FA5004-09-R-C014.pdf
PDF 374 KB Posted
- Attached to
- FA5004-09-R-C001 Federal contract opportunity
- Solicitation number
- FA5004-09-R-C001
About this file
MFH Solicitation
View the file
Other files for this federal contract opportunity
Show all 42
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until local time
A X B
C D
EX
X G F 149 - 154
155 - 158 X H 159 - 160 joseph.stewart@eielson.af.mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
1 160
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
FA5004 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
JOSEPH W. STEWART 907-377-3328
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 117
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
118 - 122
123 - 136 X K REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 137 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
138 - 147
PART II - CONTRACT CLAUSES
354 CONTRACTING SQUADRON -- ISSUING OFFI
354 BROADWAY STREET UNIT 5B
LGCB - COMMODITY/SERVICES
EIELSON AFB AK 99702-1887 907-377-1123
907-377-2389FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
31 Mar 2009
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
FA5004-09-R-C014
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES ESTIMATED
QUANTITY
UNIT UNIT PRICE ESTIMATED AMOUNT
Government Owned Housing Maintenance
FFP
Service Provider shall furnish all necessary transportation, labor, and materials for MFH Unit maintenance to include service calls, COM maintenance, unoccupied unit surveillance, recurring maintenance and repair of housing units and mechanical vaults, mechanical rooms, garages, play-grounds, and equipment, roofs, name plates and holders, fireplace and chimney cleaning, and Self-Help Store Operation. Reference PWS Paragraphs 1.2, 1.2.1, 1.3.3, 1.3.4, 1.3.4.1, 1.3.4.2, 1.4.6, 1.7, 1.7.1.1, 1.7.1.2, 1.7.1.3, sections 1.5, 1.6, 1.12, 1.16 and 1.17 for maintenance covered under this CLIN.
FOB: Destination
NSN: Z163-SE-RVI-CES1
SIGNAL CODE: A
ESTIMATED
NET AMT
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AA 9 Months Basic Monthly Charge
FFP
Base Period is 1 June 2009-28 Feb 2010. Refer to PWS Para. 1.1 FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AB Each Government Owned Housing Reimbursables
FFP
This is a cost reimbursable CLIN for all parts, labor, and materials in support of Government Owned Housing Maintenance. This line item will be a Not To Exceed (NTE) CLIN. Service provider shall invoice for materials, parts and supplies in excess of $50.00. Any commodity items priced over $3000 each requires contracting officer or authorized representitive approval. Mandatory requirements for these types of purchases are: justification for purchase and price information from 3 sources. Reference PWS section 4.7.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AC 300 Hours Supplementary Cleaning
FFP
Perform cleaning of housing units IAW PWS Para 1.2.1.4.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AD 206,250 Square Foot
Paint Exterior Over 200sf
FFP
Preparation, repair, priming, texture, and finish painting of all surfaces IAW PWS Para 1.4.1.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AE 15,000 Square
Paint Exterior Under 200sf
Preparation, repair, priming, texture, and finish painting of all surfaces IAW PWS FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AF 712,500 Square
Paint Interior Over 200sf
Preparation, repair, priming, texture, and finish painting of all surfaces IAW PWS FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AG 30,000 Square
Paint Interior Under 200sf
Preparation, repair, priming, texture, and finish painting of all surfaces IAW PWS FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AH 60,000 Square
Carpet and Pad
Contractor shall repair or replace floor coverings IAW PWS Para 1.4.2.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AJ 7,500 Square
Conversion Carpet to Vinyl
Contractor shall repair or replace floor coverings IAW PWS Para 1.4.2.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AK 9,000 Square
Govt Supplied Carpet, Installed
Contractor shall repair or replace floor coverings IAW PWS Para 1.4.2.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AL 18,750 Square
Replace Vinyl Flooring
Contractor shall repair or replace floor coverings IAW PWS Para 1.4.2.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AM 112 Each Provide Appliance (Billed per Item)
FFP
Provide and Install appliances IAW PWS Para 1.7.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AN 39 Each Loaner Appliances
FFP
Contractor shall deliver, install, maintain, service and retrieve loaner appliances IAW PWS Para 1.7.1.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AP 22 Each Remove/Replace Govt Owned Appliances
FFP
Contractor shall remove government owned refrigerators, washers and/or dryers IAW PWS Para 1.7.1.3.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AQ 100 Square
Lead Based Paint Management
IAW PWS Para 1.9 FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AR 2,250 Square
Asbestos Management/Abatement
IAW PWS Para 1.8 FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AS 3,750 Square
Repair Lawns
Contractor shall repair damaged lawns and remove debris IAW PWS Para 1.10 FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AT 1 Job Seasonal Decorations
FFP
Contractor shall be responsible for installing, maintaining, removal and storage of Seasonal Decorations to include hardware IAW PWS Para 1.19.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AU 45 Job Minor Alteration Projects
FFP
IAW PWS Para 1.15 FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AV Job Disaster Response
FFP
The contractor shall provide sufficient personnel for emergency repairs resulting from unforeseen conditions IAW PWS Para 1.11 FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AW 1,125 Hours Labor Hours Skilled
FFP
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AX 375 Hours Labor Hours, Unskilled
FFP
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AY 15 Each 2 bdrm Basic Clean
FFP
Contractor shall perform basic unit cleaning IAW PWS Appendix 3 for units identified by the housing facility inspector IAW PWS Para 1.2.1.2.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0001AZ 15 Each 3 bdrm Basic Clean
FFP
Contractor shall perform basic unit cleaning IAW PWS Appendix 3 for units identified by the housing facility inspector IAW PWS Para 1.2.1.2.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BA 7 Each 4 bdrm Basic Clean
FFP
Contractor shall perform basic unit cleaning IAW PWS Appendix 3 for units identified by the housing facility inspector IAW PWS Para 1.2.1.2.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0001BB 1 Each 5 bdrm Basic Clean
FFP
Contractor shall perform basic unit cleaning IAW PWS Appendix 3 for units identified by the housing facility inspector IAW PWS Para 1.2.1.2.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
Government Leased Housing
FFP
Service Provider shall furnish all necessary transportation, labor, and materials for MFH Unit maintenance to include service calls, COM maintenance, unoccupied unit surveillance, recurring maintenance and repair of housing units and mechanical vaults, mechanical rooms, garages, play-grounds, and equipment, roofs, name plates and holders, fireplace and chimney cleaning. Reference SOW Paragraphs 1.2, 1.2.1, 1.3.3, 1.3.4, 1.3.4.1, 1.3.4.2, 1.4.6, 1.7, 1.7.1.1, 1.7.1.2, 1.7.1.3, sections 1.5, 1.6, 1.12, and 1.16 for maintenance covered under this CLIN.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0002AA 9 Months Basic Monthly Charge
FFP
Government Leased Housing Base Period is 1 June 2009-28 Feb 2010. Refer to PWS Para. 1.1 FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0002AB Each Government Leased Housing Reimbursables
FFP
This is a cost reimbursable CLIN for all parts, labor, and materials in support of Government Leased Housing Maintenance. This line item will be a Not To Exceed (NTE) CLIN. Service provider shall invoice for materials, parts and supplies in excess of $50.00. Any commodity items priced over $3000 each requires contracting officer or authorized representitive approval. Mandatory requirements for these types of purchases are: justification for purchase and price information from 3 sources. Reference PWS section 4.7.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0002AC 75 Hours Supplementary Cleaning
FFP
Perform cleaning of housing units IAW PWS Para 1.2.1.4.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0002AD 13,875 Square
Preparation, repair, priming, texture, and finish painting of all surfaces IAW PWS Para 1.4.1.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0002AE Square
Preparation, repair, priming, texture, and finish painting of all surfaces IAW PWS Para 1.4.1.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0002AF 562,500 Square
Preparation, repair, priming, texture, and finish painting of all surfaces IAW PWS Para 1.4.1.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0002AG 30,000 Square
Preparation, repair, priming, texture, and finish painting of all surfaces IAW PWS Para 1.4.1.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0002AH 48,750 Square
Contractor shall repair or replace floor coverings IAW PWS Para 1.4.2.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0002AJ 18,750 Square
Contractor shall repair or replace floor coverings IAW PWS Para 1.4.2.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0002AK 7,500 Square
Contractor shall repair or replace floor coverings IAW PWS Para 1.4.2.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0002AL 15,000 Square
Contractor shall repair or replace floor coverings IAW PWS Para 1.4.2.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0002AM 22 Each Remove/Replace Govt Owned Appliances
FFP
Contractor shall remove government owned refrigerators, washers and/or dryers IAW PWS Para 1.7.1.3.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0002AN 7,500 Square
Contractor shall repair damaged lawns and remove debris IAW PWS Para 1.10 FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0002AP 20 Job Minor Alteration Projects
FFP
IAW PWS Para 1.15 FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0002AQ Job Disaster Response
FFP
The contractor shall provide sufficient personnel for emergency repairs resulting from unforeseen conditions IAW PWS Para 1.11 FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0002AR 225 Hours Labor Hours, Skilled
FFP
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0002AS 75 Hours Labor Hours, Unskilled
FFP
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0002AT 12 Each 2 bdrm Basic Clean
FFP
Contractor shall perform basic unit cleaning IAW PWS Appendix 3 for units identified by the housing facility inspector IAW PWS Para 1.2.1.2.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0002AU 12 Each 3 bdrm Basic Clean
FFP
Contractor shall perform basic unit cleaning IAW PWS Appendix 3 for units identified by the housing facility inspector IAW PWS Para 1.2.1.2.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0002AV 4 Each 4 bdrm Basic Clean
FFP
Contractor shall perform basic unit cleaning IAW PWS Appendix 3 for units identified by the housing facility inspector IAW PWS Para 1.2.1.2.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0002AW 1 Each 5 bdrm Basic Clean
FFP
Contractor shall perform basic unit cleaning IAW PWS Appendix 3 for units identified by the housing facility inspector IAW PWS Para 1.2.1.2.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
Unaccompained Housing
FFP
Service Provider shall furnish all necessary transportation, labor, and materials for MFH Unit maintenance to include service calls, COM maintenance, unoccupied unit surveillance, recurring maintenance and repair of housing units and mechanical vaults, mechanical rooms, garages, play-grounds, and equipment, roofs, name plates and holders, fireplace and chimney cleaning. Reference PWS Paragraphs 1.2, 1.2.1, 1.3.3, 1.3.4, 1.3.4.1, 1.3.4.2, 1.4.6, 1.7, 1.7.1.1, 1.7.1.2, 1.7.1.3, sections 1.5, 1.6, 1.12, and 1.16 for maintenance covered under this CLIN.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0003AA 9 Months Basic Monthly Charge
FFP
Unaccompanied Housing Base Period is 1 June 2009-28 Feb 2010. Refer to PWS Para. 1.1 FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0003AB Each Unaccompained Housing Reimbursables
FFP
This is a cost reimbursable CLIN for all parts, labor, and materials in support of Unaccompanied MFH Maintenance. This line item will be a Not To Exceed (NTE) CLIN. Service provider shall invoice for materials, parts and supplies in excess of $50.00. Any commodity items priced over $3000 each requires contracting officer or authorized representitive approval. Mandatory requirements for these types of purchases are: justification for purchase and price information from 3 sources.
Reference PWS section 4.7.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0003AC 10 Hours Supplementary Cleaning
FFP
Perform cleaning of housing units IAW PWS Para 1.2.1.4.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0003AD 8,250 Square
Preparation, repair, priming, texture, and finish painting of all surfaces IAW PWS FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0003AE 750 Square
Preparation, repair, priming, texture, and finish painting of all surfaces IAW PWS FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0003AF 5,550 Square
Preparation, repair, priming, texture, and finish painting of all surfaces IAW PWS FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0003AG 375 Square
Preparation, repair, priming, texture, and finish painting of all surfaces IAW PWS FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0003AH 450 Square
Contractor shall repair or replace floor coverings IAW PWS Para 1.4.2.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0003AJ 170 Square
Contractor shall repair or replace floor coverings IAW PWS Para 1.4.2.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0003AK 110 Square
Contractor shall repair or replace floor coverings IAW PWS Para 1.4.2.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0003AL 200 Square
Contractor shall repair or replace floor coverings IAW PWS Para 1.4.2.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0003AM 1 Each Remove/Replace Govt Owned Appliances
FFP
Contractor shall remove government owned refrigerators, washers and/or dryers FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0003AN 100 Square
Lead Based Paint Management
IAW PWS Para 1.9 FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0003AP 500 Square
Asbestos Management/Abatement
IAW PWS Para 1.8 FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0003AQ 75 Square
Contractor shall repair damaged lawns and remove debris IAW PWS Para 1.10.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0003AR Job Minor Alteration Projects
FFP
IAW PWS Para 1.15 FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0003AS Job Disaster Response
FFP
The contractor shall provide sufficient personnel for emergency repairs resulting from unforeseen conditions IAW PWS Para 1.11.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0003AT 3 Hours Labor Hours, Skilled
FFP
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0003AU 3 Hours Labor Hours, Unskilled
FFP
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0003AV 2 Each 4 bdrm Basic Clean
FFP
Contractor shall perform basic unit cleaning IAW PWS Appendix 3 for units identified by the housing facility inspector IAW PWS Para 1.2.1.2.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0003AW 1 Each 4 bdrm Enhanced Clean
FFP
Contractor shall perform enhanced unit cleaning IAW PWS Appendix 3 for units identified by the housing facility inspector IAW PWS Para 1.2.1.3.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0004 Each Self Help Center Reimbursables
FFP
This is a cost reimbursable CLIN for all materials purchased in support of the self help center inventory (see appendix 7 of PWS). Reference Paragraphs 1.17.1 and
1.17.2 of the PWS.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
Clean & Clear MFH
FFP
Services Provider shall provide complete change of owner maintenance (COM) cleaning services for two, three, four and five bedroom units IAW PWS Paragraphs 1.2.1.1, 1.2.1.2, 1.2.1.3, 1.2.1.5, 1.3.1. See attached Appendix 3, Tables 1, 2, and 3.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0005AA 71 Each 2 bdrm Enhanced Clean
FFP
Contractor shall perform enhanced unit cleaning IAW PWS Appendix 3 for units identified by the housing facility inspector IAW PWS Para 1.2.1.3.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0005AB 71 Each 3 bdrm Enhanced Clean
FFP
Contractor shall perform enhanced unit cleaning IAW PWS Appendix 3 for units identified by the housing facility inspector IAW PWS Para 1.2.1.3.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0005AC 37 Each 4 bdrm Enhanced Clean
FFP
Contractor shall perform enhanced unit cleaning IAW PWS Appendix 3 for units identified by the housing facility inspector IAW PWS Para 1.2.1.3.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
0005AD 15 Each 5 bdrm Enhanced Clean
FFP
Contractor shall perform enhanced unit cleaning IAW PWS Appendix 3 for units identified by the housing facility inspector IAW PWS Para 1.2.1.3.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Government Owned Housing Maintenance
FFP
Service Provider shall furnish all necessary transportation, labor, and materials for MFH Unit maintenance to include service calls, COM maintenance, unoccupied unit surveillance, recurring maintenance and repair of housing units and mechanical vaults, mechanical rooms, garages, play-grounds, and equipment, roofs, name plates and holders, fireplace and chimney cleaning, and Self-Help Store Operation. Reference PWS Paragraphs 1.2, 1.2.1, 1.3.3, 1.3.4, 1.3.4.1, 1.3.4.2, 1.4.6, 1.7, 1.7.1.1, 1.7.1.2, 1.7.1.3, sections 1.5, 1.6, 1.12, 1.16 and 1.17 for maintenance covered under this CLIN.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AA 12 Months OPTION Basic Monthly Charge
FFP
Option Year 1, is 1 March 2010-28 Feb 2011. Refer to PWS Para. 1.1 FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AB Each OPTION Government Owned Housing Reimbursables
FFP
This is a cost reimbursable CLIN for all parts, labor, and materials in support of Government Owned Housing Maintenance. This line item will be a Not To Exceed (NTE) CLIN. Service provider shall invoice for materials, parts and supplies in excess of $50.00. Any commodity items priced over $3000 each requires contracting officer or authorized representitive approval. Mandatory requirements for these types of purchases are: justification for purchase and price information from 3 sources. Reference PWS section 4.7.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AC 400 Hours OPTION Supplementary Cleaning
FFP
Perform cleaning of housing units IAW PWS Para 1.2.1.4.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AD 275,000 Square
OPTION Paint Exterior Over 200sf
Preparation, repair, priming, texture, and finish painting of all surfaces IAW PWS Para 1.4.1.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AE 20,000 Square
OPTION Paint Exterior Under 200sf
Preparation, repair, priming, texture, and finish painting of all surfaces IAW PWS Para 1.4.1.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AF 950,000 Square
OPTION Paint Interior Over 200sf
Preparation, repair, priming, texture, and finish painting of all surfaces IAW PWS Para 1.4.1.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AG 40,000 Square
OPTION Paint Interior Under 200sf
Preparation, repair, priming, texture, and finish painting of all surfaces IAW PWS Para 1.4.1.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AH 80,000 Square
OPTION Carpet and Pad
Contractor shall repair or replace floor coverings IAW PWS Para 1.4.2.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AJ 10,000 Square
OPTION Conversion Carpet to Vinyl
Contractor shall repair or replace floor coverings IAW PWS Para 1.4.2.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AK 12,000 Square
OPTION Govt Supplied Carpet, Installed
Contractor shall repair or replace floor coverings IAW PWS Para 1.4.2.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AL 25,000 Square
OPTION Replace Vinyl Flooring
Contractor shall repair or replace floor coverings IAW PWS Para 1.4.2.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AM 150 Each OPTION Provide Appliance (Billed per Item)
FFP
Provide and Install appliances IAW PWS Para 1.7.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AN 52 Each OPTION Loaner Appliances
FFP
Contractor shall deliver, install, maintain, service and retrieve loaner appliances IAW PWS Para 1.7.1.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AP 30 Each OPTION Remove/Replace Govt Owned Appliances
FFP
Contractor shall remove government owned refrigerators, washers and/or dryers IAW PWS Para 1.7.1.3.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AQ 100 Square
OPTION Lead Based Paint Management
IAW PWS Para 1.9 FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AR 3,000 Square
OPTION Asbestos Management/Abatement
IAW PWS Para 1.8 FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AS 5,000 Square
OPTION Repair Lawns
Contractor shall repair damaged lawns and remove debris IAW PWS Para 1.10 FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AT 2 Job OPTION Seasonal Decorations
FFP
Contractor shall be responsible for installing, maintaining, removal and storage of Seasonal Decorations to include hardware IAW PWS Para 1.19.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AU 60 Job OPTION Minor Alteration Projects
FFP
IAW PWS Para 1.15 FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AV Job OPTION Disaster Response
FFP
The contractor shall provide sufficient personnel for emergency repairs resulting from unforeseen conditions IAW PWS Para 1.11 FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AW 1,500 Hours OPTION Labor Hours Skilled
FFP
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AX 500 Hours OPTION Labor Hours, Unskilled
FFP
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AY 20 Each OPTION 2 bdrm Basic Clean
FFP
Contractor shall perform basic unit cleaning IAW PWS Appendix 3 for units identified by the housing facility inspector IAW PWS Para 1.2.1.2.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001AZ 20 Each OPTION 3 bdrm Basic Clean
FFP
Contractor shall perform basic unit cleaning IAW PWS Appendix 3 for units identified by the housing facility inspector IAW PWS Para 1.2.1.2.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BA 10 Each OPTION 4 bdrm Basic Clean
FFP
Contractor shall perform basic unit cleaning IAW PWS Appendix 3 for units identified by the housing facility inspector IAW PWS Para 1.2.1.2.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1001BB 2 Each OPTION 5 bdrm Basic Clean
FFP
Contractor shall perform basic unit cleaning IAW PWS Appendix 3 for units identified by the housing facility inspector IAW PWS Para 1.2.1.2.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Government Leased Housing
FFP
Service Provider shall furnish all necessary transportation, labor, and materials for MFH Unit maintenance to include service calls, COM maintenance, unoccupied unit surveillance, recurring maintenance and repair of housing units and mechanical vaults, mechanical rooms, garages, play-grounds, and equipment, roofs, name plates and holders, fireplace and chimney cleaning. Reference SOW Paragraphs 1.2, 1.2.1, 1.3.3, 1.3.4, 1.3.4.1, 1.3.4.2, 1.4.6, 1.7, 1.7.1.1, 1.7.1.2, 1.7.1.3, sections 1.5, 1.6, 1.12, and 1.16 for maintenance covered under this CLIN.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1002AA 12 Months OPTION Basic Monthly Charge
FFP
Government Leased Housing Option Year , is 1 March 2010-28 Feb 2011. Refer to PWS Para. 1.1 FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1002AB Each OPTION Government Leased Housing Reimbursables
FFP
This is a cost reimbursable CLIN for all parts, labor, and materials in support of Government Owned Housing Maintenance. Prices will be based on attached price list. This line item will be a Not To Exceed (NTE) CLIN. Service provider shall invoice for materials, parts and supplies in excess of $50.00. Any commodity items priced over $3000 a piece will have contracting officer approval upon recommendation by QAP prior to purchase. Mandatory requirements for these types of purchases are: justification for purchase and price information from 3 sources. Reference PWS section 4.7.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1002AC 100 Hours OPTION Supplementary Cleaning
FFP
Perform cleaning of housing units IAW PWS Para 1.2.1.4.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1002AD 18,500 Square
Preparation, repair, priming, texture, and finish painting of all surfaces IAW PWS Para 1.4.1.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1002AE 1,000 Square
Preparation, repair, priming, texture, and finish painting of all surfaces IAW PWS Para 1.4.1.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1002AF 750,000 Square
Preparation, repair, priming, texture, and finish painting of all surfaces IAW PWS Para 1.4.1.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1002AG 40,000 Square
Preparation, repair, priming, texture, and finish painting of all surfaces IAW PWS Para 1.4.1.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1002AH 65,000 Square
Contractor shall repair or replace floor coverings IAW PWS Para 1.4.2.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1002AJ 25,000 Square
Contractor shall repair or replace floor coverings IAW PWS Para 1.4.2.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1002AK 10,000 Square
Contractor shall repair or replace floor coverings IAW PWS Para 1.4.2.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1002AL 20,000 Square
Contractor shall repair or replace floor coverings IAW PWS Para 1.4.2.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1002AM 30 Each OPTION Remove/Replace Govt Owned Appliances
FFP
Contractor shall remove government owned refrigerators, washers and/or dryers IAW PWS Para 1.7.1.3.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1002AN 10,000 Square
Contractor shall repair damaged lawns and remove debris IAW PWS Para 1.10 FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1002AP 40 Job OPTION Minor Alteration Projects
FFP
IAW PWS Para 1.15 FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1002AQ Job OPTION Disaster Response
FFP
The contractor shall provide sufficient personnel for emergency repairs resulting from unforeseen conditions IAW PWS Para 1.11 FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1002AR 300 Hours OPTION Labor Hours, Skilled
FFP
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1002AS 100 Hours OPTION Labor Hours, Unskilled
FFP
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1002AT 16 Each OPTION 2 bdrm Basic Clean
FFP
Contractor shall perform basic unit cleaning IAW PWS Appendix 3 for units identified by the housing facility inspector IAW PWS Para 1.2.1.2.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1002AU 16 Each OPTION 3 bdrm Basic Clean
FFP
Contractor shall perform basic unit cleaning IAW PWS Appendix 3 for units identified by the housing facility inspector IAW PWS Para 1.2.1.2.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1002AV 6 Each OPTION 4 bdrm Basic Clean
FFP
Contractor shall perform basic unit cleaning IAW PWS Appendix 3 for units identified by the housing facility inspector IAW PWS Para 1.2.1.2.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1002AW 2 Each OPTION 5 bdrm Basic Clean
FFP
Contractor shall perform basic unit cleaning IAW PWS Appendix 3 for units identified by the housing facility inspector IAW PWS Para 1.2.1.2.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Unaccompained Housing
FFP
Service Provider shall furnish all necessary transportation, labor, and materials for MFH Unit maintenance to include service calls, COM maintenance, unoccupied unit surveillance, recurring maintenance and repair of housing units and mechanical vaults, mechanical rooms, garages, play-grounds, and equipment, roofs, name plates and holders, fireplace and chimney cleaning. Reference PWS Paragraphs 1.2, 1.2.1, 1.3.3, 1.3.4, 1.3.4.1, 1.3.4.2, 1.4.6, 1.7, 1.7.1.1, 1.7.1.2, 1.7.1.3, sections 1.5, 1.6, 1.12, and 1.16 for maintenance covered under this CLIN.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1003AA 12 Months OPTION Basic Monthly Charge
FFP
Unaccompanied HousingOption Year 1, is 1 March2010-28 Feb 2011. Refer to PWS Para. 1.1 FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1003AB Each OPTION Unaccompained Housing Reimbursables
FFP
This is a cost reimbursable CLIN for all parts, labor, and materials in support of Unaccompanied MFH Maintenance. This line item will be a Not To Exceed (NTE) CLIN. Service provider shall invoice for materials, parts and supplies in excess of $50.00. Any commodity items priced over $3000 each requires contracting officer or authorized representitive approval. Mandatory requirements for these types of purchases are: justification for purchase and price information from 3 sources. Reference PWS section 4.7.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1003AC 10 Hours OPTION Supplementary Cleaning
FFP
Perform cleaning of housing units IAW PWS Para 1.2.1.4.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1003AD 11,000 Square
Preparation, repair, priming, texture, and finish painting of all surfaces IAW PWS FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1003AE 1,000 Square
Preparation, repair, priming, texture, and finish painting of all surfaces IAW PWS FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1003AF 7,400 Square
Preparation, repair, priming, texture, and finish painting of all surfaces IAW PWS FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1003AG 500 Square
Preparation, repair, priming, texture, and finish painting of all surfaces IAW PWS FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1003AH 600 Square
Contractor shall repair or replace floor coverings IAW PWS Para 1.4.2.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1003AJ 170 Square
Contractor shall repair or replace floor coverings IAW PWS Para 1.4.2.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1003AK 200 Square
Contractor shall repair or replace floor coverings IAW PWS Para 1.4.2.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1003AL 110 Square
Contractor shall repair or replace floor coverings IAW PWS Para 1.4.2.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1003AM 1 Each OPTION Remove/Replace Govt Owned Appliances
FFP
Contractor shall remove government owned refrigerators, washers and/or dryers FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1003AN 100 Square
IAW PWS Para 1.9 FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1003AP 1,000 Square
IAW PWS Para 1.8 FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1003AQ 100 Square
Contractor shall repair damaged lawns and remove debris IAW PWS Para 1.10.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1003AR Job OPTION Minor Alteration Projects
FFP
IAW PWS Para 1.15 FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1003AS Job OPTION Disaster Response
FFP
The contractor shall provide sufficient personnel for emergency repairs resulting from unforeseen conditions IAW PWS Para 1.11.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1003AT 4 Hours OPTION Labor Hours, Skilled
FFP
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1003AU 4 Hours OPTION Labor Hours, Unskilled
FFP
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1003AV 3 Each OPTION 4 bdrm Basic Clean
FFP
Contractor shall perform basic unit cleaning IAW PWS Appendix 3 for units identified by the housing facility inspector IAW PWS Para 1.2.1.2.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1003AW 1 Each OPTION 4 bdrm Enhanced Clean
FFP
Contractor shall perform enhanced unit cleaning IAW PWS Appendix 3 for units identified by the housing facility inspector IAW PWS Para 1.2.1.3.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1004 Each OPTION Self Help Center Reimbursables
FFP
This is a cost reimbursable CLIN for all materials purchased in support of the self help center inventory (see appendix 7 of PWS). Reference Paragraphs 1.17.1 and
1.17.2 of the PWS.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Clean & Clear MFH
FFP
Services Provider shall provide complete change of owner maintenance (COM) cleaning services for two, three, four and five bedroom units IAW PWS Paragraphs 1.2.1.1, 1.2.1.2, 1.2.1.3, 1.2.1.5, 1.3.1. See attached Appendix 3, Tables 1, 2, and 3.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1005AA 95 Each OPTION 2 bdrm Enhanced Clean
FFP
Contractor shall perform enhanced unit cleaning IAW PWS Appendix 3 for units identified by the housing facility inspector IAW PWS Para 1.2.1.3.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1005AB 95 Each OPTION 3 bdrm Enhanced Clean
FFP
Contractor shall perform enhanced unit cleaning IAW PWS Appendix 3 for units identified by the housing facility inspector IAW PWS Para 1.2.1.3.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1005AC 50 Each OPTION 4 bdrm Enhanced Clean
FFP
Contractor shall perform enhanced unit cleaning IAW PWS Appendix 3 for units identified by the housing facility inspector IAW PWS Para 1.2.1.3.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
1005AD 20 Each OPTION 5 bdrm Enhanced Clean
FFP
Contractor shall perform enhanced unit cleaning IAW PWS Appendix 3 for units identified by the housing facility inspector IAW PWS Para 1.2.1.3.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Government Owned Housing Maintenance
FFP
Service Provider shall furnish all necessary transportation, labor, and materials for MFH Unit maintenance to include service calls, COM maintenance, unoccupied unit surveillance, recurring maintenance and repair of housing units and mechanical vaults, mechanical rooms, garages, play-grounds, and equipment, roofs, name plates and holders, fireplace and chimney cleaning, and Self-Help Store Operation. Reference PWS Paragraphs 1.2, 1.2.1, 1.3.3, 1.3.4, 1.3.4.1, 1.3.4.2, 1.4.6, 1.7, 1.7.1.1, 1.7.1.2, 1.7.1.3, sections 1.5, 1.6, 1.12, 1.16 and 1.17 for maintenance covered under this CLIN.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AA 12 Months OPTION Basic Monthly Charge
FFP
Option Year 2, 1 March 2011-29 Feb 2012. Refer to PWS Para. 1.1 FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AB Each OPTION Government Owned Housing Reimbursables
FFP
This is a cost reimbursable CLIN for all parts, labor, and materials in support of Government Owned Housing Maintenance. This line item will be a Not To Exceed (NTE) CLIN. Service provider shall invoice for materials, parts and supplies in excess of $50.00. Any commodity items priced over $3000 each requires contracting officer or authorized representitive approval. Mandatory requirements for these types of purchases are: justification for purchase and price information from 3 sources. Reference PWS section 4.7.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AC 400 Hours OPTION Supplementary Cleaning
FFP
Perform cleaning of housing units IAW PWS Para 1.2.1.4.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AD 275,000 Square
Preparation, repair, priming, texture, and finish painting of all surfaces IAW PWS Para 1.4.1.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AE 20,000 Square
Preparation, repair, priming, texture, and finish painting of all surfaces IAW PWS Para 1.4.1.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AF 950,000 Square
Preparation, repair, priming, texture, and finish painting of all surfaces IAW PWS Para 1.4.1.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AG 40,000 Square
Preparation, repair, priming, texture, and finish painting of all surfaces IAW PWS Para 1.4.1.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AH 80,000 Square
Contractor shall repair or replace floor coverings IAW PWS Para 1.4.2.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AJ 10,000 Square
Contractor shall repair or replace floor coverings IAW PWS Para 1.4.2.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AK 12,000 Square
Contractor shall repair or replace floor coverings IAW PWS Para 1.4.2.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AL 25,000 Square
Contractor shall repair or replace floor coverings IAW PWS Para 1.4.2.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AM 150 Each OPTION Provide Appliance (Billed per Item)
FFP
Provide and Install appliances IAW PWS Para 1.7.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AN 52 Each OPTION Loaner Appliances
FFP
Contractor shall deliver, install, maintain, service and retrieve loaner appliances IAW PWS Para 1.7.1.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AP 30 Each OPTION Remove/Replace Govt Owned Appliances
FFP
Contractor shall remove government owned refrigerators, washers and/or dryers IAW PWS Para 1.7.1.3.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AQ 100 Square
IAW PWS Para 1.9 FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AR 3,000 Square
IAW PWS Para 1.8 FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AS 5,000 Square
Contractor shall repair damaged lawns and remove debris IAW PWS Para 1.10 FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AT 60 Job OPTION Seasonal Decorations
FFP
Contractor shall be responsible for installing, maintaining, removal and storage of Seasonal Decorations to include hardware IAW PWS Para 1.19.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AU Job OPTION Minor Alteration Projects
FFP
IAW PWS Para 1.15 FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AV Job OPTION Disaster Response
FFP
The contractor shall provide sufficient personnel for emergency repairs resulting from unforeseen conditions IAW PWS Para 1.11 FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AW 1,500 Hours OPTION Labor Hours Skilled
FFP
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AX 500 Hours OPTION Labor Hours, Unskilled
FFP
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001AY 20 Each OPTION 2 bdrm Basic Clean
FFP
Contractor shall perform basic unit cleaning IAW PWS Appendix 3 for units identified by the housing facility inspector IAW PWS Para 1.2.1.2.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BA 10 Each OPTION 4 bdrm Basic Clean
FFP
Contractor shall perform basic unit cleaning IAW PWS Appendix 3 for units identified by the housing facility inspector IAW PWS Para 1.2.1.2.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BB 2 Each OPTION 5 bdrm Basic Clean
FFP
Contractor shall perform basic unit cleaning IAW PWS Appendix 3 for units identified by the housing facility inspector IAW PWS Para 1.2.1.2.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2001BC 20 Each OPTION 3 bdrm Basic Clean
FFP
Contractor shall perform basic unit cleaning IAW PWS Appendix 3 for units identified by the housing facility inspector IAW PWS Para 1.2.1.2.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Government Leased Housing
FFP
Service Provider shall furnish all necessary transportation, labor, and materials for MFH Unit maintenance to include service calls, COM maintenance, unoccupied unit surveillance, recurring maintenance and repair of housing units and mechanical vaults, mechanical rooms, garages, play-grounds, and equipment, roofs, name plates and holders, fireplace and chimney cleaning. Reference SOW Paragraphs 1.2, 1.2.1, 1.3.3, 1.3.4, 1.3.4.1, 1.3.4.2, 1.4.6, 1.7, 1.7.1.1, 1.7.1.2, 1.7.1.3, sections 1.5, 1.6, 1.12, and 1.16 for maintenance covered under this CLIN.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2002AA 12 Months OPTION Basic Monthly Charge
FFP
Government Leased Housing Option Year 2, 1 March 2011-2 Feb 2012. Refer to PWS Para. 1.1 FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2002AB Each OPTION Government Leased Housing Reimbursables
FFP
This is a cost reimbursable CLIN for all parts, labor, and materials in support of Government Leased Housing Maintenance. This line item will be a Not To Exceed (NTE) CLIN. Service provider shall invoice for materials, parts and supplies in excess of $50.00. Any commodity items priced over $3000 each requires contracting officer or authorized representitive approval. Mandatory requirements for these types of purchases are: justification for purchase and price information from 3 sources. Reference PWS section 4.7.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2002AC 100 Hours OPTION Supplementary Cleaning
FFP
Perform cleaning of housing units IAW PWS Para 1.2.1.4.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2002AD 18,500 Square
Preparation, repair, priming, texture, and finish painting of all surfaces IAW PWS Para 1.4.1.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2002AE 1,000 Square
Preparation, repair, priming, texture, and finish painting of all surfaces IAW PWS Para 1.4.1.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2002AF 750,000 Square
Preparation, repair, priming, texture, and finish painting of all surfaces IAW PWS Para 1.4.1.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2002AG 40,000 Square
Preparation, repair, priming, texture, and finish painting of all surfaces IAW PWS Para 1.4.1.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2002AH 65,000 Square
Contractor shall repair or replace floor coverings IAW PWS Para 1.4.2.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2002AJ 25,000 Square
Contractor shall repair or replace floor coverings IAW PWS Para 1.4.2.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2002AK 10,000 Square
Contractor shall repair or replace floor coverings IAW PWS Para 1.4.2.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2002AL 20,000 Square
Contractor shall repair or replace floor coverings IAW PWS Para 1.4.2.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2002AM 30 Each OPTION Remove/Replace Govt Owned Appliances
FFP
Contractor shall remove government owned refrigerators, washers and/or dryers IAW PWS Para 1.7.1.3.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2002AN 10,000 Square
Contractor shall repair damaged lawns and remove debris IAW PWS Para 1.10 FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2002AP 40 Job OPTION Minor Alteration Projects
FFP
IAW PWS Para 1.15 FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2002AQ Job OPTION Disaster Response
FFP
The contractor shall provide sufficient personnel for emergency repairs resulting from unforeseen conditions IAW PWS Para 1.11 FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2002AR 300 Hours OPTION Labor Hours, Skilled
FFP
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2002AS 100 Hours OPTION Labor Hours, Unskilled
FFP
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2002AT 16 Each OPTION 2 bdrm Basic Clean
FFP
Contractor shall perform basic unit cleaning IAW PWS Appendix 3 for units identified by the housing facility inspector IAW PWS Para 1.2.1.2.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2002AU 16 Each OPTION 3 bdrm Basic Clean
FFP
Contractor shall perform basic unit cleaning IAW PWS Appendix 3 for units identified by the housing facility inspector IAW PWS Para 1.2.1.2.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2002AV 6 Each OPTION 4 bdrm Basic Clean
FFP
Contractor shall perform basic unit cleaning IAW PWS Appendix 3 for units identified by the housing facility inspector IAW PWS Para 1.2.1.2.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2002AW 2 Each OPTION 5 bdrm Basic Clean
FFP
Contractor shall perform basic unit cleaning IAW PWS Appendix 3 for units identified by the housing facility inspector IAW PWS Para 1.2.1.2.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Unaccompained Housing
FFP
Service Provider shall furnish all necessary transportation, labor, and materials for MFH Unit maintenance to include service calls, COM maintenance, unoccupied unit surveillance, recurring maintenance and repair of housing units and mechanical vaults, mechanical rooms, garages, play-grounds, and equipment, roofs, name plates and holders, fireplace and chimney cleaning. Reference PWS Paragraphs 1.2, 1.2.1, 1.3.3, 1.3.4, 1.3.4.1, 1.3.4.2, 1.4.6, 1.7, 1.7.1.1, 1.7.1.2, 1.7.1.3, sections 1.5, 1.6, 1.12, and 1.16 for maintenance covered under this CLIN.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2003AA 12 Months OPTION Basic Monthly Charge
FFP
Unaccompanied Housing Option Year 2, 1 March 2011-29 Feb 2012. Refer to PWS Para. 1.1 FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2003AB Each OPTION Unaccompained Housing Reimbursables
FFP
This is a cost reimbursable CLIN for all parts, labor, and materials in support of Unaccompanied MFH Maintenance. This line item will be a Not To Exceed (NTE) CLIN. Service provider shall invoice for materials, parts and supplies in excess of $50.00. Any commodity items priced over $3000 each requires contracting officer or authorized representitive approval. Mandatory requirements for these types of purchases are: justification for purchase and price information from 3 sources. Reference PWS section 4.7.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2003AC 10 Hours OPTION Supplementary Cleaning
FFP
Perform cleaning of housing units IAW PWS Para 1.2.1.4.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2003AD 11,000 Square
Preparation, repair, priming, texture, and finish painting of all surfaces IAW PWS FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2003AE 1,000 Square
Preparation, repair, priming, texture, and finish painting of all surfaces IAW PWS FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2003AF 7,400 Square
Preparation, repair, priming, texture, and finish painting of all surfaces IAW PWS FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2003AG 500 Square
Preparation, repair, priming, texture, and finish painting of all surfaces IAW PWS FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2003AH 600 Square
Contractor shall repair or replace floor coverings IAW PWS Para 1.4.2.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2003AJ 170 Square
Contractor shall repair or replace floor coverings IAW PWS Para 1.4.2.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2003AK 110 Square
Contractor shall repair or replace floor coverings IAW PWS Para 1.4.2.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2003AL 200 Square
Contractor shall repair or replace floor coverings IAW PWS Para 1.4.2.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2003AM 1 Each OPTION Remove/Replace Govt Owned Appliances
FFP
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2003AN 100 Square
IAW PWS Para 1.9 FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2003AP 1,000 Square
IAW PWS Para 1.8 FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2003AQ 100 Square
Contractor shall repair damaged lawns and remove debris IAW PWS Para 1.10.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2003AR Job OPTION Minor Alteration Projects
FFP
IAW PWS Para 1.15 FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2003AS Job OPTION Disaster Response
FFP
The contractor shall provide sufficient personnel for emergency repairs resulting from unforeseen conditions IAW PWS Para 1.11.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2003AT 4 Hours OPTION Labor Hours, Skilled
FFP
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2003AU 4 Hours OPTION Labor Hours, Unskilled
FFP
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2003AV 3 Each OPTION 4 bdrm Basic Clean
FFP
Contractor shall perform basic unit cleaning IAW PWS Appendix 3 for units identified by the housing facility inspector IAW PWS Para 1.2.1.2.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2003AW 1 Each OPTION 4 bdrm Enhanced Clean
FFP
Contractor shall perform enhanced unit cleaning IAW PWS Appendix 3 for units identified by the housing facility inspector IAW PWS Para 1.2.1.3.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
2004 Each OPTION Self Help Center Reimbursables
FFP
This is a cost reimbursable CLIN for all materials purchased in support of the self help center inventory (see appendix 7 of PWS). Reference Paragraphs 1.17.1 and
1.17.2 of the PWS.
FOB: Destination
UNIT UNIT PRICE ESTIMATED AMOUNT
OPTION Clean & Clear…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .