Attachment 23 - 2025 MAG Specifications for Public Works Construction.pdf

PDF 12 MB Posted

Attached to
Buildings 1383 and 1384 Inside Plant (ISP) Replacement and Building 123 Fiber Optic Work
Solicitation number
FA488725R0008
Issued by

About this file

This document is the 2025 MAG Specifications for Public Works Construction, a comprehensive technical manual providing uniform standards and specifications for public works construction projects in Maricopa County, Arizona. The 2025 edition includes numerous updates and revisions across multiple sections, with significant changes to specifications for water and sanitary sewer tracer wire installation, trenchless or open cut installation of steel casing, corrugated metal pipe, and various asphalt and pavement construction techniques. Key modifications include new specifications in Section 632 for water and sanitary sewer tracer wire, updates to sections on asphalt concrete placement, water line construction, and testing procedures, and the addition of several new details such as tracer wire installation and tapping saddle installation.

The document also provides comprehensive guidance on material selection, construction methods, measurement, and payment for different types of public works projects, covering areas like earthwork, street construction, structures, water and sewer systems, and materials specifications. It includes technical details on everything from aggregate base course placement to concrete pavement construction, with specific requirements for compaction, testing, and quality control. The specifications are designed to promote uniformity, reduce conflicts, and provide clear standards for construction across Maricopa County and participating agencies, with provisions for local jurisdictions to make minor adaptations as needed.

View the file

Other files

File Type Posted
Attachment 24 - B123 Rack Elevations.pdf PDF
Solicitation Amendment FA488725R0008 0003 SF 30.pdf PDF
Attachment 21 - As-Built 1384.pdf PDF
Attachment 1 - SOW Luke AFB B1383 ISP Upgrade - 25July2025.pdf PDF
Attachment 19 - Luke AFB BLDG 528 - As-Built.pdf PDF
Solicitation Amendment FA488725R0008 0002 SF 30.pdf PDF
Attachment 22 - 2015 MAG Detail Drawings.pdf PDF
Attachment 18 - B1384 Comm Cabinet Rack Elevation.pdf PDF
Attachment 17 - B1383 Comm Cabinet Rack Elevation.pdf PDF
Attachment 2 - SOW Luke AFB B1384 ISP Upgrade - 25July2025.pdf PDF
Attachment 20 - As-Built bldg 1383.pdf PDF
Attachment 16 - B123 Communications Facility Drawings AS-BUILD 9-29-2022.pdf PDF
Attachment 12 - RFI Log - B1383 and B1384 ISP Replacement and B123 Fiber Optic - Gov Reponse.xlsx XLSX spreadsheet
Attachment 10 - WD AZ20250039 dated 25 July 2025.pdf PDF
Solicitation Amendment FA488725R0008 0001 SF 30.pdf PDF
Solicitation - FA488725R0008.pdf PDF
Attachment 8 - Asbestos Certification B530.pdf PDF
Attachment 1 - SOW Luke AFB B1383 ISP Upgrade - 8 Jan 2025.pdf PDF
Attachment 13 - Past Performance Questionnaire.docx DOCX document
Attachment 10 - WD AZ20250039 dated 30 May 2025.pdf PDF
Attachment 9 - LUKE MASTER SPECS.zip ZIP file
Attachment 5 - Asbestos Recert Ltr B1383 Wiring Upgrade.pdf PDF
Attachment 3 - SOW Luke AFB FOC B123 to B528 and B530 - 10 April 2025.pdf PDF
Attachment 2 - SOW Luke AFB B1384 ISP Upgrade - 8 Jan 2025.pdf PDF
Attachment 15 - Section M Evaluation Factors For Award.pdf PDF
Attachment 12 - RFI Log - B1383 and B1384 ISP Replacement and B123 Fiber Optic.xlsx XLSX spreadsheet
Attachment 11 - Anti-Terrorism Pamphlet.pdf PDF
Attachment 6 - Asbestos Recert Ltr B1384 Wiring Upgrade.pdf PDF
Attachment 14 - Section L Instructions Conditions and Notices to Offerors.pdf PDF
Attachment 7 - Asbestos Certification B528.pdf PDF
Attachment 4 - AETC First 400 Feet Standard Guidance with Luke Supplemental May 2015 v4.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Uniform Standard Specifications and Details for Public Works Construction

Sponsored and Distributed by the

January 2025

2025 Edition

NEW IN THE 2025 EDITION

Uniform Standard Specifications and Details for Public Works Construction—2025 Edition The MAG Standard Specifications and Details Committee, with assistance from specialized working groups, considered 14 cases during the 2024 session. Of these, two were carried forward, and 12 were approved and included in this edition.

The 2025 Edition also includes all revisions since the 2020 Edition.

New specifications:

• Section 632: Water and Sanitary Sewer Tracer Wire

Installation

Specifications rewritten, or with major updates:

• Section 602: Trenchless or Open Cut Installation of Steel

Casing

• Section 621: Corrugated Metal Pipe and Arches

• Section 760: Coating Corrugated Metal Pipe and Arches

Specifications with minor updates:

• Section 321: Placement and Construction of Asphalt Concrete Pavement

• Section 325: Placement and Construction of Asphalt- Rubber Asphalt Concrete

• Section 326: Placement and Construction of Polymer Modified Asphalt Concrete

• Section 610: Water Line Construction

• Section 611: Water, Sewer and Storm Drain Testing

• Section 615: Sanitary Sewer Line Construction

• Section 616: Reclaimed Water Line Construction

• Section 631: Water Taps and Meter Service Connections

• Section 710: Asphalt Concrete

• Section 711: Paving Asphalt

• Section 714: Micro-surfacing Materials

• Section 750: Ductile Iron Water Pipe and Fittings

• Section 771: Galvanizing

Specifications moved into the Supplemental Specifications and Details for Civil Construction Outside the Right-of-Way (OROW) document and deleted here:

• MAG Section New #

• Section 303: Pervious Concrete Base Course OROW 405

• Section 323: Placement of Pervious Concrete OROW 450

• Section 343: Exposed Aggregate Paving OROW 455

• Section 723: Pervious Concrete OROW 720

Other updates:

• Updated cover design

• Updated Table of Contents and Index pages

• Updated heading styles and improved accessibility

• Renumbered headings as needed to be sequential

• Removed extra blank pages

• Removed deleted or moved sections and details

• Made capitalization more consistent

• Made degree notations more consistent (i.e. 40° F)

• Made fraction formatting more consistent (i.e. ½, ¼, 1/8)

• Made minor grammar and punctuation corrections

• Added missing hyperlinks

New details

• Detail 341: TAPPING SADDLE INSTALLATION ON

DUCTILE IRON PIPE

• Detail 399-1: TRACER WIRE & I.D. TAPE

INSTALLATION

• Detail 399-2: TRACER WIRE CONNECTIONS

• Detail 399-3: TRACER WIRE FOR WATER SERVICE

• Detail 399-4: TRACER WIRE FOR FIRE HYDRANT

• Detail 399-5: TRACER WIRE FOR SEWER SERVICE

• Detail 399-6: TRACER WIRE FOR SEWER MANHOLE

Details that have been updated:

• Detail 100-1: INDEX (Page 1 of 3)

• Detail 100-2: INDEX (Page 2 of 3)

• Detail 120: SURVEY MARKER

• Detail 150: PRECAST SAFETY CURB

• Detail 200-1: TRENCH BACKFILL AND SURFACE

REPLACEMENT

• Detail 342: CONCRETE PRESSURE PIPE TAPPING

SLEEVE

• Detail 345-2: 4”, 6” WATER METER WITH ON-SITE

HYDRANTS

• Detail 391-1: VALVE BOX INSTALLATION AND

GRADE ADJUSTMENT

• Detail 422-2: MANHOLE FRAME AND COVER

ADJUSTMENT - TYPE ‘B’

• Detail 441: SEWER CLEANOUT

• Detail 545: END SECTION - REINFORCED CONCRETE

PIPE

• Detail 552: FORD CROSSING AND CUT-OFF WALLS

Details moved into the Supplemental Specifications and Details for Civil Construction Outside the Right-of-Way (OROW) document and deleted here:

• MAG Detail New #

• Detail 227: SEDIMENT TRAP OROW-511

• Detail 228: PERVIOUS CONCRETE

PAVEMENT OROW-230

• Detail 346: FIRE LINE DETECTOR

CHECK VAULT OROW-346

Details that have been deleted:

• Detail 302-1: JOINT RESTRAINT WITH TIE RODS

(DRAWING)

• Detail 302-2: JOINT RESTRAINT WITH TIE RODS

(NOTES)

• Detail 389: CURB STOP WITH VALVE BOX AND

COVER

For more information and links to agency supplements please visit the Agency Supplemental Specifications and Details page.

http://www.azmag.gov/Programs/Public-Works/Specifications-and-Details/Agency-Supplemental-Specifications-and-Details

Title VI Notice to the Public Maricopa Association of Governments

The Maricopa Association of Governments (MAG) hereby gives public notice that it is the policy of the agency to assure full compliance with Title VI of the Civil Rights Act of 1964, the Civil Rights Restoration Act of 1987, Executive Order 12898 on Environmental Justice, and related statutes and regulations in all programs and activities. Title VI requires that no person in the United States of America shall, on the basis of actual or perceived race, color, or national origin, be excluded from the participation in, be denied the benefits of, or be otherwise subjected to discrimination under any program or activity for which MAG receives federal financial assistance. Additional protections are provided in other federal and state statutes for discrimination based on religion, sex, disability, age, gender identity (as defined in paragraph 249(c)(4) of title 18, United States Code) or sexual orientation.

Any person who believes they have experienced discrimination under Title VI has a right to file a formal complaint with MAG. Any such complaint must be filed with MAG’s Title VI Coordinator within 180 days following the date of the alleged discriminatory occurrence.

[Complaints should, at a minimum, include the following information:

• Your name and address, and a number at which you can be reached during business hours

• A general description of the person(s) injured by the alleged discriminatory acts

• A description of the alleged discriminatory act(s) in sufficient detail to enable the Title VI Coordinator to understand what occurred, when it occurred, and the basis of the alleged discrimination complaint (race, color, national origin, etc.)

• The letter must be signed and dated by the person filing the complaint or by someone authorized to do so on his or her behalf.] For more information, or to file a complaint, please contact the Title VI Coordinator at (602) 254-6300.

STANDARD

SPECIFICATIONS

for

PUBLIC WORKS

CONSTRUCTION

SPONSORED and DISTRIBUTED by the

2025 Edition

ARIZONA

Standard Specifications for Public Works Construction

FOREWORD

Publication of these Uniform Standard Specifications and Details for Public Works Construction fulfills the goal of a group of agencies who joined forces in 1966 to produce such a set of documents. Subsequently, in the interest of promoting countywide acceptance and use of these standards and details, the Maricopa Association of Governments accepted their sponsorship and the responsibility of keeping them current and viable.

These specifications and details, representing the best professional thinking of representatives of several Public Works Departments, reviewed and refined by members of the construction industry, were written to fulfill the need for uniform rules governing public works construction performed for Maricopa County and the various cities and public agencies within Maricopa County who could not afford to promulgate such standards for themselves. Agencies in other regions or climes that desire to use these specifications may need to make adjustments for local conditions.

A uniform set of specifications and details, updated and embracing the most modern materials and construction techniques will reduce conflicts, provide clarity and lower construction costs for the benefit of the public.

Use of these standards for projects outside of the right-of-way should be reviewed by professional engineers and architects and applied with care to insure relevance to the planned work.

Specifications and details should be incorporated into project plans and specifications after careful review by the design engineer or architect of specific project needs. Not all specifications contained herein will apply to all projects. Prepared plans and specifications should clearly call out only those specific uniform specifications and details required for the project.

Uniform specifications and details are not a substitute for good engineering judgment. Unique conditions will arise that are outside the scope of these standards. When this happens, professional engineers and architects are required to use their judgment to amend these standards to best meet site-specific project needs in accordance with the rules set forth by the State of Arizona and policy statements made by the Arizona State Board of Technical Registration.

The Uniform Standard Specifications and Details for Public Works Construction are revised periodically and reprinted to reflect the changing technology of the construction industry. To this end a Specifications and Details Committee has been established as a permanent organization to continually study and recommend changes to the Specifications and Details. Interested parties may address suggested changes and questions to:

Standard Specifications & Details Committee c/o Maricopa Association of Governments

302 North First Avenue, Suite 300 Phoenix, Arizona, 85003

Suggestions will be reviewed by the committee and appropriate segments of the construction industry and revisions will be published the first of each year. A copy of this publication is available on the internet at the website listed below. Please follow the links to the Specs and Details page and look for Uniform Standard Specifications for Public Works Construction and/or Uniform Standard Details for Public Works Construction.

https://azmag.gov/Programs/Public-Works/Specifications-and-Details

In the interest of regional uniformity, it is hoped that all using agencies will adopt these standards with minimal changes. It is recognized that because of charter requirements and for other reasons, some agencies will find it necessary to modify or supplement certain requirements. In the interest of regional uniformity, it is strongly recommended that using agencies bring desired modifications to the MAG Committee for consideration and inclusion into these standards.

Revised 2025 https://azmag.gov/Programs/Public-Works/Specifications-and-Details

TABLE OF CONTENTS

PART 100 - GENERAL CONDITIONS

Section Last Revised Title Page 101 2024 Abbreviations and Definitions ................................................................................................... 101-1 102 2024 Bidding Requirements and Conditions ...................................................................................... 102-1 103 1999 Award and Execution of Contract .............................................................................................. 103-1 104 2012 Scope of Work ........................................................................................................................... 104-1 105 2018 Control of Work ......................................................................................................................... 105-1 106 2017 Control of Materials ................................................................................................................... 106-1 107 2024 Legal Regulations and Responsibility to Public ........................................................................ 107-1 108 2014 Commencement, Prosecution and Progress ............................................................................... 108-1 109 2011 Measurements and Payments ..................................................................................................... 109-1 110 2000 Notification of Changed Conditions and Dispute Resolution .................................................... 110-1

PART 200 - EARTHWORK

Section Last Revised Title Page 201 1999 Clearing and Grubbing ............................................................................................................... 201-1 205 1998 Roadway Excavation ................................................................................................................. 205-1 206 2020 Structure Excavation and Backfill ............................................................................................. 206-1 210 2009 Borrow Excavation .................................................................................................................... 210-1 211 2015 Fill Construction ........................................................................................................................ 211-1 215 1998 Earthwork for Open Channels.................................................................................................... 215-1 220 2024 Riprap Construction ................................................................................................................... 220-1 230 2010 Dust Palliative Application ........................................................................................................ 230-1

PART 300 - STREETS AND RELATED WORK

Section Last Revised Title Page 301 2014 Subgrade Preparation ................................................................................................................. 301-1 306 2010 Mechanically Stabilized Subgrade-Geogrid Reinforcement ...................................................... 306-1 309 2017 Lime Stabilization or Modification of Subgrade........................................................................ 309-1 310 2018 Placement and Construction of Aggregate Base Course ............................................................ 310-1 311 2023 Placement and Construction of Cement Treated Subgrade ........................................................ 311-1 312 2023 Cement Treated Base ................................................................................................................. 312-1 315 1998 Bituminous Prime Coat .............................................................................................................. 315-1 317 2013 Asphalt Milling .......................................................................................................................... 317-1 320 1999 Road-Mixed Surfacing ............................................................................................................... 320-1 321 2025 Placement and Construction of Asphalt Concrete Pavement ..................................................... 321-1 322 2017 Decorative Asphalt .................................................................................................................... 322-1 324 2015 Portland Cement Concrete Pavement (PCCP) ........................................................................... 324-1 325 2025 Placement and Construction of Asphalt-Rubber Asphalt Concrete ........................................... 325-1 326 2025 Placement and Construction of Polymer Modified Asphalt Concrete ....................................... 326-1 327 2012 Hot In-Place Recycling .............................................................................................................. 327-1 329 1998 Tack Coat ................................................................................................................................... 329-1 330 1998 Asphalt Chip Seal ...................................................................................................................... 330-1 331 2020 Placement and Construction of Asphalt Emulsion Micro-Surfacing Treatments ...................... 331-1 332 2020 Placement and Construction of Asphalt Emulsion Slurry Seal Treatments ............................... 332-1 333 2012 Fog Seal Coats ........................................................................................................................... 333-1 334 2024 Preservative Seal for Asphalt Concrete...................................................................................... 334-1 335 2012 Placement and Construction of Hot Asphalt-Rubber Seal ......................................................... 335-1 336 2016 Pavement Matching and Surfacing Replacement ....................................................................... 336-1 337 2018 Asphalt Pavement Crack Sealing and Crack Filling .................................................................. 337-1 340 2018 Concrete Curb, Gutter, Sidewalk, Curb Ramps, Driveway and Alley Entrance ........................ 340-1 342 2016 Interlocking Concrete Paver Installations .................................................................................. 342-1 345 2021 Adjusting Frames, Covers and Valve Boxes .............................................................................. 345-1 350 2013 Removal of Existing Improvements .......................................................................................... 350-1 355 2024 Utility Potholes-Keyhole Method .............................................................................................. 355-1 360 2021 Telecommunications Installation ............................................................................................... 360-1

PART 400 - RIGHT-OF-WAY AND TRAFFIC CONTROL

Section Last Revised Title Page 401 2024 Traffic Control ........................................................................................................................... 401-1 405 2015 Survey Monuments .................................................................................................................... 405-1 410 1998 Precast Safety Curbs .................................................................................................................. 410-1 415 2022 Flexible Metal Guardrail ............................................................................................................ 415-1 420 1998 Chain Link Fences ..................................................................................................................... 420-1 424 1998 Parkway Grading ....................................................................................................................... 424-1 425 2023 Topsoils ...................................................................................................................................... 425-1 430 2023 Landscaping .............................................................................................................................. 430-1 440 2023 Landscape Irrigation .................................................................................................................. 440-1

PART 500 - STRUCTURES

Section Last Revised Title Page 505 2017 Concrete Structures .................................................................................................................... 505-1 506 2012 Precast Prestressed Concrete Members ...................................................................................... 506-1 510 1998 Concrete Block Masonry ........................................................................................................... 510-1 511 1998 Brick Masonry ........................................................................................................................... 511-1 515 1998 Steel Structures .......................................................................................................................... 515-1 520 2012 Steel and Aluminum Handrails .................................................................................................. 520-1 525 2020 Pneumatically Placed Mortar ..................................................................................................... 525-1 530 2000 Painting ...................................................................................................................................... 530-1

PART 600 – WATER, SEWER, STORM DRAIN AND IRRIGATION

Section Last Revised Title Page 601 2022 Trench Excavation, Backfilling and Compaction ...................................................................... 601-1 602 2025 Trenchless or Open Cut Installation of Steel or CCFRPM Casing ............................................ 602-1 604 2018 Placement of Controlled Low Strength Material ....................................................................... 604-1 605 2024 Subdrainage ............................................................................................................................... 605-1 607 2015 Trenchless Installation of Smooth Wall Jacking Pipe ................................................................ 607-1 608 2017 Horizontal Directional Drilling .................................................................................................. 608-1 610 2025 Water Line Construction ............................................................................................................ 610-1 611 2025 Water, Sewer and Storm Drain Testing ..................................................................................... 611-1 615 2025 Sanitary Sewer Line Construction ............................................................................................. 615-1 616 2025 Reclaimed Water Line Construction .......................................................................................... 616-1 618 2023 Storm Drain Construction .......................................................................................................... 618-1 620 2021 Cast-in-Place Concrete Pipe ...................................................................................................... 620-1 621 2025 Corrugated Metal Pipe and Arches ............................................................................................ 621-1 625 2020 Manhole Construction and Drop Sewer Connections ................................................................ 625-1 626 2021 Corrosion Coating of Sanitary Sewer Manholes ........................................................................ 626-1 627 2020 Painting Sanitary Sewer Manholes with Insecticide .................................................................. 627-1 630 2019 Tapping Sleeves, Valves and Valve Boxes on Water Lines ...................................................... 630-1 631 2025 Water Taps and Meter Service Connections .............................................................................. 631-1 632 2025 Water and Sanitary Sewer Tracer Wire Installation ................................................................... 632-1

PART 700 - MATERIALS

Section Last Revised Title Page 701 2013 Aggregate ................................................................................................................................... 701-1 702 2023 Base Materials............................................................................................................................ 702-1 703 2012 Riprap ........................................................................................................................................ 703-1 705 2012 Portland Cement Treated Base ................................................................................................... 705-1 708 2011 Asphalt Pavement Core Bonding Materials ............................................................................... 708-1 710 2025 Asphalt Concrete ........................................................................................................................ 710-1 711 2025 Paving Asphalt ........................................................................................................................... 711-1 712 1999 Liquid Asphalt ........................................................................................................................... 712-1

PART 700 – MATERIALS (Continued) Section Last Revised Title Page 713 2020 Emulsified Asphalts Materials ................................................................................................... 713-1 714 2025 Micro-surfacing Materials ......................................................................................................... 714-1 715 2024 Slurry Seal Materials.................................................................................................................. 715-1 716 2012 Cover Material ........................................................................................................................... 716-1 717 2017 Asphalt-Rubber Asphalt Concrete ............................................................................................. 717-1 718 2024 Preservative Seal for Asphalt Concrete...................................................................................... 718-1 719 2020 Polymer Modified Asphalt Concrete ......................................................................................... 719-1 725 2024 Portland Cement Concrete ......................................................................................................... 725-1 726 2018 Concrete Curing Materials ......................................................................................................... 726-1 727 2017 Steel Reinforcement ................................................................................................................... 727-1 728 2024 Controlled Low Strength Material ............................................................................................. 728-1 729 2019 Expansion Joint Filler ................................................................................................................ 729-1 735 2016 Reinforced Concrete Pipe .......................................................................................................... 735-1 736 2012 Non-Reinforced Concrete Pipe .................................................................................................. 736-1 738 2023 High Density Polyethylene Pipe and Fittings for Storm Drain and Sanitary Sewer .................. 738-1 739 2015 Steel Reinforced Polyethylene Pipe & Fittings for Storm Drain, Irrigation & Sanitary Sewer . 739-1 740 2019 Polypropylene Pipe and Fittings for Storm Drain, Irrigation and Sanitary Sewer ..................... 740-1 741 2011 Lining for Reinforced Concrete Sanitary Sewer Pipe ................................................................ 741-1 742 2015 Precast Manhole ......................................................................................................................... 742-1 743 1998 Vitrified Clay Pipe ..................................................................................................................... 743-1 744 2020 Precast Polymer Concrete Manhole ........................................................................................... 744-1 745 1998 PVC Sewer Pipe and Fittings ..................................................................................................... 745-1 750 2025 Ductile Iron Water Pipe and Fittings ......................................................................................... 750-1 753 2000 Galvanized Pipe and Fittings ..................................................................................................... 753-1 754 2012 Copper Pipe, Tubing and Fittings .............................................................................................. 754-1 755 2012 Polyethylene Pipe for Water Distribution .................................................................................. 755-1 756 2008 Dry Barrel/Fire Hydrants ........................................................................................................... 756-1 757 2023 Irrigation System Materials ........................................................................................................ 757-1 758 2005 Concrete Pressure Pipe - Steel Cylinder Type ........................................................................... 758-1 759 2002 Steel Pipe ................................................................................................................................... 759-1 760 2025 Coating Corrugated Metal Pipe and Arches ............................................................................... 760-1 761 1998 Structural Plate Pipe, Arches, and Pipe Arches ......................................................................... 761-1 770 2013 Structural and Rivet Steel, Rivets, Bolts, Pins, and Anchor Bolts ............................................. 770-1 771 2025 Galvanizing ................................................................................................................................ 771-1 772 2017 Chain Link Fence ....................................................................................................................... 772-1 775 2015 Brick and Concrete Masonry Units (Blocks) ............................................................................. 775-1 776 2022 Masonry Mortar and Grout ........................................................................................................ 776-1 778 1998 Lumber ....................................................................................................................................... 778-1 779 1998 Wood Preservatives ................................................................................................................... 779-1 787 2021 Gray Iron Castings ..................................................................................................................... 787-1 790 1999 Paint ........................................................................................................................................... 790-1 792 2010 Dust Palliative ............................................................................................................................ 792-1 795 2023 Landscape Material .................................................................................................................... 795-1 796 2017 Geosynthetics ............................................................................................................................. 796-1

2025 Index ....................................................................................................................................... Index-1

This Page Reserved for Future Use

PART 100

GENERAL CONDITIONS

Section Last Title Page Revised

101 2024 Abbreviations and Definitions ............................................................................................................ 101-1

102 2024 Bidding Requirements and Conditions................................................................................................ 102-1

103 1999 Award and Execution of Contract ....................................................................................................... 103-1

104 2012 Scope of Work .................................................................................................................................... 104-1

105 2018 Control of Work .................................................................................................................................. 105-1

106 2017 Control of Materials ............................................................................................................................ 106-1

107 2024 Legal Regulations and Responsibility to Public .................................................................................. 107-1

108 2014 Commencement, Prosecution and Progress ........................................................................................ 108-1

109 2011 Measurements and Payments .............................................................................................................. 109-1

110 2000 Notification of Changed Conditions and Dispute Resolution ............................................................. 110-1

This Page Reserved for Future Use

SECTION 101

101-1

Public Works Construction

ABBREVIATIONS

101.1 ABBREVIATIONS:

Wherever the following abbreviations are used in these specifications, standard details or on the plans, they are to be constructed the same as the respective expressions represented.

AASHTO American Association of State Highway and

Transportation Officials AAN American Association of Nurserymen AB Aggregate base Aban Abandon ABC Aggregate base course AC Asphalt cement or concrete ACB Asphalt concrete base ACI American Concrete Institute ACP Asbestos cement pipe ACPA American Concrete Pipe Association ACWS Asphalt concrete wearing surface AFRB Arizona Fire Rating Bureau AGC Associated General Contractors of America, Inc.

Agg Aggregate ADOT Arizona Department of Transportation ADA Americans With Disabilities Act of 1990 ADEQ Arizona Department of Environmental

Quality Ahd Ahead AIA American Institute of Architects AIEE American Institute of Electrical Engineers AISC American Institute of Steel Construction ANSI American National Standards Institute APA American Plywood Association Approx Approximate APWA American Public Works Association AR Aged residue ARAC Asphalt-Rubber Asphalt Concrete ARIZ Arizona Department of Transportation Test

Method ARS Arizona Revised Statutes ASCE American Society of Civil Engineers ASME American Society of Mechanical Engineers ASTM American Society for Testing Materials Ave Avenue AWPA American Wood Preservers Association AWSC American Welding Society Code AWWA American Water Works Association Bbl Barrel BC Beginning of curve BCR Beginning of curb return Beg Beginning Bk Book or Back Blvd Boulevard

AND DEFINITIONS

BM Bench Mark or Board Measure Brg Bearing BST Bituminous Surface Treatment BTB Bituminous Treated Base BTU British Thermal Units BVC Beginning of vertical curve C Centigrade or Curb CB Catch Basin CBF&C Catch basin frame & cover CC or C/C Center to Center CE City or County Engineer Cem Cement CF Curb face cfs Cubic Feet per Second CIP Cast Iron Pipe CIPP Cast-in-place concrete pipe CL or C Centerline CLR Clear Cm Centimeter CMP Corrugated metal pipe CO Clean out Col Column Conc Concrete Const Construct CP Concrete pipe (non-reinforced) CTB Cement Treated Base Cu Cubic Deg Degree DF Douglas Fir DG Decomposed granite Dia Diameter Dim Dimension DIP Ductile Iron Pipe Div Division Dr Drive Drwg Drawing Dwy Driveway Ea Each Ease Easement E East EC End of curve ECR End of curb return El or Elv Elevation Equa or Eq Equation EVC End of vertical curve Ex or Exist Existing F Fahrenheit FB Field book F & C Frame & cover FH Fire hydrant FL or F Floor line or flow line

101-2

Public Works Construction

Fl El Floor Elevation Fnd Found fps Feet per second FS Finished surface FSS Federal Specifications and Standards Ft Foot or feet G Gutter Ga Gage Galv Galvanized GL Ground line Gpm Gallons per minute Gr Grade H High or height HC House connection HH Hand Hole Hdwl Headwall Horiz Horizontal Hwy Highway ICA Industrial Commission of Arizona ID Improvement District or inside diameter IE Invert Elevation IEEE Institute of Electrical and Electronic

Engineers In Inch Inv Invert IP Iron Pipe IPS Iron Pipe Size Irrig Irrigation Jt Joint JC Junction Chamber Jct Junction JS Junction Structure L Length Lb Pound L&T Lead and Tack LD Local Depression LF Linear Feet LH Lamp Hole Lin Linear Long Longitudinal Lt Left M Map or Maps MAG Maricopa Association of Governments Max Maximum MCR Maricopa County Records Meas Measured MH Manhole MHF&C Manhole Frame and Cover Min Minutes or Minimum Misc Miscellaneous ML or M Monument Line mm Millimeter Mon Monolithic or monument MTD Multiple Tile Duct N North

NBS National Bureau of Standards NCPI National Clay Pipe Institute NE Northeast NEC National Electric Code NEMA National Electrical Manufacturer’s

Association NFPA National Fire Protection Association NP Non-Plastic NPI Non pay item NSC National Safety Council NSF National Sanitation Foundation NTS Not to Scale NW Northwest No Number OC On Center OD Outside Diameter Oz Ounces PC Point of Curvature PCC Point of Compound Curve or Portland Cement Concrete PI Point of Intersection or Plastic Index PL Property Line POC Point of Curve POS Point of Spiral PP Power Pole ppm Parts per million PRC Point of Reverse Curve Prod Produced Prop Proposed or Property psi Pounds per square inch psf Pounds per square foot PT or POT Point of Tangent P&TP Power and Telephone Pole Pvmt Pavement Q Rate of flow R Radius RC Reinforced Concrete RCP Reinforced Concrete Pipe Rd Road Rdwy Roadway Reinf Reinforced, Reinforcing Ret Wall Retaining Wall RGRCP Rubber Gasket Reinforced Concrete Pipe rpm Revolutions Per Minute Rt Right R/W Right-of-way S South or Slope SAE Society of Automotive Engineers San Sanitary SC Spiral to Curve SCCP Steel Cylinder Concrete Pipe SD Storm Drain or Sewer District Sdl Saddle

101-3

Public Works Construction

Sec Seconds Sect Section SE Southeast Sht Sheet Spec Specifications SPR Simplified Practice Recommendation Sp MH Special Manhole Sq Ft Yd Square Foot, Yard SS Sanitary Sewer St Street Sta Station Std Standard Str gr Structural grade Struct Structure or structural SW Southwest SWPPP Stormwater Pollution Prevention Plan T Tangent Distance Tel Telephone Temp Temporary TH Test Hole TP Telephone pole Tr Tract Trans Transition TS Traffic signal or Tangent to spiral TSC Traffic signal conduit Typ Typical UL Underwriters’ Laboratories Inc.

USC & GS United States Coast and Geodetic Survey USGS United States Geological Survey V Velocity of flow VC Vertical curve VCP Vitrified clay pipe Vert Vertical W West or width WI Wrought iron WS Wearing surface Wt Weight Yd Yard ’ feet or minutes ” inches or seconds ̊ degrees % percent # number or pound @ at / per = equals

101-4

Public Works Construction

101.2 DEFINITIONS AND TERMS:

Whenever in these specifications or in other contract documents the following terms or pronouns in place of them are used, the intent and meaning shall be interpreted as follows:

Addendum: A supplement to any of the Contract Documents issued, in writing, after advertisement of but prior to the opening of bids for a contract.

Advertisement: The public announcement, as required by law, inviting bids for work to be performed or materials to be furnished.

Agency: The governmental agency for which the construction is being done, either by permit or by contract.

Architect: The individual or firm who has accomplished the architectural services for the project, including his representatives.

Arizona Test Method: Arizona Department of Transportation Materials Testing Manual test method.

Award: The formal action of the governing body is accepting a proposal.

Backfill: Material placed in an excavated space to fill such space. For trenches, see definitions for Initial Backfill and Final Backfill.

Base Course: The upper course of the granular base of a pavement or the lower course of an asphalt concrete pavement structure.

Bedding: A material layer placed on top of the trench foundation to the bottom of the pipe, typically 4-6 inches in height. The bedding establishes the line and grade for a conduit and provides support that is firm, but not hard.

Bidder: Any qualified individual, firm, partnership, corporation, or combination thereof, acting directly or through a duly authorized representative who legally submits a proposal for the advertised work.

Board of Supervisors: The Maricopa County Board of Supervisors acting under the authority of the laws of the State of Arizona.

Bond Issue Project: A project financed from bonds issued by the City or County pledging credit or a revenue resource.

Bridge: A structure, including supports, erected over a depression or an obstruction, as water, highway, or railway, and having a track or passageway for carrying traffic or other moving loads and having a length measured along the center of roadway of more than 20 feet between undercopings of abutments or extreme ends of openings for multiple boxes.

(Length) The length of a bridge structure is the over-all length measured along the line of survey stationing back-to-back of backwalls of abutments, if present, otherwise end to end of the bridge floor; but in no case less than the total clear opening of the structure.

(Roadway Width) The clear width measured at right angles to the longitudinal centerline of the bridge between the bottom or curbs or guard timbers or in the case of multiple heights of curbs, between the bottoms of the lower risers.

Budget Project: A project financed by funds from General Tax levies and shared revenue funds set aside in the annual budget adopted by the Council or Board of Supervisors.

Building: Any structure built for the support, shelter, or enclosure of persons, animals, chattel or movable property.

Building Code: A regulation adopted by the governing body establishing minimum standards of construction for the protection of the public health, safety, and welfare in terms of measured performance rather than in terms of rigid specification of materials and methods.

101-5

Public Works Construction

Calendar Day: Every day shown on the calendar.

Call for Bids: The standard forms inviting proposals or bids.

“Careful and prudent manner”: means conducting excavation in such a way that when it approaches within twenty-four inches of the underground facility located and marked by the owner or operator, by stakes, paint or in some customary manner, the exact location is manually determined, and the uncovered facility is supported and protected.

Change Order: A written order issued by the Engineer to the Contractor to make changes in the work or to perform extra work, and setting forth conditions for payment and/or adjustment in time of completion.

City: A municipal corporation, organized and existing under and by virtue of the laws of the State of Arizona.

City/County Clerk: The duly authorized person who performs the duties of clerk for the Contracting Agency.

Completion Time: The number of calendar days for completion of an act, including authorized time extensions. In case a calendar date of completion is shown in the proposal in lieu of the number of calendar days, the contract shall be completed by that date. The time within which an act is to be done shall be computed by excluding the first and including the last day; and if the last day be Sunday or a legal holiday, that shall be excluded.

Conflicting Utility: An existing utility, shown or not shown on the plans is conflicting when any part of the utility falls within the dimensions of the new installation, such that it would be in physical contact with the new installation.

Construction Project: The erection, installation, remodeling, alteration, of durable facilities upon, under, or over the ground.

This shall include, but is not limited to buildings, roadways and utility pipes, lines, poles or other structures.

Contingent Bid Item: This is a minor bid item, which is likely, but not certain, to occur during the course of work. If the Engineer determines that this work is required, the Contractor will accomplish the work and payment will be made based on the contingent unit bid price included in the proposal. Since the quantity listed in the proposal is primarily for bid comparison, the amount of work required by the Engineer may vary materially from this.

Contract: The written instrument executed by the Contractor and the Contracting Agency by which the Contractor is bound to furnish all labor, equipment, and materials and to perform the work specified, and by which the Contracting Agency is obligated to compensate the Contractor therefore at the prices set forth therein. The Contract Documents are herewith by reference made a part of the contract as if fully set forth therein.

Contract Documents: All the integral documents of the contract, including but not limited to, Call for Bids, Plans, Standard Specifications and Details, Special Provisions, Proposal, Addenda, Performance Bond, Payment Bond, Certificates of Insurance, Ordinance, Contract, and Change Orders.

Contracting Agency: The legal entity that has contracted for the performance of the work or for whom the work is being performed.

Contractor: The individual, firm, partnership, corporation or combination thereof entering into a contract with the Contracting Agency to perform the advertised work.

Coal Ash: Fly ash and bottom ash resulting from the process of combustion of ground or powdered coal obtained either from current power plant production or harvested from landfills or impoundments. This definition of coal ash does not include, among other things, the residue resulting from: (1) fluidized bed combustion, (2) the burning of municipal solid waste or any other refuse with coal, or (3) the burning of industrial or municipal solid waste in incinerators.

Council: The City Council, which by law constitutes the Legislative Department of the City.

County: Maricopa County, organized and existing under and by virtue of the laws of the State of Arizona.

101-6

Public Works Construction

Culvert: Any structure not classified as a bridge, which provides an opening under or adjacent to the roadway.

Days: Unless otherwise designated, days will be understood to mean calendar days.

Deflection: The amount the certified mean inside diameter (CMID) of pipe has reduced under load, as applied to thermoplastic pipe. Deflection is expressed as a percentage reduction in the CMID.

Emergency: Unforeseen occurrences and combinations of circumstances involving the public welfare or the protection of work already done under the Contract Documents, or which endanger life or property and call for immediate action or remedy.

Engineer: The person, appointed as City or County Engineer by the Council or the Board of Supervisors, acting directly or through his duly authorized representative.

Equipment: (Construction) — All machinery and equipment, together with the necessary supplies for upkeep and maintenance, and also tools and apparatus necessary for the proper construction and acceptable completion of work. (Installed)

— All material or articles used in equipping a facility as furnishings or apparatus to fulfill a functional design.

Extra Work: An item of work not provided for in the contract as awarded but found essential to the satisfactory completion of the contract within its intended scope.

Final Backfill: The material placed in a trench above the initial backfill to the top of the trench or to the bottom of the road base material.

Flooding: Flooding will consist of the inundation of the entire lift with water, puddle with poles or bars to insure saturation of the entire lift.

Fly Ash: Finely divided residue that results from the process of combustion of ground or powdered coal and that is transported by flue gases.

Force Account Work: Work done by personnel of the Contracting Agency as in-house work.

Foundation: For buildings or structures, this will be the substructure. For a trench, the foundation is the bottom of the required trench excavation. The foundation surface is either native material, or replacement material when unsuitable material occurs, and is removed and replaced at the bottom of the required trench excavation.

Full Depth Pavement: An asphalt concrete pavement structure in which the granular base and subbase are replaced by proportionate thicknesses of asphalt concrete.

Haunching: The area of a pipe trench between the bottom of the pipe and the springline of the pipe.

Improvement District Project: A project financed by assessments against the property included in a special assessment district authorized under, or implemented by an act of the legislature of the State and/or a procedural ordinance of the City or County.

Initial Backfill: The material placed in a trench between the springline and 12 inches above the crown of the conduit.

Inspector: The Engineer’s authorized representative assigned to make detailed inspections of contract performance.

Jetting: Jetting is the densification of material, using a continuous supply of water, under pressure, transmitted to the material through a rigid pipe of sufficient length to reach the bottom of the lift being densified. In all cases, the entire lift will be completely saturated working from the top to the bottom.

Laboratory: The established materials testing laboratory of the Contracting Agency’s Engineering Department, or other laboratories acceptable to and/or authorized by the Engineer to test materials and work involved in the Contract.

101-7

Public Works Construction

Major Item: A major item shall be the total of any item of work and/or materials specified in the bid schedule that exceeds the amount established in Table 109-1.

Materials: Any substance specified in the project, equipment and other material used or consumed in the performance of the work.

Median: The portion of a divided highway separating the roadways used by traffic going in opposite directions.

Non Pay Item: An item of work for which no separate payment will be made under the proposal, but which must be included as an incidental cost for payment on an associated item included in the proposal.

Notice of Award: A letter from the City or County Clerk advising the Contractor that he is the successful bidder and the Council or Board of Supervisors has accepted his proposal.

Notice to Proceed: A directive issued by the Engineer, authorizing the Contractor to start the work or improvements required in the Contract.

Obligee: One to whom another is obligated.

Open Trench: The excavated area shall be considered as open trench until all the aggregate base course for pavement replacement has been placed and compacted or, if outside of a pavement area, until the excavated area is brought to finish grade or natural grade.

Owner: The City or County, acting through its legally constituted officials, officers or employees.

Pavement: Any surfacing of streets, alleys, sidewalks, courts, driveways, etc., consisting of mineral aggregate bound into a rigid or semi-rigid mass by a suitable binder such as, but not limited to, Portland cement or asphalt cement.

Pavement Structure: The combination of subbase, base course, and surface course placed on a subgrade to support the traffic load and distribute it to the roadbed.

Pay Item: A detail of work for which separate payments are to be made under the Contract, as specified in the proposal.

Payment Bond: The security provided by the…