AFI31-601.pdf
PDF 482 KB Posted
- Solicitation number
- FA4890-09-R-0019
About this file
AFI31-601
View the file
Other files
Show 40 more
Latest 50 of 101 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BY ORDER OF THE
SECRETARY OF THE AIR FORCE
AIR FORCE INSTRUCTION 31-601
29 JUNE 2005
Security
INDUSTRIAL SECURITY PROGRAM
MANAGEMENT
COMPLIANCE WITH THIS PUBLICATION IS MANDATORY
ACCESSIBILITY: Publications and forms are available on the e-Publishing website at www.e-publishing.af.mil for downloading or ordering.
RELEASABILITY: There are no releasability restrictions on this publication.
OPR: HQ USAF/XOS-F Certified by: HQ USAF/XOS-FI (Brigadier General James M. Shamess)
Supersedes AFI31-601, 22 November 2000 Pages: 34
This instruction implements Air Force Policy Directive (AFPD) 31-6, Industrial Security. It provides guidance for implementing the National Industrial Security Program. Use this instruction with DOD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), DOD 5220.22-R, Industrial Security Regulation, and DOD 5200.1-R, Information Security Program Regulation and changes thereto. Maintain and dispose of all records created as a result of processes prescribed in this instruction in accordance with the WebRims Records Disposition Schedule. HQ USAF/XOS-FI is dele-gated approval authority for revision of this AFI.
SUMMARY OF CHANGES
This revision incorporates Interim Change 2005-1 and aligns this guidance with the revised Air Force Pol-icy Directive (AFPD) 31-6, Industrial Security. Revisions include renumbering the chapters; updating office symbols and publication references; requiring the identification of government information and sensitive resources that require protection in classified contract documents; mandating the integration of on-base contractor operations into the installation information security program per AFPD 31-6; requiring the execution of a security agreement with contractors that perform contractual services on Air Force installations and require access to classified and gives installation commanders the discretionary authority to also require the execution of an security agreement with on-base contractors that require access to sen-sitive unclassified information or frequent "entry" to the installation; clarifying responsibilities and proce-dures for processing National Interest Determinations (NIDs); requiring a review of the DD Form 254, Contract Security Classification Specification, at two year intervals; requiring subcontractors that per-form contractual services on Air Force installations to execute a Visitors Group Security Agreement (VGSA) when execution is required per this instruction; requiring contractors that use government infor-mation technology (IT) and automated information systems (AISs) to undergo a background investigation prior to IT usage; and eliminating the requirement to use the DD Form 696, Industrial Security Inspection Report. (NOTE: As used in this publication, the term “security review” is not synonymous nor does it negate the “security and policy review” requirement of AFI 35-101, Public Affairs Policies and Proce-http://www.e-publishing.af.mil
2 AFI31-601 29 JUNE 2005
dures. The term "sensitive unclassified information" refers to information identified in a classified con-tract that has been marked "For Official Use Only (FOUO)" per DOD 5200.1-R, Information Security Program, and is exempt from release under the Freedom of Information Act (FOIA)). A bar ( | ) indicates a revision from the previous edition. The entire text of the IC is at the last attachment.
Chapter 1— GENERAL PROVISIONS AND REQUIREMENTS 5
1.1. Policy
1.2. Purpose
1.3. Scope
1.4. Submitting Interpretation and Waiver Requests
1.5. Authority and Responsibilities
1.6. Program Implementation and Administration
1.7. Public Release of Information
1.8. Reporting Requirements
Chapter 2— SECURITY CLEARANCES 11
2.1. Facility Security Clearances (FCLs)
2.2. Contractors with Foreign Ownership, Control or Influence (FOCI)
2.3. Contractor Personnel Security Clearances (PCLs)
2.4. Processing Trustworthiness Determinations
2.5. Reciprocity
Chapter 3— SECURITY TRAINING AND BRIEFINGS 14
3.1. Security Training Requirements
3.2. Security Briefing/Debriefing Requirements
Chapter 4— SECURITY SPECIFICATIONS AND GUIDANCE 15
4.1. Issuing Security Classification Guidance
4.2. DD Form 254, Contract Security Classification Specifications
4.3. Reviewing and Certifying the DD Form 254
4.4. Distribution of the DD Form 254
4.5. Visitor Group Security Agreement (VGSA)
Chapter 5— SAFEGUARDING 17
5.1. Designation of On-Base Visitor Groups
5.2. Integrated Visitor Group
AFI31-601 29 JUNE 2005 3
5.3. Cleared Facility
5.4. Intermittent Visitors
5.5. On-Base Contract Completion or Termination
Chapter 6— OVERSIGHT REVIEWS AND REPORTING REQUIREMENTS 18
6.1. Conducting Industrial Security Reviews (SRs)
6.2. Conducting Information Security Program Reviews
Chapter 7— VISITS AND MEETINGS 21
7.1. Installation Visitors
7.2. Visitor Groups
7.3. Contractor Visits to Air Force Installations
7.4. Air Force Visits to Contractor Facilities
Chapter 8— SUBCONTRACTING 22
8.1. Prime Contractor’s Responsibilities
8.2. Subcontractor Responsibilities
Chapter 9— INFORMATION TECHNOLOGY (IT) AND AUTOMATED INFORMATED
SYSTEM (AIS) SECURITY 23
9.1. Information Technology and Automated Information System Accreditation
Chapter 10— SPECIAL REQUIREMENTS 24
10.1. Special Access Program
10.2. Sensitive Compartmented Information
Chapter 11— INTERNATIONAL SECURITY REQUIREMENTS 25
11.1. Procedures for Contractor Operations Overseas
11.2. Disclosure of Information to Foreign Visitors/Interests
11.3. Documentary Disclosure of Information to a Foreign Entity
11.4. Foreign Visits
Chapter 12— OTHER APPLICABLE SECURITY GUIDANCE 26
12.1. Integrated visitor groups use existing Air Force security program related plans
12.2. Applicability of Other Security Program Requirements
4 AFI31-601 29 JUNE 2005
Attachment 1— GLOSSARY OF REFERENCES AND SUPPORTING INFORMATION 27
Attachment 2— IC 2005-1 TO AFI 31-601, INDUSTRIAL SECURITY PROGRAM
MANAGEMENT 31
AFI31-601 29 JUNE 2005 5
Chapter 1
GENERAL PROVISIONS AND REQUIREMENTS
1.1. Policy. It is Air Force policy to identify in its classified contracts (DD Form 254, Contract Security Classification Specification) [DOD 5220.22-R] specific government information (regardless of classifi-cation, sensitivity, physical form, media or characteristics) and sensitive resources, which must be pro-tected against compromise and or loss while entrusted to industry.
1.2. Purpose. This instruction implement Executive Order 12829, National Industrial Security Program, DOD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), and DOD 5220.22-R, Industrial Security Regulation (ISR) and AFPD 31-6, Industrial Security. It assigns func-tional responsibilities and establishes a system of review that identifies outdated, inappropriate and unnecessary contractual security requirements. It outlines and provides guidance for establishing on-base integrated contractor visitor groups.
1.3. Scope. The security policies, requirements and procedures identified in this instruction are applica-ble to Air Force personnel and on-base DOD contractors performing services under the terms of a prop-erly executed contract and associated security agreement or similar document, as determined appropriate by the installation commander (IC).
1.4. Submitting Interpretation and Waiver Requests. Submit requests regarding the interpretation, clarification and/or waiving of requirements stipulated in Air Force Policy Directive (AFPD) 31-6, Indus-trial Security and this instruction through command Information Security Program Manager (ISPM) channels to HQ USAF/XOS-FI, 1340 Air Force Pentagon, Washington, D.C., 20330-1340.
1.5. Authority and Responsibilities.
1.5.1. The Secretary of Defense (SECDEF) is the Cognizant Security Agency (CSA) for the Depart-ment of Defense (DOD). The SECDEF has designated the Defense Security Service (DSS) as the Cognizant Security Office (CSO) for DOD. DSS oversees security for cleared contractor facilities located off-base and on-base when so requested by the installation commander, in writing.
1.5.2. The Administrative Assistant to the Secretary of the Air Force (SAF/AA) is designated the Air Force Senior Security Official responsible for ensuring implementation of the Industrial Security Pro-gram.
1.5.3. Headquarters United States Air Force, Deputy Chief of Staff (DCS)/Air & Space Operations, Directorate of Strategic Security, Director of Security Forces and Force Protection, Information Secu-rity Division, (HQ USAF/XOS-FI) is responsible for industrial security policy development, interpre-tation, administration and program oversight.
1.5.4. The Assistant for Federal Acquisition Regulation (FAR) System, Deputy Assistant Secretary (Contracting), Assistant Secretary (Acquisition), (SAF/AQC) is responsible for formulating and inter-preting contracting policy and issuing supplemental guidance to the FAR. The contracting office (CO) is responsible for coordinating contractual changes and modifications with Air Force contractors.
1.5.5. Headquarters United States Air Force, DCS/Air & Space Operations, Director of Intelligence, Surveillance and Reconnaissance (HQ USAF/XOI) is responsible for Sensitive Compartmented Infor-
6 AFI31-601 29 JUNE 2005
mation (SC) policy, when applicable to Air Force (AF) awarded contracts. Furthermore, AF/XOI is responsible for formulating policy and disseminating guidance pertaining to AFPD 10-11, Operations Security (OPSEC) requirements.
1.5.6. The Secretary of the Air Force, Warfighting Integration - Chief Information Officer, (SAF/ XC), is responsible for formulating and oversee implementation of information technology (IT) secu-rity policy, and disseminating communications security (COMSEC) and emission security (EMSEC) guidance, when applicable to AF awarded contracts. SAF/XC also formulates and disseminates guid-ance pertaining to DOD Regulation 5400.7/AF Supplement, Freedom of Information Act Program.
Referenced publication addresses the handling, marking and protection of sensitive unclassified and “For Official Use Only (FOUO)” information.
1.5.7. DELETED.
1.5.8. The Secretary of the Air Force, Office of Public Affairs, Security and Review Division (SAF/ PAX), 1690 Air Force Pentagon, Washington DC 20330-1690, formulates policy and disseminates guidance pertaining to the clearance and release of information to the public, in any form.
1.5.9. The IC or designated designee is responsible for authorizing and/or granting DOD contractors access to the installation and for providing appropriate security supervision over the on-base contrac-tor operation and its personnel.
1.6. Program Implementation and Administration.
1.6.1. The IC will:
1.6.1.1. Designate on-base contractor operations that require access to classified information as an intermittent visitor, visitor group, or cleared facility.
1.6.1.2. Execute a VGSA with all contractor operations located on Air Force installations that require or will have access to classified information. This provision may also be extended to include other contractors that perform contractual services on the installation and require or have access to sensitive unclassified information or those that require routine or infrequent “entry” to the installation in the performance of other types of contracts, services or maintenance.
1.6.1.3. Ensure NISPOM or equivalent security procedures are implemented for contractor oper-ations supporting classified efforts within the confines of the installation.
1.6.1.4. Designate the installation ISPM (see AFI 31-401, Information Security Program Manage-ment) as the authority to perform industrial security program oversight for on-base contractor operations, unless unique or special operational circumstances warrant the use of the DSS.
1.6.1.5. Ensure security reviews are conducted on those on-base contractor operations designated as a “cleared facility,” when determined by the IC. In these instances, DSS must be notified that the Air Force will retain “security oversight” for the on-base contractor operations.
1.6.2. Air Force Activity (System, Program or Project Manager) will:
1.6.2.1. Initiate procurement requests and identify program unique security requirements in solic-itations and contract documents.
1.6.2.2. Draft and incorporate program specific security classification guidance into the DD Form 254, DOD Contract Security Classification Specification.
AFI31-601 29 JUNE 2005 7
1.6.2.3. Coordinate contractual security specifications with the contracting office and responsible security discipline, office of primary responsibility (OPR) or functional.
1.6.2.4. As a minimum, review and revise the classification/declassification security guidance every five years or as circumstances require.
1.6.2.5. Work in concert with the CO, ISPM, security program disciplines and/or functional OPRs to develop the VGSA.
1.6.3. Contracting Officers will:
1.6.3.1. Implement the NISPOM by incorporating specific security clauses into (classified/ unclassified) contracts and solicitations as outlined in the Federal Acquisition Regulation (FAR) and supplementation thereto.
1.6.3.2. Negotiate all contractual agreements, modifications, changes and revisions with contrac-tors.
1.6.3.3. Initiate and/or implement other actions as outlined in the FAR, DFARS, AFFARS, NIS- POM and ISR relative to the administration of the industrial security program.
1.6.4. The Defense Security Service (DSS) will accomplish the following tasks per DOD 5220.22-M, NISPOM and DOD 5220.22-R, ISR:
1.6.4.1. Administer the National Industrial Security Program (NISP) in accordance with national and DOD policy.
1.6.4.2. Establish and maintain a network of automated systems which provide real-time person-nel security clearance (PCL) and facility security clearance (FCL) data on DOD contractors and their employees.
1.6.4.3. Assume industrial security program oversight responsibility for on-base cleared facilities at the request of the IC.
1.6.5. Information Security Program Manager (ISPM) will:
1.6.5.1. Oversee and administer the industrial security program on behalf of the IC.
1.6.5.2. Integrate on-base contractor operations into the installation Information Security Program in accordance with AFPD 31-6, para 7 and this instruction.
1.6.5.3. Review pre-award and/or draft solicitations, contract documents, security classification guides, and DD Form 254 to ensure appropriate security clauses and/or language is contained therein which address the protection of government information and sensitive resources.
1.6.5.4. Serve as technical OPR for the development and preparation of the VGSA or other secu-rity agreements as determined necessary by the IC.
1.6.5.5. Maintain a folder on each on-base contractor for which a VGSA has been executed.
1.6.5.6. Conduct security oversight of an on-base designated “cleared facility” as determined by the IC. A designated on-base cleared facility operates under the security provisions and require-ments of the NISPOM.
1.6.5.7. Ensure the contractor takes prompt corrective actions when security program deficiencies are identified and promptly report security violations and/or compromises.
8 AFI31-601 29 JUNE 2005
1.6.5.8. Forward to DSS a copy of the security review and survey reports and other applicable documentation, which pertains to an on-base “cleared facility” per DOD 5220.22-M, DOD 5220.22-R, AFPD 31-6, and this instruction, if required.
1.6.5.9. Participate and/or provide input during the source selection process, incentive awards evaluation process, etc.
1.7. Public Release of Information.
1.7.1. Contracting offices (COs) forward contractor’s requests for public release of information relat-ing to Air Force classified contracts or programs to the installation Public Affairs (PA) office. The PA office processes the request in accordance with AFI 35-101, Public Affairs Policies and Proce-dures, Chapter 15, Security and Policy Review and Chapter 18, News Media and Public Affairs.
1.7.1.1. Information requiring Air Force or DOD-level review will be forwarded by the entry-level public affairs office to the Secretary of the Air Force, Office of Public Affairs, Security and Review Division (SAF/PAX), 1690 Air Force Pentagon, Washington DC 20330-1690. SAF/ PAX forwards the requests, as required, to the Directorate for Freedom of Information and Secu-rity Review (DFOSIR), Washington Headquarters Service, Department of Defense, Pentagon, Washington DC 20301-1400.
1.7.2. When a contractor reports that classified information has appeared publicly, follow the guide-lines in these documents: DOD 5200.1-R, Information Security Program Regulation; Air Force Pol-icy Directive (AFPD) 31-4, Information Security; and Air Force Instruction (AFI) 31-401, Information Security Program Management.
1.8. Reporting Requirements.
1.8.1. Reporting Adverse Information and Suspicious Contact Reporting.
1.8.1.1. On-base integrated visitor groups satisfy NISPOM adverse information and suspicious contacts reporting requirements by notifying or submitting the appropriate report or information to the ISPM through the AF activity they support. This reporting provision must be outlined in the visitor group security agreement (VGSA), when applicable. On-base designated “cleared facili-ties” make reports or submit information directly to the ISPM.
1.8.1.2. Upon receipt of information submitted per paragraph 1.8.1., the ISPM will forward the report to the visitor group’s Home Office Facility (HOF). Any subsequent or additional reporting required by the NISPOM to other federal agencies, e.g., CSA, CSO, Federal Bureau of Investiga-tions (FBI), is thereafter the responsibility of the HOF.
1.8.1.3. The ISPM will retain a copy of the adverse information or suspicious contact report in the visitor group’s files for 2 years.
1.8.1.4. The ISPM is responsible for notifying other AF activities, e.g., contracting office, Air Force Office of Special Investigations (AFOSI), when appropriate.
1.8.2. Reporting Security Violations.
1.8.2.1. A designated on-base “cleared facility” reports the loss, compromise, suspected compro-mise or other security violations pursuant to the NISPOM through the ISPM, who in-turn is responsible for notifying the CSO.
AFI31-601 29 JUNE 2005 9
1.8.2.2. On-base integrated visitor groups report such incidents and/or information in accordance with AFI 31-401 to the ISPM via the AF activity security manager. This reporting requirement must be specified in the VGSA, if applicable. The commander of the AF activity being supported appoints an assigned federal employee (military or civilian) to conduct the preliminary inquiry in accordance with AFI 31-401, Chapter 9.
1.8.2.3. The CSO and ISPM report significant contractor security violations and compromises (resulting in actual loss or compromise) of classified information to the contracting officer.
1.8.3. Reporting Espionage, Sabotage, and Subversive Activities.
1.8.3.1. The ISPM reports espionage, sabotage, subversive activities, deliberate compromises of classified information, and leaks of classified information to the media, involving cleared facilities or visitor groups located on Air Force installations to the servicing AFOSI. AFOSI coordinates with the FBI, as appropriate. The ISPM sends a report via secure communications (STU III or classified fax) with an information copy to each of the following activities:
1.8.3.1.1. Cognizant Security Office (CSO)
1.8.3.1.2. Functional Office of Primary Responsibility (OPR)
1.8.3.1.3. Headquarters United States Air Force, Information Security Division (HQ AF/
XOS-FI)
1.8.3.1.4. Headquarters United States Air Force, Public Affairs (SAF/PA)
1.8.3.1.5. Appropriate Major Command (MAJCOM) Headquarters
1.8.3.2. Such a report should:
1.8.3.2.1. Identify the cleared facility or integrated visitor group involved.
1.8.3.2.2. Identify the contractor involved. Identify the person(s) involved, including the full name, date and place of birth, social security number, local address, present location, position with the contractor, security clearance (including past or present participation in any special access programs (SAPs), and a description of any plans or action and any recommendations to suspend or revoke the individual’s personnel security clearance (PCL).
1.8.3.2.3. Establish the known circumstances of the incident, including the identity of the classified material involved; any subsequent activities or circumstances (including whether and which news media know about the incident); and culpable individuals, where known.
1.8.3.2.4. Document when (time and date) the ISPM reported the incident to the AFOSI or when the CSO reported the incident to the FBI, if known.
1.8.3.2.5. Include a copy of any investigative reports.
1.8.3.2.6. Identify any changes in contractor procedures necessitated by the incident and any recommendations for change in the security program, which might prevent similar future vio-lations.
1.8.4. The reporting requirement outlined in paragraph 1.8.3. is exempt from licensing with a report control symbol (RCS) IAW paragraph 2.11.1. of AFI 33-324, The Information Collections and Reports Management Program; Controlling Internal, Public and Interagency Air Force Information Collections.
10 AFI31-601 29 JUNE 2005
1.8.5. Reporting Loss, Compromise, and Possible Compromise.
1.8.5.1. ICs follow this instruction and perform actions as directed by DOD 5220.22-R, Industrial Security Regulation, to report the loss, compromise, or possible compromise of classified informa-tion for on-base contractor operations for which the Air Force has retained security oversight.
1.8.5.2. Contracting officers who learn of contractor loss, compromise, or possible compromise of classified information immediately notify the servicing ISPM and the Air Force functional office that has responsibility for the compromised information.
1.8.5.3. The original classification authority (OCA) or designated organization is responsible for determining whether a damage assessment is warranted and making any subsequent
1.8.5.4. The OCA or designated organization notifies the Air Force activity, CSO, and/or the con-tractor of decisions to declassify, downgrade, or retain classification of the affected information.
Do not give copies of damage assessment reports to the CSO or contractor operation.
1.8.5.5. Unless assistance is needed, do not notify the CSO of action begin taken to mitigate dam-age to national security.
1.8.5.6. Correspondence associated with or related to any such incidents should be handled between the CSO and/or ISPM and the affected Air Force activity direct.
1.8.5.7. When the seriousness of the incident warrants, the ISPM will provide a copy of the secu-rity incident investigation report to the CSO that has jurisdiction over the HOF.
AFI31-601 29 JUNE 2005 11
Chapter 2
SECURITY CLEARANCES
2.1. Facility Security Clearances (FCLs).
2.1.1. Sponsoring FCLs. The contracting office (CO) is responsible for Facility Security Clearance (FCL) sponsorship. Defense Security Service is the authorizing agent for the FCL. DSS establishes and maintains all FCLs within the NISP. Also see DOD 5220.22-M, DOD 5200.2-R, Personnel Secu-rity Program, AFPD 31-5, Personnel Security, and AFI 31-501, Personnel Security Program Man-agement.
2.1.1.1. To request an FCL sponsorship, write to the CSO with oversight responsibility for the sponsored facility.
2.1.1.2. Give the full name for the sponsored facility, its physical and mailing address, telephone number, and a specific point of contact at the facility, when known. Give the full name, job title, and direct-dial telephone number of the Air Force sponsor.
2.1.1.3. Establishing final FCLs through DSS may take several months. When circumstances do not permit such delays, sponsors may request an interim FCL through DSS.
2.1.2. Sponsoring Interim FCLs. DSS automatically processes all requests for Confidential and Secret FCLs for interim clearances when possible. However, Air Force sponsorship of interim Top Secret FCLs must be justified on a case-specific basis in accordance with DOD 5220.22-R. To request a Top Secret interim FCL, the CO prepares and routes sponsorships through command channels to the MAJ- COM, FOA, or DRU commander for approval. Each request must include these items:
2.1.2.1. An explanation of why an interim Top Secret FCL would prevent a crucial delay in the award or performance of a classified contract.
2.1.2.2. A listing giving the legal name of the facility being sponsored, its complete street address, and the names and positions of people who are applying for interim Top Secret access authoriza-tion.
2.1.2.3. The address of the authorizing DSS.
2.1.3. Establishing FCLs. DSS establishes and maintains FCL for contractor operations participating in the NISP.
2.1.3.1. The ISPM with oversight responsibility for a cleared facility conducts required security reviews of the operation and assists the CSO, as necessary.
2.1.3.2. The ISPM also conducts surveys and/or administrative inquiries pertaining to an on-base cleared facility as requested by the CSO and ensures contractor compliance with
DOD 5220.22-M, NISPOM.
2.1.3.3. Complete the survey by using the DD Form 374, Facility Security Clearance Survey Data Sheet, [DOD 5220.22-R], or an equivalent/acceptable automated format when conducting survey for an on-base cleared facility and forward a copy to the CSO.
2.2. Contractors with Foreign Ownership, Control or Influence (FOCI).
12 AFI31-601 29 JUNE 2005
2.2.1. The CSO tells COs if a contractor performing on a classified contract has foreign ownership, control, or influence (FOCI) or whether it can be negated. Such influence might jeopardize the secu-rity of classified information held by the contractor.
2.2.2. To resolve a FOCI problem, the CSO may establish a facility clearance that limits the level and type of classified information to which a FOCI contractor has access. Such restrictions might affect ongoing, pending and future classified contracts with the contractor. The CO should discuss this impact with the ISPM and servicing Foreign Disclosure office.
2.2.3. The CO considers sponsoring a National Interest Determination (NID) after receiving written justification from the requesting program office or activity. This justification must address and explain how the FOCI contractor’s product or service is crucial or is the sole available source to the AF. If applicable, the program or activity must also provide a written explanation when contract can-cellation would cause unacceptable delays for mission-essential weapons systems in the field or for support organizations.
2.2.3.1. The requesting program office or activity is responsible for obtaining written release approval authority from the functional owner of the “proscribed information,” prior to submitting the NID to the contracting office. The program office or activity contacts the OCA for Top Secret (TS), NSA for Communications Security (COMSEC), DCI for Sensitive Compartmented Infor-mation (SCI), and DOE for Restricted Data (RD) or Formerly Restricted Data (FRD) to obtain release approval. (NOTE: All release determination request (NID) involving/for SCI must be submitted to HQ USAF/XOIIS for review, coordination and processing).
2.2.3.2. The CO reviews, validates, and processes the NID and associated written approvals as follows:
2.2.3.2.1. Forward request for NID related to special access program (SAP) performance through the appropriate SAP and command channels to the Deputy for Security and Investiga-tive Programs, Office of the Administrative Assistant (SAF/AAZ), 1720 Air Force Pentagon, Washington, D.C. 20330-1720 for approval.
2.2.3.2.2. Forward request for non-SAP NID through command ISPM channels to HQ USAF/ XOS-FI for review and coordination. The NIDs are then be forwarded to SAF/AAZ for review and endorsement.
2.2.3.3. SAF/AA endorse the NID and forwards it to the Office of the Under Secretary of Defense for Counterintelligence and Security (OSD-USD/I), 5000 Defense Pentagon, Washington, D.C.
20301-3040, for final approval.
2.3. Contractor Personnel Security Clearances (PCLs).
2.3.1. The Defense Security Service grants and maintains contractor PCLs. DSS also terminates con-tractor PCLs when the contractor no longer needs them or when a contractor employee is terminated.
Administrative termination of a PCL carries no adverse implications regarding the employee or the contractor.
2.3.2. The Directorate for Industrial Security Clearance Review, DOD Office of General Counsel, may suspend or revoke contractor PCLs following due process.
2.3.3. DSS automatically processes all requests for Confidential or Secret PCLs for interim clear-ances, where possible.
AFI31-601 29 JUNE 2005 13
2.3.4. When a contractor employee who is not cleared for access to Top Secret information needs such access to perform on an Air Force classified contract, the employing contractor may sponsor the individual for an interim Top Secret PCL.
2.3.4.1. The contractor should send requests to the CO who seeks concurrence of the system pro-gram office (SPO), system manager (SM), or program manager (PM).
2.3.4.2. The contractor's request should document clearly why the individual needs an interim PCL, why contract requirements may not be satisfied with another individual more suitably cleared, and what the potential adverse impact would be on contract performance if an interim PCL were not granted. The contracting officer will deny contractor requests that do not meet these criteria.
2.3.4.3. The CO routes the appropriate contractor’s request for interim Top Secret PCLs to the MAJCOM, FOA, or DRU commander for approval.
2.3.4.4. The CO sends favorably endorsed requests to the contractor, who then includes the endorsement in the personnel security questionnaire package for transmission to DSS for action.
The CO promptly returns denied requests.
2.4. Processing Trustworthiness Determinations.
2.4.1. When contractors require unescorted entry to restricted areas, access to sensitive unclassified information, access to government automated information systems (AIS) and/ or sensitive equipment, not involving access to classified information, the contractor’s personnel security questionnaire is pro-cessed by the sponsoring Air Force activity per DOD 5200.2-R and AFI 31-501.
2.5. Reciprocity. The CO, ISPM, and other installation security disciplines offices of primary responsi-bility (OPRs) work together to resolve issues pertaining to reciprocity, as applicable to inspections, sur-veys, audits, security clearances, security reviews, etc. Elevate reciprocity issues to the next higher level of command when they can not be resolved locally.
14 AFI31-601 29 JUNE 2005
Chapter 3
SECURITY TRAINING AND BRIEFINGS
3.1. Security Training Requirements.
3.1.1. Air Force classified solicitations and/or contracts [Statement of Objectives (SOO), Statement of Work (SOW), Request for Bid (RFB), Request for Quote (RFQ), VGSA, etc.] may stipulate con-tractor compliance with and participation in pertinent Air Force, command and installation security training programs when performance or services will occur on an Air Force installation.
3.1.2. When specified in an executed VGSA, AFI 31-401, Information Security Program Manage-ment, security training requirements satisfy the NISPOM training provision for on-base integrated vis-itor groups. Other Air Force functionals and/or security discipline OPRs may use this training provision for operational efficiency, however the specific requirements must be identified in the
VGSA.
3.1.3. When an on-base contractor operation is designated as a cleared facility, the ISPM will provide the initial facility security officer (FSO) briefing in accordance with the NISPOM and CSO guidance.
3.1.4. Air Force unit security managers or security officers will provide information security program training (initial, refresher and annual) and other security awareness support to integrated visitor groups. The AF activity, working in concert with the ISPM, will incorporate language into the VGSA, which requires visitor group personnel to attend and/or receive information security training per DOD 5200.1-R and AFI 31-401, Chapter 8. Unit security managers will ensure integrated visitor group personnel are included in their security education program.
3.2. Security Briefing/Debriefing Requirements.
3.2.1. Management officials of the on-base cleared facility visitor groups are responsible for ensuring their employees receive all required security briefings and debriefings as mandated by the NISPOM.
3.2.2. For integrated visitor groups, DOD 5200.1-R and AFI 31-401 security training requirements are equivalent to and satisfy the training requirements of NISPOM, where appropriate. On-base con-tractor management officials are responsible for ensuring their personnel’s attendance and satisfying NISPOM documentation requirements.
3.2.3. The ISPM will invite on-base cleared facility, Facility Security Officers (FSOs) and/or security representatives, to the installation’s information security manager meetings.
AFI31-601 29 JUNE 2005 15
Chapter 4
SECURITY SPECIFICATIONS AND GUIDANCE
4.1. Issuing Security Classification Guidance.
4.1.1. The AF program, project, activity and contracting office (CO) implements NISPOM, DOD 5200.1-R, and installation security requirements through contract documents. Only COs can sign, modify or negotiate changes to contracts.
4.1.2. When a contractor requires access to classified information, the AF program, project or activity prepares the required DD Forms 254, DOD Contract Security Classification Specifications. The contractor should use the security requirements in this form to accurately estimate the cost of security measures. More detailed security requirements are specified in the statement of work (SOW), state-ment of objectives (SOO), performance work statement (PWS), Visitor Group Security Agreement (VGSA), etc.
4.1.3. The responsible AF program, project, or activity will identify (by title, functional OPR, and approval date), the specific security classification guidance or guides (SCGs) applicable to the con-tract in Block #13 of the DD Form 254. The AF activity/program will provide copies of the SCG to the contractor prior to the contract commencing.
4.2. DD Form 254, Contract Security Classification Specifications.
4.2.1. The AF program, project or activity prepares a draft DD Form 254 for each classified contract.
When drafting the DD Form 254s, the program, project or activity will consult with the CO, ISPM and other installation security discipline or functional OPRs affected under the terms of the solicitation/ contract to ensure accuracy. Once drafted, the draft DD Form 254 is forwarded to the CO for process-ing. The contractor should use the security classification/declassification specifications and other con-tractual security requirements listed in the DD Form 254 to accurately estimate the cost of security.
4.2.2. The CO reviews and coordinates the draft DD Form 254 with all affected security disciplines and functionals, as appropriate. This action ensures that approved security guidance is being provided to the contractor. Once the review has been completed, the requesting AF entity/activity incorporates the necessary changes and prepares and forwards an original DD Form 254 to the CO for subsequent approval and signing.
4.2.3. Prior to signing the original DD Form 254, the CO will verify that all affected security disci-plines and/or functional OPRs have reviewed and coordinated on the draft DD Form 254. This review and coordination action will be recorded/annotated in Block 13 (office symbol, date and initial’s of reviewer) of the draft DD Form 254. The CO will file and maintain a copy of the annotated draft DD Form 254 in the respective contract file. When SAPs are involved, coordinate draft and original DD Form 254 with the office responsible for SAP security oversight. Keep DD Form 254 for collateral programs and SAPs unclassified, whenever possible.
4.3. Reviewing and Certifying the DD Form 254.
4.3.1. The ISPM reviews the draft and original DD Form 254 to ensure that the security classification guidance is accurate, approved and appropriate. However, the ISPM only annotates Block 13 of the
16 AFI31-601 29 JUNE 2005
draft DD Form 254. Other security requirements are incorporated into the SOW, SOO, PWS, VGSA, etc.
4.3.2. The AF program, project or activity reviews the DD Form 254 and applicable security classifi-cation/declassification guidance at least once every five years or as required, to ensure accuracy and currency. When changes are necessary, the contract will be modified, if appropriate and revised guid-ance issued.
4.3.3. The CO certifies (signs) the DD Form 254, Block 16e. At the CO discretion, this authority may be delegated (in writing) as authorized by the Federal Acquisition Regulations (FAR) or supplemen-tation thereto.
4.4. Distribution of the DD Form 254.
4.4.1. When DSS is relieved of security oversight responsibility for cleared facilities performing on SCI or SAP programs, furnish Headquarters DSS, 1340 Braddock Place, Alexandria VA 22314-1651, a copy of the DD Form 254.
4.4.2. When a contractor’s performance will be on Air Force installation, the AF program, project or activity must identify/specify all contract performance locations, if known, on the DD Form 254.
When the contract is performed elsewhere, the CO will provide a copy of the signed DD Form 254 to that location’s ISPM.
4.4.3. Procuring Contracting Officers (PCOs), their designated representatives, including Adminis-trative Contracting Officers (ACOs), distribute DD Form 254.
4.5. Visitor Group Security Agreement (VGSA).
4.5.1. Execute a VGSA with all contractor operations located on Air Force installations that will require access to classified information. At the IC’s discretion, the VGSA execution requirement may be extended to contractors performing on contracts that require access to sensitive unclassified infor-mation, sensitive resources or frequent "entry" to the installation.
4.5.2. The installation ISPM, security disciplines and functional OPRs work in concert with the AF program, project and/or activity to develop the Visitor Group Security Agreement (VGSA) require-ments. The requirement to execute a VGSA is in addition to preparing the DD Form 254.
4.5.3. The VGSA must address those security requirements and/or procedures that are unique to the installation for which the contractor will be held contractually liable. VGSAs need only address those areas of security, safeguarding and/or protection that have not been covered elsewhere within the con-tract, DD Form 254, SOW, SOO, PWS, etc.
4.5.4. The ISPM is the technical OPR for development and preparation of the VGSA. For coordina-tion purposes, the ISPM routes the VGSA to all installation security discipline OPRs and/or other agencies lending expertise to the contractual security requirements.
4.5.5. The ISPM signs the VGSA on behalf of the installation commander. The ISPM forwards a copy of the executed/signed VGSA to the contracting officer who awarded the contract or to the con-tracting officer’s designated representative, when appropriate.
4.5.6. An authorized company official shall sign the VGSA. The CO will file a copy of the authori-zation with the contract.
AFI31-601 29 JUNE 2005 17
Chapter 5
SAFEGUARDING
5.1. Designation of On-Base Visitor Groups. The IC works in concert with the Air Force activity, CO and ISPM to determine the designation of an on-base visitor group (cleared facility, integrated visitor group or intermittent visitor).
5.2. Integrated Visitor Group.
5.2.1. Integrated visitor groups operate in accordance with DOD 5200.1-R and supplemental guid-ance thereto. They handle, generate, process, and store classified information per AF guidance. The exception being, their “access” is limited to “need-to-know” contract-specific classified performance information.
5.2.2. The AF must stipulate the specific DOD 5200.1-R and supplemental guidance, which is appli-cable under the terms of the executed VGSA.
5.2.3. The guidance conveyed to on-base contractor operation via the VGSA is limited to the AF installation and the AF solicitation/contract which it was executed to support. All other NISPOM mandated security requirements not addressed or specifically exempted by the executed VGSA or other contracting document must be implemented by the contractor.
5.2.4. The VGSA must clearly reflect that the Air Force is accountable for and controls all classified information. Integrated contractor visitor groups are prohibited from establishing separate classified information controls. (NOTE: Integrated visitor group personnel can not be appointed as primary or alternate security managers for AF activities. However, they can be required (via the VGSA) to pro-vide other security program support, under AF direction, such as, conducting end-of-day security checks, security training/briefings, etc.).
5.3. Cleared Facility. An on-base cleared facility operates under the security mandates and requirements of the NISPOM. See AFPD 31-6 for further guidance regarding their establishment.
5.4. Intermittent Visitors. Intermittent visitors may operate under the security requirements of the NIS- POM or the installation security program. The IC makes this determination after considering the intermit-tent visitor’s relationship and interface with the AF activity and/or installation.
5.5. On-Base Contract Completion or Termination. The program, project or AF activity will notify the ISPM in writing when the contractual services and/or performance has been completed or terminated.
18 AFI31-601 29 JUNE 2005
Chapter 6
OVERSIGHT REVIEWS AND REPORTING REQUIREMENTS
6.1. Conducting Industrial Security Reviews (SRs).
6.1.1. Industrial Security Reviews. The ISPM conduct security reviews (SRs) of on-base cleared facilities that performs classified work on Air Force installations. Such SRs evaluate the contractor’s compliance with contract specific-security requirements and pertinent DOD and Air Force security instructions.
6.1.2. Scheduling Industrial Security Reviews. Conduct (SRs) of on-base cleared facilities per DOD 5220.22-M and DOD 5220.22-R. Unless conducting an unannounced security review on a cleared facility, provide contractor activity’s management 30 days advanced written notification.
6.1.3. Performing Industrial Security Reviews. ISPMs coordinate with other Air Force security dis-cipline OPRs such as; Operations Security (OPSEC), Computer Security (COMPUSEC) and Commu-nications Security (COMSEC), to provide specialized expertise when necessary to complete a security review. The SR is complete when all security requirements imposed under the terms of the contract have been evaluated.
6.1.3.1. When SRs are conducted for cleared facilities, provide copies of completed SR report, with all related correspondence, to the CSO. Use DSS’ automated format to document the results of the SR. Contact HQ USAF/XOS-FI to obtain a copy of the automated DSS format.
6.1.3.2. Facility security clearance (FCL) files must contain all key documentation prescribed by DOD 5220.22-R and the CSO, to include DD Form 254 and related contract security requirement documents.
6.1.4. Post-Industrial Security Review Requirements.
6.1.4.1. Send a letter/report to senior management officials of the cleared facility within 10 days of completing the security review. The letter should:
6.1.4.2. Confirm the contractor's security status as discussed during the exit interview.
6.1.4.3. List any deficiencies requiring corrective action.
6.1.4.4. Within 30 days, request written confirmation on the status of any open major discrepancy (condition which resulted in or could reasonably be expected to result in the loss or compromise of classified information).
6.1.4.5. The ISPM may extend the time for corrective action if required changes are significant and the contractor is making a conscientious effort to resolve problems expeditiously.
6.1.5. Unsatisfactory Industrial Security Reviews.
6.1.5.1. The ISPM assigns an on-base cleared facility an unsatisfactory SR rating:
6.1.5.1.1. To a cleared facility visitor groups if it fails to satisfactorily perform its contractual security responsibilities.
6.1.5.1.2. When major failures in the contractor's security program have resulted in or could reasonably be expected to result in the loss or compromise of classified information.
AFI31-601 29 JUNE 2005 19
6.1.5.1.3. When the contractor is clearly responsible for the security problems cited during a security review.
6.1.5.1.4. The ISPM coordinates with the CSO and contracting officer when assigning an unsatisfactory SR rating for an on-base cleared facility.
6.1.5.1.5. The home office facility (HOF) for the cleared facility is ultimately responsible for meeting contract security requirements. When assigning an unsatisfactory SR rating, the ISPM notifies the HOF immediately through the contracting office and requests prompt and complete corrective action. If the HOF fails to take corrective action, its security clearance may be affected. The servicing security activity should notify the HOF’s CSO if problems continue.
6.1.6. Invalidating the Facility Security Clearance (FCL).
6.1.6.1. The CSO notifies the contracting officers in writing when the FCL of a contractor under their jurisdiction is invalidated.
6.1.6.2. A contractor who fails to correct security deficiencies that subsequently results in invali-dation may lose its FCL.
6.1.6.3. Although most contractors resolve invalidations promptly, contractors with foreign owned, controlled, or influence (FOCI) invalidations may have to wait for many months. Where FOCI is evident, the facility clearance may remain invalidated for more than a year while methods to resolve the FOCI are considered, approved, and implemented. The FCL is invalidated while DSS negotiates voting trusts, proxy agreements, or special agreements with foreign interests.
6.1.6.4. Document SR for an on-base cleared facility as required by the DOD 5220.22-M, DOD 5220.22-R, and CSO guidance. Keep copies of completed SR reports with pre-security review let-ter and completed post-review correspondence for 2 years from the date of the most recent SR.
6.1.6.5. Maintain copies of self-inspection reports or reviews for 2 years from date of the most recent self-inspection.
6.2. Conducting Information Security Program Reviews.
6.2.1. Information Security Program Reviews. On-base integrated visitor groups will be evaluated and conduct self-inspections collectively with the AF activity per DOD 5200.1-R and AFI 31-401, guidance. Integrated visitor groups will not be subjected to the SR requirements of the NISPOM. The installation prescribes the report for documenting program reviews.
6.2.2. Scheduling Information Security Program Reviews. Schedule program reviews per DOD 5200.1-R and AFI 31-401 guidance.
6.2.3. The AF activity is responsible for ensuring its integrated visitor group implement and comply with DOD 5200.1-R and AFI 31-401 requirements.
6.2.4. The ISPM, unit security manager and integrated visitor group establishes files and maintain the following documentation, as appropriate:
6.2.4.1. Signed copy of the DD Form 254 and any revisions.
6.2.4.2. Signed copy of the VGSA. (NOTE: Maintaining a copy of the VGSA is optional for the
ISPM).
20 AFI31-601 29 JUNE 2005
6.2.4.3. Current listing of the key on-base management officials or representatives.
6.2.4.4. Copy of the last annual program review.
6.2.4.5. Copies of last two self-inspections reports. The annual program review can be used to substitute for one of the self-inspections. (NOTE: The maintenance of self-inspection reports is optional for ISPMs).
6.2.4.6. DELETED.
6.2.5. For visitor groups, the ISPM briefs key Air Force and designated visitor group managers on the status of the unit’s security program. Provide both parties a copy of the PR report and any other related assessment, survey or staff assistance visit (SAV) report. Do not furnish copies of these reports to the CSO.
6.2.5.1. When warranted, AF commanders notify the contractor’s home office facility (HOF), in writing, through the contracting office of major security program deficiencies or non-compliance with the terms of the VGSA.
6.2.6. The ISPM will maintain files/records on each on-base integrated visitor group in accordance with paragraph 6.2.4., this publication.
AFI31-601 29 JUNE 2005 21
Chapter 7
VISITS AND MEETINGS
7.1. Installation Visitors. The installation commander is the sole authority responsible for granting con-tractors access to the installation, regardless of which DOD agency, military service component, or activ-ity awarded the contract.
7.2. Visitor Groups. The IC designates contractors who require access to the installation in the perfor-mance of a government contract as intermittent visitors, integrated visitor groups, or cleared facilities.
7.3. Contractor Visits to Air Force Installations.
7.3.1. DOD contractors located on or visiting Air Force installations in support of a classified contract must comply with DOD 5220.22-M, Chapter 6, Section 1, visit requirements.
7.3.2. DELETED.
7.3.3. DELETED.
7.4. Air Force Visits to Contractor Facilities. Air Force personnel who require access to classified information while visiting non-DOD contractor facilities must comply with the visit request submission requirements of DOD 5200.1-R, DOD 5220.22-M, AFI 31-401 and/or the contractor location to be vis-ited.
22 AFI31-601 29 JUNE 2005
Chapter 8
SUBCONTRACTING
8.1. Prime Contractor’s Responsibilities.
8.1.1. Prime contractors are responsible for ensuring their on-base subcontractors are knowledgeable of and comply with the applicable security requirements (NISPOM, installation, etc.) as identified in contracts and/or other contracting documents.
8.1.2. Prime contractors supporting classified efforts must include a provision in each on-base sub-contract that requires subcontractors to contact the installation commander or designee and execute a VGSA prior to beginning on-base operations.
8.2. Subcontractor Responsibilities. On-base subcontractors must execute a separate and/or indepen-dent…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .