FA489010R0008_0001.pdf

PDF 734 KB Posted

Attached to
T-38 Companion Trainer Program (CTP)
Solicitation number
FA4890-10-R-0008A
Issued by

About this file

Amendment 0001 RFP FA4890-10-R-0008

View the file

Other files

File Type Posted
T-38 Award Synopsis -.doc DOC document
T-38 RFP Q A as of 10 Feb 2011.docx DOCX document
T-38 RFP Q A as of 3 Feb 2011.docx DOCX document
Langley MOU.pdf PDF
Tyndall AFB WD 2005-3008 rev 12.pdf PDF
T-38 CTP PWS 3 Feb 2011.docx DOCX document
CDRL A010 Safety and Health Plan.doc DOC document
T-38 CTP Projected Force Structure and Flying Hours.docx DOCX document
Add NDI to Mech.pdf PDF
T-38 CTP Optional Priced CLIN Workload Information.docx DOCX document
Langley AFB WD 2005-2544 rev 12.pdf PDF
PWS Addendum 1 Description of Services to Accept and Regenerate 15 T-38 Aircraft.docx DOCX document
Whiteman AFB WD 2005-2308 rev 12.pdf PDF
CDRL A010 Safety and Health Plan.doc DOC document
T-38 CTP Optional Priced CLIN Workload Information.docx DOCX document
T-38 CTP Projected Force Structure and Flying Hours.docx DOCX document
PWS Addendum 1 Description of Services to Accept and Regenerate 15 T-38 Aircraft.docx DOCX document
Section B CLIN Schedule for New T-38 CTP Contract 14 Jan 11.docx DOCX document
T-38 Final Preproposal Conf Attendees list.docx DOCX document
Combined Final T-38 PPC Brief.pptx PPTX presentation
AFOSHSTD91-110.pdf PDF
AFOSHSTD48-9.pdf PDF
T-38 RFP Q A as of 17 Jan 2011.docx DOCX document
T-38 RFP Q A as of 10 Jan 2011.docx DOCX document
T-38 RFP DD254.pdf PDF
Pre-Proposal_Conference_Letter_to_Industry.docx DOCX document
Offical Question--Pre Proposal Conference.docx DOCX document
T-38 CTP Award Fee Plan - 21 Dec 10.docx DOCX document
T-38 CTP Sections L and M 04 Jan 2011.docx DOCX document
Appendix M - Proposal Incorporations.docx DOCX document
WD 2005-2308 rev 10.pdf PDF
WDs CBAs CAM 2010.pdf PDF
WD 2005-2056 rev 12.pdf PDF
T-38 CTP RFP 04 Jan 2011.docx DOCX document
FA4890-10-R-0008A T-38 RFP PWS Appendices List 04 Jan 2011.docx DOCX document
T-38 CTP PWS 04 Jan 2011.docx DOCX document
T-38_CBA_Aug_2010.pdf PDF
WD 2005-2512 rev 12.pdf PDF
1T-38-847.PDF PDF
1T-38-845C.pdf PDF
1T-38-840.pdf PDF
1T-38-840C.pdf PDF
1T-38-850.pdf PDF
1T-38-842.pdf PDF
1T-38-848.pdf PDF
1T-38-849.pdf PDF
1T-38-845.pdf PDF
1T-38-843.pdf PDF
Langley_753_2.pdf PDF
HPIM0602.JPG JPG image
Show 40 more

Latest 50 of 189 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Revisions of various portions of the RFP due to Industry questions and subsequent Government answ ers have resulted in this Amendment.

In addition, the submittal due date for the Technical & Price Volumes has been extended to 1600hrs EST, 24 Feb 2011. The submittal due date for the Past Performance Volume remains unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

1 59

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 04-Feb-2011

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA4890-10-R-0008

X 9B. DATED (SEE ITEM 11)

04-Jan-2011

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

04-Feb-2011

CODE

ACC AMIC/PKC

11817 CANON BLVD, SUITE 306

NEWPORT NEWS VA 23606-4516

FA4890 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA4890-10-R-0008

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 17-Feb-2011 04:00 PM to 24-Feb-

2011 04:00 PM.

SECTION B - SUPPLIES OR SERVICES AND PRICES

The following have been modified:

SECTION B SUPPLIES,SERVICES

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0100 2 Months $

TRANSITION, TWO-MONTH PERIOD

FFP

Transition Services at Beale, Holloman, Langley, Tyndall, and Whiteman AFBs prior to commencement of the contract performance period in accordance with

PWS, Section D. Transition Period is from 1 Aug 11 thru 30 Sep 11.

FOB: Destination

MILSTRIP:

SIGNAL CODE: A

NET AMT

0001 12 Months S ACC T-38 Program Management

FFP

FY12 ACC T-38 CTP Program Management for Organizational and Intermediate

Maintenance in support of T-38 operations at Holloman, Langley, and Tyndall

AFBs in accordance with PWS, Section A, Paragraph 2.0. Period of performance is from 01 Oct 11 thru 30 Sep 12.

FOB: Destination

PURCHASE REQUEST NUMBER:

0002 12 Months $ $ ACC T-38 Program Management

FFP

FY12 ACC T-38 CTP Program Management for Organizational and Intermediate

Maintenance in support of T-38 operations at Beale AFB in accordance with PWS, Section A, Paragraph 2.0. Period of performance is from 01 Oct 11 thru 30 Sep 12.

FOB: Destination

NET AMT $

0003 12 Months $ $ AFGSC T-38 Program Management

FFP

FY12 AFGSC T-38 CTP Program Management for Organizational and

Intermediate Maintenance in support of T-38 operations at Whiteman AFB in accordance with PWS, Section A, Paragraph 2.0. Period of performance is from 01

Oct 11 thru 30 Sep 12.

FOB: Destination

0004 12 Months $ $ Organizational Maintenance for T-38 support at Holloman

FFP

FY 12 Organizational Maintenance for ACC T-38 support at Holloman AFB in accordance with PWS, Section A, Paragraph 3.2. Period of performance is from 01

Oct 11 thru 30 Sep 12.

FOB: Destination

0005 12 Months $ $ Organizational Maintenance for T-38 support at Langley

FFP

FY 12 Organizational Maintenance for ACC T-38 support at Langley AFB in

0006 12 Months $ $ Organizational Maintenance for T-38 support at Beale

FFP

FY 12 Organizational Maintenance for ACC T-38 support at Beale AFB in

0007 12 Months $ $ Organizational Maintenance for T-38 support at Whiteman

FFP

FY 12 Organizational Maintenance for AFGSC T-38 support at Whiteman AFB in

0008 12 Months $ $ Organizational Maintenance for T-38 support at Tyndall

FFP

FY 12 Organizational Maintenance for T-38 support at Tyndall AFB in accordance with PWS, Section A, Paragraph 3.2. Period of performance is from 01 Oct 11 thru 30 Sep 12.

0009 1 Lot $ $96,000 Organizational Maintenance Associate Unit Weekend Flying Support, COST

FY 12 Organizational Maintenance Associate Unit Weekend Flying Support. Cost reimbursement for services required to support associate unit weekend flying in accordance with PWS, Section A, Paragraph 3.2.11. Period of performance is from

01 Oct 11 thru 30 Sep 12. Contractor handling rate of ______.

NTE $96,000

0010 12 Months $ $ Intermediate Maintenance provided by the Holloman T-38 CRF

FFP

FY 12 Intermediate maintenance services provided by the Holloman T-38 CRF in support of ACC T-38s assigned to Holloman, Langley and Tyndall AFBs in accordance with PWS Section A, paragraph 3.3. Period of performance is from 01

Oct 11 thru 30 Sep 12.

FOB: Destination

0011 12 Months $ $ Intermediate Maintenance provided by the Holloman CRF

FFP

FY 12 Intermediate maintenance services provided by the Holloman T-38 CRF in support of ACC T-38s assigned to Beale AFB in accordance with PWS Section A, paragraph 3.3. Period of performance is from 01 Oct 11 thru 30 Sep 12.

FOB: Destination

0012 12 Months $ $ Intermediate Maintenance provided by the Holloman CRF

FFP

FY 12 Intermediate maintenance services provided by the Holloman T-38 CRF in support of AFGSC T-38s assigned to Whiteman AFB in accordance with PWS

Section A, paragraph 3.3. Period of performance is from 01 Oct 11 thru 30 Sep 12.

FOB: Destination

0013 12 Months $ $ Intermediate Maintenance provided by the Holloman CRF

FFP

FY 12 Intermediate maintenance services provided by the Holloman T-38 CRF in support of AFMC T-38s assigned to Holloman AFB in accordance with PWS

Section A, paragraph 3.3. Period of performance is from 01 Oct 11 thru 30 Sep 12.

FOB: Destination

0014 12 Months $ $ Transient Maintenance Services at Holloman AFB

FFP

FY 12 Transient Maintenance Services at Holloman AFB in accordance with PWS

Section A, paragraph 3.9. Period of performance is from 01 Oct 11 thru 30 Sep 12.

FOB: Destination

0015 12 Months $ $ Transient Maintenance Services at Whiteman AFB

FFP

FY12 Transient Maintenance Services at Whiteman AFB in accordance with PWS

Section A, paragraph 3.9. Period of performance is from 01 Oct 11 thru 30 Sep 12.

FOB: Destination

0016 2 EA $15,000 $30,000

Aircraft Full Strip of ACC T-38s

COST

FY12 Full strip of ACC T-38s assigned to Holloman, Langley and Tyndall AFBs in accordance with PWS Section A, paragraph 3.3.13.4. Period of performance is from 01 Oct 11 thru 30 Sep 12. Contractor handling rate of ______.

FOB: Destination

SIGNAL CODE:

NTE $30,000

0017 1 EA $15,000 $ 15,000

Aircraft Full Strip

COST

FY12 Full strip of ACC T-38s assigned to Beale AFB in accordance with PWS

Section A, paragraph 3.3.13.4. Period of performance is from 01 Oct 11 thru 30

Sep 12. Contractor handling rate of ______.

FOB: Destination

NTE $15,000

0018 1 EA $15,000 $15,000

Aircraft Full Strip

COST

FY12 Full strip of AFGSC T-38s assigned to Whiteman AFB in accordance with

PWS Section A, paragraph 3.3.13.4. Period of performance is from 01 Oct 11 thru

30 Sep 12. Contractor handling rate of ______.

FOB: Destination

0019 1 EA $15,000 $15,000

Aircraft Full Strip

COST

FY12 Full strip of AFMC T-38s assigned to Holloman AFB in accordance with

PWS Section A, paragraph 3.3.13.4. Period of performance is from 01 Oct 11 thru

30 Sep 12. Contractor handling rate of ______.

FOB: Destination

0020 12 Months $ $ Services for 46 Test Group, 586 FLTS

FFP

FY 12 Support Services for Air Force Material Command (AFMC) 46th Test

Group (586FLTS) in accordance with PWS, Section A, Paragraph 4.1. Period of performance is from 01 Oct 11 thru 30 Sep 12.

FOB: Destination

0021 12 Months $ $ Services for Det 1, 82 Aerial Target Squadron

FFP

FY 12 Support Services for Det 1, 82nd Aerial Targets Squadron (ATRS) in accordance with PWS, Section A, Paragraph 4.2. Period of performance is from 1

Oct 11 thru 30 Sept 12

FOB: Destination

0022 12 Months $ $ Services for NASA

FFP

FY 12 Support Services for National Aeronautics and Space Administration

(NASA) Contract Field Team (CFT) in accordance with PWS, Section A, Paragraph 4.4. Period of performance is from 1 Oct 11 thru 30 Sept 12.

FOB: Destination

0023 12 Months $ $ Services for US Army Air Directorate , White Sands Missile Range

FFP

FY 12 Support services for US Army Air Directorate, White Sands Missile Range, in accordance with PWS, Section A, Paragraph 4.3. Period of performance is from

1 Oct 11 thru 30 Sept 12

FOB: Destination

0024 12 Months $ $ German Air Force (GAF) at Holloman AFB

FFP

FY 12 Support services for the GAF at Holloman AFB in accordance with PWS, Section A, Paragraph 4.5. Period of performance is from 1 Oct 11 thru 30 Sept 12

FOB: Destination

0025 1 Lot $ $35,000 Travel for ACC T-38 support

COST

FY12 Cost reimbursable travel for government directed and approved travel for conferences, meetings, aircraft off-station-recoveries, and training in support of

ACC T-38 aircraft assigned to Holloman, Langley and Tyndall AFBs in accordance with PWS, Section A, Paragraphs 2.2.4.5., 2.21., 2.25 and 3.10.

Period of performance is from 01 Oct 11 thru 30 Sep 12. Contractor handling rate of ______.

FOB: Destination

NTE $35,000

0026 1 Lot $ $30,000 Travel for ACC T-38 support

COST

FY12 Cost reimbursable travel for government directed and approved travel for conferences, meetings, aircraft off-station-recoveries, and training in support of

ACC T-38 aircraft assigned to Beale AFB in accordance with PWS, Section A, Paragraphs 2.2.4.5., 2.21., 2.25 and 3.10. Period of performance is from 01 Oct 11 thru 30 Sep 12. Contractor handling rate of ______.

FOB: Destination

0027 1 Lot $ $30,000 Travel for AFGSC T-38 support

COST

FY12 Cost reimbursable travel for government directed and approved travel for conferences, meetings, aircraft off-station-recoveries, and training in support of

ACC T-38 aircraft assigned to Whiteman AFB in accordance with PWS, Section

A, Paragraphs 2.2.4.5., 2.21., 2.25 and 3.10. Period of performance is from 01 Oct

11 thru 30 Sep 12. Contractor handling rate of ______.

FOB: Destination

NTE $30,000 $25,000

0028 1 Lot $ $20,000 Travel Deployment Services in support of ACC T-38 Operations

COST

FY 12 Cost reimbursable travel for Deployment Support Services for Air Combat

Command (ACC) T-38s assigned to Holloman, Langley and Tyndall AFBs in accordance with PWS, Section A Paragraph 3.2.10 and JTR. Period of

Performance is 01 Oct 11 thru 30 Sep 12. Travel is Government-directed travel in addition to fixed-price travel requirements. Contractor handling rate of ______.

NTE $20,000

0029 1 Lot $ $20,000 Travel Deployment Services in support of ACC T-38 Operations

COST

FY 12 Cost reimbursable travel for Deployment Support Services for Air Combat

Command (ACC) T-38s assigned to Beale AFB in accordance with PWS, Section

A Paragraph 3.2.10 and JTR. Period of Performance is 01 Oct 11 thru 30 Sep 12.

Travel is Government-directed travel in addition to fixed-price travel requirements.

Contractor handling rate of ______.

0030 1 Lot $ $15,000 Travel Deployment Services in support of AFMC Test Missions

COST

FY 12 Cost reimbursable travel for Deployment Support Services for Air Force

Material Command (AFMC) T-38 test missions in accordance with PWS, Section

A Paragraph 4.1.10. and JTR. Period of Performance is 01 Oct 11 thru 30 Sep 12.

Travel is Government-directed travel in addition to fixed-price travel requirements.

Contractor handling rate of ______.

0031 1 Lot $0 $10,000 Supplies and GFE repairs for ACC T-38 Support

COST

FY12 Supplies and GFE repairs in support of ACC T-38 aircraft assigned to

Holloman, Langley and Tyndall AFBs. Purchases shall be approved in accordance with PWS Section A, paragraph 5.4.17.3 and 5.4.17.4. Period of performance is from 01 Oct 11 thru 30 Sep 12. Contractor handling rate of

FOB: Destination

NTE $10,000

0032 1 Lot $0 $5,000 Supplies and GFE repairs for ACC T-38 Support

COST

FY12 Supplies and GFE repairs in support of ACC T-38 aircraft assigned to Beale

AFB. Purchases shall be approved in accordance with PWS Section A, paragraph

5.4.17.3 and 5.4.17.4. Period of performance is from 01 Oct 11 thru 30 Sep 12.

Contractor handling rate of ______.

FOB: Destination

NTE $5,000

0033 1 Lot $0 $10,000 Supplies and GFE repairs for AFGSC T-38 Support

COST

FY12 Supplies and GFE repairs in support of AFGSC T-38 aircraft assigned to

Whiteman AFB. Purchases shall be approved in accordance with PWS Section A, paragraph 5.4.17.3 and 5.4.17.4. Period of performance is from 01 Oct 11 thru 30

Sep 12. Contractor handling rate of ______.

FOB: Destination

0034 1 Lot $0 $2,000 Supplies and GFE repairs for AFMC 46 TG Test Mission Support

COST

FY12 Supplies and GFE repairs in support of AFMC T-38 aircraft assigned to the

46 TG (586 FTS) at Holloman AFB. Purchases shall be approved in accordance with PWS Section A, paragraph 5.4.17.3 and 5.4.17.4. Period of performance is from 01 Oct 11 thru 30 Sep 12. Contractor handling rate of ______.

FOB: Destination

NTE $2,000

0035 Lot $0.00 NTE FY12: AWARD FEE, EVALUATION PERIOD: 01 Oct 11-31 Mar 12

FFP

Actual award fee amount is determined in accordance with the Award Fee Plan and definitized by contract modification. Period of performance is from 01 Oct 11 to

31 Mar 12

NOT TO EXCEED $291,935

NET AMT $0.00

0036 Lot $0.00 NTE FY12: AWARD FEE, EVALUATION PERIOD: 01 Apr 12-30 Sep 12

FFP

Actual award fee amount is determined in accordance with the Award Fee Plan and definitized by contract modification. Period of performance is from 01 Apr 12 to

30 Sep 12

NOT TO EXCEED $291,935

0037 1 Lot $ $12,000 46 Test Group (586 th FLTS) Aircraft and Equipment modification

COST

FY12 46 Test Group (586 FLTS) special test aircraft and equipment modification in accordance with PWS Section A, paragraph 4.1.11. Period of performance is from 01 Oct 11 thru 30 Sep 12. Handling rate of _____.

FOB: Destination

NTE $12,000

0038 6 Months $ $ Aircraft Regeneration support at the Holloman CRF

FFP

FY 12 Aircraft acceptance and regeneration actions in accordance with PWS

Section A, Paragraph 1.7.1. Period of performance is from 01 Oct 11 thru 31 Mar

FOB: Destination

1001 12 Months OPTION YEAR ONE: ACC T-38 Program Management

FFP

FY13 ACC T-38 CTP Program Management for Organizational and Intermediate

Maintenance in support of T-38 operations at Holloman, Langley, and Tyndall

AFBs in accordance with PWS, Section A, Paragraph 2.0. Period of performance is from 01 Oct 12 thru 30 Sep 13.

FOB: Destination

1002 12 Months $ $ OPTION YEAR ONE: ACC T-38 Program Management

FFP

FY13 ACC T-38 CTP Program Management for Organizational and Intermediate

Maintenance in support of T-38 operations at Beale AFB in accordance with PWS, Section A, Paragraph 2.0. Period of performance is from 01 Oct 12 thru 30 Sep 13.

FOB: Destination

1003 12 Months $ $ OPTION YEAR ONE: AFGSC T-38 Program Management

FFP

FY13 AFGSC T-38 CTP Program Management for Organizational and

Intermediate Maintenance in support of T-38 operations at Whiteman AFB in accordance with PWS, Section A, Paragraph 2.0. Period of performance is from 01

Oct 12 thru 30 Sep 13.

FOB: Destination

1004 12 Months $ $ OPTION YEAR ONE: Organizational Maintenance for T-38 support at Holloman

FFP

FY 13 Organizational Maintenance for ACC T-38 support at Holloman AFB in

Oct 12 thru 30 Sep 13.

1005 12 Months $ $ OPTION YEAR ONE: Organizational Maintenance for T-38 support at Langley

FFP

FY 13 Organizational Maintenance for ACC T-38 support at Langley AFB in

Oct 12 thru 30 Sep 13.

1006 12 Months $ $ OPTION YEAR ONE: Organizational Maintenance for T-38 support at Beale

FFP

FY 13 Organizational Maintenance for ACC T-38 support at Beale AFB in accordance with PWS, Section A, Paragraph 3.2. Period of performance is from 01

Oct 12 thru 30 Sep 13.

FOB: Destination

1007 12 Months $ $ OPTION YEAR ONE: Organizational Maintenance for T-38 support at Whiteman

FFP

FY 13 Organizational Maintenance for AFGSC T-38 support at Whiteman AFB in accordance with PWS, Section A, Paragraph 3.2. Period of performance is from 01

Oct 12 thru 30 Sep 13.

FOB: Destination

1008 12 Months $ $ OPTION YEAR ONE: Organizational Maintenance for T-38 support at Tyndall

FFP

FY 13 Organizational Maintenance for T-38 support at Tyndall AFB in accordance with PWS, Section A, Paragraph 3.2. Period of performance is from 01 Oct 12 thru 30 Sep 13.

FOB: Destination

1009 1 Lot $ $99,360 OPTION YEAR ONE: Organizational Maintenance Associate Unit Weekend

Flying Support

COST

FY 13 Organizational Maintenance Associate Unit Weekend Flying Support. Cost reimbursement for services required to support associate unit weekend flying in accordance with PWS, Section A, Paragraph 3.2.11. Period of performance is from

01 Oct 12 thru 30 Sep 13. Contractor handling rate of ______.

FOB: Destination

NTE $99,360

1010 12 Months $ $ OPTION YEAR ONE: Intermediate Maintenance provided by the Holloman T-38

CRF

FFP

FY 13 Intermediate maintenance services provided by the Holloman T-38 CRF in support of ACC T-38s assigned to Langley and Tyndall AFBs in accordance with

PWS Section A, paragraph 3.3. Period of performance is from 01 Oct 12 thru 30

Sep 13.

FOB: Destination

1011 12 Months $ $ OPTION YEAR ONE: Intermediate Maintenance provided by the Holloman CRF

FFP

FY 13 Intermediate maintenance services provided by the Holloman T-38 CRF in support of ACC T-38s assigned to Beale AFB in accordance with PWS Section A, paragraph 3.3. Period of performance is from 01 Oct 12 thru 30 Sep 13.

1012 12 Months $ $ OPTION YEAR ONE: Intermediate Maintenance provided by the Holloman CRF

FFP

FY 13 Intermediate maintenance services provided by the Holloman T-38 CRF in support of AFGSC T-38s assigned to Whiteman AFB in accordance with PWS

Section A, paragraph 3.3. Period of performance is from 01 Oct 12 thru 30 Sep 13.

FOB: Destination

1013 12 Months $ $ OPTION YEAR ONE: Intermediate Maintenance provided by the Holloman CRF

FFP

FY 13 Intermediate maintenance services provided by the Holloman T-38 CRF in support of AFMC T-38s assigned to Holloman AFB in accordance with PWS

Section A, paragraph 3.3. Period of performance is from 01 Oct 12 thru 30 Sep 13.

FOB: Destination

1014 12 Months $ $ OPTION YEAR ONE: Transient Maintenance Services at Holloman AFB

FFP

FY 13 Transient Maintenance Services at Holloman AFB in accordance with PWS

Section A, paragraph 3.9. Period of performance is from 01 Oct 12 thru 30 Sep 13.

1015 12 Months $ $ OPTION YEAR ONE: Transient Maintenance Services at Whiteman AFB

FFP

FY13 Transient Maintenance Services at Whiteman AFB in accordance with PWS

Section A, paragraph 3.9. Period of performance is from 01 Oct 12 thru 30 Sep 13.

FOB: Destination

1016 2 EA $ $30,000

OPTION YEAR ONE: Aircraft Full strip of ACC T-38s

COST

FY 13 Full strip of ACC T-38s assigned to Holloman, Langley and Tyndall AFBs in accordance with PWS Section A, paragraph 3.3.13.4. Period of performance is from 01 Oct 12 thru 30 Sep 13. Contractor handling rate of ______.

FOB: Destination

1017 1 EA $ $ 15,000

OPTION YEAR ONE: Aircraft Full Strip

COST

FY 13 Full strip of ACC T-38s assigned to Beale AFB in accordance with PWS

Section A, paragraph 3.3.13.4. Period of performance is from 01 Oct 12 thru 30

Sep 13. Contractor handling rate of ______.

FOB: Destination

1018 1 EA $ $15,000

OPTION YEAR ONE: Aircraft Full Strip

COST

FY 13 Full strip of AFGSC T-38s assigned to Whiteman AFB in accordance with

PWS Section A, paragraph 3.3.13.4. Period of performance is from 01 Oct 12 thru

30 Sep 13. Contractor handling rate of ______.

FOB: Destination

1019 1 EA $ $15,000

OPTION YEAR ONE: Aircraft Full Strip

COST

FY13, Full strip of AFMC T-38s assigned to Holloman AFB in accordance with

PWS Section A, paragraph 3.3.13.4. Period of performance is from 01 Oct 12 thru

30 Sep 13. Contractor handling rate of ______.

FOB: Destination

1020 12 Months $ $ OPTION YEAR ONE: Services for 46 Test Group, 586 FLTS

FFP

FY 13, Support Services for Air Force Material Command (AFMC) 46th Test

Group (586FLTS) in accordance with PWS, Section A, Paragraph 4.1. Period of performance is from 01 Oct 12 thru 30 Sep 13.

1021 12 Months $ $ OPTION YEAR ONE: Services for Det 1, 82 Aerial Target Squadron

FFP

FY 13 Support Services for Det 1, 82nd Aerial Targets Squadron (ATRS) in accordance with PWS, Section A, Paragraph 4.2. Period of performance is from 1

Oct 12 thru 30 Sept 13

FOB: Destination

1022 12 Months $ $ OPTION YEAR ONE: Support Services for NASA

FFP

FY 13 Support Services for National Aeronautics and Space Administration

(NASA) Contract Field Team (CFT) in accordance with PWS, Section A, Paragraph 4.4. Period of performance is from 1 Oct 12 thru 30 Sept 13.

FOB: Destination

1023 12 Months $ $ OPTION YEAR ONE: Services for US Army Air Directorate , White Sands

Missile Range

FFP

FY 13 Support services for US Army Air Directorate, White Sands Missile Range in accordance with PWS, Section A, Paragraph 4.3. Period of performance is from

1 Oct 12 thru 30 Sept 13

FOB: Destination

1024 12 Months $ $ OPTION YEAR ONE: German Air Force (GAF) at Holloman AFB

FFP

FY 13 Support services for the GAF at Holloman AFB in accordance with PWS, Section A, Paragraph 4.5. Period of performance is from 1 Oct 12 thru 30 Sept 13

FOB: Destination

1025 1 Lot $ $35,000 OPTION YEAR ONE: Travel for ACC T-38 support

COST

FY13 Cost reimbursable travel for government directed and approved travel for conferences, meetings, aircraft off-station-recoveries, and training in support of

ACC T-38 aircraft assigned to Holloman, Langley and Tyndall AFBs in accordance with PWS, Section A, Paragraphs 2.2.4.5., 2.21., 2.25 and 3.10. Period of performance is from 01 Oct 12 thru 30 Sep 13. Contractor handling rate of

FOB: Destination

PURCHASE REQUEST NUMBER:

NTE

$35,000

1026 1 Lot $ $30,000 OPTION YEAR ONE: Travel for ACC T-38 support

COST

FY13 Cost reimbursable travel for government directed and approved travel for conferences, meetings, aircraft off-station-recoveries, and training in support of

ACC T-38 aircraft assigned to Beale AFB in accordance with PWS, Section A, Paragraphs 2.2.4.5., 2.21., 2.25 and 3.10. Period of performance is from 01 Oct 12 thru 30 Sep 13. Contractor handling rate of ______.

FOB: Destination

1027 1 Lot $ $32,000 OPTION YEAR ONE: Travel for AFGSC T-38 support

COST

FY13 Cost reimbursable travel for government directed and approved travel for conferences, meetings, aircraft off-station-recoveries, and training in support of

ACC T-38 aircraft assigned to Whiteman AFB in accordance with PWS, Section

A, Paragraphs 2.2.4.5., 2.21., 2.25 and 3.10. Period of performance is from 01 Oct

12 thru 30 Sep 13. Contractor handling rate of ______.

FOB: Destination

NTE $32,000 $25,000

1028 1 Lot $ $20,000 OPTION YEAR ONE: Travel Deployment Services in support of ACC T-38

Operations

COST

FY 13 Cost reimbursable travel for Deployment Support Services for Air Combat

Command (ACC) T-38s assigned to Holloman, Langley and Tyndall AFBs in accordance with PWS, Section A Paragraph 3.2.10 and JTR. Period of

Performance is 01 Oct 12 thru 30 Sep 13. Travel is Government-directed travel in addition to fixed-price travel requirements. Contractor handling rate of ______.

$20,000

ITEM NO

SUPPLIES/SERVICES

QUANTITY

UNIT

UNIT PRICE

AMOUNT

1029 1 Lot $ $20,000 OPTION YEAR ONE: Travel Deployment Services in support of ACC T-38

Operations

COST

FY 13 Cost reimbursable travel for Deployment Support Services for Air Combat

Command (ACC) T-38s assigned to Beale AFB in accordance with PWS, Section

A Paragraph 3.2.10 and JTR. Period of Performance is 01 Oct 12 thru 30 Sep 13.

Travel is Government-directed travel in addition to fixed-price travel requirements.

Contractor handling rate of ______.

1030 1 Lot $ $15,000 OPTION YEAR ONE: Travel Deployment Services in support of AFMC Test

Missions

COST

FY 13 Cost reimbursable travel for Deployment Support Services for Air Force

Material Command (AFMC) T-38 test missions in accordance with PWS, Section

A Paragraph 4.1.10. and JTR. Period of Performance is 01 Oct 12 thru 30 Sep 13.

Travel is Government-directed travel in addition to fixed-price travel requirements.

Contractor handling rate of ______.

1031 1 Lot $0 $20,000 OPTION YEAR ONE: Supplies and GFE repairs for ACC T-38 Support

COST

FY 13 Supplies and GFE repairs in support of ACC T-38 aircraft assigned to

Holloman, Langley and Tyndall AFBs. Purchases shall be approved in accordance with PWS Section A, paragraph 5.4.17.3 and 5.4.17.4. Period of performance is from 01 Oct 12 thru 30 Sep 13. Contractor handling rate of

FOB: Destination

1032 1 Lot $0 $5,000 OPTION YEAR ONE: Supplies and GFE repairs for ACC T-38 Support

COST

FY13 Supplies and GFE repairs in support of ACC T-38 aircraft assigned to Beale

AFB. Purchases shall be approved in accordance with PWS Section A, paragraph

5.4.17.3 and 5.4.17.4. Period of performance is from 01 Oct 12 thru 30 Sep 13.

Contractor handling rate of ______.

FOB: Destination

NTE $5,000

1033 1 Lot $0 $10,000 OPTION YEAR ONE: Supplies and GFE repairs for AFGSC T-38 Support

COST

FY13 Supplies and GFE repairs in support of AFGSC T-38 aircraft assigned to

Whiteman AFB. Purchases shall be approved in accordance with PWS Section A, paragraph 5.4.17.3 and 5.4.17.4. Period of performance is from 01 Oct 12 thru 30

Sep 13. Contractor handling rate of ______.

FOB: Destination

1034 1 Lot $0 $2,000 OPTION YEAR ONE: Supplies and GFE repairs for AFMC 46 TG Test Mission

Support

COST

FY13 Supplies and GFE repairs in support of AFMC T-38 aircraft assigned to the

46 TG (586 FTS) at Holloman AFB. Purchases shall be approved in accordance with PWS Section A, paragraph 5.4.17.3 and 5.4.17.4. Period of performance is from 01 Oct 12 thru 30 Sep 13. Contractor handling rate of ______.

FOB: Destination

NTE $2,000

1035 Lot $0.00 NTE OPTION YEAR ONE: AWARD FEE, EVALUATION PERIOD: 01 Oct 12-31

Mar 13

FFP

Actual award fee amount is determined in accordance with the Award Fee Plan and definitized by contract modification. Period of performance is 01 Oct 12 to 31 Mar

NOT TO EXCEED $314,693

1036 Lot $0.00 NTE OPTION YEAR ONE: AWARD FEE, EVALUATION PERIOD: 01 Apr 13-30

Sep 13

FFP

Actual award fee amount is determined in accordance with the Award Fee Plan and definitized by contract modification. Period of performance is 01 Apr 13 to 30 Sep

NOT TO EXCEED $314,693

1037 1 Lot $ $12,000 OPTION YEAR ONE: 46 Test Group (586 th FLTS) Aircraft and Equipment modification

COST

46 Test Group (586 FLTS) special test aircraft and equipment modification in accordance with PWS Section A, paragraph 4.1.10. Period of performance is from 01 Oct 12 thru 30 Sep 13. Handling rate of _____.

FOB: Destination

NTE $12,000

1039 12 Months $ $ OPTION YEAR ONE: OPTIONAL PRICED; Increase of 3 T-38 Aircraft at Tyndall

FFP

FY 13 Increase of three additional T-38 aircraft for Organizational Maintenance support at Tyndall AFB in accordance with PWS, Section A, Paragraph 3.2. Period of performance is from 01 Oct 12 thru 30 Sep 13.

FOB: Destination

1040 12 Months $ $ OPTION YEAR ONE: OPTIONAL PRICED, Increase of 7 T-38 Aircraft at

Langley

FFP

FY 13 Increase of seven additional aircraft for Organizational Maintenance at

Langley AFB in accordance with PWS, Section A, Paragraph 3.2. Period of performance is from 01 Oct 12 thru 30 Sep 13.

FOB: Destination

1041 12 Months $ $ OPTION YEAR ONE: OPTIONAL PRICED Increase capacity of Intermediate

Maintenance provided by the Holloman T-38 CRF for F-22 Support

FFP

FY 13 Increased capacity of intermediate maintenance services provided by the

Holloman T-38 CRF in support of an additional 10 (total) ACC T-38s assigned and distributed to Langley and Tyndall AFBs in accordance with PWS Section A, paragraph

3.3. Period of performance is from 01 Oct 12 thru 30 Sep 13.

FOB: Destination

2001 12 Months $ $ OPTION YEAR TWO: ACC T-38 Program Management, FFP

FY14 ACC T-38 CTP Program Management for Organizational and Intermediate

Maintenance in support of T-38 operations at Holloman, Langley, and Tyndall

AFBs in accordance with PWS, Section A, Paragraph 2.0. Period of performance is from 01 Oct 13 thru 30 Sep 14.

FOB: Destination

2002 12 Months $ $ OPTION YEAR TWO: ACC T-38 Program Management, FFP

FY14 ACC T-38 CTP Program Management for Organizational and Intermediate

Maintenance in support of T-38 operations at Beale AFB in accordance with PWS, Section A, Paragraph 2.0. Period of performance is from 01 Oct 13 thru 30 Sep 14.

FOB: Destination

2003 12 Months $ $ OPTION YEAR TWO: AFGSC T-38 Program Management, FFP

FY14 AFGSC T-38 CTP Program Management for Organizational and

Intermediate Maintenance in support of T-38 operations at Whiteman AFB in accordance with PWS, Section A, Paragraph 2.0. Period of performance is from 01

Oct 13 thru 30 Sep 14.

FOB: Destination

2004 12 Months $ $ OPTION YEAR TWO: Organizational Maintenance for T-38 support at Holloman

FFP

FY 14 Organizational Maintenance for ACC T-38 support at Holloman AFB in

Oct 13 thru 30 Sep 14.

2005 12 Months $ $ OPTION YEAR TWO: Organizational Maintenance for T-38 support at Langley

FFP

FY 14 Organizational Maintenance for ACC T-38 support at Langley AFB in

Oct 13 thru 30 Sep 14.

2006 12 Months $ $ OPTION YEAR TWO: Organizational Maintenance for T-38 support at Beale

FY 14 Organizational Maintenance for ACC T-38 support at Beale AFB in accordance with PWS, Section A, Paragraph 3.2. Period of performance is from 01

Oct 13 thru 30 Sep 14.

FOB: Destination

2007 12 Months $ $ OPTION YEAR TWO: Organizational Maintenance for T-38 support at

Whiteman

FFP

FY 14 Organizational Maintenance for AFGSC T-38 support at Whiteman AFB in accordance with PWS, Section A, Paragraph 3.2. Period of performance is from 01

Oct 13 thru 30 Sep 14.

FOB: Destination

2008 12 Months $ $ OPTION YEAR TWO: Organizational Maintenance for T-38 support at Tyndall

FFP

FY 14 Organizational Maintenance for T-38 support at Tyndall AFB in accordance with PWS, Section A, Paragraph 3.2. Period of performance is from 01 Oct 13 thru 30 Sep 14.

FOB: Destination

2009 1 Lot $ $102,838 OPTION YEAR TWO: Organizational Maintenance Associate Unit Weekend

Flying Support

FY 14 Organizational Maintenance Associate Unit Weekend Flying Support. Cost reimbursement for services required to support associate unit weekend flying in accordance with PWS, Section A, Paragraph 3.2.11. Period of performance is from

01 Oct 13 thru 30 Sep 14. Contractor handling rate of ______.

FOB: Destination

NTE $102,838

2010 12 Months $ $ OPTION YEAR TWO: Intermediate Maintenance provided by the Holloman T-38

CRF

FFP

FY 14 Intermediate maintenance services provided by the Holloman T-38 CRF in support of ACC T-38s assigned to Langley and Tyndall AFBs in accordance with

PWS Section A, paragraph 3.3. Period of performance is from 01 Oct 13 thru 30

Sep 14.

FOB: Destination

2011 12 Months $ $ OPTION YEAR TWO: Intermediate Maintenance provided by the Holloman CRF

FFP

FY 14 Intermediate maintenance services provided by the Holloman T-38 CRF in support of ACC T-38s assigned to Beale AFB in accordance with PWS Section A, paragraph 3.3. Period of performance is from 01 Oct 13 thru 30 Sep 14.

FOB: Destination

2012 12 Months $ $ OPTION YEAR TWO: Intermediate Maintenance provided by the Holloman CRF

FFP

FY 14 Intermediate maintenance services provided by the Holloman T-38 CRF in support of AFGSC T-38s assigned to Whiteman AFB in accordance with PWS

Section A, paragraph 3.3. Period of performance is from 01 Oct 13 thru 30 Sep 14.

FOB: Destination

2013 12 Months $ $ OPTION YEAR TWO: Intermediate Maintenance provided by the Holloman CRF

FFP

FY 14 Intermediate maintenance services provided by the Holloman T-38 CRF in support of AFMC T-38s assigned to Holloman AFB in accordance with PWS

Section A, paragraph 3.3. Period of performance is from 01 Oct 13 thru 30 Sep 14.

FOB: Destination

2014 12 Months $ $ OPTION YEAR TWO: Transient Maintenance Services at Holloman AFB

FFP

FY 14 Transient Maintenance Services at Holloman AFB in accordance with PWS

Section A, paragraph 3.9. Period of performance is from 01 Oct 13 thru 30 Sep 14.

FOB: Destination

2015 12 Months $ $ OPTION YEAR TWO: Transient Maintenance Services at Whiteman AFB

FFP

FY14 Transient Maintenance Services at Whiteman AFB in accordance with PWS

Section A, paragraph 3.9. Period of performance is from 01 Oct 13 thru 30 Sep 14.

FOB: Destination

2016 2 EA $ $30,000

OPTION YEAR TWO: Aircraft Full strip of ACC T-38s

COST

FY14 Full strip of ACC T-38s assigned to Langley and Tyndall AFBs in accordance with PWS Section A, paragraph 3.3.13.4. Period of performance is from 01 Oct 13 thru 30 Sep 14. Contractor handling rate of ______.

FOB: Destination

2017 1 EA $ $ 15,000

OPTION YEAR TWO: Aircraft Full Strip

COST

FY 14 Full strip of ACC T-38s assigned to Beale AFB in accordance with PWS

Section A, paragraph 3.3.13.4. Period of performance is from 01 Oct 13 thru 30

Sep 14. Contractor handling rate of ______.

FOB: Destination

2018 1 EA $ $15,000

OPTION YEAR TWO: Aircraft Full Strip

COST

FY 14 Full strip of AFGSC T-38s assigned to Whiteman AFB in accordance with

PWS Section A, paragraph 3.3.13.4. Period of performance is from 01 Oct 13 thru

30 Sep 14. Contractor handling rate of ______.

FOB: Destination

2019 1 EA $ $15,000

OPTION YEAR TWO: Aircraft Full Strip

COST

FY 14 Full strip of AFMC T-38s assigned to Holloman AFB in accordance with

PWS Section A, paragraph 3.3.13.4. Period of performance is from 01 Oct 13 thru

30 Sep 14. Contractor handling rate of ______.

FOB: Destination

PURCHASE REQUEST NUMBER:

$15,000

2020 12 Months $ $ OPTION YEAR TWO: Services for 46 Test Group, 586 FLTS

FFP

FY 14 Support Services for Air Force Material Command (AFMC) 46th Test

Group (586FLTS) in accordance with PWS, Section A, Paragraph 4.1. Period of performance is from 01 Oct 13 thru 30 Sep 14.

FOB: Destination

2021 12 Months $ $ OPTION YEAR TWO: Services for Det 1, 82 Aerial Target Squadron

FFP

FY 14 Support Services for Det 1, 82nd Aerial Targets Squadron (ATRS) in accordance with PWS, Section A, Paragraph 4.2. Period of performance is from 1

Oct 13 thru 30 Sept 14

FOB: Destination

2022 12 Months $ $ OPTION YEAR TWO: Services for NASA

FFP

FY 14 Support Services for National Aeronautics and Space Administration

(NASA) Contract Field Team (CFT) in accordance with PWS, Section A, Paragraph 4.4. Period of performance is from 1 Oct 13 thru 30 Sept 14.

FOB: Destination

2023 12 Months $ $ OPTION YEAR TWO: Services for US Army Air Directorate , White Sands

Missile Range

FFP

FY 14 Support services for US Army Air Directorate, White Sands Missile Range in accordance with PWS, Section A, Paragraph 4.3. Period of performance is from

1 Oct 13 thru 30 Sept 14

FOB: Destination

2024 12 Months $ $ OPTION YEAR TWO: German Air Force (GAF) at Holloman AFB

FFP

FY 14 Support services for the GAF at Holloman AFB in accordance with PWS, Section A, Paragraph 4.5. Period of performance is from 1 Oct 13 thru 30 Sept 14

FOB: Destination

2025 1 Lot $ $36,000 OPTION YEAR TWO: Travel for ACC T-38 support

COST

FY14 Cost reimbursable travel for government directed and approved travel for conferences, meetings, aircraft off-station-recoveries, and training in support of

ACC T-38 aircraft assigned to Holloman, Langley and Tyndall AFBs in accordance with PWS, Section A, Paragraphs 2.2.4.5., 2.21., 2.25 and 3.10. Period of performance is from 01 Oct 13 thru 30 Sep 14. Contractor handling rate of

FOB: Destination

NTE $36,000

2026 1 Lot $ $30,000 OPTION YEAR TWO: Travel for ACC T-38 support

COST

FY14 Cost reimbursable travel for government directed and approved travel for conferences, meetings, aircraft off-station-recoveries, and training in support of

ACC T-38 aircraft assigned to Beale AFB in accordance with PWS, Section A, Paragraphs 2.2.4.5., 2.21., 2.25 and 3.10. Period of performance is from 01 Oct 13 thru 30 Sep 14. Contractor handling rate of ______.

FOB: Destination

2027 1 Lot $ $32,000 OPTION YEAR TWO: Travel for AFGSC T-38 support

COST

FY14 Cost reimbursable travel for government directed and approved travel for conferences, meetings, aircraft off-station-recoveries, and training in support of

ACC T-38 aircraft assigned to Whiteman AFB in accordance with PWS, Section

A, Paragraphs 2.2.4.5., 2.21., 2.25 and 3.10. Period of performance is from 01 Oct

13 thru 30 Sep 14. Contractor handling rate of ______.

FOB: Destination

NTE $32,000 $25,000

2028 1 Lot $ $20,000 OPTION YEAR TWO: Travel Deployment Services in support of ACC T-38

Operations

FY 14 Cost reimbursable travel for Deployment Support Services for Air Combat

FY 14 Increase of seven additional aircraft for Organizational Maintenance at

Langley AFB in accordance with PWS, Section A, Paragraph 3.2. Period of performance is from 01 Oct 13 thru 30 Sep 14.

FOB: Destination

2041 12 Months $ $ OPTION YEAR TWO: OPTIONAL PRICED Increase capacity of Intermediate

Maintenance provided by the Holloman T-38 CRF for F-22 Support

FFP

FY 14 Increased capacity of intermediate maintenance services provided by the

Holloman T-38 CRF in support of an additional 10 (total) ACC T-38s assigned and distributed to Langley and Tyndall AFBs in accordance with PWS Section A, paragraph 3.3. Period of performance is from 01 Oct 13 thru 30 Sep 14.

FOB: Destination

2042 12 Months $ OPTION YEAR TWO: OPTIONAL PRICED Organizational Maintenance for T-

38 support location TBD

FFP

FY 14 Organizational Maintenance for T-38 support at for 7 T-38 at a location

TBD in accordance with PWS, Section A, Paragraph 3.2. Period of performance is from 01 Oct 13 thru 30 Sep 14.

FOB: Destination

NET AMT $ $

3001 12 Months $ $ OPTION YEAR THREE: ACC T-38 Program Management

FFP

FY15 ACC T-38 CTP Program Management for Organizational and Intermediate

Maintenance in support of T-38 operations at Holloman, Langley, and Tyndall AFBs in accordance with PWS, Section A, Paragraph 2.0. Period of performance is from 01

Oct 14 thru 30 Sep 15.

FOB: Destination

3002 12 Months $ $

FY 15 Intermediate maintenance services provided by the Holloman T-38 CRF in support of AFGSC T-38s assigned to Whiteman AFB in accordance with PWS Section

A, paragraph 3.3. Period of performance is from 01 Oct 14 thru 30 Sep 15.

FOB: Destination

3013 12 Months $ $ OPTION YEAR THREE: Intermediate Maintenance provided by the Holloman CRF

FFP

FY 15 Intermediate maintenance services provided by the Holloman T-38 CRF in support of AFMC T-38s assigned to Holloman AFB in accordance with PWS Section

A, paragraph 3.3. Period of performance is from 01 Oct 14 thru 30 Sep 15.

FOB: Destination

3014 12 Months $ $ OPTION YEAR THREE: Transient Maintenance Services at Holloman AFB

FFP

FY 15 Transient Maintenance Services at Holloman AFB in accordance with PWS

Section A, paragraph 3.9. Period of performance is from 01 Oct 14 thru 30 Sep 15.

FOB: Destination

3015 12 Months $ $ OPTION YEAR THREE: Transient Maintenance Services at Whiteman AFB

FFP

FY15 Transient Maintenance Services at Whiteman AFB in accordance with PWS

Section A, paragraph 3.9. Period of performance is from 01 Oct 14 thru 30 Sep 15.

FOB: Destination

FY15 Cost reimbursable travel for government directed and approved travel for conferences, meetings, aircraft off-station-recoveries, and training in support of

ACC T-38 aircraft assigned to Whiteman AFB in accordance with PWS, Section

A, Paragraphs 2.2.4.5., 2.21., 2.25 and 3.10. Period of performance is from 01 Oct

14 thru 30 Sep 15. Contractor handling rate of ______.

FOB: Destination

NTE $33,000 $25,000

3028 1 Lot $ $20,000 OPTION YEAR THREE: Travel Deployment Services in support of ACC T-38

Operations

COST

FY 15 Cost reimbursable travel for Deployment Support Services for Air Combat

Command (ACC) T-38s assigned to Holloman, Langley and Tyndall AFBs in accordance with PWS, Section A Paragraph 3.2.10 and JTR. Period of Performance is 01 Oct 14 thru 30 Sep 15 Travel is Government-directed travel in addition to fixed-price travel requirements. Contractor handling rate of ______.

3029 1 Lot $ $24,000 OPTION YEAR THREE: Travel Deployment Services in support of ACC T-38

Operations

COST

FY 15 Cost reimbursable travel for Deployment Support Services for Air Combat

Command (ACC) T-38s assigned to Beale AFB in accordance with PWS, Section A

Paragraph 3.2.10 and JTR. Period of Performance is 01 Oct 14 thru 30 Sep 15. Travel is Government-directed travel in addition to fixed-price travel requirements.

Contractor handling rate of ______.

NTE $24,000

3030 1 Lot $ $15,000 OPTION YEAR THREE: Travel Deployment Services in support of AFMC Test

Missions

COST

FY 15 Cost reimbursable travel for Deployment Support Services for Air Force

Material Command (AFMC) T-38 test missions in accordance with PWS, Section A

Paragraph 4.1.10. and JTR. Period of Performance is 01 Oct 14 thru 30 Sep 15. Travel is Government-directed travel in addition to fixed-price travel requirements.

Contractor handling rate of ______.

FY 15 Organizational Maintenance for T-38 support at for 7 T-38 aircraft at a location TBD in accordance with PWS, Section A, Paragraph 3.2. Period of performance is from 01 Oct 14 thru 30 Sep 15.

FOB: Destination

4001 12 Months $ OPTION YEAR FOUR: ACC T-38 Program Management

FFP

FY16 ACC T-38 CTP Program Management for Organizational and Intermediate

Maintenance in support of T-38 operations at Holloman, Langley, and Tyndall AFBs in accordance with PWS, Section A, Paragraph 2.0. Period of performance is from 01

Oct 15 thru 30 Sep 16.

FOB: Destination

4002 12 Months $ $ OPTION YEAR FOUR: ACC T-38 Program Management

FFP

FY16 ACC T-38 CTP Program Management for Organizational and Intermediate

Maintenance in support of T-38 operations at Beale AFB in accordance with PWS, Section A, Paragraph 2.0. Period of performance is from 01 Oct 15 thru 30 Sep 16.

FOB: Destination

4003 12 Months $ $ OPTION YEAR FOUR: AFGSC T-38 Program Management

FFP

FY16 AFGSC T-38 CTP Program Management for Organizational and Intermediate

Maintenance in support of T-38 operations at Whiteman AFB in accordance with

PWS, Section A, Paragraph 2.0. Period of performance is from 01 Oct 15 thru 30 Sep

16.

4013 12 Months $ $ OPTION YEAR FOUR: Intermediate Maintenance provided by the Holloman CRF

FFP

FY16 Intermediate maintenance services provided by the Holloman T-38 CRF in support of AFMC T-38s assigned to Holloman AFB in accordance with PWS Section

A, paragraph 3.3. Period of performance is from 01 Oct 15 thru 30 Sep 16.

FOB: Destination

4014 12 Months $ $ OPTION YEAR FOUR: Transient Maintenance Services at Holloman AFB

FFP

FY16 Transient Maintenance Services at Holloman AFB in accordance with PWS

Section A, paragraph 3.9. Period of performance is from 01 Oct 15 thru 30 Sep 16.

FOB: Destination

4015 12 Months $ $ OPTION YEAR FOUR: Transient Maintenance Services at Whiteman AFB

FFP

FY16 Transient Maintenance Services at Whiteman AFB in accordance with PWS

Section A, paragraph 3.9. Period of performance is from 01 Oct 15 thru 30 Sep 16.

FOB: Destination

4016 1 EA $ $15,000

OPTION YEAR FOUR: Aircraft Full strip of ACC T-38s

COST

FY 16 Full strip of ACC T-38s assigned to Langley and Tyndall AFBs in accordance with PWS Section A, paragraph 3.3.13.4. Period of performance is from 01 Oct 15 thru 30 Sep 16. Contractor handling rate of ______.

15 thru 30 Sep 16. Contractor handling rate of ______.

NTE $34,000 $25,000

4028 1 Lot $ $20,000 OPTION YEAR FOUR: Travel Deployment Services in support of ACC T-38

Operations

COST

FY 16 Cost reimbursable travel for Deployment Support Services for Air Combat

Command (ACC) T-38s assigned to Holloman, Langley and Tyndall AFBs in accordance with PWS, Section A Paragraph 3.2.10 and JTR. Period of

Performance is 01 Oct 15 thru 30 Sep 16. Travel is Government-directed travel in addition to fixed-price travel requirements. Contractor handling rate of ______.

4029 1 Lot $ $24,000 OPTION YEAR FOUR: Travel Deployment Services in support of ACC T-38

Operations

COST

FY 16 Cost reimbursable travel for Deployment Support Services for Air Combat

Command (ACC) T-38s assigned to Beale AFB in accordance with PWS, Section

A Paragraph 3.2.10 and JTR. Period of Performance is 01 Oct 15 thru 30 Sep 16.

Travel is Government-directed travel in addition to fixed-price travel requirements.

Contractor handling rate of ______.

NTE $24,000

4030 1 Lot $ $15,000 OPTION YEAR FOUR: Travel Deployment Services in support of AFMC Test

Missions

COST

FY 16 Cost reimbursable travel for Deployment Support Services for Air Force

Material Command (AFMC) T-38 test missions in accordance with PWS, Section

A Paragraph 4.1.10. and JTR. Period of Performance is 01 Oct 15 thru 30 Sep 16.

Travel is Government-directed travel in addition to fixed-price travel requirements.

Contractor handling rate of ______.

5001 6 Months $ $

SIX MONTH EXTENSION OPTION CLIN: OPTIONAL PRICED, ACC T-38

Program Management, FFP

FY17 ACC T-38 CTP Program Management for Organizational and Intermediate

Maintenance in support of T-38 operations at Holloman, Langley, and Tyndall

AFBs in accordance with PWS, Section A, Paragraph 2.0. Period of performance is from 01 Oct 16 to 31 Mar 17.

FOB: Destination

5002 6 Months $ $

SIX MONTH EXTENSION OPTION CLIN: OPTIONAL PRICED, ACC T-38

Program Management, FFP

FY12 ACC T-38 CTP Program Management for Organizational and Intermediate

Maintenance in support of T-38 operations at Beale AFB in accordance with PWS, Section A, Paragraph 2.0. Period of performance is from 01 Oct 16 thru 31 Mar

17.

FOB: Destination

5003 6 Months $ $

SIX MONTH EXTENSION OPTION CLIN: OPTIONAL PRICED, AFGSC T-38

Program Management, 5014 6 Months $ $ SIX MONTH EXTENSION OPTION CLIN: Transient Maintenance Services at

Holloman AFB

FFP

FY17 Transient Maintenance Services at Holloman AFB in accordance with PWS

Section A, paragraph 3.9. Period of performance is from 01 Oct 16 thru 31 Mar 17.

FOB: Destination

5015 6 Months $ $ SIX MONTH EXTENSION OPTION CLIN: Transient Maintenance Services at

Whiteman AFB

FFP

FY17 Transient Maintenance Services at Whiteman AFB in accordance with PWS

Section A, paragraph 3.9. Period of performance is from 01 Oct 16 thru 31 Mar

17.

FOB: Destination

5016 1 EA $ $15,000

SIX MONTH EXTENSION OPTION CLIN: Aircraft Full strip of ACC T-38s

COST

FY 17 Full strip of ACC T-38s assigned to Langley and Tyndall AFBs in accordance with PWS Section A, paragraph 3.3.13.4. Period of performance is from 01 Oct 16 thru 31 Mar 17. Contractor handling rate of ______.

FOB: Destination

5017 1 EA $ $15,000

SIX MONTH EXTENSION OPTION CLIN: Aircraft Full Strip

COST

FY17 Full strip of ACC T-38s assigned to Beale AFB in accordance with PWS

Section A, paragraph 3.3.13.4. Period of performance is from 01 Oct 16 thru 31

Mar 17. Contractor handling rate of ______.

FOB: Destination

$10,350

5029 1 Lot $ $12,420 SIX MONTH EXTENSION OPTION CLIN: Travel Deployment Services in support of ACC T-38 Operations

COST

FY 17 Cost reimbursable travel for Deployment Support Services for Air Combat

Command (ACC) T-38s assigned to Beale AFB in accordance with PWS, Section

A Paragraph 3.2.10 and JTR. Period of Performance is 01 Oct 16 thru 31 Mar 17.

Travel is Government-directed travel in addition to fixed-price travel requirements.

Contractor handling rate of ______.

NTE $12,420

5030 1 Lot $ $7,762 SIX MONTH EXTENSION OPTION CLIN: Travel Deployment Services in support of AFMC Test Missions

COST

FY 17 Cost reimbursable travel for Deployment Support Services for Air Force

Material Command (AFMC) T-38 test missions in accordance with PWS, Section

A Paragraph 4.1.10. and JTR. Period of Performance is 01 Oct 16 thru 31 Mar 17..

Travel is Government-directed travel in addition to fixed-price travel requirements.

Contractor handling rate of ______.

NTE $7,762

5031 1 Lot $0 $13,973 SIX MONTH EXTENSION OPTION CLIN: Supplies and GFE repairs for ACC

T-38 Support

COST

FY17 Supplies and GFE repairs in support of ACC T-38 aircraft assigned to

Holloman, Langley and Tyndall AFBs. Purchases shall be approved in accordance with PWS Section A, paragraph 5.4.17.3 and 5.4.17.4. Period of performance is from 01 Oct 16 thru 31 Mar 17. Contractor handling rate of

FOB: Destination

NTE $13,973

5032 1 Lot $0 $2,794 SIX MONTH EXTENSION OPTION CLIN: Supplies and GFE repairs for ACC

T-38 Support

FY17 supplies and GFE repairs in support of ACC T-38 aircraft assigned to Beale

SECTION F - DELIVERIES OR PERFORMANCE

The following have been added by reference:

52.242-15 Stop-Work Order AUG 1989

PERFORMANCE

Section F - Deliveries or Performance

PERIODS OF PERFORMANCE:

TRANSITION 01 AUG 11 THROUGH 30 SEP 11

BASE PERIOD 01 OCT 11 THROUGH 30 SEP 12

OPTION YEAR ONE 01 OCT 12 THROUGH 30 SEP 13

OPTION YEAR TWO 01 OCT 13 THROUGH 30 SEP 14

OPTION YEAR THREE 01 OCT 14 THROUGH 30 SEP 15

OPTION YEAR FOUR 01 OCT 15 THROUGH 30 SEP 16

EXTENSION OF SERVICES 01 OCT 16 THROUGH 31 MAR 17