FA4861-16-R-A100-0006_Updated_Docs_Technical_QnA.pdf

PDF 80 KB Posted

Attached to
Nellis AFB Multiple Award Construction Contract (MACC) Solicitation Federal contract opportunity
Solicitation number
FA4861-16-R-A100
Issued by
Department of the Air Force Air Combat Command

About this file

Solicitation Amendment 0006 Updated attachments Technical Questions and Answers and CAD Drawings.

View the file

Other files for this federal contract opportunity

Other files attached to Nellis AFB Multiple Award Construction Contract (MACC) Solicitation, newest first.
File Type Posted
SYNOPSIS_OF_AWARD.docx DOCX document
Atch_62__Nellis_Creech_AFB_Facility_Metering_Requirements.pdf PDF
Atch_60_ETL_07-04_AF_Carpet_Standard.pdf PDF
16RA100_Tech_QA_(Part_3).pdf PDF
Atch_61__AF_Facility_Metering_Policy.pdf PDF
Atch_53_Statement_of_Work _RKMF_16-0062_Rpr_Courtroom _Bldg_16_Revision_2.pdf PDF
Atch_43_Schedule_of_Values_Template_UNLOCKED.xlsx XLSX spreadsheet
Atch_01_MACC_SOW_Revision_1.pdf PDF
16RA100SignInRosters.pdf PDF
Atch_54_Demolition_Plan _RKMF_16-0062_Rpr_Courtroom _Bldg_16.pdf PDF
Atch_48_Teaming_List.doc DOC document
16RA100_General_Q As_(Part_2).pdf PDF
16RA100_Q A_(Part_1).pdf PDF
Atch_53_Statement_of_Work _RKMF_16-0062_Rpr_Courtroom _Bldg_16_Revision1.pdf PDF
FA4861-16-R-A100-0003_Amendment.pdf PDF
FA4861-16-R-A100-0001_Amendment.pdf PDF
Atch_25_3PH__CJE_CREECH_4in-Profile_A-size.pdf PDF
Atch_29_Trench_Sand.pdf PDF
Atch_46_WD_NV160022_201600603.pdf PDF
Atch_50_Subcontractor_Teaming_Partner_Consent_Form.doc DOC document
Atch_19_AFI_33-580_Spectrum_Management.pdf PDF
Atch_31_UM3-14-Profile_A-size.pdf PDF
Atch_45_WD_NV160004_20160603.pdf PDF
Atch_06_Engineering_Technical_Letter_20020627.pdf PDF
Atch_52_Past_Performance_Questionnaire.doc DOC document
Atch_41_AF_3064_Progress_Schedule.xfdl XFDL file
Atch_11_AFI_23-204_Material_Management.pdf PDF
Atch_40_AF_3052_Construction_Cost_Estimate_Breakdown.xlsx XLSX spreadsheet
Atch_42_Contract_Progress_Report_Template.xfdl XFDL file
Atch_24_1PH_CJE-Profile_A-size.pdf PDF
Atch_55_Facility_Photos _RKMF_16-0062_Rpr_Courtroom _Bldg_16.pdf PDF
Atch_16_AFI_32-7042_Waste_Management.pdf PDF
Atch_10_ACCMAN32-7051_hollomanafbsup_1.pdf PDF
Atch_02_Nellis_Creech_ID2_Handbook_201108.pdf PDF
Atch_12_AFI_32-1021_Planning_and_Programming_MILCON_Projects.pdf PDF
Atch_08_ACC_Architectural_and_Interior_Design_Stds_200201.pdf PDF
Atch_17_AFI_32-7086_Hazardous_Materials.pdf PDF
Atch_32_UM17-2_XFMR-Profile_A-size.pdf PDF
Atch_54_Demolition_Plan _RKMF_16-0062_Rpr_Courtroom _Bldg_16.pdf PDF
Atch_18_NAFB_Plan_32-7086_Hazardous_Materials_Management_Plan.pdf PDF
Atch_51_Sample_Client_Authorization_Letter.doc DOC document
FA486116RA100_Solicitaion.pdf PDF
Atch_20_AFI_40-201_Radioactive_Materials_Management.pdf PDF
Atch_14_AFI_32-1044_Visual_Air_Navigation_Systems.pdf PDF
Atch_15_AFI_32-7044_Storage_Tank.pdf PDF
Atch_07_Communication_Installation_Stds_20140320.pdf PDF
Atch_03_Nellis_Creech_AFB_Lighting_Fixture_Req_20150528.pdf PDF
Atch_47_WD_NV160034_20160108.pdf PDF
Atch_26_3PH__CJE-Profile_A-size.pdf PDF
Atch_27_1728F-806_UG__Main_VEA_standard.pdf PDF
Show all 50

Nellis AFB Multiple Award Construction Contract (MACC) Solicitation has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

1. Update Attachment 01 MACC SOW to remove "w et-stamp" requirement from paragraph 1.4.6.

2. Provide unlocked version of Attachment 43 Schedule of Values.

3. Update Attachment 53, Statement of Work, RKMF 16-0062 Rpr Courtroom, Bldg 16

4. Update Attachment 56 Asbestos & LBP Reports, RKMF 16-0062 Rpr Courtroom, Bldg 16

5. Provide Attachment 60, Enneering Technical Letter 07-04, Air Force Carpet Standards

6. Provide Attachment 61, Air Force Facility Metering Policy

7. Provide Attachment 62, Nellis/Creech AFB Facility Metering Requirements

8. Provide CAD Draw ings for RKMF 16-0062 Rpr Courtroom, Bldg 16

9. Provide Technical Questions and Answ ers (Part 3)

1. CONTRACT ID CODE PAGE OF PAGES

J 1 6

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 20-Jul-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA4861-16-R-A100

X 9B. DATED (SEE ITEM 11)

20-Jun-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

20-Jul-2016

CODE

99 CONS/LGCA

5865 SWAAB BLVD, BLDG 588

NELLIS AFB NV 89191-7063

FA4861 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA4861-16-R-A100

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 01 Statement of Work 71 06-DEC-2015

Attachment 02 Nellis-Creech AFB ID2

Handbook

146 01-AUG-2011

Attachment 03 Nellis-Creech AFB

Lighting Fixture

Requirement

3 28-MAY-2015

Attachment 04 Nellis-Creech AFB Fire

Protection Standards

7 23-JUL-2013

Attachment 05 Environmental Permit

Guidance

2 01-JAN-2015

Attachment 06 Communications

Engineering Technical

Letter (ETL) 02-12

25 27-JUN-2002

Attachment 07 Communication

Installation Standards

27 20-MAR-2014

Attachment 08 ACC Architectural And

Interior Design Standards

24 01-JAN-2002

Attachment 09 ACC Sole Source EMCS

Letter

1 03-JUN-2003

Attachment 10 ACCMAN32-

7051_hollomanafbsup_1

307 22-MAR-2006

Attachment 11 AFI 23-204, Material

Management

11 24-JUL-2012

Attachment 12 AFI 32-1021, Planning and Programming

MILCON Projects

52 31-OCT-2014

Attachment 13 AFI 32-1024, Standard

Facility Requirements

8 14-JUL-2011

Attachment 14 AFI 32-1044, Visual Air

Navigation Systems

9 24-DEC-2014

Attachment 15 AFI 32-7044, Storage

Tank

46 25-APR-2001

Attachment 16 AFI 32-7042 Waste

Management

42 07-NOV-2014

Attachment 17 AFI 32-7086, Hazardous

Materials

31 04-FEB-2015

Attachment 18 NAFB Plan 32-7086

Hazardous Materials

Managament Plan

57 01-FEB-2010

Attachment 19 AFI 33-580, Spectrum

Management

79 17-JAN-2013

Attachment 20 AFI 40-201, Radioactive

Materials Management

104 17-SEP-2014

Attachment 21 AFMAN 32-1084, Facility Requirements

531 20-APR-2012

Attachment 22 (CREECH) UM1-6C 1 20-JUN-2013

Attachment 23 (CREECH) UR2 (S) 1 20-JUN-2013

Attachment 24 1PH CJE-Profile A-size 1 21-JUN-2013

Attachment 25 3PH CJE CREECH 4in-

Profile A-size

1 21-JUN-2013

Attachment 26 3PH CJE-Profile A-size 1 20-JUN-2013

Attachment 27 1728F-806 UG Main

VEA standard

91 26-JUN-2000

Attachment 28 Cooper Transformers -

07-12-13 - three phase list

1 12-JUL-2013

Attachment 29 Trench Sand 2 30-APR-2013

Attachment 30 Ug 17-2 Delta-Wye 1 28-JUN-2013

Attachment 31 UM3-14-Profile A-size 1 21-JUN-2013

Attachment 32 UM17-2 XFMR-Profile

A-size

1 21-JUN-2013

Attachment 33 UM33-Profile A-size 1 21-JUN-2013

Attachment 34 UM48-2 Multi-ground rod-Profile A-size

1 21-JUN-2013

Attachment 35 VEA Connection Charge

Agreement

Attachment 36 NAFB 0-74, Range Pass

(NAFB Form O-74)

3 11-JUN-2011

Attachment 37 Nuclear Gauge Form 1 1

Attachment 38 Nuclear Gauge Form 2 1

Attachment 39 AF Form 103, Base Civil

Engineering Work

Clearance Request

1 01-AUG-1994

Attachment 40 AF Form 3052, Construction Cost

Estimate Breakdown

Attachment 41 AF Form 3064, Progress

Schedule

1 01-SEP-2003

Attachment 42 AF Form 3065, Progress

Report

1 01-APR-1996

Attachment 43 Schedule of Values

Template

Attachment 44 Wage Determination

NV160001

9 11-MAR-2016

Attachment 45 Wage Determination

NV160004

7 03-JUN-2016

Attachment 46 Wage Determination

NV160022

6 03-JUN-2016

Attachment 47 Wage Determination

NV160034

16 08-JAN-2016

Attachment 48 Teaming List 1

Attachment 49 Past Performance

Information Sheet

Attachment 50 Subcontractor/Teaming

Partner Consent Form

Attachment 51 Sample Client

Authorization Letter

Attachment 52 Past Performance

Questionairre

Attachment 53 Statement of Work, RKMF 16-0062 Rpr

Courtroom

20 22-JAN-2016

Attachment 54 Demolition Plan, RKMF

16-0062 Rpr Courtroom

Attachment 55 Facility Photos, RKMF

16-0062 Rpr Courtroom

Attachment 56 Asbestos & LBP Reports, RKMF 16-0062 Rpr

Courtroom

18 14-JUN-2004

Attachment 57 As-Built Drawings, RKMF 16-0062 Rpr

Courtroom

26 04-JUL-1995

Attachment 58 Bid Schedule, RKMF 16-

0062 Rpr Courtroom

Attachment 59 Conceptual Floor Plan, RKMF 16-0062 Rpr

Courtroom, Bldg 16 to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 01 Statement of Work

Revision 1

71 20-JUL-2016

Attachment 02 Nellis-Creech AFB ID2

Handbook

146 01-AUG-2011

Attachment 03 Nellis-Creech AFB

Lighting Fixture

Requirement

3 28-MAY-2015

Attachment 04 Nellis-Creech AFB Fire

Protection Standards

7 23-JUL-2013

Attachment 05 Environmental Permit

Guidance

2 01-JAN-2015

Attachment 06 Communications

Engineering Technical

Letter (ETL) 02-12

25 27-JUN-2002

Attachment 07 Communication

Installation Standards

27 20-MAR-2014

Attachment 08 ACC Architectural And

Interior Design Standards

24 01-JAN-2002

Attachment 09 ACC Sole Source EMCS

Letter

1 03-JUN-2003

Attachment 10 ACCMAN32-

7051_hollomanafbsup_1

307 22-MAR-2006

Attachment 11 AFI 23-204, Material

Management

11 24-JUL-2012

Attachment 12 AFI 32-1021, Planning and Programming

MILCON Projects

52 31-OCT-2014

Attachment 13 AFI 32-1024, Standard

Facility Requirements

8 14-JUL-2011

Attachment 14 AFI 32-1044, Visual Air

Navigation Systems

9 24-DEC-2014

Attachment 15 AFI 32-7044, Storage

Tank

46 25-APR-2001

Attachment 16 AFI 32-7042 Waste

Management

42 07-NOV-2014

Attachment 17 AFI 32-7086, Hazardous

Materials

31 04-FEB-2015

Attachment 18 NAFB Plan 32-7086

Hazardous Materials

Managament Plan

57 01-FEB-2010

Attachment 19 AFI 33-580, Spectrum

Management

79 17-JAN-2013

Attachment 20 AFI 40-201, Radioactive

Materials Management

104 17-SEP-2014

Attachment 21 AFMAN 32-1084, Facility Requirements

531 20-APR-2012

Attachment 22 (CREECH) UM1-6C 1 20-JUN-2013

Attachment 23 (CREECH) UR2 (S) 1 20-JUN-2013

Attachment 24 1PH CJE-Profile A-size 1 21-JUN-2013

Attachment 25 3PH CJE CREECH 4in-

Profile A-size

1 21-JUN-2013

Attachment 26 3PH CJE-Profile A-size 1 20-JUN-2013

Attachment 27 1728F-806 UG Main

VEA standard

91 26-JUN-2000

Attachment 28 Cooper Transformers -

07-12-13 - three phase list

1 12-JUL-2013

Attachment 29 Trench Sand 2 30-APR-2013

Attachment 30 Ug 17-2 Delta-Wye 1 28-JUN-2013

Attachment 31 UM3-14-Profile A-size 1 21-JUN-2013

Attachment 32 UM17-2 XFMR-Profile

A-size

1 21-JUN-2013

Attachment 33 UM33-Profile A-size 1 21-JUN-2013

Attachment 34 UM48-2 Multi-ground rod-Profile A-size

1 21-JUN-2013

Attachment 35 VEA Connection Charge

Agreement

Attachment 36 NAFB 0-74, Range Pass

(NAFB Form O-74)

3 11-JUN-2011

Attachment 37 Nuclear Gauge Form 1 1

Attachment 38 Nuclear Gauge Form 2 1

Attachment 39 AF Form 103, Base Civil

Engineering Work

Clearance Request

1 01-AUG-1994

Attachment 40 AF Form 3052, Construction Cost

Estimate Breakdown

Attachment 41 AF Form 3064, Progress

Schedule

1 01-SEP-2003

Attachment 42 AF Form 3065, Progress

Report

1 01-APR-1996

Attachment 43 Schedule of Values

Template

Attachment 44 Wage Determination

NV160001

9 11-MAR-2016

Attachment 45 Wage Determination

NV160004

7 03-JUN-2016

Attachment 46 Wage Determination

NV160022

6 03-JUN-2016

Attachment 47 Wage Determination

NV160034

16 08-JAN-2016

Attachment 48 Teaming List 1

Attachment 49 Past Performance

Information Sheet

Attachment 50 Subcontractor/Teaming

Partner Consent Form

Attachment 51 Sample Client

Authorization Letter

Attachment 52 Past Performance

Questionairre

Attachment 53 Statement of Work, RKMF 16-0062 Rpr

Courtroom Revision 2

20 20-JUL-2016

Attachment 54 Demolition Plan, RKMF

16-0062 Rpr Courtroom

Attachment 55 Facility Photos, RKMF

16-0062 Rpr Courtroom

Attachment 56 Asbestos & LBP Reports, RKMF 16-0062 Rpr

Courtroom

13 04-MAR-2016

Attachment 57 As-Built Drawings, RKMF 16-0062 Rpr

Courtroom

26 04-JUL-1995

Attachment 58 Bid Schedule, RKMF 16-

0062 Rpr Courtroom

Attachment 59 Conceptual Floor Plan, RKMF 16-0062 Rpr

Courtroom, Bldg 16

Attachment 60 Engineering Technical

Letter 07-04, AF Carpet

Standards

17 28-MAY-2007

Attachment 61 Air Force Facility

Metering Policy

2 06-MAY-2010

Attachment 62 Nellis/Creech AFB

Facility Metering

Requirement

4 04-JAN-2016

(End of Summary of Changes)