Attachment_9_-_Asbestos_and_Lead_Inspection.pdf
PDF 2 MB Posted
- Attached to
- Chapel Kitchen Renovation Federal contract opportunity
- Solicitation number
- FA489719BA009
About this file
Attachment 9 - Asbestos and Lead Inspection
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_FA489719BA0090001.pdf | ||
| Amendment_FA489719BA0090002.pdf | ||
| Attachment_10_-_Utilities_Map.pdf | ||
| Attachment_8_-_FSRM_PCR.pdf | ||
| Amendment_FA489719BA0090002.pdf | ||
| Attachment_7_-_Questions_and_Answers.pdf | ||
| Attachment_11_-_Addendum_1.pdf | ||
| Amendment_FA489719BA0090001.pdf | ||
| Attachment_3_-_PCR_Appendices2.pdf | ||
| Attachment_1_-_Chapel_Kitchen_SOW.pdf | ||
| Attachment_2_-_Design_Drawings3.pdf | ||
| Solicitation_-_FA489719BA009.pdf | ||
| Attachment_4_-_Wage_Determinations.pdf | ||
| Attachment_5_-_Grand_View_Gate_Access_Information.pdf | ||
| Attachment_2_-_Design_Drawings2.pdf | ||
| Attachment_6_-_SFS_FORM_30.pdf | ||
| Attachment_2_-_Design_Drawings1.pdf | ||
| Attachment_3_-_PCR_Appendices1.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
8312 W Northview St. #100, Boise, ID, 83704 • 208-323-8287 • www.industrialhygieneresources.com
Report of Asbestos and Lead Inspection MHAFB Chapel (Facility 2606) Kitchen
Mountain Home Air Force Base Mountain Home, Idaho
Prepared for:
Paul Derr, Project Manager HDR, Inc.
Prepared by:
Rebecca Ellis
AHERA Building Inspector Anthony Bongiovano
EPA Lead Inspector
Assessment Date:
September 20, 2018
Report Date:
October 9, 2018
Project Number:
F:\2018\IHR 2018\6068-HDR MHAFB-Chapel Kitchen\Narrative.docx
Executive Summary
Industrial Hygiene Resources (IHR: www.industrialhygieneresources.com) of Boise, Idaho was contracted by HDR, Inc. to conduct a limited hazardous materials inspection of the Chapel (Facility 2606) kitchen and fellowship hall #1 located on the Mountain Home Air Force Base in Mountain Home, Idaho. The inspection was focused on asbestos containing materials (ACM) and lead-based paints (LBP). This evaluation was the first action to support renovation activities.
Rebecca Ellis and Anthony Bongiovano of IHR, conducted the inspection on September 20, 2018. Rebecca is an accredited (AHERA)1 Asbestos Building Inspector and Anthony is an EPA Lead Based Paint Inspector. Matthew Call, CIH, CSP, Vice President of IHR reviewed and approved this survey report.
Conclusions
➢ The following building materials contained greater than 1% asbestos and were characterized as asbestos containing material (ACM):
Miscellaneous:
• Black mastic under vinyl floor tile in the fellowship hall #1: ~2,300 ft2
➢ No lead-based paint was found on surfaces in the chapel kitchen and fellowship hall #1.
Recommendations
✓ Contractors should be apprised of the presence of asbestos in these buildings.
✓ Prior to any renovation requiring the removal of asbestos above the threshold of 160 square feet, or 260 linear feet, a 10-day notification must be filed with Environmental Protection Agency (EPA). All asbestos containing materials (ACM) should be abated by a qualified contractor utilizing AHERA trained workers. Upon removal, all ACM must be disposed of at a landfill qualified to accept asbestos containing waste material. All demolition projects must submit a 10-day notification to EPA even if no asbestos is present.
1 AHERA: Asbestos Hazard Emergency Response Act - 1985 (“Asbestos in Schools”).
http://www.industrialhygieneresources.com/
Contents Executive Summary
Conclusions
Recommendations
Background
Objectives
Methods
Results and Discussion:
Conclusions
Recommendations
Appendix A-Photolog
Appendix B- Laboratory Reports
Appendix C- Consultant’s Certifications
Limitations/Disclaimer
Background
The Chapel is located on the Mountain Home Air Force Base. This single-story building consisted of offices, restrooms, fellowship halls, a chapel, and a kitchen.
Asbestos is also regulated by the US Environmental Protection Agency (EPA) via three regulations. All regulations apply when building materials contain greater than 1% asbestos (>1%):
1) National Emission Standards for Hazardous Air Pollutants (NESHAP-Asbestos)
2) Asbestos Hazard Emergency Response Act (AHERA-schools-1983). This Act provided officials in schools, K-12, with rules and guidance for the management of asbestos containing materials. The majority of asbestos related procedures and regulations are based on this act. EPA produced regulations (40CFR763) mandating eight topics, with the first one being inspections (as produced here in this report). This section also includes EPA Worker Protection Rule (subpart G of AHERA).
3) Asbestos School Hazard Abatement Reauthorization Act (ASHARA-1992). This regulation extended AHERA regulations to cover public and commercial buildings.
The US Occupational Safety and Health Administration is charged with protecting the health of workers (OSHA: 34TUhttps://www.osha.gov/SLTC/asbestos/index.htmlU). OSHA considers building materials that contain any amount of asbestos to have the potential to cause excessive asbestos fiber exposures to employees (including contractors), and regulates operations and restoration work via its asbestos general industry and construction standards. The full standard applies when building materials contain greater than 1% asbestos (>1%).
OSHA also regulates worker exposures to lead. OSHA considers any amount of lead in paint to have the potential to cause excessive lead exposures to workers (and to their children). Where lead is present in building materials, OSHA requires employers to perform exposure assessments that consider the type of work that may disturb the lead.
https://www.osha.gov/SLTC/asbestos/index.html
Table I: Potential hazards evaluated during this assessment, September 20, 2018.
Potential Hazard Source / Product Physical
State Defining
Threshold Source Limit Type
Asbestos Building Materials Solid >1.0 % Asbestos EPA Regulatory
Lead-Based Paint Paint Solid Any amount OSHA Regulatory
Objectives
The purpose of this work was to identify Asbestos Containing Material (ACM) and Lead Based Paint (LBP) to support the planned renovation of this building. Ultimately, the purpose of this work was to protect building occupants and workers from asbestos and lead hazards.
Methods
Asbestos Inspection:
Rebecca Ellis, an accredited (AHERA)2 Asbestos Building Inspector, performed the survey work on September 20, 2018. Rebecca collected thirteen bulk samples of building materials suspected of containing asbestos during the inspection. The asbestos sampling scheme was developed to comply with ASHARA and NESHAP requirements
Asbestos containing materials (ACM) are defined as materials with an asbestos content greater than 1% by volume (>1%). If a sample is found to have a trace of asbestos, but less than 10% by PLM, it should be assumed to be asbestos. In order for a material to not be considered ACM, the sample must be re-analyzed by the point-count method, and documented to be 1% or less (≤1%). Two samples were point counted for this inspection.
Asbestos bulk samples were analyzed by DCM Science Lab, Inc. (www.dcmsciencelab.com) located at 12421 West 49th Ave, #6, Wheat Ridge, Colorado. DCM is accredited by the NVLAP/NIST3 program for asbestos in bulk materials. DCM Science Laboratory is also accredited by the AIHA4 for the analysis of asbestos air samples (www.aihaaccreditedlabs.org).
The laboratory results are presented in the Appendix.
2 AHERA: Asbestos Hazard Emergency Response Act - 1985 (“Asbestos in Schools”).
3 NVLAP/NIST: National Voluntary Laboratory Accreditation Program/National Institute of Standards and Technology (asbestos in bulk materials).
4 AIHA: American Industrial Hygiene Association.
http://www.dcmsciencelab.com/certQual.htm http://www.aihaaccreditedlabs.org/AccredPrograms/IHLAP/Pages/default.aspx
Lead-Based Paint:
Anthony Bongiovano, an accredited EPA Certified Lead Paint Inspector, performed the survey work on the same day September 20, 2018. Anthony used a direct reading, Thermo-Scientific, Niton®, XLp 300 Lead Paint Analyzer (Serial Number 23516) to quantify concentrations of lead in paint on surfaces. These included interior walls, doors, and door jambs. Anthony sampled nine locations for lead and included periodic calibration checks for accuracy verification.
Table II: Sampling and Analytical Methods for Bulk Asbestos and Direct Reading XRF Samples
Air Contaminant Sample Type Analytical Method Detection limit
Asbestos Bulk Material PLM Method 600 0.25%
Lead Direct reading XRF 0.01 mg/cm2
Results and Discussion:
Asbestos Containing Materials (Table III):
The Figures and Table IV document the presence and concentrations of asbestos found in building materials from this inspection. The building materials found to have regulated amounts of asbestos are as follows:
Thermal System Insulation:
➢ None.
Surfacing:
➢ None.
Miscellaneous:
Non-Regulated Materials (no regulated amounts of asbestos):
➢ The following building material samples scheduled to be impacted for renovation were found to have no regulated amounts of asbestos (<1% asbestos by volume). Any of these types of building materials generated from remodeling or demolition activities can be discarded as general construction debris at the local landfill.
✓ Ceiling tiles
✓ Sheet vinyl
✓ Cove base
✓ Mudded elbow
✓ Drywall
N
Industrial Hygiene Resources
Mountain Home Air Force Base Chapel and Fellowship Hall #1
Sample Locations Mountain Home, Idaho
October 2018
Legend:
12’’x12’’ VFT with black mastic underneath
DW-1B
drywall
SV-1A
sheet vinyl
CB-1A
covebase
DW-1C
drywall
DW-1A
drywall
CT-1A
ceiling tile
ME-1A
mudded elbow
DW-2C
drywall
DW-2A
drywall
VFT-1A
vinyl floor tile
DW-2B
drywall
DW-2C
drywall
CT-2A
CT-3A
ceiling tile becca Typewritten Text becca Typewritten Text
Table III: Asbestos Content in Building Materials: MHAFB Chapel Kitchen
Sample Number Description/Location Results %
Asbestos* Material Condition**
SV-1A Sheet vinyl flooring/kitchen N/A A. Yellow mastic ND B. Grey fibrous resin ND C. Multicolored resinous tile ND
CB-1A Covebase-blue 4in/kitchen N/A
A. White mastic ND B. Blue basecove ND
DW-1A Drywall-blue wall/kitchen N/A
A. Blue/white paint ND B. White texture ND
DW-1B Drywall/ kitchen east side N/A
A. Tan/white paint ND B. Tan fibrous ND C. White texture ND D. White drywall ND
DW-1C Drywall/kitchen west entrance N/A
A. Tan paint ND B. Tan fibrous ND C. White texture ND D. White drywall ND
*Asbestos containing materials (ACM), under current EPA regulation are defined as material with an asbestos content greater than 1% by volume. OSHA regulation defines ACM as material with any amounts of asbestos content, including trace amounts.
Bolded numbers are above the regulatory threshold for regulated asbestos.
** Good condition: no visible damage or deterioration Fair condition: damaged Poor condition: significantly damaged † Sample was point counted
Table III (continued): Asbestos Content in Building Materials: MHAFB Chapel Kitchen
Sample Number Description/Location Results %
Asbestos* Material
Condition**
CT-1A Ceiling tile 2x4 bird’s feet/kitchen N/A
A. White texture ND B. Tan perlitic ceiling tile ND
ME-1A Mudded elbow/Above ceiling north kitchen side N/A A. White paint ND B. White fibrous woven ND C. Grey fibrous plaster
DW-2A Drywall/fellowship hall #1 south wall N/A
B. White drywall ND C. Tan/white fibrous ND D. Multicolored paint ND E. Grey drywall mud 0.75% Chrysotile †
DW-2B Drywall/fellowship hall #1 north wall N/A
B. Multicolored paint ND C. Tan fibrous ND D. White drywall ND
DW-2C Drywall/fellowship hall #1 west wall N/A
B. White paint ND C. Grey drywall mud 0.50% Chrysotile †
CT-2A Ceiling tile 2x2 birds feet/fellowship hall #1 N/A A. White paint ND B. Tan perlitic ceiling tile ND
*Asbestos containing materials (ACM), under current EPA regulation are defined as material with an asbestos content greater than 1% by volume. OSHA regulation defines ACM as material with any amounts of asbestos content, including trace amounts.
Bolded numbers are above the regulatory threshold for regulated asbestos.
** Good condition: no visible damage or deterioration Fair condition: damaged
Table III (continued): Asbestos Content in Building Materials: MHAFB Chapel Kitchen
Sample Number Description/Location Results %
Asbestos* Material Condition**
CT-3A
Ceiling tile 1x1 stapled/above fellowship hall ceiling
N/A
A. White plaster ND B. White paint ND C. Yellow ceiling tile ND
VFT-1A Vinyl floor tile 12’’x12’’ tan/fellowship hall #1 Good
A. Black tar 9.0% Chrysotile B. Grey concrete ND C. White plaster ND D. Yellow mastic ND E. White tile ND
*Asbestos containing materials (ACM), under current EPA regulation are defined as material with an asbestos content greater than 1% by volume. OSHA regulation defines ACM as material with any amounts of asbestos content, including trace amounts.
Bolded numbers are above the regulatory threshold for regulated asbestos.
** Good condition: no visible damage or deterioration Fair condition: damaged
Lead-Based Paint (Table IV):
Table V documents the concentrations of lead-based paint on the painted surfaces. In Table IV, the column labeled Total Pb (PbC) is the concentration of lead in the paint in milligrams of lead per square centimeter of surface area (mg/cm2). Painted surfaces containing lead are marked with bold print.
Materials regulated under the OSHA Lead in Construction Standard:
➢ None
Lead in Surface Coatings (Table IV):
Table V documents the amount of lead present in paint on building surfaces from this inspection.
Table IV: Concentrations of Lead in in Surface Materials: MHAFB Chapel Kitchen
Reading No.
Color Component Substrate Area Side Total
Pb (PbC)
1 RED Calibration Chapel 1.4
2 BLUE Wall Drywall Chapel S <LOD
3 BEIGE Wall Drywall Chapel S <LOD
4 TAN Wall Drywall Chapel N <LOD
5 TAN Wall Drywall Chapel W <LOD
6 RED Calibration Chapel 0.9
Conclusions
➢ The following building materials contained greater than 1% asbestos and were characterized as asbestos containing material (ACM):
Miscellaneous:
➢ No lead-based paint was found on surfaces in the chapel kitchen and fellowship hall #1.
Recommendations
✓ Contractors should be apprised of the presence of asbestos in these buildings.
✓ Prior to any renovation requiring the removal of asbestos above the threshold of 160 square feet, or 260 linear feet, a 10-day notification must be filed with Environmental Protection Agency (EPA). All asbestos containing materials (ACM) should be abated by a qualified contractor utilizing AHERA trained workers. Upon removal, all ACM must be disposed of at a landfill qualified to accept asbestos containing waste material. All demolition projects must submit a 10-day notification to EPA even if no asbestos is present.
Report by:
Occupational Safety and Health AHERA Building Inspector Certification #5892-11
Anthony S Bongiovano Industrial Hygiene Technician EPA Lead Inspector Certificate: LBP-I-I176053-1
Reviewed By:
Matthew Call, MS, CIH, CSP Vice President Industrial Hygiene Resources (IHR)
Appendix A-Photolog
Photo 1: View of the sample location for the vinyl floor tile located in the fellowship hall #1.
The black mastic on the underside of the tile contains 9.0% chrysotile asbestos.
Appendix B- Laboratory Reports
12421 W. 49TH AVENUE, UNIT #6
WHEAT RIDGE, CO 80033 (303) 463-8270
BULK ASBESTOS TEST REPORT
CLIENT: ANALYSIS DATE: 9-25-18
INDUSTRIAL HYGIENE RESOURCES REPORTING DATE: 9-26-18
8312 NORTHVIEW, SUITE #100 RECEIPT DATE: 9-21-18
BOISE, ID 83704 CLIENT JOB NO.: 6068
PROJECT TITLE: MHAFB CHAPEL KITCHEN
DCMSL PROJECT: IHR5364
PERCENTAGE COMPOSITION BY VISUAL ESTIMATE
TOTAL
DCMSL CLIENT TOTAL PERCENTAGE
SAMPLE SAMPLE SAMPLE PERCENT ASBESTOS ASBESTOS OTHER FIBROUS NON-FIBROUS IDENTIFIED NUMBER NUMBER DATE DESCRIPTION OF SAMPLE TYPE RANGE % IN SAMPLE CONSTITUENTS CONSTITUENTS MATERIALS
-1 SV-1A 9-20-18 A. YELLOW MASTIC 4.0% ND 0.0 100.0 100.0
B. GREY FIBROUS RESIN 25.0% ND 60.0 40.0 100.0
C. MULTICOLORED RESINOUS TILE 71.0% ND ____________ 0.0 100.0 100.0
ND
-2 CB-1A 9-20-18 A. WHITE MASTIC 2.0% ND 0.0 100.0 100.0
B. BLUE BASECOVE 98.0% ND ____________ 0.0 100.0 100.0
ND
-3 DW-1A 9-20-18 A. BLUE/WHITE PAINT 7.0% ND 0.0 100.0 100.0
B. WHITE TEXTURE 93.0% ND ____________ 0.0 100.0 100.0
ND
-4 DW-1B 9-20-18 A. TAN/WHITE PAINT 4.0% ND 0.0 100.0 100.0
B. TAN FIBROUS 5.0% ND 100.0 0.0 100.0
C. WHITE TEXTURE 37.0% ND 0.0 100.0 100.0
D. WHITE DRYWALL 54.0% ND ____________ 1.0 99.0 100.0
ND
-5 DW-1C 9-20-18 A. TAN PAINT 2.0% ND 0.0 100.0 100.0
B. TAN FIBROUS 4.0% ND 100.0 0.0 100.0
C. WHITE TEXTURE 5.0% ND 0.0 100.0 100.0
D. WHITE DRYWALL 89.0% ND ____________ 1.0 99.0 100.0
ND
-6 CT-1A 9-20-18 A. WHITE PAINT 5.0% ND 0.0 100.0 100.0
B. TAN PERLITIC CEILING TILE 95.0% ND ____________ 73.0 27.0 100.0
ND
BULK ASBESTOS TEST REPORT
CLIENT: ANALYSIS DATE: 9-25-18
INDUSTRIAL HYGIENE RESOURCES REPORTING DATE: 9-26-18
8312 NORTHVIEW, SUITE #100 RECEIPT DATE: 9-21-18
BOISE, ID 83704 CLIENT JOB NO.: 6068
PROJECT TITLE: MHAFB CHAPEL KITCHEN
DCMSL PROJECT: IHR5364
PERCENTAGE COMPOSITION BY VISUAL ESTIMATE
TOTAL
DCMSL CLIENT TOTAL PERCENTAGE
SAMPLE SAMPLE SAMPLE PERCENT ASBESTOS ASBESTOS OTHER FIBROUS NON-FIBROUS IDENTIFIED NUMBER NUMBER DATE DESCRIPTION OF SAMPLE TYPE RANGE % IN SAMPLE CONSTITUENTS CONSTITUENTS MATERIALS
-7 ME-1A 9-20-18 A. WHITE PAINT 2.0% ND 0.0 100.0 100.0
B. WHITE FIBROUS WOVEN 40.0% ND 100.0 0.0 100.0
C. GREY FIBROUS PLASTER 58.0% ND ____________ 24.0 76.0 100.0
ND
-8 DW-2A 9-20-18 A. WHITE TEXTURE 0.5% ND 0.0 100.0 100.0
B. WHITE DRYWALL 5.0% ND 0.0 100.0 100.0
C. TAN/WHITE FIBROUS 10.0% ND 100.0 0.0 100.0
D. MULTICOLORED PAINT 15.0% ND 0.0 100.0 100.0
E. GREY DRYWALL MUD 69.5% CHRYSOTILE [TR-1] 1.0 ____________ 0.0 99.0 100.0
0.7
-9 DW-2B 9-20-18 A. WHITE TEXTURE 0.5% ND 0.0 100.0 100.0
B. MULTICOLORED PAINT 3.0% ND 0.0 100.0 100.0
C. TAN FIBROUS 5.0% ND 100.0 0.0 100.0
D. WHITE DRYWALL 91.5% ND ____________ 1.0 99.0 100.0
ND
-10 DW-2C 9-20-18 A. WHITE TEXTURE 0.5% ND 0.0 100.0 100.0
B. MULTICOLORED PAINT 3.0% ND 0.0 100.0 100.0
C. GREY DRYWALL MUD 96.5% CHRYSOTILE [TR-1] 1.0 ____________ 0.0 99.0 100.0
1.0
-11 CT-2A 9-20-18 A. WHITE PAINT 6.0% ND 0.0 100.0 100.0
B. TAN PERLITIC CEILING TILE 94.0% ND ____________ 73.0 27.0 100.0
ND
-12 CT-3A 9-20-18 A. WHITE PLASTER 3.0% ND 0.0 100.0 100.0
B. WHITE PAINT 5.0% ND 0.0 100.0 100.0
C. YELLOW CEILING TILE 92.0% ND ____________ 100.0 0.0 100.0
ND
BULK ASBESTOS TEST REPORT
CLIENT: ANALYSIS DATE: 9-25-18
INDUSTRIAL HYGIENE RESOURCES REPORTING DATE: 9-26-18
8312 NORTHVIEW, SUITE #100 RECEIPT DATE: 9-21-18
BOISE, ID 83704 CLIENT JOB NO.: 6068
PROJECT TITLE: MHAFB CHAPEL KITCHEN
DCMSL PROJECT: IHR5364
PERCENTAGE COMPOSITION BY VISUAL ESTIMATE
TOTAL
DCMSL CLIENT TOTAL PERCENTAGE
SAMPLE SAMPLE SAMPLE PERCENT ASBESTOS ASBESTOS OTHER FIBROUS NON-FIBROUS IDENTIFIED NUMBER NUMBER DATE DESCRIPTION OF SAMPLE TYPE RANGE % IN SAMPLE CONSTITUENTS CONSTITUENTS MATERIALS
-13 VFT-1A 9-20-18 A. BLACK TAR 0.5% CHRYSOTILE [5-15] 9.0 0.0 91.0 100.0
B. GREY CONCRETE 0.5% ND 0.0 100.0 100.0
C. WHITE PLASTER 1.0% ND 0.0 100.0 100.0
D. YELLOW MASTIC 4.0% ND 0.0 100.0 100.0
E. WHITE TILE 94.0% ND ____________ 0.0 100.0 100.0
<0.1
FOR CALCULATION PURPOSES, TRACE (TR) IS ASSUMED TO BE 0.5%.
(I) INSEPARABLE LAYERS ND - NONE DETECTED
THE SAMPLES WERE RECEIVED IN ACCEPTABLE CONDITION. THIS TEST REPORT RELATES ONLY TO THE ITEMS TESTED. THIS REPORT MAY NOT BE REPRODUCED EXCEPT IN FULL, WITHOUT THE WRITTEN APPROVAL OF THE LABORATORY.
BULK ASBESTOS ANALYSIS - POINT COUNT METHOD
CLIENT: ANALYSIS DATE: 10-4-18
INDUSTRIAL HYGIENE RESOURCES REPORTING DATE: 10-4-18
8312 NORTHVIEW, SUITE #100 REQUEST DATE: 10-1-18
BOISE, ID 83704 CLIENT JOB NO.: 6068
PROJECT TITLE: MHAFB CHAPEL KITCHEN
DCMSL PROJECT: IHR5366
CROSS REFERENCE: IHR5364
PERCENTAGE COMPOSITION BY AREA/VOLUME
DCM LAB NO.: -1 -2
SAMPLE DATE: 9-20-18 9-20-18
% OF TOTAL SAMPLE: 69.5% 96.5%
CLIENT NO.: DW-2A DW-2C
PART E PART C
ASBESTIFORM MINERAL FIBERS:
CHRYSOTILE 0.75% 0.50%
AMOSITE ND ND
CROCIDOLITE ND ND
TREMOLITE-ACTINOLITE ND ND
ANTHOPHYLLITE ND ND
TOTAL ASBESTOS COUNTED 0.75% 0.50%
TOTAL ASBESTOS IN LAYER 0.75% 0.50%
TOTAL ASBESTOS IN SAMPLE 0.52% 0.48%
NOTES: SAMPLES NO. 1 AND 2 ARE GREY DRYWALL MUD.
ND - NONE DETECTED
DEFINITIONS
TOTAL ASBESTOS COUNTED = THE AMOUNT OF ASBESTOS PRESENT IN THE SAMPLE
EXPRESSED AS A PERCENT.
TOTAL ASBESTOS IN LAYER = THE PERCENT OF SAMPLE REMAINING TIMES ASBESTOS
COUNTED EXPRESSED AS A PERCENT.
TOTAL ASBESTOS IN SAMPLE = THE PERCENT OF TOTAL SAMPLE (FROM PLM/SM
ANALYSIS) TIMES THE TOTAL ASBESTOS IN LAYER (IF NO
ASBESTOS IN OTHER LAYERS).
Appendix C- Consultant’s Certifications
Certificate of Completion
Has attended and successfully completed the Asbestos Building Inspector
AHERA 4 Hours Refresher Training Course In accordance with Title II of TSCA
40 CFR Part 763, Appendix C to Subpart E Consistent with Utah Administrative Rule R307-801: Asbestos
Course Date: 4/13/2018 Certificate Number: 5892-11 ________________________________________ Expiration Date: 4/13/2019 Instructor: Harry Beaulieu
Industrial Hygiene Resources – 8312 W. Northview, Suite 100 – Boise, Idaho 83704 Tel: (208) 323-8287 Fax: (208) 323-0783
Limitations/Disclaimer
The scope of the investigation described in this report has been limited by agreement of the parties based upon financial and other considerations. Further, the scope of this report is limited to the matters expressly covered herein. The investigation, testing and analysis of compounds and materials at the site have been limited to those compounds and materials set out in the parties’ agreement. Other compounds or materials not tested for could be present at the site.
The investigation, testing and analysis described in this report has been undertaken and performed in a professional manner in accordance with generally accepted practices, using the degree of skill and care ordinarily exercised by a Diplomat of the American Board of Industrial Hygiene (ABIH); a “Certified Industrial Hygienist (CIH)”.
During the investigation and in preparing this report we have relied upon information provided by third parties, including independent laboratories and testing services (with appropriate accreditations). It is believed that the information obtained from others during the investigation is reasonable. However, it is not warranted or guaranteed that the information provided by others is complete or accurate.
The investigation and this report are limited to the conditions present at the time of the site visits and inspections, and to the information available at the time this report was prepared.
However, there is a distinct possibility that conditions, compounds or materials may exist which could not be identified within the agreed scope of this investigation or which were not apparent during site inspections or testing. Should any additional information become available, or should additional site work be undertaken, consultant should be notified so that we can determine if modification should be made to this report.
Where indicated or implied in this report, or where mandated by the condition of the site including its structure/improvements, the conclusions of this report are based on visual observations of the site. The conclusions of this report do not apply to any areas of the site not available for inspection or testing.
It should be recognized that the investigation and evaluation of environmental conditions is a science and an art. Judgments leading to conclusions and recommendations are at times made with an incomplete knowledge of all conditions applicable to the site. More detailed, focused and/or extensive studies can tend to reduce the inherent uncertainties associated with the evaluation of environmental conditions. No warranty, express or implied, is given.
This report is prepared for and intended for the exclusive use of the company, organization or individual to whom it is addressed. It may not be used or relied upon in any manner or for any purpose whatsoever by any other party without written authorization by IHR.
| IHR5364-FINAL.pdf |
| IHR5364 |
| BULKN |
Scanned Document(1)
| Point count-IHR5366-FINAL.pdf |
| IHR5366 |
| PTCT |
Scanned Document(1)
| Rebecca Ellis-Asbestos Inspector-Exp 4-13-19.pdf |
| Certificate of Completion |
| Rebecca Ellis |
File details come from the government source that posted it.