Appendix_B_-_Reports_17_Mar_17.pdf

PDF 34 KB Posted

Attached to
Remotely Piloted Aircraft (RPA) Operations and Maintenance (O&M) Support
Solicitation number
FA4890-16-R-0032
Issued by

About this file

17 Mar 17 update to RFP Atch 01 RPA PWS Appendix B - Reports, revised in response to questions and comments received from Industry. Incorporated with Amendment 0001.

View the file

Other files

File Type Posted
Atch_1_RPA_Perfomance_Work_Statement_6_Apr_17.pdf PDF
FA4890-16-R-0032_Amendment_0005.pdf PDF
RFP_Question_and_Responses_Posted_4_Apr_17.pdf PDF
FA4890-16-R-0032_Amendment_0004.pdf PDF
Atch_5_CBA_List_3_Apr_17.pdf PDF
Atch_4_WD_List_3_Apr_17.pdf PDF
FA4890-16-R-0032_Amendment_0003.pdf PDF
Atch_4H_WD_CBA-17-9840_R0_Cochise_AZ-Ft_Huachuca.pdf PDF
Atch_5E_BFS_and_IAM_Collective_Bargaining_Agreement_Fort_Huachuca_Feb_2017.pdf PDF
RFP_Questions_and_Responses_Posted_31_Mar_17_Draft.pdf PDF
Atch_1_RPA_Perfomance_Work_Statement_30_Mar_17.pdf PDF
FA4890-16-R-0032_Amendment_0002.pdf PDF
Appendix_F_-_Award_Fee_Plan_30_Mar_17.pdf PDF
Q&A_posted_24_Mar_17.pdf PDF
TO_000F_(Ft._Smith)_Unique_Requirements.pdf PDF
TO_000J_(Springfield)_Unique_Requirements.pdf PDF
Atch_1_RPA_Perfomance_Work_Statement_20_Mar_17.pdf PDF
Amendment_0001_23Mar17_-_RPA_Solicitation_FA489016-R-0032.pdf PDF
TO_000L_(Nashville)_Unique_Requirements.pdf PDF
Atch_8_List_of_Unique_Reqts_14Mar17.pdf PDF
TO_000T_(DP-44_LRE)_Unique_Requirements.pdf PDF
Atch_3_Pricing_Tables_20_Mar_17.xlsx XLSX spreadsheet
Appendix_N_-_Operational_Requirements_20_Mar_17.pdf PDF
TO_000R_(DP-32_MX)_Unique_Requirements.pdf PDF
TO_000M_(Battle_Creek)_Unique_Requirements.pdf PDF
TO_000U_(Sigonella)_Unique_Requirements.pdf PDF
Appendix_E_-_Government_Property_Inventory_16_Mar_17.xlsx XLSX spreadsheet
TO_000Q_(DP-31_MX)_Unique_Requirements.pdf PDF
TO_000G_(Des_Moines)_Unique_Requirements.pdf PDF
TO_000P_(DP-14_MX)_Unique_Requirements.pdf PDF
Atch_4K_WD_15_2449_R4_Montgomery_PA-Horsham.pdf PDF
TO_000K_(Horsham)_Unique_Requirements.pdf PDF
TO_000H_(Niagara_Falls)_Unique_Requirements.pdf PDF
TO_000B_(Nellis)_Unique_Requirements.pdf PDF
TO_000C_(Whiteman)_Unique_Requirements.pdf PDF
TO_000V_(Andersen)_Unique_Requirements.pdf PDF
TO_000D_(Ellsworth)_Unique_Requirements.pdf PDF
TO_000E_(Ft._Huachuca)_Unique_Requirements_22Mar17.pdf PDF
TO_000A_(Creech)_Unique_Requirements.pdf PDF
TO_000S_(DP-14_LRE)_Unique_Requirements.pdf PDF
RFP_Q&A_Posted_22_Mar_17.pdf PDF
RFP_Q_and_A_Posted_22_Mar_17.pdf PDF
RFP_Q_and_A_Posted_20_Mar_17.pdf PDF
PPQ_Follow-up_Posted_20_Mar_17.pdf PDF
Q_and_A_posted_17_Mar_17.pdf PDF
RFP_FA4890-16-R-0032_Q_and_A_17_March_2017.pdf PDF
Questions_and_Responses_PPC_and_Site_Visits.pdf PDF
RPA_Pre_Proposal_Conf_Site_Visit_Briefing_(Final).pdf PDF
PPC_Site_Visit_Attendance.pdf PDF
Atch_4B_WD_15-5693_R1_Guam_Statewide-Andersen.pdf PDF
Show 40 more

Latest 50 of 182 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation: FA4890-16-R-0032 17 Mar 17

Title Content Delivery POC Frequency Naming Convention

PWS

Reference Notes

15 days after contract start; annually after initial delivery

15 days after contract full performance start date; annually after initial delivery

Government Furnished Property Inventory listings shall be by site and types of property (i.e., consumable, nonexpendable, equipment, or reparable). The data contained in the report shall be current through 30 September of each subsequent year.

ACC AMIC/PKC,

ACC AMIC/PLG,

ACC AMIC/PMAU

The first delivery of the report shall be no later than 30 days after contract full performance start date. Then NLT 15 October of each fiscal year.

Section A, para 4.18.6

Environmental Protection Plans Base specific plans shall include, but not limited to: Hazardous Material (HazMat) Program, Hazardous Waste Program, Pollution Prevention Program, POL, Air Quality Ozone Depleting Chemicals (ODCs), Occupational Health Considerations, Spill Prevention and Response, Recycling Program, and Training.

ACC AMIC/PKC,

ACC AMIC/PCE,

ACC AMIC/PMAU

90 DAC Section A, para 5.3.1

The document will be accepted or rejected by the Government within 30 business days after receipt. Contractor shall revise and resubmit the document within 10 business days after receipt unless otherwise directed by the CO.

The contractor shall review and update their plans IAW with the approved QMS. When a plan is revised it shall be submitted to the CO for approval NLT 10 business days after revision. Revised plans shall include a revision page clearly delineating what has changed.

Spill Report

The pollution spill report to include all the applicable information shown on the attached form plus “Actual Damage/Potential Threat, Findings and Causes, Management Actions Taken to Prevent Reoccurrence, Casualties or Injuries Including Personnel Information, and Assistance Required” will constitute submission.

ACC AMIC/PKC,

ACC AMIC/PCE,

ACC AMIC/PMAU

As Required Section A, para 5.3.2 Report shall be submitted to designated offices the NLT COB next business day a spill event occurs. Updates shall be provided as an addendum to the original report

Safety & Health Plan

Base-specific plans shall at a minimum include: Confined Space Management, Lock/Out-Tag/Out, Hazardous Communication (HAZCOM), Weapons Safety, Job Safety Training, Safety Inspections, Mishap Notification & Reporting Procedures, Hazard Abatement Procedures, and Hazard Prevention & Control Procedures, Safety Supplies and Equipment, Safety Reviews, Mishap Prevention, and the Voluntary Protection Program, as applicable.

ACC AMIC/PKC,

ACC AMIC/PCE,

ACC AMIC/PMAU

90 DAC Section A, para 5.3.3

The document will be accepted or rejected by the Government within 30 business days after receipt. Contractor shall revise and resubmit the document within 10 business days after receipt unless otherwise directed by the CO.

The contractor shall review and update their plans IAW with the approved QMS. When a plan is revised it shall be submitted to the CO for approval NLT 10 business days after revision. Revised plans shall include a revision page clearly delineating what has changed.

Safety Mishap Report ACC Form 164 Ground Mishap Report Submit mishap/event information IAW AFI 91-204, Chapter 5 with follow-up information

ACC AMIC/PKC,

ACC AMIC/PCE,

ACC AMIC/PMAU,

host Wing Safety Office

As Required Section A, para 5.3.4, 5.3.5

Report shall be submitted to designated offices the NLT COB next business day a mishap/event occurs. Updates shall be provided as an addendum to the original report.

Personnel Report Includes full name, job title, last four of social security number, permanently assigned location, deployed location, and deployment start and end dates. Report shall be organized by location. ACC AMIC/PMAU Every Wednesday YYYYMMDD Section A, para 2.6

Appendix B Reports Matrix

Property Control Plan

Identify and code all assets according to their property class (e.g., consumable, nonexpendable equipment, repairable). At a minimum, the following fields shall be included in the property records:

• Nomenclature

• P/N/Stock Number

• Unit of Issue

• Quantity

• Unit Price

• Stock Level

• Property Location

• Equipment Category, (e.g. consumable, repairable, equipment, ADPE, TMDE)

• Date of Last Inventory

• Asset Disposal Date

• Shelf Life Code

• Date Property Assigned to Inventory List

ACC AMIC/PKC,

ACC AMIC/PLG,

ACC AMIC/PMAU

Section A, para 4.18.1

B-1

1027451361C Highlight

Title Content Delivery POC Frequency Naming Convention

PWS

Reference Notes

Appendix B Reports Matrix

Cost Performance Report (CPR)

Report shall contain the following:

- Contract identification data

- Funding authorized to date

- Cumulative billings

- Actual cumulative costs to date

- Actual costs incurred since last reporting period

- Estimated costs through end of contract year

- Detailed listing of all costs for cost reimbursable CLINS by category to include supplies, equipment purchases, and travel

- Contract Line Item Number (CLIN), description, cost

ACC AMIC/PMAU 25th of each month Section A, para 2.8

All data shall reflect the same time period as the invoice submitted to WAWF. Submittal shall be no later than the 25th calendar day of each month.

Note: Document financial information to reflect current and previous fiscal year (FY) contract cost data, projected funding requirements, and specific expenditures.

Status Report

Submit report up to 2 times per day broken down by site and include:

- Aircraft/GCS tail number

- Aircraft configuration to include air handler serial number

- Status

- Breaks

- Daily sortie data to include number of combat lines, number of total sorties, number of commander-directed sorties, and flying hours

- MQ-1: Time to next 720- and 1080-hour inspections, and propeller change

- MQ-9: Time to next 2000- and 4000-hour engine inspections, and propeller change

- Spare engine availability by site

- Any MICAP parts on order, estimated delivery date, and document number

- TCTO information to include tail number and status

ACC AMIC/PMAU,

AMIC/PSC,

ACC/A4I/A5I, other organizations as directed by

ACC/AMIC/PMAU,

and as required to fulfill requirements at each location

Up to twice a day YYYYMMDD Section A, para 2.11, 4.11

Submit first report at start of contract full performance and updated daily thereafter. Unless otherwise stated in this paragraph, CONUS sites shall submit the report via NIPRNET. Deployed sites, Whiteman AFB, Ellsworth AFB, and all ANG bases where the contractor supports ground control stations flying OCONUS missions shall submit the report via SIPRNET.

Contingency Management Plan

Provide a contingency plan that provides reasonable assurance of maintaining operations at all site locations in the event of contingency or crisis conditions. Specifically address maintaining operations in the event of a labor strike. Include contractor's strategy to retain, and rotate site personnel as required to meet mission requirements in these conditions.

ACC AMIC/PMAU

Submit plan within 7 days of contract full performance start date, with revisions submitted as required.

Section A, para 2.12

The document will be accepted/rejected by the government within 30 working days after receipt. Contractor shall revise and resubmit the document within 5 working days after receipt unless otherwise directed by the CO.

Contractor Travel on Military Aircraft Report Include traveler’s name, dates of travel, flight number, origin, and destination. ACC AMIC/PMAU

Submit first report 30 days after contract full performance start date and monthly thereafter.

Section A, para 2.22.6

Weekly Aircraft Statistics Include Mission Capable Rate, Total Non-Mission Capable Rate for Maintenance, Total Non-Mission Capable Rate for Supply, and high drivers for contractor- and military- supported aircraft in a format provided by the Government Program Office.

ACC AMIC/PMAU,

ACC/A4I/A5I

Submit first report the first Monday NLT 1200 EST/EDT after contract full performance start date and weekly thereafter.

YYYYMMDD Section A, para 2.11

Monthly RPA Statistics Report

Include site-by-site statistics for number of flying hours, total sorties, and all service summary metrics.

Include a summary of all commander-directed sorties by site and date. Report shall also include a summary of the entire contractor effort on a calendar month basis and a running total for the current fiscal year.

ACC AMIC/PMAU

Submit first report NLT the 20th calendar day of each month beginning the month after contract full performance start date.

Section A, para 2.11

B-2

Title Content Delivery POC Frequency Naming Convention

PWS

Reference Notes

Appendix B Reports Matrix

Monthly Aircrew Training Report

Include LRE qualification and currency status for aircrew personnel and status of check ride qualification to include delays in LRQT with reasons (ie SNP, Wx, Mx issues); number of contractor aircrew personnel deployed with schedule of future deployments; list CONUS training events (by individual name) accomplished to maintain LRE currency; list number of OCONUS LRE events to include any training events accomplished to support operations per paragraph 3.2.3 (i.e. local area training, specialized training provided by the deployed location that was not provided during LRQT by event type) accomplished supporting deployed operations (include as a minimum number of aircraft launches, recoveries, and, if tracked by on site SARM, inflight emergencies). Also include any Student Non-Progression (SNP) and Duty Not Involving Flying (DNIF) statuses involving Contractor aircrew.

ACC AMIC/PMAU

Submit NLT than the 10th of each month for previous month

Section A, 2.15 Contractor format is acceptable.

Monthly Logistics Indicators Report

RCS: ACC-LGP (M) 9302

Format IAW ACCI 21-118 or other MAJCOM equivalent directives.

ACC AMIC/PMAU,

ACC/A4I/A5I Section A, para 4.12

Monthly Vehicle Report Include vehicle registration number, date and duration of maintenance, reason for maintenance, cost of maintenance. Include a complete inventory broken down by site of all government furnished vehicles to include registration number and type vehicle.

ACC AMIC/PLGT Section A, para

5.5.3.1 Contractor format is acceptable.

Monthly QMS Summary Report

Contractor status in meeting both internal and external QMS metrics. Provide results of internal contractor quality inspection results by calendar month to include all audits, QA follow-ups, personnel evaluations, technical inspections and any other results of contractor-identified quality measurements from the previous month. Provide status of all external quality inspection results to include, but not limited to, non-conformances, follow-ups performed, and results from non-conformance Action Plan.

Include any additional contractor-identified quality issues to, planned courses of corrective action, and results of issues/corrective actions closed out.

ACC AMIC/DRQA

NLT the 7th business day following the last calendar day of the previous month.

Section A, para 2.18

B-3