Atch_43_Schedule_of_Values_Template_UNLOCKED.xlsx

XLSX spreadsheet 22 KB Posted

Attached to
Nellis AFB Multiple Award Construction Contract (MACC) Solicitation
Solicitation number
FA4861-16-R-A100
Issued by

About this file

Atch 43_Schedule of Values Template UNLOCKED

View the file

Other files

File Type Posted
SYNOPSIS_OF_AWARD.docx DOCX document
Bldg16_CAD.zip ZIP file
AutoCADcombined.dwg DWG drawing
Atch_61__AF_Facility_Metering_Policy.pdf PDF
FA4861-16-R-A100-0006_Updated_Docs_Technical_QnA.pdf PDF
Atch_53_Statement_of_Work _RKMF_16-0062_Rpr_Courtroom _Bldg_16_Revision_2.pdf PDF
Atch_62__Nellis_Creech_AFB_Facility_Metering_Requirements.pdf PDF
Atch_56_Asbestos_ _LBP_Reports _RKMF_16-0062_Rpr_Courtroom _Bldg_16 _Mar_2016.pdf PDF
Atch_60_ETL_07-04_AF_Carpet_Standard.pdf PDF
16RA100_Tech_QA_(Part_3).pdf PDF
Atch_01_MACC_SOW_Revision_1.pdf PDF
Atch_54_Demolition_Plan _RKMF_16-0062_Rpr_Courtroom _Bldg_16.pdf PDF
Atch_48_Teaming_List.doc DOC document
16RA100SignInRosters.pdf PDF
FA4861-16-R-A100-0005_General_QnA.pdf PDF
16RA100_General_Q As_(Part_2).pdf PDF
16RA100_Q A_(Part_1).pdf PDF
Atch_53_Statement_of_Work _RKMF_16-0062_Rpr_Courtroom _Bldg_16_Revision1.pdf PDF
FA4861-16-R-A100-0004_Amend_Demo_SOW_QnA.pdf PDF
Atch_59_Concept_Floor_Plan _RKMF_16-0062_Rpr_Courtroom _Bldg_16.pdf PDF
FA4861-16-R-A100-0003_Amendment.pdf PDF
FA4861-16-R-A100-0002_Amendment.pdf PDF
FA4861-16-R-A100-0001_Amendment.pdf PDF
Atch_41_AF_3064_Progress_Schedule.xfdl XFDL file
Atch_11_AFI_23-204_Material_Management.pdf PDF
Atch_01_MACC_SOW_20160505.pdf PDF
Atch_37_Nuclear_Gauge_Form_1.xlsx XLSX spreadsheet
Atch_18_NAFB_Plan_32-7086_Hazardous_Materials_Management_Plan.pdf PDF
Atch_32_UM17-2_XFMR-Profile_A-size.pdf PDF
Atch_54_Demolition_Plan _RKMF_16-0062_Rpr_Courtroom _Bldg_16.pdf PDF
Atch_51_Sample_Client_Authorization_Letter.doc DOC document
FA486116RA100_Solicitaion.pdf PDF
Atch_43_Schedule_of_Values_Template.xlsx XLSX spreadsheet
Atch_42_Contract_Progress_Report_Template.xfdl XFDL file
Atch_40_AF_3052_Construction_Cost_Estimate_Breakdown.xlsx XLSX spreadsheet
Atch_56_Asbestos_ _LBP_Reports _RKMF_16-0062_Rpr_Courtroom _Bldg_16.pdf PDF
Atch_13_AFI_32-1024_Standard_Facility_Requirements.pdf PDF
Atch_33_UM33-Profile_A-size.pdf PDF
Atch_05_Environmental_Permit_ATP_Guidance.pdf PDF
Atch_21_AFMAN_32-1084_Facility_Requirements.pdf PDF
Atch_23_(CREECH)_UR2_(S).pdf PDF
Atch_58_Bid_Schedule _RKMF_16-0062_Rpr_Courtroom _Bldg_16.doc DOC document
Atch_48_Teaming_List.doc DOC document
Atch_25_3PH__CJE_CREECH_4in-Profile_A-size.pdf PDF
Atch_55_Facility_Photos _RKMF_16-0062_Rpr_Courtroom _Bldg_16.pdf PDF
Atch_24_1PH_CJE-Profile_A-size.pdf PDF
Atch_29_Trench_Sand.pdf PDF
Atch_10_ACCMAN32-7051_hollomanafbsup_1.pdf PDF
Atch_16_AFI_32-7042_Waste_Management.pdf PDF
Atch_02_Nellis_Creech_ID2_Handbook_201108.pdf PDF
Show 40 more

Latest 50 of 81 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE OF VALUES
Contract No: FA4861-XX
Project No & Title: RKMF/LKTC XX-XXXX Construct Warehouse
DIVISION 01 - GENERAL REQUIREMENTS
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
1.1Project Management$38,098.730.98%
1.2Supervision$37,709.970.97%
1.3Project Trailer$1,555.050.04%
1.4Dumpsler$777.530.02%
1.5Temporary Fence$777.530.02%
1.6Bond$54,038.001.39%
Division 01 Total$132,956.813.42%3.42%
DIVISION 02 - EXISTING CONDITIONS
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
2.1Demolition Interior (Electrical)$11,662.880.30%
2.2Demolition Interior (Mechanical)$17,494.320.45%
2.3Demolition (Plumbing)$4,665.150.12%
2.4Demolition (Flooring)$4,665.150.12%
2.5Demolition (Openings)$11,662.880.30%
2.6Demolition (Concrete)$11,662.880.30%
2.7Demolition (Ceilings)$11,662.880.30%
2.8Demolition (Walls)$17,105.550.44%
2.9Demolition (Fire Suppression)$11,662.880.30%
2.10Demolition (Fire Alarm System)$5,442.680.14%
2.11Demolition (Communications)$7,775.250.20%
Division 02 Total$115,462.502.97%2.97%
DIVISION 03 - CONCRETE
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
3.1Concrete Pad (Generator)$48,595.321.25%
3.2Concrete Ceiling {Vault)$5,442.680.14%
3.3Concrete Pad (Mechanical Yard}$34,599.870.89%
3.4Concrete Pad (HVAC Units)$6,608.960.17%
3.5Concrete Reinforcements$27,602.140.71%
3.6Expansion Joints, Contraction Joinls$20,993.180.54%
Division 03 Total$143,842.153.70%3.70%
DIVISION 04 - MASONRY
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
4.1Mechanical Yard Masonrv Wall$40,431.311.04%
4.2Generator Pad Masonry Wall$20,215.650.52%
4.3Infill (Front Entry Area)$6,608.960.17%
4.4Masonry Patch Work (Roll-up Door)$6,608.960.17%
4.5Infill (Mechanical Louver Area$6,220.200.16%
4.6Vault$13,217.930.34%
Division 04 Total$93,303.012.40%2.40%
DIVISION 05 - METALS
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
5.1Metal Stud Framing (Interior)$8,552.780.22%
5.20.00%
5.30.00%
Division 05 Total$8,552.780.22%0.22%
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
6.1Casework (Women's Restroom)$2,721.340.07%
6.2Casework (Men's Restroom)$2,721.340.07%
6.3Casework (Break Room)0.00%
Division 06 Total$5,442.680.14%0.14%
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
7.1Mineral Fiber Blanket lnsulation (Interior)$40,042.541.03%
7.20.00%
7.30.00%
Division 07 Total$40,042.541.03%1.03%
DIVISION 08 - OPENINGS
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
8.1Steel Doors and Frames$186,606.034.80%
8.2Rolling Service Doors$10,885.350.28%
8.3Windows$4,276.390.11%
Division 08 Total$201,767.775.19%5.19%
DIVISION 09 - FINISHES
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
9.1Gypsum Board$148,507.303.82%
9.2Paints and Coatings$65,312.111.68%
9.3Epoxv Flooring$9,719.060.25%
9.4Acoustlcal Ceiling$35,766.160.92%
9.5Resilient Flooring & Ceramic Tile$20,604.420.53%
9.6Rigid Access Flooring$146,174.733.76%
Division 09 Total$426,083.7810.96%10.96%
DIVISION 10 - SPECIALTIES
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
10.1Toilet Accessories$4,665.150.12%
10.2Interior Signage$3,498.860.09%
10.30.00%
Division 10 Total$8,164.010.21%0.21%
DIVISION 13 - SPECIAL CONSTRUCTION
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
13.1Steel Deck Vault$17,105.550.44%
13.2Steel I-beam (Openings)$27,990.900.72%
13.3Steel louvers (Mech Yard)$8,552.780.22%
13.4Steel Gale (Generator)$2,332.580.06%
Division 13 Total$55,981.811.44%1.44%
DIVISION 21 - FIRE SUPPRESSION
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
21.1Riser$39,265.021.01%
21.2Wet Pipe Fire Sprinkler Piping$27,602.140.71%
21.3Testing$8,552.780.22%
Division 21 Total$75,419.941.94%1.94%
DIVISION 22 - PLUMBING
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
22.1Plumbing (Fixtures)$80,085.092.06%
22.2Plumbing Piping& Materials$38,098.730.98%
22.30.00%
Division 22 Total$118,183.823.04%3.04%
DIVISION 23 - HEATING, VENTILATION AND AIR CONDITIONING
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
23.1HVAC Air Handlers$204,489.115.26%
23.2Acoustics Duct Silencers$20,993.180.54%
23.3Exhaust & Supply Fans$10,885.350.28%
23.4Boiler & Computer Room Units (CRAC)$257,749.586.63%
23.5Variable Air Volume 0JAV) Boxes$15,161.740.39%
23.6Fire Smoke Dampers & Louvers$10,885.350.28%
23.7Testing, Adjusting & Balancing of HVAC Sys$34,211.110.88%
23.8Thermal lnsulation for Mechanical Sys$10,885.350.28%
23.9Duct Insulation$53,649.231.38%
23.10Duct Work & Duct Work Accessories$123,626.503.18%
23.11Diffusers, Registers & Grills$45,485.221.17%
23.12HVAC Controls$214,985.705.53%
Division 23 Total$1,003,007.4225.80%25.80%
DIVISION 26 - ELECTRICAL
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
26.1Electrical Conduit, Fillings, Boxes$138,788.243.57%
26.2Electrical Wire & Cable$291,571.937.50%
26.3Interior Distribution Systems$198,268.915.10%
26.4Low Voltage SwitchQear$192,826.234.96%
26.5Switchboards & Panel Boards$46,651.511.20%
26.6Interior lighting$65,312.111.68%
26.7Electrical Exterior Underground$77,363.751.99%
Division 26 Total$1,010,782.6826.00%26.00%
DIVISION 27 - COMMUNICATIONS
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
27.1Comm Piping, Fittings and Boxes$96,801.882.49%
27.2Communications Wire$145,008.443.73%
27.3Communications Cable Tray$47,817.801.23%
27.4Testing$32,656.060.84%
Division 27 Total$322,284.188.29%8.29%
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
28.1Fire Alarm System Conduit & Fittings$43,930.171.13%
28.2Fire Alarm Panel and Power Boosters$6,608.960.17%
28.3Fire Alarm Programming & Testing$1,555.050.04%
28.4MNS Conduit and Fittings$22,159.470.57%
28.5MNS Panels$12,440.400.32%
28.6MNS Programming & Testing$1,166.290.03%
Division 28 Total$87,860.342.26%2.26%
DIVISION 31 - EARTHWORK
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
31.1Landscaping (Demo)$9,719.060.25%
31.2Landscaping (Replace)$9,719.060.25%
31.3Soi! Compaction Test$4,665.150.12%
Division 31 Total$24,103.270.62%0.62%
DIVISION 32 - EXTERIOR IMPROVEMENTS
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
32.1Bollards$2,332.580.06%
32.2Concrete Sidewalks$1,555.050.04%
32.3Fog Seal (Parking Lot)$3,887.630.10%
32.4Curb Stops (Parking Lot)$1,555.050.04%
32.5Restnping (Parking Lot)$1,166.290.03%
Division 32 Total$10,496.600.27%0.27%
DIVISION 33 - UTILITIES
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
33.1Natural Gas$3,887.630.10%
33.20.00%
33.30.00%
Division 33 Total$3,887.630.10%0.10%
CLOSE-OUT DOCUMENTS
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
AAs-Built Drawings0.00%
BWarranties
CO&M Manuals0.00%
D0.00%
Close-out Total$0.000.00%0.00%
BID TOTAL$3,887,625.72100.00%100.00%