request.
6. Hazardous Noise:
6.1 All equipment utilized by the Contractor that produces noise levels in excess of 84 dBA ("A" weighted decibels) must be so identified by the Contractor. This equipment will be utilized in a manner that precludes exposure of non-contractor personnel to levels exceeding 84 dBA.
7. Asbestos Containing Material:
7.1 No new asbestos-containing materials shall be used or installed under this contract, without specific written permission from the Contracting Officer after coordination with USAF Clinic Bioenvironmental Engineering and 354 CES/CEOM. Areas involving removal of existing asbestos containing materials will be identified during the task ordering process.
7.2 A written plan detailing all aspects of the planned asbestos operation, must be submitted to the Contracting Officer for Bioenvironmental Engineering Services and 354 CES/CEOM approval, a minimum of 30 working days prior to the anticipated start date for asbestos related work.
7.3 If work involving asbestos not identified is encountered and the asbestos must be dealt with by the Contractor, an asbestos work plan shall be submitted within 5 working days. No asbestos related work is to be accomplished, other than emergency containment actions, until written approval of the asbestos work plan has been received by the Contracting Officer from Bioenvironmental Engineering and 354 CES/CEOM.
7.4 If known or suspected asbestos containing materials are encountered and are damaged or disturbed in any manner that could cause any reasonable possibility of airborne asbestos fibers being generated, immediate containment actions must be taken by the Contractor. These actions will be IAW Section 02180, and may include, but are not limited to: wetting down the affected materials, establishing a containment area and sealing the material with plastic. All operations in the affected area(s) will be stopped until the hazard has been evaluated by the Contracting Officer, the Bioenvironmental Engineer, and 354 CES/CEOM, and either the corrective actions or an asbestos work plan submittal (as determined by the circumstances) has been approved. If an asbestos work plan is required, it shall be submitted 5 working days. No asbestos work related to the problem shall be accomplished, other than the aforementioned containment actions, until written approval of the corrective actions or asbestos work plan submittal has been received by the Contracting Officer from Bioenvironmental Engineering and 354 CES/CEOM.
7.5 An asbestos notification must be submitted to the Environmental Protection Agency (EPA) and the Occupational Safety and Health Administration (OSHA) at least 10 days prior to asbestos removal.
7.6 ASBESTOS MANIFESTS: All asbestos waste manifests shall be signed by 1 CES/CEV prior to removal of such waste from the base. A copy of the completed manifest (signed by the receiving landfill) shall be submitted to 1 CES/CEVC.
7.6.1 The Contractor shall follow Section 2.1.13, below, of the Eielson Air Force Base Asbestos Management and Operations Plan (AMOP). A copy of the AMOP may be obtained from CEAN: The Contractor is:
7.6.1.1. Responsible for identifying asbestos containing material (ACM) prior to conducting maintenance, abatement, renovation, or demolition activities.
7.6.1.2. Responsible for contacting CES/CEOII shop to ascertain presence or absence of ACM.
7.6.1.3. Responsible for making proper notification and providing copies to CES/CEAN and CES/CEO-2.
8. Protection of Air Quality:
8.1 In accordance with the National Defense Authorization Act for Fiscal Year 1993, Title III, Section 326 (Public Law 102-484), the Contractor shall not make use of, nor provide to the Government, any chemical, solvent, material, or any system making use of materials, classified as a Class I Ozone Depleting Chemical (ODC). Class I ODC's include chlorofluorocarbons (CFC's -11, -12, -113, -114, -115, -13, -111, -112, -211, -213, -214, -215, -126, and -217), carbon tetrachloride, methyl chloroform, methyl bromide, HC-140A/Methyl Chloroform, HC-10/Carbon Tetrachloride, and Halons 1211, 1301, 1202, 2402, and 1011. Contractor shall also comply with the requirements identified in section 608 of the "Clean Air Act".
8.2 All chutes for refuse or other materials disposed of during execution of a task order shall be covered or of such design as to fully confine the material to prevent dissemination of dust.
8.3 The Contractor must submit MSDSs and quantities of paints and solvents to CEAN before use.
8.4 Any dirt or mud, which is tracked onto paved roadways, by the contractors during construction, shall be cleaned away the same day. Depending on conditions, the roadway will be watered before cleaning, or if a street sweeper is used, it will have a water system that controls dust around the sweeper during operation. The contractor is responsible for supplying/ funding sweeper use and qualified personnel to operate sweeper.
8.5 Refrigerant circuit – coordinate with Charles Herbert at CEOMH before removing or installing any refrigerant circuits.
9. Cliff Swallow Protection:
9.1 The cliff swallow that builds mud nests on base facilities is protected by federal and states laws. Once the cliff swallow establishes a nest and lays eggs, the nest cannot be removed. All demo work to known cliff swallow nesting location, i.e. eaves, vents, porches, entrance ways, etc., should be done prior to 10 May so nesting cliff swallows do not delay the project. The contractor shall initiate a program to remove the partially completed nests daily from 10 May to 21 July to avoid work stoppage. If the contractor removes nests in violation of federal and state law the contractor is responsible for any charges filed by the US Fish and Wildlife Service and State of Alaska Department of Public Safety and is the liable party. The contractor cannot file a project delay claim against the Government if the contractor does not follow these cliff swallow procedures.
10. Noise Control:
10.1 The contractor shall comply with all applicable state, local, and installation laws, ordinances, and regulations relative to noise control.
11. Waste Disposal and Borrow Pits:
11.1 Contractors must comply with the following procedures of the Eielson AFB Waste Disposal/Borrow Pit Plan and submit a project specific Environmental Protection/Borrow Pit Plan.
11.2 The design/build contractor shall submit an Eielson AFB Waste Disposal/Borrow Pit worksheet (see Appendix A) to Natural Resources prior to construction.
11.3 To authorize use of the base waste disposal sites and borrow pits the Eielson AFB Waste Disposal/Borrow Pit Worksheet shall be signed by all reviewers listed at the end of the document.
11.4 Natural Resources will prepare a final Eielson AFB Waste Disposal/Borrow Pit Areas Plan for the design/build project using the processed (approved) Eielson AFB Waste Disposal/Borrow Pit Worksheet. The final plan may differ from and supercedes the preliminary plan. The design/build contractor shall comply with the final plan.
11.5 On-Base Solid Waste Disposal Sites:
11.5.1 Flightline Swamp off Flightline Avenue (see Appendix B).
11.5.1.1. Acceptable fill - Only concrete, rock, gravel, and clean soil (uncontaminated) are acceptable fill for the Flightline Swamp. Dumping at the Flightline Swamp is controlled and permission shall be obtained from 354 CES/CECB (377-5128).
11.5.1.2. The concrete disposed of at the Flightline Swamp shall be no higher than one foot above the water line. All clean fill more than one foot above the water line shall be free from concrete and trees and roots two inches in diameter or larger.
11.5.1.3. Access to the Flightline Swamp will be from Flightline Avenue using the access road at the south end of the swamp (see Appendix B).
11.5.1.4. All dumping will be as close to the location being filled as possible.
11.5.1.5. Each week the disposal area is used, the contractor shall push the waste into the disposal area with a dozer to match the surrounding terrain by close of business each Friday.
11.5.2 Contractor Use of Base Waste Disposal Sites and Borrow Pits:
11.5.2.1. General: Disposal sites will be provided on Eielson AFB for asbestos, concrete, rock, gravel, clean soil (uncontaminated), trees and stumps, and recyclable asphalt only. No variation shall be permitted. The disposal sites for each of these items will be designated by the Air Force at the pre-construction conference. Disposal sites will typically be within a five mile radius of the project site. It shall be the responsibility of the contractor to locate legal off-base disposal sites for materials not specifically approved for on-base disposal. Contractor shall dispose of all waste (including those items approved for on-base disposal) in accordance with local, state, and federal regulations. All waste hauling except concrete, rock, gravel, soil, trees, stumps, and recyclable asphalt shall be done in covered vehicles to prevent spillage. Any cost incurred in the disposal of waste shall be the responsibility of the contractor.
11.5.2.2. Trees: All trees and accompanying soil may be disposed of in the Tree Disposal Area or the Flightline Swamp (see Appendix B). The exact location will be identified in the final Eielson AFB Waste Disposal/Borrow Pit Areas Plan for the design/build project.
11.5.2.3. Clean fill from construction site excavation: Many times the Air Force can use clean fill for land management projects. If there is a need, these sites will be identified at the pre-construction conference, or in the final Eielson AFB Waste Disposal/Borrow Pit Areas Plan for the design/build project.
11.5.2.4. Contaminated Soils: Handling and disposal shall be as outlined in the final Eielson AFB Waste Disposal/Borrow Pit Areas Plan for the design/build project. Excavated contaminated soil shall be the responsibility of the contractor.
11.5.2.5. Asbestos Disposal: Asbestos may be disposed of at the base asbestos landfill when removed, packaged, and disposed of according to 40 CFR 61, Subpart M; 29 CFR 1910.1001; and 29 CFR 1926.58. Before the contractor uses the site, he shall coordinate with the Contracting Officer for exact location of placement within the landfill. Asbestos materials shall be transported in enclosed vehicles. An asbestos abatement plan including any necessary monitoring or wetting procedures shall be submitted to the Contracting Officer for submittal to the Alaska Department of Environmental Conservation prior to commencement of demolition. Mastic removed with chemicals must be taken to HAZMAT (377-1668) for turn in disposal.
11.5.2.6. Hazardous Wastes: The contractor shall collect and dispose of all hazardous wastes as defined in 40 CFR, part 261, in accordance with 40 CFR, parts 260-265. Contractor shall not store hazardous wastes on base for greater than 30 days.
11.5.2.7. Borrow Pits: Base borrow pit development and/or reclamation work for this project is shown in Appendix A. The base gravel and topsoil source for this project will be Mullins Pit Borrow Pit. The contractor shall coordinate with 354 CES/CEVN (377-5182) prior to removing topsoil from Mullins Pit Borrow Pit for instruction, location(s) and direction. The topsoil has been pushed into stockpiles. The topsoil will require screening. The screened topsoil shall be free from trees, roots, and rocks one inches in diameter or larger. The contractor shall dispose of all screening debris as directed by 354 CES/CEVN. Other contractors will be using Mullins Pit Borrow Pit. Contractor shall coordinate as required. Borrow pit operations shall be as outlined in final Eielson AFB Waste Disposal/Borrow Pit Areas Plan for the design/build project.
11.5.2.8. Environmental Protection/Borrow Pit Plan: At 65% design review or prior to project groundbreaking, whichever comes first, the contractor shall submit an environmental protection/borrow pit plan to the Contracting Officer which covers the requirements of all waste disposal, borrow pit, and project site operations. This plan shall include, but not be limited to, the use of on-base waste disposal sites, the name and location of off-base disposal sites, methods used to safely and legally transport wastes to all disposal sites, borrow pits to be used, borrow pit development, methods used to prevent erosion and other non-point source pollution at the project site (including a contingency plan for effectively handling spills of hazardous materials), and training for employees on all elements of this plan. No on-site work, to include mobilization, staging, and site preparation, shall be permitted prior to this plan's approval by the Contracting Officer. The contractor shall comply with all applicable environmental laws and regulations and specific requirements stated elsewhere in the contract specifications. Ignorance of environmental regulations shall not be acceptable cause for contractor non-compliance. AN EXAMPLE ENVIRONMENTAL PROTECTION/BORROW PIT PLAN IS AVAILABLE FROM THE CONTRACTING OFFICER.
11.5.2.9. Any exceptions to the Environmental Protection Plan must be requested in writing and coordinated with CEVN, CEV, CEO, CEC, and signed by the Base Civil Engineer.
11.5.2.10. Violations of the Environmental Protection Plan may be cause for termination of the privileges to use the Eielson AFB waste disposal areas and borrow pits.
END OF SECTION 01020
SECTION 01400 – Warranty Requirements
1. Warranty Requirements:
1.1 Work performed under this contract will be warranted as follows:
1.1.1 Repairs to any existing roof will be warranted for a TWO-YEAR period from the date of final acceptance of the repair. This warranty is for labor, workmanship, and materials.
1.1.2 New standing seam metal roofs shall have a manufacturer’s warranty for a minimum of TWENTY YEARS from date of final acceptance. This warranty is for labor and materials.
1.1.3 New shingled roofs shall have a manufacturer’s warranty for a minimum of FIFTEEN YEARS from date of final acceptance. Warranties shall not be pro-rated or include dollar limitations.
1.1.4 New protected membrane or Insulated Roof Membrane Assembly (IRMA) systems shall have a manufacturer’s warranty for a minimum of FIFTEEN YEARS from date of final acceptance. This shall be a full system warranty which is not pro-rated or that includes dollar limitations. Manufacturer shall be responsible for removal and replacement of pavers and insulation if repair or replacement is needed.
1.1.5 New exposed membrane roofs shall have a manufacture’s warranty for a minimum of FIFTEEN YEARS from date of final acceptance. This shall be a full system warranty which is not pro-rated or that includes dollar limitations.
1.1.6 All other replacement projects shall have a manufacture’s warranty for a minimum period of TEN YEARS from date of final acceptance. Warranties shall not be pro-rated or include dollar limitations.
1.1.7 Warranty Documentation: Prior to final payment of any roof repair or new installation, the contractor will provide a written warranty to the Contracting Officer.
1.2 WARRANTY SIGNS: The contractor will also post a 12" x 12" x 1/8" brown sign with white lettering at any and all access points to the roof. These signs will be posted at or near eye level on the nearest vertical surfaces to the access points to the roof and will read as follows:
THIS ROOF IS UNDER WARRANTY UNTIL
EXPIRATION DATE: [expiration date of warranty]
DO NOT PENETRATE THIS ROOF WITHOUT NOTIFYING
354 CES Roofing Engineer, 377-2100
1.3 HOLES AND ANTENNAS: The contractor may be responsible for erecting antennas that were previously located on the roof and drilling/cutting holes in the roof (ex. Vents). When the work is performed by the contractor, the warranty will remain valid regardless of these tasks. The antennas may be and are encouraged to be fixed to the side of the building rather than on the surface of the roof; however, exact location of antennas will be agreed upon for each task order.
1.3.1 Contractor is responsible for notifying the government of any antennas, unistruts, electrical fixtures, utility outages, etc. that need to be permanently or temporarily relocated at least two weeks ahead of time. The contractor should notify the government during the initial site visit.
1.4 The contractor will provide the contracting officer with the manufacturer’s warranty indicated above upon completion of the project.
DIVISION 2 – SITE CONSTRUCTION
SECTION 02070 – DEMOLITION
1. Purpose:
1.1 Demolition and removal of selected portions of a building.
2. Definitions:
2.1 Remove: Remove and legally dispose of items except those indicated to be reinstalled, salvaged, or to remain the government’s property.
2.2 Remove and Salvage: Items indicated to be removed and salvaged remain the Government’s property.
2.3 Remove and Reinstall: Remove items indicated; clean, service, and otherwise prepare them for reuse; store and protect against damage. Reinstall items in the same locations or in locations indicated.
2.4 Existing to Remain: Protect construction indicated to remain against damage and soiling during selective demolition. When permitted by the Contracting Officer, items may be removed to a suitable, protected storage location during selective demolition and then cleaned and reinstalled in their original locations.
3. Material Ownership:
3.1 Except for items or materials indicated to be reused, salvaged, reinstalled, or otherwise indicated to remain the Government’s property, demolished materials shall become the Contractor's property and shall be removed from the site with further disposition at the Contractor's option.
4. Submittals:
4.1 Submit each item in this Article according to the Conditions of the Contract unless otherwise indicated.
4.2 Schedule of selective demolition activities indicating the following:
4.2.1 Inventory of items to be removed and salvaged.
4.2.2 Inventory of items to be removed by Government.
4.2.3 Record drawings at Project closeout according to General Conditions of the Contract.
4.2.4 Eielson Air Force Base Landfill records indicating receipt and acceptance of hazardous wastes by the landfill facility.
5. Quality Assurance:
5.1 Demolition Firm Qualifications: Experience in successfully completed selective demolition work similar to that indicated for this Project.
5.2 Regulatory Requirements: Comply with governing EPA notification regulations before starting selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.
6. Project Conditions:
6.1 Government will occupy portions of the building immediately adjacent to selective demolition area. Conduct selective demolition so that Government operations will not be disrupted. Provide not less than 72 hours notice to Government of activities that will affect Government’s operations.
6.2 Government assumes no responsibility for actual condition of items to be selectively demolished.
6.2.1 Conditions existing at time of inspection for bidding purpose will be maintained by Government as far as practical.
6.3 Asbestos: Asbestos maybe present in the materials to be selectively demolished. A report on the presence of asbestos is on file for review and use. Examine the report to become aware of locations where asbestos is present.
6.3.1 Asbestos abatement is specified elsewhere in the Contract Documents.
6.3.2 Do not disturb asbestos or any material suspected of containing asbestos except under the procedures specified elsewhere in the Contract Documents.
7. Scheduling:
7.1 Arrange selective demolition schedule so as not to interfere with Government’s on-site operations.
8. Demolition:
8.1 Survey existing conditions and correlate with requirements indicated to determine extent of selective demolition required.
8.2 Inventory and record the condition of items to be removed and reinstalled.
8.3 When unanticipated mechanical, electrical, or structural elements that conflict with the intended function or design are encountered, investigate and measure the nature and extent of the conflict. Promptly submit a written report to the Contracting Officer.
8.4 Perform surveys as the work progresses to detect hazards resulting from selective demolition activities.
9. Safety:
9.1 Remove debris to ensure minimum interference with roads, streets, walks, and other adjacent occupied and used facilities.
9.2 Do not close or obstruct streets, walks, or other adjacent occupied or used facilities without permission from the Contracting Officer. Provide alternate routes around closed or obstructed traffic ways if required by governing regulations.
9.2.1 Erect temporary protection, such as walks, fences, railings, canopies, and covered passageways, where required by authorities having jurisdiction.
9.2.2 Provide temporary weather protection, during interval between demolition and removal of existing construction, on exterior surfaces and new construction to ensure that no water leakage or damage occurs to structure or interior areas.
9.2.3 Protect walls, ceilings, floors, and other existing finish work that are to remain and are exposed during selective demolition operations.
9.2.4 Cover and protect furnishings and equipment that have not been removed.
10. Pollution Control:
10.1 Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.
10.2 Remove debris from elevated portions of building by chute, hoist, or other device that will convey debris to grade level.
10.3 Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition that existed prior to selective demolition.
10.4 Remove structural framing members and lower to ground by method suitable to avoid free fall and to prevent ground impact or dust generation.
10.5 Promptly dispose of demolished materials. Do not allow demolished materials to accumulate on-site.
END OF SECTION 02070
SECTION 02080 - ASBESTOS ABATEMENTPRIVATE
1. Purpose:
1.1. Describe procedures for properly abating and disposing of asbestos material
2. Applicable Guidance:
2.1 All work under this contract and any other trade work done in conjunction with the abatement shall be done in strict accordance with all applicable Federal, State and local regulations, standards and codes governing asbestos abatement.
2.2 The most recent edition of any relevant regulation, standard or code shall be in effect. Any conflicts discovered are to be brought to the attention of the Contracting Officer’s Representative promptly.
2.3 Copies of all standards, regulations, codes and other applicable documents, including these specifications and documents listed in 1.05 D, shall be provided by the Contractor.
2.4 The Contractor is reminded of the following applicable agency regulations, in particular:
2.4.1 Environmental Protection Agency (EPA) Title 40 CFR Part 61, Subpart M, National Emission Standard for Asbestos.
2.4.2 EPA Title 40 CFR Part 763, Subpart E, Asbestos-Containing Materials in Schools (Asbestos Hazard Emergency Response Act Regulations).
2.4.3 Alaska Department of Labor, Division of Labor Standards and Safety.
2.4.3.1. 8 AAC 05.045 - Asbestos Construction Standard
2.4.3.2. 8 AAC 61.600-.790 - Asbestos Abatement Certification
2.4.4 Alaska Department of Environmental Conservation, 18 AAC 60.087 - Hazardous Waste.
3. Notification:
3.1 Environmental Protection Agency (EPA) Notification:
3.1.1 Contractor shall notify the EPA Region X office in Seattle, at least ten days before work begins, of the intent to remove ACM in accordance with 40 CFR 61.146.
3.2 Alaska Department of Labor (ADOL) Notification
3.2.1 Contractor shall submit an employee training plan for the project to the ADOL, Division of Labor Standards and Safety, in Anchorage at least ten days before work begins, in accordance with 8 AAC 61.620(b) Asbestos Abatement Certification Programs, Contractor Plan Approval.
3.3 Contractor shall provide informational copy of EPA- and ADOL-notification letters to the Owner's Representative as part of asbestos-abatement submittal package.
3.4 Contractor shall provide copy of responses from EPA and ADOL once they are received.
4. Submittals:
4.1 Contractor shall submit a detailed work plan for approval by the Owner's Representative prior to beginning asbestos abatement. The work plan shall include the following items:
4.1.1 A sketch or drawing of the work area indicating where and how the Engineering controls will be set up and operated.
4.1.2 A description of the sequence and methods of removal of asbestos-containing pipe insulation and ductwork.
4.1.3 A description of cleaning methods to be used.
4.1.4 A worker personal air-monitoring plan for ADOL compliance.
4.1.5 A description of the personal protective equipment to be used.
4.1.6 A plan for emergencies such as an accident or fire.
4.1.7 A list of chemical products to be used and their material safety data sheets.
4.1.8 An identification of the Contractor's Competent Person.
4.1.9 A statement of the medical surveillance and training status of each worker.
4.1.10 A project schedule.
4.1.11 A copy of Contractor's Work Plan Submittal to Alaska Department of Labor (ADOL) and proof of ADOL approval of the work plan including the approved list of Certified Asbestos Abatement Workers. Certified asbestos inspectors and certified project designers must be used.
4.1.12 A copy of Contractor's EPA NESHAPS notification and any responses received.
5. General Methods:
5.1 The Contractor will be guided by Appendix F to 8 AAC 05.045 the Alaska Construction Standard for Asbestos, titled Work Practices and Engineering Controls for Major Asbestos Removal, Renovation, and Demolition Operations.
6. Site Control:
6.1 Contractor shall establish, demarcate and restrict access to, regulated areas per 8 AAC 05.045 (f).
6.2 Contractor shall post warning signs per 8 AAC 05.045 (m)(1).
6.3 General: Engineering controls are required in abatement areas to reduce fiber concentrations in the work area for worker protection and to prevent escape of particulates from the work area during abatement work. The Owner's Representative must approve the installation of all engineering controls before abatement work begins. The Contractor will remove engineering controls only when final clearance has been achieved.
6.4 Containment Areas: The Contractor shall establish containment areas within the abatement areas as described in Appendix F to 8 AAC 05.045 , sufficient to isolate the abatement work area from the occupied portions of the building.
6.5 Exhaust Ventilation: The Contractor shall provide high-efficiency, filtered exhaust ventilation sufficient to provide a minimum of four air changes per hour (ACPH) and sufficient to maintain a minimum air gauge pressure in each containment area of -0.02 inches water column. Exhaust air shall be ducted to the outdoors. Volumetric flow rates and pressure differentials will be measured by the Owner's Representative prior to approval of final project set-up.
6.6 Preliminary cleaning is intended to remove gross debris from the space in order to avoid its disturbance as workers move through the area, removing insulation from pipes. Prior to beginning removal of asbestos from pipes, the Contractor shall clear loose gross debris, asbestos debris piles and insulation chunks and other debris from the space using a HEPA filtered vacuum, disposal bag, and wet methods. It is not necessary to preclean the space of all dust.
6.7 Preliminary cleaning should be used when removing asbestos containing tiles, sheetrock, mastic, duct insulation, or any asbestos containing building material when there is gross loose debris in the area.
6.8 Contractor shall use work practices such as HEPA vacuums and wet methods as called for in Appendix F to 8 AAC 05.045, as necessary to remove debris, to prevent the spread of any released fibers, and to maintain acceptable worker-breathing-zone fiber air concentrations.
6.9 Workers shall not disturb dry materials, except to vacuum them up.
6.10 Contractor shall shut down hot piping in advance of abatement procedures to allow piping to cool sufficiently for handling
6.11 Asbestos-containing materials shall be saturated with a wetting agent or removal encapsulant before removal from structures. Materials shall be removed carefully in pieces as large as possible and bagged immediately before they can dry out.
6.12 Insulated fittings on runs of fiberglass-insulated piping shall be removed by cutting piping on either side of the fitting and disposing of the fitting and insulation intact as a unit, where ever possible. If the insulation is damaged or unencapsulated, it shall be treated with asbestos encapsulant before the piping is cut. The intent of this procedure is reduce the amount of asbestos material that is disturbed and to reduce the potential for fiber release into the worker's breathing zone.
6.13 Decontamination, work methods and sequencing for the abatement area shall be included in the submitted work plan and approved by the Owner's Representative with the goals to minimize potential worker exposure and to minimize down time for the high pressure steam- and condensate-return lines.
7. Waste Disposal:
7.1 Workers shall double bag all asbestos contaminated debris in sealed leak-tight 6-mil plastic bags. Waste shall be removed through the waste load-out facilities separate from the personnel decontamination facility.
7.2 Contractor shall deliver the waste to an asbestos-approved Class III landfill. Contractor shall maintain a log of asbestos waste leaving the work area and shipped to the landfill. Owner’s Representative shall pre-approve shipments.
7.3 Payment of disposal charges shall be the responsibility of the Contractor. Contractor shall provide a receipt from the landfill for the waste material.
8. Post-Abatement Cleanup:
8.1 Contractor shall clean all remaining piping from which insulation has been removed to eliminate all visible traces of original insulation.
8.2 Contractor shall clean all surfaces in the workspace, using HEPA vacuums and wet methods, to eliminate all visible dust and debris.
9. Encapsulation and Lockdown:
9.1 Contractor shall encapsulate all remaining surfaces from which asbestos pipe insulation has been removed.
9.2 Contractor shall repair and encapsulate all asbestos fittings remaining on structures not to be demolished.
9.3 When the project has passed the final visual inspection, Contractor shall spray a lockdown product over all surfaces in the work area. The product must be an acrylic- or latex-based material intended for application after removal of asbestos-containing materials.
END OF SECTION 02080
DIVISION 5- METALS
SECTION 05090-Basic Materials and Methods
1. Fasteners:
1.1. General: Provide plated fasteners complying with ASTM B 633, Class Fe/Zn 25 for electrodeposited zinc coating, for exterior use or where built into exterior walls. Select fasteners for the type, grade, and class required.
DELETE BELOW IF NO DETAILED FASTENING REQUIREMENTS. RETAIN FOR COMPLEX WORK.
1.2. Bolts and Nuts: Regular hexagon-head bolts, ASTM A 307, Grade A, with hex nuts, ASTM A 563, and, where indicated, flat washers.
1.3. Machine Screws: ANSI B18.6.3.
1.4. Lag Bolts: ANSI B18.2.1.
1.5. Wood Screws: Flat head, carbon steel, ANSI B18.6.1.
1.6. Plain Washers: Round, carbon steel, ANSI B18.22.1.
1.7. Lock Washers: Helical, spring type, carbon steel, ANSI B18.21.1.
1.8. Expansion Anchors: Anchor bolt and sleeve assembly of material indicated below with capability to sustain, without failure, a load equal to 6 times the load imposed when installed in unit masonry and equal to 4 times the load imposed when installed in concrete as determined by testing per ASTM E 488 conducted by a qualified independent testing agency.
1.8.1. Material: Carbon steel components zinc-plated to comply with ASTM B 633, Class Fe/Zn 5 or Group 1 alloy 304 or 316 stainless-steel bolts and nuts complying with ASTM F 593 and ASTM F 594, as indicated.
1.9. Toggle Bolts: FS FF-B-588, tumble-wing type, class and style as required.
END OF SECTION 05090
SECTION 05514- Ladders
1. Steel Ladders:
1.1 General: Fabricate ladders for the locations shown, with dimensions, spacings, details, and anchorages as indicated. Comply with requirements of ANSI A14.3.
1.2 Side rails: Continuous, steel, 1/2-by-2-1/2-inch flat bars, with eased edges, spaced 18 inches apart.
1.3 Bar Rungs: 3/4-inch-diameter steel bars, spaced 12 inches O.C.
1.4 Fit rungs in centerline of side rails, plug weld and grind smooth on outer rail faces.
1.5 Support each ladder at top and bottom and at intermediate points spaced not more than 60 inches O.C. with welded or bolted steel brackets.
1.5.1 Size brackets to support design dead and live loads indicated and to hold centerline of ladder rungs clear of the wall surface by not less than 7 inches.
1.5.2 Extend side rails 42 inches above top rung, and return rails to wall or structure unless other secure handholds are provided. If the adjacent structure does not extend above the top rung, goose-neck the extended rails back to the structure to provide secure ladder access.
1.6 Galvanize ladders, including brackets and fasteners where indicated.
2. Ladder Safety Cages:
2.1 General: Fabricate ladder safety cages to comply with ANSI A14.3. Assemble by welding or riveting.
2.2 Primary Hoops: 5/16-by-4-inch steel bars for top and bottom hoops; and for cages longer than 20 feet, intermediate hoops spaced not more than 20 feet O.C.
2.3 Secondary Intermediate Hoops: 5/16-by-2-inch steel bar hoops spaced not more than 48 inches O.C. between primary hoops.
2.4 Vertical Bars: 5/16-by-2-inch steel bars secured to each hoop, spaced approximately 9 inches O.C.
2.5 Fasten assembled safety cage to ladder rails and adjacent construction as indicated.
2.6 Galvanize ladder safety cages, including fasteners where indicated.
3. Aluminum Finishes:
3.1 Finish designations prefixed by AA conform to the system established by the Aluminum Association for designating aluminum finishes.
3.2 Class I, Clear Anodic Finish: AA-M12C22A41 (Mechanical Finish: non-specular as fabricated; Chemical Finish: etched, medium matte; Anodic Coating: Architectural Class I clear coating 0.7 mil or thicker) complying with AAMA 607.1.
4. General Installation:
4.1 Fastening to In-Place Construction: Provide anchorage devices and fasteners where necessary for securing miscellaneous metal fabrications to in-place construction. Include threaded fasteners for concrete and masonry inserts, toggle bolts, through-bolts, lag bolts, wood screws, and other connectors as required.
4.2 Cutting, Fitting, and Placement: Perform cutting, drilling, and fitting required for installing miscellaneous metal fabrications. Set metal fabrication accurately in location, alignment, and elevation; with edges and surfaces level, plumb, true, and free of rack; and measured from established lines and levels.
END OF SECTION 05514
DIVISION 6- WOOD AND PLASTICS
SECTION 06100 - ROUGH CARPENTRY
1. Purpose:
1.1 This Section is for carpentry work not specified as part of other Sections and generally not exposed, unless otherwise specified and Includes the following:
1.1.1 Framing.
1.1.2 Framing with engineered wood products.
1.1.3 Rooftop equipment bases and support curbs.
1.1.4 Wood nailers and blocking.
1.1.5 Sheathing.
2. Applicable Publications:
2.1 The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.
2…
This is the start of the file's text. The full file is on GovTribe.
Other files for this federal contract opportunity
Show all 42
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .