TO_000Q_(DP-31_MX)_Unique_Requirements.pdf
PDF 8 KB Posted
- Solicitation number
- FA4890-16-R-0032
About this file
14 Mar 17 update to RFP Atch 08, Document TO 000Q, DP-31 Maintenance (OCONUS) Unique Requirements, renumbered to match Atch 03 tabs and incorporated with Amendment 0001.
View the file
Other files
Show 40 more
Latest 50 of 182 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation: FA4890-16-R-0032 / Task Order 000Q 14 Mar 17
ATTACHMENT 1
TECHNICAL TASK ORDER REQUIREMENTS
1.0 INTRODUCTION/BACKGROUND: ACC AMIC requires RPA organizational-level (O-level) support at the OCONUS location as identified below.
2.0 TASK ORDER OBJECTIVE: Provide O-level maintenance to OCONUS military units tasked for local and OCONUS missions.
3.0 REFERENCE: RPA Performance Work Statement (PWS) and Appendix N (Operational Requirements).
4.0 UNIQUE TASK ORDER REQUIREMENTS.
Task Order
Adjustments to Appendix N (Operational Requirements)
000Q
DP-31 MX
- Commercial travel from CONUS to JRC.
- Travel to support boresight operations requires approximately 40 minute round trip drive approximately 1-3 times per week.
- Physical layout of flightline requires longer tows as aircraft are moved between hangars/shelters and open ramp area.
- Munitions Holding Area described in PWS Paragraph 4.23.4 does not apply.
- Contractor authorized to drive off base only to conduct official business. Driver must possess valid international driver’s license. Follow applicable Government and host nation laws and regulations.
- Provide off-base crash recovery support as required within a 75-mile radius of site.
Notify the Government Program Office immediately in the event of an off-base mishap requiring contractor support.
- Government provides all munitions storage area and munitions delivery support.
- Transition from MQ-1 to MQ-9 aircraft at this location is expected to be ongoing throughout Calendar Year 18. The Contractor shall be prepared to support this transition.
- Contractor shall be prepared to support (during and after transition) UHK97000-10 (Block 1), UHK97000-12 (Block 1+), and UHK97000-15 (Block 5), and/or Extended Range (ER) MQ-9 aircraft.
File details come from the government source that posted it. Updated .