Attachment JA-2 Wage Determination 4 Mar 2009.doc
DOC document 72 KB Posted
- Attached to
- FA5004-09-R-C001 Federal contract opportunity
- Solicitation number
- FA5004-09-R-C001
About this file
Current Wage Determination
View the file
Other files for this federal contract opportunity
Show all 42
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No. FA5004-09-R-C001
Roofing IDIQ
General Decision Number: AK080001 02/27/2009 AK1
Superseded General Decision Number: AK20070001
State: Alaska
Construction Types: Building and Heavy
Counties: Alaska Statewide.
BUILDING AND HEAVY CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories)
Modification Number Publication Date
0 02/08/2008
1 02/15/2008
2 02/29/2008
3 04/04/2008
4 04/18/2008
5 05/09/2008
6 05/23/2008
7 06/06/2008
8 06/27/2008
9 08/01/2008
10 08/08/2008
11 08/15/2008
12 08/22/2008
13 09/05/2008
14 09/19/2008
15 11/07/2008
16 01/02/2009
17 02/06/2009
18 02/27/2009
* ASBE0097-001 02/01/2009
Rates Fringes
Asbestos Workers/Insulator
(includes application of all insulating materials protective coverings, coatings and finishings to all types of mechanical systems).........................$ 31.54 16.70
* ASBE0097-002 01/01/2009
Rates Fringes
HAZARDOUS MATERIAL HANDLER
(includes preparation, wetting, stripping, removal scrapping, vacuming, bagging, and disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems).........$ 27.35 13.70
BOIL0502-002 10/01/2007
Rates Fringes
BOILERMAKER......................$ 39.12 19.01
BRAK0001-002 07/01/2008
Rates Fringes
Bricklayer, Blocklayer, Stonemason, Marble Mason, Tile Setter, Terrazzo Worker.....$ 33.82 15.80
Tile & Terrazzo Finisher.........$ 28.65 15.80
CARP1243-003 07/01/2008
North of the 63rd Parallel
Rates Fringes
Carpenter/Lather/Drywall
Applicator.......................$ 33.30 17.85
Carpenter: Fire or Flood
Repair Work......................$ 33.30 17.85
MILLWRIGHT.......................$ 33.39 16.08
CARP1281-004 07/01/2008
SOUTH OF 63RD PARALLEL
Rates Fringes
Acoustical Applicator and
Lather...........................$ 33.30 17.23
Carpenters & Drywallers..........$ 33.30 17.23
MILLWRIGHT.......................$ 33.39 16.08
CARP2520-003 07/01/2008
Rates Fringes
Diver
Stand-by....................$ 37.34 17.23
Tender......................$ 36.34 17.23
Working.....................$ 74.68 17.23
Piledriver
Carpenter...................$ 33.30 17.23
Piledriver; Skiff Operator and Rigger..................$ 32.30 17.23
Sheet Stabber...............$ 33.30 17.23
Welder......................$ 34.30 17.23
DEPTH PAY PREMIUM FOR DIVERS BELOW WATER SURFACE:
50-100 feet $1.00 per foot
101 feet and deeper $2.00 per foot
ENCLOSURE PAY PREMIUM WITH NO VERTICAL ASCENT:
5-50 FEET $1.00 PER FOOT/DAY
51-100 FEET $2.00 PER FOOT/DAY
101 FEET AND ABOVE $3.00 PER FOOT/DAY
SATURATION DIVING:
The standby rate applies until saturation starts. The saturation diving rate applies when divers are under pressure continuously until work task and decompression are complete. the diver rate shall be paid for all saturation hours.
WORK IN COMBINATION OF CLASSIFICATIONS:
Employees working in any combination of classifications within the diving crew (except dive supervisor) in a shift are paid in the classification with the highest rate for that shift.
ELEC1547-004 11/24/2008
Rates Fringes
CABLE SPLICER....................$ 37.85 3%+$17.17
Electrician;Technician...........$ 36.10 3%+$17.17
ELEC1547-005 05/05/2008
Line Construction
Rates Fringes
CABLE SPLICER....................$ 44.48 3%+19.42
Line Construction:
(Tree Trimmer Shredder)..........$ 31.53 3%+19.42
Linemen (Including Equipment
Operators, Technician)...........$ 42.73 3%+19.42
Powderman........................$ 40.73 3%+19.42
TREE TRIMMER.....................$ 42.73 3%+19.42
ELEV0019-002 01/01/2009
Rates Fringes
ELEVATOR MECHANIC................$ 45.405 18.285+a+b
FOOTNOTE: a. Employer contributes 8% of the basic hourly rate for over 5 year's service and 6% of the basic hourly rate for 6 months to 5 years' of service as vacation paid credit. b. Eight paid holidays:
New Year's Day; Memorial Day; Independence Day;
Labor Day; Veteran's Day; Thanksgiving Day; Friday after
Thanksgiving and Christmas Day
ENGI0302-002 01/01/2009
Rates Fringes
Power equipment operators:
GROUP 1.....................$ 36.19 15.95
GROUP 1A....................$ 37.95 15.95
GROUP 2.....................$ 35.42 15.95
GROUP 3.....................$ 34.70 15.95
GROUP 4.....................$ 28.49 15.95
TUNNEL WORK
GROUP 1....................$ 39.81 15.95
GROUP 1A...................$ 41.75 15.95
GROUP 2....................$ 38.96 15.95
GROUP 3....................$ 38.17 15.95
GROUP 4....................$ 31.34 15.95
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Asphalt Roller; Back Filler; Barrier Machine
(Zipper); Batch Plant Operator: Batch and Mixer over 200 yds.; Beltcrete with power pack and similar conveyors;
Bending Machine; Boat Coxwains; Bulldozers; Cableways, Highlines and Cablecars; Cleaning Machine; Coating Machine;
Concrete Hydro Blaster; Cranes-45 tons and under or 150 foot boom and under (including jib and attachments): (a)
Shovels, Backhoes, Draglines, Clamshells; Gradalls-3 yards and under; (b) Hydralifts or Transporters, all track or truck type,(c) Derricks; Crushers; Deck Winches-Double
Drum; Ditching or Trenching Machine (16 inch or over);
Drilling Machines, core, cable, rotary and exploration;
Finishing Machine Operator, concrete paving, Laser Screed, sidewalk, curb and gutter machine; Helicopters; Hover
Craft, Flex Craft, Loadmaster, Air Cushion, All Terrain
Vehicle, Rollagon, Bargecable, Nodwell Sno Cat; Hydro Ax:
Feller Buncher and similar; Loaders: Forklifts with power boom and swing attachment, Overhead and front end, 2 1/2 yards through 5 yards, Loaders with forks or pipe clamps, Loaders, elevating belt type, Euclid and similar types;
Mechanics, Bodyman; Micro Tunneling Machine; Mixers: Mobile type w/hoist combination; Motor Patrol Grader; Mucking
Machines: Mole, Tunnel Drill, Horizontal/Directional Drill
Operator, and/or Shield; Operator on Dredges; Piledriver
Engineers, L. B. Foster, Puller or similar Paving Breaker;
Power Plant, Turbine Operator, 200 k.w. and over (power plants or combination of power units over 300 k.w.);
Sauerman-Bagley; Scrapers-through 40 yards; Service
Oiler/Service Engineer; Sidebooms-under 45 tons; Shot Blast
Machine; Spreaders, Blaw Knox, Cedarapids, Barber Greene, Slurry Machine; Sub-grader (Gurries, C.M.I. and C.M.I. Roto
Mills and similar types); Tack tractor; Truck mounted
Concrete Pumps, Conveyor, Creter; Water Kote Machine;
Unlicensed off road hauler; Welder; Electrical Mechanic, Camp Maintenance Engineer
GROUP 1A: Cranes-over 45 tons or 150 foot (including jib and attachments): (a) Shovels, backhoes, draglines, clamshells-over 3 yards, (b) Tower cranes; Loaders over 5 yds.; Motor Patrol Grader, Dozer, Grade Tractor (finish:
when finishing to final grade and/or to hubs, or for asphalt); Power Plants: 1000 k.w. and over; Quad; Screed;
Sidebooms over 45 tons; Slip Form Paver C.M.I. and similar types; Scrapers over 40 yards; Camera/Tool/Video Operator
(Slipline).
GROUP 2: Batch Plant Operators: Batch and Mixer 200 yds. per hour and under; Boiler-fireman; Cement Hog and Concrete
Pump Operator; Conveyors (except as listed in group 1);
Hoist on steel erection; Towermobiles and Air Tuggers;
Horizontal/Directional Drill Locator; Loaders, Elevating
Grader, Dumor and similar; Locomotives: rod and geared engines; Mixers; Screening, Washing Plant; Sideboom
(cradling rock drill regardless of size); Skidder; Trencing
Machine under 16 inches.
GROUP 3: "A" Frame Trucks, Deck Winches: single power drum;
Bombardier (tack or tow rig); Boring Machine; Brooms-power;
Bump Cutter; Compressor; Farm tractor; Forklift, industrial type; Gin Truck or Winch Truck with poles when used for hoisting; Grade Checker and Stake Hopper; Hoist, Air
Tuggers, Elevators; Loaders: (a) Elevating-Athey, Barber
Green and similar types (b) Forklifts or Lumber Carrier
(on construction job site) (c) Forklifts with Tower (d)
Overhead and Front-end, under 2 1/2 yds. Locomotives:Dinkey
(air, steam, gas and electric) Speeders; Mechanics (light duty); Mixers: Concrete Mixers and Batch 200 yds. per hour and under; Oil, Blower Distribution; Post Hole Diggers, mechanical; Pot Fireman (power agitated); Power Plant, Turbine Operator, under 300 k.w.; Pumps-water; Rig oiler/assistant engineer, over 45 ton, over 3 yards or over
150 foot boom; Roller-other than Plantmix; Saws, concrete;
Straightening Machine; Tow Tractor
GROUP 4: Rig Oiler/Assistant Engineer (Advances to Group
III if over 45 tons or 3 yards or 150 ft. boom); Swamper
(on trenching machines or shovel type equipment); Spotter;
Steam Cleaner
FOOTNOTE: Groups 1-4 receive 10% premium while performing tunnel or underground work. Rig Oiler/Assistant Engineer shall be required on cranes over 85 tons or over 100 feet of boom.
IRON0751-003 08/01/2008
Rates Fringes
Ironworkers:
BRIDGE, STRUCTURAL,
ORNAMENTAL, REINFORCING
MACHINERY MOVER, RIGGER,
SHEETER, STAGE RIGGER,
BENDER OPERATOR.............$ 32.29 18.60
FENCE, BARRIER AND
GUARDRAIL INSTALLERS........$ 28.79 18.35
GUARDRAIL LAYOUT MAN........$ 29.53 18.35
HELICOPTER, TOWER...........$ 33.29 18.60
LABO0341-005 07/01/2008
Rates Fringes
Laborers: North of the 63rd
Parallel & East of Longitude
138 Degrees
GROUP 1.....................$ 28.24 15.20
GROUP 2.....................$ 29.14 15.20
GROUP 3.....................$ 29.94 15.20
GROUP 3A....................$ 32.84 15.20
GROUP 3B....................$ 33.58 15.20
GROUP 4.....................$ 19.00 15.20
TUNNELS, SHAFTS, AND RAISES
GROUP 1....................$ 31.10 15.20
GROUP 2....................$ 32.09 15.20
GROUP 3....................$ 32.96 15.20
GROUP 3A...................$ 36.15 15.20
GROUP 3B...................$ 36.96 15.20
Laborers: South of the 63rd
Parallel & West of Longitude
138 Degrees
GROUP 1.....................$ 27.41 14.25
GROUP 2.....................$ 28.27 14.25
GROUP 3.....................$ 29.04 14.25
GROUP 3A....................$ 31.82 14.25
GROUP 3B....................$ 32.53 14.25
GROUP 4.....................$ 18.55 14.25
TUNNELS, SHAFTS, AND RAISES
GROUP 1....................$ 30.11 14.25
GROUP 2....................$ 31.05 14.25
GROUP 3....................$ 31.90 14.25
GROUP 3A...................$ 34.95 14.25
GROUP 3B...................$ 35.75 14.25
LABORERS CLASSIFICATIONS
GROUP 1: Asphalt Workers (shovelman, plant crew); Brush
Cutters; Camp Maintenance Laborer; Carpenter Tenders; Choke
Setters, Hook Tender, Rigger, Signalman; Concrete
Laborer(curb and gutter, chute handler, grouting, curing, screeding); Crusher Plant Laborer; Demolition Laborer;
Ditch Diggers; Dump Man; Environmental Laborer (asbestos
(limited to nonmechanical systems), hazardous and toxic waste, oil spill); Fence Installer; Fire Watch Laborer;
Flagman; Form Strippers; General Laborer; Guardrail
Laborer, Bridge Rail Installers; Hydro-Seeder Nozzleman;
Laborers (building); Landscape or Planter; Laying of
Decorative Block (retaining walls, flowered decorative block 4 feet and below); Material Handlers; Pneumatic or
Power Tools; Portable or Chemical Toilet Serviceman; Pump
Man or Mixer Man; Railroad Track Laborer; Sandblast, Pot
Tender; Saw Tenders; Scaffold Building and Erecting; Slurry
Work; Stake Hopper; Steam Point or Water Jet Operator;
Steam Cleaner Operator; Tank Cleaning; Utiliwalk, Utilidor
Laborer and Conduit Installer; Watchman (construction projects); Window Cleaner
GROUP 2: Burning and Cutting Torch; Cement or Lime Dumper or
Handler (sack or bulk); Choker Splicer; Chucktender (wagon, airtrack and hydraulic drills); Concrete Laborers (power buggy, concrete saws, pumpcrete nozzleman, vibratorman);
Culvert Pipe Laborer; Cured in place Pipelayer;
Environmental Laborer (marine work, oil spill skimmer operator, small boat operator); Foam Gun or Foam Machine
Operator; Green Cutter (dam work); Gunnite Operator; Hod
Carriers; Jackhammer or Pavement Breakers (more than 45 pounds);Laying of Decorative Block (retaining walls, flowered decorative block above 4 feet); Mason Tender and
Mud Mixer (sewer work); Pilot Car; Plasterer, Bricklayer and Cement Finisher Tenders; Power Saw Operator; Railroad
Switch Layout Laborer; Sandblaster; Sewer Caulkers; Sewer
Plant Maintenance Man; Thermal Plastic Applicator; Timber
Faller, chain saw operator, filer; Timberman
GROUP 3: Alarm Installer; Bit Grinder; Guardrail Machine
Operator; High Rigger and tree topper; High Scaler;
Multiplate; Slurry Seal Squeegee Man
GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill
Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);
Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers
GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)
GROUP 4: Final Building Cleanup
TUNNELS, SHAFTS, AND RAISES CLASSIFICATIONS
GROUP 1: Brakeman; Muckers; Nippers; Topman and Bull Gang;
Tunnel Track Laborer
GROUP 2: Burning and Cutting Torch; Concrete Laborers;
Jackhammers; Nozzleman, Pumpcrete or Shotcrete.
GROUP 3: Miner; Retimberman
GROUP 3A: Asphalt Raker, Asphalt Belly dump lay down; Drill
Doctor (in the field); Drillers (including, but not limited to, wagon drills, air track drills; hydraulic drills);
Powderman; Pioneer Drilling and Drilling Off Tugger (all type drills); Pipelayers.
GROUP 3B: Grade checker (setting or transfering of grade marks, line and grade)
Tunnel shaft and raise rates only apply to workers regularly employed inside a tunnel portal or shaft collar.
PAIN1140-004 12/01/2008
SOUTH OF THE 63RD PARALLEL
Rates Fringes
Painters:
Brush, Roller, Sign, Paper and Vinyl, Swing Stage, Hand Taper/Drywall, Structural Steel, and
Commercial Spray............$ 27.18 17.22
Machine Taper/Drywall.......$ 28.38 17.22
Spray-Sand/Blast, Epoxy and Tar Applicator..........$ 28.48 17.22
PAIN1140-005 04/01/2008
Rates Fringes
FLOOR LAYER: CARPET (SOFT)
FLOOR............................$ 28.57 10.59
PAIN1140-006 12/01/2008
SOUTH OF THE 63RD PARALLEL
Rates Fringes
GLAZIER..........................$ 30.12 17.25
PAIN1555-004 12/01/2008
NORTH OF THE 63RD PARALLEL
Rates Fringes
PAINTER
BRUSH, ROLLER PAINTER,
WALLCOVERER.................$ 29.85 17.29
STRUCTURAL, SANDBLAST, POT
TENDER, FINISH METAL,
SPRAY, BUFFER OPERATOR,
FLOORCOVERER, RADON
MITIGATION, LEAD BASED
PAINT ABATEMENT, HAZARDOUS
MATERIAL HANDLER, TAPER,
TEXTURING...................$ 30.35 17.29
PAIN1555-005 12/01/2008
NORTH OF THE 63RD PARALLEL
Rates Fringes
GLAZIER..........................$ 31.87 16.30
PLAS0867-001 02/01/2009
Rates Fringes
PLASTERER
North of the 63rd parallel..$ 34.04 15.65
South of the 63rd parallel..$ 33.79 15.65
PLAS0867-004 02/01/2009
Rates Fringes
CEMENT MASON/CONCRETE FINISHER
North of the 63rd parallel..$ 33.79 15.65
South of the 63rd parallel..$ 33.54 15.65
* PLUM0262-002 01/01/2009
East of the 141st Meridian
Rates Fringes
Plumber; Steamfitter.............$ 33.02 17.87
PLUM0367-002 07/01/2008
South of the 63rd Parallel
Rates Fringes
Plumber; Steamfitter.............$ 35.58 17.12
PLUM0375-002 07/01/2008
North of the 63rd Parallel
Rates Fringes
Plumber; Steamfitter.............$ 35.54 18.32
PLUM0669-002 04/01/2008
Rates Fringes
SPRINKLER FITTER.................$ 41.05 16.15
ROOF0190-002 09/01/2007
Rates Fringes
ROOFER, Including Built Up, Composition and Single Ply
Roofs
North of the 63rd Parallel..$ 32.12 10.50
South of the 63rd Parallel..$ 32.12 10.50
SHEE0023-003 08/01/2008
South of the 63rd Parallel
Rates Fringes
Sheet Metal Worker...............$ 37.34 16.60
SHEE0023-004 07/01/2008
North of the 63rd Parallel
Rates Fringes
Sheet Metal Worker...............$ 39.93 17.11
TEAM0959-003 09/01/2008
Rates Fringes
TRUCK DRIVER
GROUP 1.....................$ 34.98 13.90
GROUP 1A....................$ 36.16 13.90
GROUP 2.....................$ 33.81 13.90
GROUP 3.....................$ 33.05 13.90
GROUP 4.....................$ 32.51 13.90
GROUP 5.....................$ 31.80 13.90
GROUP 1: Semi with Double Box Mixer; Dump Trucks (including rockbuggy and trucks with pups) over 40 yards up to and including 60 yards; Deltas, Commanders, Rollogans and similar equipment when pulling sleds, trailers or similar equipment; Boat Coxswain; Lowboys including attached trailers and jeeps, up to and including 12 axles; Ready-mix over 12 yards up to and including 15 yards); Water Wagon
(250 Bbls and above); Tireman, Heavy Duty/Fueler
GROUP 1A: Dump Trucks (including Rockbuggy and Trucks with pups) over 60 yards up to and including 100 yards; Jeeps
(driver under load)
GROUP 2: Turn-O-Wagon or DW-10 not self-loading; All Deltas, Commanders, Rollogans, and similar equipment; Mechanics;
Dump Trucks (including Rockbuggy and Trucks with pups) over
20 yards up to and including 40 yards; Lowboys including attached trailers and jeeps up to and including 8 axles;
Super vac truck/cacasco truck/heat stress truck; Ready-mix over 7 yards up to and including 12 yards;
GROUP 3: Dump Trucks (including Rockbuggy and Trucks with pups) over 10 yards up to and including 20 yards; batch trucks 8 yards and up; Oil distributor drivers; Partsman;
Oil Distributor Drivers; Trucks/Jeeps (push or pull);
Traffic Control Technician
GROUP 4: Buggymobile; Semi or Truck and trailer; Dumpster;
Tireman (light duty); Dump Trucks (including Rockbuggy and
Truck with pups) up to and including 10 yards; Track Truck
Equipment; Stringing Truck; Grease Truck; Flat Beds, dual rear axle; Hyster Operators (handling bulk aggregate);
Lumber Carrier; Water Wagon, semi; Water Truck, dual axle;
Gin Pole Truck, Winch Truck, Wrecker, Truck Mounted "A"
Frame manufactured rating over 5 tons; Bull Lifts and Fork
Lifts with Power Boom and Swing attachments, over 5 tons;
Front End Loader with Forks; Bus Operator over 30 passengers; All Terrain Vehicles; Boom Truck/Knuckle Truck over 5 tons; Foam Distributor Truck/dual axle;
Hydro-seeders, dual axle; Vacuum Trucks, Truck Vacuum
Sweepers; Loadmaster (air and water); Air Cushion or similar type vehicle; Fire Truck/Ambulance Driver;
Combination Truck-fuel and grease; Compactor (when pulled by rubber tired equipment); Rigger (air/water/oilfield);
Ready Mix, up to and including 7 yards;
GROUP 5: Gravel Spreader Box Operator on Truck; Flat Beds, single rear axle; Boom Truck/Knuckle Truck up to and including 5 tons; Pickups (Pilot Cars and all light duty vehicles); Water Wagon (Below 250 Bbls); Gin Pole Truck, Winch Truck, Wrecker, Truck Mounted "A" Frame, manufactured rating 5 tons and under; Bull Lifts and Fork Lifts (fork lifts with power broom and swing attachments up to and including 5 tons); Buffer Truck; Tack Truck; Farm type
Rubber Tired Tractor (when material handling or pulling wagons on a construction project); Foam Distributor, single axle; Hydro-Seeders, single axle; Team Drivers (horses, mules and similar equipment); Fuel Handler (station/bulk attendant); Batch Truck, up to and including 7 yards;
Gear/Supply Truck; Bus Operator, Up to 30 Passengers;
Rigger/Swamper
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29 CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
General Decision Number: AK080005 02/06/2009 AK5
Superseded General Decision Number: AK20070005
State: Alaska
Construction Type: Residential
Counties: Fairbanks North Star, Nome, North Slope, Northwest
Artic, Southeast Fairbanks and Yukon-Koyukuk Counties in Alaska.
RESIDENTIAL CONSTRUCTION PROJECTS (consisting of single family homes and apartments up to and including 4 stories)
Modification Number Publication Date
0 02/08/2008
1 03/28/2008
2 04/04/2008
3 05/09/2008
4 06/06/2008
5 01/02/2009
6 02/06/2009
ENGI0302-004 01/01/2009
Rates Fringes
Power Equipment Operator
Backhoe: 3 yards and under..$ 36.19 15.95
Backhoe: Over 3 yards.......$ 37.95 15.95
Bulldozer...................$ 36.19 15.95
Mechanic....................$ 36.19 15.95
Motor Patrol Graders........$ 36.19 15.95
Rollers: Asphalt............$ 36.19 15.95
Rollers: Other than
Plantmix....................$ 34.70 15.95
* PAIN1555-006 12/01/2008
Rates Fringes
Painters:
Brush.......................$ 29.85 17.29
SUAK1996-001 06/25/1996
AREA 1
Rates Fringes
CARPENTER........................$ 25.05 7.80
ELECTRICIAN......................$ 23.38
Laborer, General.................$ 16.18 6.30
Plumbers and Pipefitters.........$ 27.17 6.20
Power Equipment Operator
Loader......................$ 24.61 8.06
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29 CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
JA-2 Wage Determination
File details come from the government source that posted it. Updated .