The document is a Telecommunications System Installation Plan detailing rack elevations for data center racks 201-208 at Luke Air Force Base, Arizona. The detailed diagrams show comprehensive equipment placement across multiple 6' 44U racks, including network infrastructure components such as FODP (Fiber Optic Distribution Panels), patch panels, cable management systems, switches (Juniper, EX4300 series), routers, wireless controllers, media converters, Dell servers, and specialized network equipment like Infoblox DNS servers and VoIP gateways. Each rack elevation is meticulously labeled with specific run numbers, panel designations, and equipment positioning, providing a precise blueprint for the telecommunications system infrastructure installation.
The rack elevations are part of the NCC Relocation project, dated 31 August 2020, and represent a comprehensive technical diagram for network equipment placement across multiple racks. The document shows systematic organization of networking equipment, including redundant systems like primary and backup wireless controllers, multiple patch panels, cable management solutions, and diverse network communication devices. The elevation drawings provide granular detail about equipment positioning, including specific unit locations (U01-U44), panel assignments, and equipment type, which would be crucial for precise telecommunications infrastructure implementation.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Last Edited: 31 August, 2020
Data Center Rack 201 & 202 Elevation
NCC Relocation
POC:
Telecommunications System Installation Plan - CDRL A008 - Luke AFB, AZ
31 August 2020
U01
U02
U03
U04
U05
U06
U07
U08
U09
U10
U11
U12
U13
U14
U15
U16
U17
U18
U19
U20
U21
U22
U23
U24
U25
U26
U27
U28
U29
U30
U31
U32
U33
U34
U35
U36
U37
U38
U39
U40
U41
U42
U43
U44
6' 44U Rack 202
FODP
24 (205) Run #208 Panel A
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
12 (205) Run #308 Panel B
Cable Management
Boundary SDS-1
Switches SDS-2 Media Converter iBypass BYP-001 Tap 1, Tap 2, Tap 3
DMZ Switch (Future)
Cable Management
Cisco ASR SDP/External Router
Cable Management HP A5120 Nuex SW3-001 Cable Management
Palo Alto
U01
U02
U03
U04
U05
U06
U07
U08
U09
U10
U11
U12
U13
U14
U15
U16
U17
U18
U19
U20
U21
U22
U23
U24
U25
U26
U27
U28
U29
U30
U31
U32
U33
U34
U35
U36
U37
U38
U39
U40
U41
U42
U43
U44
6' 44U Rack 201
FODP
24 (205) Run #207 Panel A
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
12 (205) Run #307 Panel B
Cable Management
Infoblox DNS 1
Infoblox DNS 2
Internal Switch
MRV 4000T
Internal Router
Internal Router
Cable Management
Data Center Rack 203 & 204 Elevation
NCC Relocation
POC:
Telecommunications System Installation Plan - CDRL A008 - Luke AFB, AZ
31 August 2020
U01
U02
U03
U04
U05
U06
U07
U08
U09
U10
U11
U12
U13
U14
U15
U16
U17
U18
U19
U20
U21
U22
U23
U24
U25
U26
U27
U28
U29
U30
U31
U32
U33
U34
U35
U36
U37
U38
U39
U40
U41
U42
U43
U44
6' 44U Rack 204
FODP
24 (205) Run #210, 24 (208) Run #213 Panel A
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
12 (205) Run #310 Panel B
Cable Management
Cable Management
Juniper Network Manager
Media Converter Media Converter
Dell Server Power Edge R810 Dell Power Vault
MD3600F
Dell Power Vault
MD1200
Shelf
FODP
144 (176)
U01
U02
U03
U04
U05
U06
U07
U08
U09
U10
U11
U12
U13
U14
U15
U16
U17
U18
U19
U20
U21
U22
U23
U24
U25
U26
U27
U28
U29
U30
U31
U32
U33
U34
U35
U36
U37
U38
U39
U40
U41
U42
U43
U44
6' 44U Rack 203
FODP
24 (205) Run #209 Panel A
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
12 (205) Run #309 Panel B
Cable Management
Cable Management
EX4300-48P-TAA
Cable Management
EX4300-48P-TAA
Cable Management
Primary Wireless Authenticator
Primary Wireless Controller
Backup Wireless Controller
Data Center Rack 205 & 206 Elevation
NCC Relocation
POC:
Telecommunications System Installation Plan - CDRL A008 - Luke AFB, AZ
31 August 2020
U01
U02
U03
U04
U05
U06
U07
U08
U09
U10
U11
U12
U13
U14
U15
U16
U17
U18
U19
U20
U21
U22
U23
U24
U25
U26
U27
U28
U29
U30
U31
U32
U33
U34
U35
U36
U37
U38
U39
U40
U41
U42
U43
U44
6' 44U Rack 205
FODP
24 (201) Run #207, 24 (202) Run #208 24 (203) Run #209, 24 (204) Run #210 24 (205) Run #211, 24 (206) Run #212 Panel A
FODP
108 (304) Run #225 Panel B
Cable Management
FODP
144 (106) Run #226 Panel C
Cable Management
FODP
144 (508) Run #227 Panel D
Cable Management
FODP
144 (508) Run #227 Panel E
Cable Management
Cable Management
Cable Management
Cable Management
Cable Management
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
Patch Panel 48 (106) Run #325 Panel F
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
Patch Panel 48 (106) Run #325 Panel G
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
Patch Panel 48 (106) Run #325 Panel H
12 (201) Run #307, 12 (202) Run #308 12 (203) Run #309, 12 (204) Run #310 Panel I
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 U01
U02
U03
U04
U05
U06
U07
U08
U09
U10
U11
U12
U13
U14
U15
U16
U17
U18
U19
U20
U21
U22
U23
U24
U25
U26
U27
U28
U29
U30
U31
U32
U33
U34
U35
U36
U37
U38
U39
U40
U41
U42
U43
U44
6' 44U Rack 206
FODP
24 (205) Run #211 Panel A
FODP
144 (MH-41C) Run #408 Panel B
Cable Management
FODP
144 (MH-41C) Run #408 Panel C
Cable Management
FODP
144 (MH-41C) Run #409 Panel D
Cable Management
Future
Cable Management
Cable Management
Cable Management
Cable Management
Cable Management
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
Patch Panel 48 (304) Run #324 Panel F
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
Patch Panel 48 (304) Run #324 Panel G
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
Patch Panel 48 (304) Run #324 Panel H
Patch Panel 12 (207) Run #311, 12 (208) Run #312 Panel I1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Data Center Rack 207 & 208 Elevation
NCC Relocation
POC:
Telecommunications System Installation Plan - CDRL A008 - Luke AFB, AZ
31 August 2020
U01
U02
U03
U04
U05
U06
U07
U08
U09
U10
U11
U12
U13
U14
U15
U16
U17
U18
U19
U20
U21
U22
U23
U24
U25
U26
U27
U28
U29
U30
U31
U32
U33
U34
U35
U36
U37
U38
U39
U40
U41
U42
U43
U44
6' 44U Rack 207
FODP
24 (205) Run #212 48 (TER 2) Run #229 Panel A
Cable Management
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
Patch Panel 12 (206) Run #311 Panel B Cable Management
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
Patch Panel (F/UTP) 12 (S202) Run #330 Panel C Cable Management
FODP
144SM B910
FODP
96SM B122
36SM B465
Cable Management
EX4300-32F-TAA
EX4300-24P-TAA
Cable Management
EX4300-24P-TAA
Cable Management
EX4300-32F-TAA
FODP
144SM B176
Equipment
U01
U02
U03
U04
U05
U06
U07
U08
U09
U10
U11
U12
U13
U14
U15
U16
U17
U18
U19
U20
U21
U22
U23
U24
U25
U26
U27
U28
U29
U30
U31
U32
U33
U34
U35
U36
U37
U38
U39
U40
U41
U42
U43
U44
6' 44U Rack 208
FODP
24 (204) Run #213 Panel A
FODP
144 (B176) Run #401 Panel B
Cable Management
FODP
144 (B176) Run #402 Panel C
Cable Management
FODP
144 (B176) Run #403 Panel D
Cable Management
FODP
144 (B176) Run #403 Panel E
Cable Management
Cable Management
Cable Management
Cable Management
FODP
144 (B176) Run #404 Panel F
FODP
144 (B176) Run #404 Panel G
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
12 (206) Run #312 Panel H
Data Center Rack 301 & 302 Elevation
NCC Relocation
POC:
Telecommunications System Installation Plan - CDRL A008 - Luke AFB, AZ
31 August 2020
U01
U02
U03
U04
U05
U06
U07
U08
U09
U10
U11
U12
U13
U14
U15
U16
U17
U18
U19
U20
U21
U22
U23
U24
U25
U26
U27
U28
U29
U30
U31
U32
U33
U34
U35
U36
U37
U38
U39
U40
U41
U42
U43
U44
6' 44U Rack 301 U01
U02
U03
U04
U05
U06
U07
U08
U09
U10
U11
U12
U13
U14
U15
U16
U17
U18
U19
U20
U21
U22
U23
U24
U25
U26
U27
U28
U29
U30
U31
U32
U33
U34
U35
U36
U37
U38
U39
U40
U41
U42
U43
U44
6' 44U Rack 302
FODP
24 (304) Run #214 Panel A Cable Management
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Patch Panel 12 (304) Run #313 Panel B Cable Management
VoIP Switch
FODP
24 (304) Run #215 Panel A Cable Management
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Patch Panel 12 (304) Run #314 Panel B Cable Management
VMG-GW11P
Analog Gateway
VMG-GW6P
VPN/Voice Gateway
VMG-GW9P
Analog Gateway
VMG-GW12P
Analog Gateway
VMG-GW14P
Analog Gateway
VMG-GW13P
Analog Gateway
VMG-GW15P
Analog Gateway
VMG-GW7P
VPN/Voice Gateway
Data Center Rack 303 & 304 Elevation
NCC Relocation
POC:
Telecommunications System Installation Plan - CDRL A008 - Luke AFB, AZ
31 August 2020
U01
U02
U03
U04
U05
U06
U07
U08
U09
U10
U11
U12
U13
U14
U15
U16
U17
U18
U19
U20
U21
U22
U23
U24
U25
U26
U27
U28
U29
U30
U31
U32
U33
U34
U35
U36
U37
U38
U39
U40
U41
U42
U43
U44
6' 44U Rack 303
FODP
24 (304) Run #216 Panel A Cable Management
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Patch Panel 12 (304) Run #315 Panel B Cable Management
Cable Management
110 Block (Cat5e) 100 (MDF V5) Run #329 Panel C
Cable Management
EX4300-48P-TAA
Cable Management
EX4300-48P-TAA
Cable Management
VPS Voice Firewall
Ciena 3926M Ciena Fiber WM
U01
U02
U03
U04
U05
U06
U07
U08
U09
U10
U11
U12
U13
U14
U15
U16
U17
U18
U19
U20
U21
U22
U23
U24
U25
U26
U27
U28
U29
U30
U31
U32
U33
U34
U35
U36
U37
U38
U39
U40
U41
U42
U43
U44
6' 44U Rack 304
FODP
24 (301) Run #214, 24 (302) Run #215 24 (303) Run #216, 24 (305) Run #217 24 (306) Run #218, 24 (307) Run #219 Panel A
FODP
108 (205) Run #225 Panel B
Cable Management
FODP
72 (404) Run #224 Panel C
Cable Management
FODP
144 (508) Run #228 Panel D
Cable Management
Cable Management
Cable Management
Cable Management
Cable Management
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
Patch Panel 48 (206) Run #324 Panel E
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
Patch Panel 48 (206) Run #324 Panel F
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
Patch Panel 48 (404) Run #323, 12 (206) Run #324 Panel G
12 (301) Run #313, 12 (302) Run #314 12 (303) Run #315, 12 (305) Run #316 Panel I
Patch Panel 48 (404) Run #323 Panel H
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
Cable Management
12 (306) Run #317, 12 (307) Run #318 Panel J
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
Data Center Rack 305 & 306 Elevation
NCC Relocation
POC:
Telecommunications System Installation Plan - CDRL A008 - Luke AFB, AZ
31 August 2020
U01
U02
U03
U04
U05
U06
U07
U08
U09
U10
U11
U12
U13
U14
U15
U16
U17
U18
U19
U20
U21
U22
U23
U24
U25
U26
U27
U28
U29
U30
U31
U32
U33
U34
U35
U36
U37
U38
U39
U40
U41
U42
U43
U44
6' 44U Rack 305 U01
U02
U03
U04
U05
U06
U07
U08
U09
U10
U11
U12
U13
U14
U15
U16
U17
U18
U19
U20
U21
U22
U23
U24
U25
U26
U27
U28
U29
U30
U31
U32
U33
U34
U35
U36
U37
U38
U39
U40
U41
U42
U43
U44
6' 44U Rack 306
FODP
24 (304) Run #217 Panel A Cable Management
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Patch Panel 12 (304) Run #316 Panel B Cable Management
Shelf w/ T-1 and Media Converters
Shelf w/ T-1 and Media Converters
Shelf w/ T-1 and Media Converters
Shelf
110 Block (Cat5e) 200 (508) Run #327 Panel J Cable Management 110 Block (Cat5e) 200 (MDF V5) Run #328 Panel K
FODP
24 (304) Run #218 Panel A Cable Management
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Patch Panel 12 (304) Run #317 Panel B
Marine Switch
Data Center Rack 307 Elevation
NCC Relocation
POC:
Telecommunications System Installation Plan - CDRL A008 - Luke AFB, AZ
31 August 2020
U01
U02
U03
U04
U05
U06
U07
U08
U09
U10
U11
U12
U13
U14
U15
U16
U17
U18
U19
U20
U21
U22
U23
U24
U25
U26
U27
U28
U29
U30
U31
U32
U33
U34
U35
U36
U37
U38
U39
U40
U41
U42
U43
U44
6' 44U Rack 307
FODP
24 (304) Run #219 Panel A Cable Management
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Patch Panel 12 (304) Run #318 Panel B
FAA 24 Port Copper
File details come from the government source that posted it. Updated .