TO_000P_(DP-14_MX)_Unique_Requirements.pdf
PDF 8 KB Posted
- Solicitation number
- FA4890-16-R-0032
About this file
14 Mar 17 update to RFP Atch 08, Document TO 000P, DP-14 Maintenance (OCONUS) Unique Requirements, renumbered to match Atch 03 tabs and incorporated with Amendment 0001.
View the file
Other files
Show 40 more
Latest 50 of 182 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation: FA4890-16-R-0032 / Task Order 000P 14 Mar 17
ATTACHMENT 1
TECHNICAL TASK ORDER REQUIREMENTS
1.0 INTRODUCTION/BACKGROUND: ACC AMIC requires RPA organizational-level (O-level) support at the OCONUS location as identified below.
2.0 TASK ORDER OBJECTIVE: Provide O-level maintenance to OCONUS military units tasked for local and OCONUS missions.
3.0 REFERENCE: RPA Performance Work Statement (PWS) and Appendix N (Operational Requirements).
4.0 UNIQUE TASK ORDER REQUIREMENTS.
Task Order
Adjustments to Appendix N (Operational Requirements)
000P
DP-14 MX
- Commercial travel from CONUS to JRC.
- This effort is a joint military/contractor effort with all remaining combat lines supported by military personnel.
- Contractor provides all GCS maintenance at the site for a total of 6 GCSs supporting 13 total combat lines.
- Contractor provides maintenance at the site for 1 SETSS.
- Contractor provides all supply and tool room support at the site for a total of 13 combat lines.
- Contractor retains weapons loading functions for 8 contractor-supported combat lines.
- Contractor retains aircraft/maintenance scheduling functions for all contractor-assigned aircraft.
- Contractor shall be prepared to support UHK97000-10 (Block 1), UHK97000-12 (Block 1+), and UHK97000-15 (Block 5), and/or Extended Range (ER) MQ-9 aircraft.
- Government provides all munitions storage area and munitions delivery support.
File details come from the government source that posted it. Updated .