TO_000E_(Ft._Huachuca)_Unique_Requirements_22Mar17.pdf
PDF 11 KB Posted
- Solicitation number
- FA4890-16-R-0032
About this file
22 Mar 17 update to RFP Atch 08, Document TO 000E, Ft. Huachuca (AZ ANG) Unique Requirements, renumbered to match Atch 03 tabs and changed to show revised requirement for that site. Incorporated with Amendment 0001.
View the file
Other files
Show 40 more
Latest 50 of 182 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation: FA4890-16-R-0032 / Task Order 000E 22 Mar 17
ATTACHMENT 1
TECHNICAL TASK ORDER REQUIREMENTS
1.0 INTRODUCTION/BACKGROUND: ACC AMIC requires RPA organizational-level (O-level) support at the CONUS location as identified below.
2.0 TASK ORDER OBJECTIVE: Provide O-level maintenance to CONUS military units tasked for local and OCONUS missions.
3.0 REFERENCE: RPA Performance Work Statement (PWS), Appendix N (Operational Requirements), and Attachment 3 – Manpower, Labor Rates, and Pricing Tables.
4.0 UNIQUE TASK ORDER REQUIREMENTS.
Task Order
Adjustments to Appendix N (Operational Requirements)
000E
Ft. Huachuca, AZ
- Single shift maintenance operation.
- AFI 21-101 ANG Supplement replaces AFI 21-101 CAF Supplement in Appendix C.
- Analyst shall be stationed at Ft Huachuca, AZ.
- No weapons load support required. (Line deleted)
- Support MQ-9 crash recovery as required within 25 mile radius of Ft Huachuca; notify AMIC Program Manager within 2 hours when supporting off-base crash recovery; under no circumstances will contractor personnel enter Mexico.
- The Government will provide all munitions build-up and munitions flightline delivery services.
- Manage Mission Readiness Spares Package (MRSP) located at the 162 WG in Tucson, AZ.
Transport all parts and supplies that fit in a full size pickup truck between Ft Huachuca and the 162 WG. The 162 WG will transport all parts that do not fit into a full size pickup truck.
- Use Gov’t-provided TCMax tool control software in place of Tool Accountability System.
- 18 fly days per month, to include 1 ANG UTA weekend per month.
- Preflight spare GCS as required to support remote split operations (RSO). RSO missions shall not extend contractor’s duty day beyond normal shift schedule.
- Contractor shall be prepared to support (during and after transition) UHK97000-10 (Block 1), UHK97000-12 (Block 1+), and UHK97000-15 (Block 5), and/or Extended Range (ER) MQ-9 aircraft.
- Average Sorties per Day/Average Sortie Duration:
- MQ-9 = 1 sortie/8 hours
- Any sortie deemed non-effective due to an abort may require the contractor to launch a spare aircraft provided the follow-on sortie does not extend the contractor’s duty day.
File details come from the government source that posted it. Updated .