Attachment 18 - B1384 Comm Cabinet Rack Elevation.pdf

PDF 154 KB Posted

Attached to
Buildings 1383 and 1384 Inside Plant (ISP) Replacement and Building 123 Fiber Optic Work
Solicitation number
FA488725R0008
Issued by

About this file

The image shows two rack elevation diagrams for SERVER RM 210 at Luke Air Force Base. Rack 1 is manufactured by the first vendor, while Rack 2 is manufactured by GREAT LAKES. Both rack details include configuration settings such as "Enclosed: Yes", "Grounded: Yes", and "Secured: Yes". The diagrams display multiple rack unit positions, with some slots populated by yellow-highlighted entries labeled "CABLE MANAGER" and other entries, while most slots are marked as "Empty Rack Unit" in gray. The rack elevation details include measurements for mounting height, inside depth, outside width, and outside depth, providing a comprehensive technical layout of the server room infrastructure.

View the file

Other files

File Type Posted
Solicitation Amendment FA488725R0008 0003 SF 30.pdf PDF
Attachment 24 - B123 Rack Elevations.pdf PDF
Solicitation Amendment FA488725R0008 0002 SF 30.pdf PDF
Attachment 22 - 2015 MAG Detail Drawings.pdf PDF
Attachment 17 - B1383 Comm Cabinet Rack Elevation.pdf PDF
Attachment 2 - SOW Luke AFB B1384 ISP Upgrade - 25July2025.pdf PDF
Attachment 16 - B123 Communications Facility Drawings AS-BUILD 9-29-2022.pdf PDF
Attachment 12 - RFI Log - B1383 and B1384 ISP Replacement and B123 Fiber Optic - Gov Reponse.xlsx XLSX spreadsheet
Attachment 10 - WD AZ20250039 dated 25 July 2025.pdf PDF
Attachment 21 - As-Built 1384.pdf PDF
Attachment 1 - SOW Luke AFB B1383 ISP Upgrade - 25July2025.pdf PDF
Attachment 19 - Luke AFB BLDG 528 - As-Built.pdf PDF
Attachment 23 - 2025 MAG Specifications for Public Works Construction.pdf PDF
Attachment 20 - As-Built bldg 1383.pdf PDF
Solicitation Amendment FA488725R0008 0001 SF 30.pdf PDF
Attachment 13 - Past Performance Questionnaire.docx DOCX document
Attachment 10 - WD AZ20250039 dated 30 May 2025.pdf PDF
Attachment 9 - LUKE MASTER SPECS.zip ZIP file
Attachment 5 - Asbestos Recert Ltr B1383 Wiring Upgrade.pdf PDF
Attachment 3 - SOW Luke AFB FOC B123 to B528 and B530 - 10 April 2025.pdf PDF
Attachment 2 - SOW Luke AFB B1384 ISP Upgrade - 8 Jan 2025.pdf PDF
Attachment 14 - Section L Instructions Conditions and Notices to Offerors.pdf PDF
Attachment 7 - Asbestos Certification B528.pdf PDF
Attachment 4 - AETC First 400 Feet Standard Guidance with Luke Supplemental May 2015 v4.pdf PDF
Solicitation - FA488725R0008.pdf PDF
Attachment 8 - Asbestos Certification B530.pdf PDF
Attachment 1 - SOW Luke AFB B1383 ISP Upgrade - 8 Jan 2025.pdf PDF
Attachment 15 - Section M Evaluation Factors For Award.pdf PDF
Attachment 12 - RFI Log - B1383 and B1384 ISP Replacement and B123 Fiber Optic.xlsx XLSX spreadsheet
Attachment 11 - Anti-Terrorism Pamphlet.pdf PDF
Attachment 6 - Asbestos Recert Ltr B1384 Wiring Upgrade.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .