Atch_43_Schedule_of_Values_Template_UNLOCKED.xlsx

XLSX spreadsheet 22 KB Posted

Attached to
Nellis AFB Multiple Award Construction Contract (MACC) Solicitation Federal contract opportunity
Solicitation number
FA4861-16-R-A100
Issued by
Department of the Air Force Air Combat Command

About this file

Atch 43_Schedule of Values Template UNLOCKED

View the file

Other files for this federal contract opportunity

Other files attached to Nellis AFB Multiple Award Construction Contract (MACC) Solicitation, newest first.
File Type Posted
Bldg16_CAD.zip ZIP file
AutoCADcombined.dwg DWG drawing
Atch_56_Asbestos_ _LBP_Reports _RKMF_16-0062_Rpr_Courtroom _Bldg_16 _Mar_2016.pdf PDF
Atch_62__Nellis_Creech_AFB_Facility_Metering_Requirements.pdf PDF
Atch_60_ETL_07-04_AF_Carpet_Standard.pdf PDF
16RA100_Tech_QA_(Part_3).pdf PDF
Atch_61__AF_Facility_Metering_Policy.pdf PDF
Atch_01_MACC_SOW_Revision_1.pdf PDF
FA4861-16-R-A100-0005_General_QnA.pdf PDF
16RA100SignInRosters.pdf PDF
Atch_54_Demolition_Plan _RKMF_16-0062_Rpr_Courtroom _Bldg_16.pdf PDF
16RA100_General_Q As_(Part_2).pdf PDF
Atch_53_Statement_of_Work _RKMF_16-0062_Rpr_Courtroom _Bldg_16_Revision1.pdf PDF
Atch_59_Concept_Floor_Plan _RKMF_16-0062_Rpr_Courtroom _Bldg_16.pdf PDF
FA4861-16-R-A100-0003_Amendment.pdf PDF
FA4861-16-R-A100-0002_Amendment.pdf PDF
Atch_56_Asbestos_ _LBP_Reports _RKMF_16-0062_Rpr_Courtroom _Bldg_16.pdf PDF
Atch_48_Teaming_List.doc DOC document
Atch_58_Bid_Schedule _RKMF_16-0062_Rpr_Courtroom _Bldg_16.doc DOC document
Atch_13_AFI_32-1024_Standard_Facility_Requirements.pdf PDF
Atch_23_(CREECH)_UR2_(S).pdf PDF
Atch_21_AFMAN_32-1084_Facility_Requirements.pdf PDF
Atch_33_UM33-Profile_A-size.pdf PDF
Atch_05_Environmental_Permit_ATP_Guidance.pdf PDF
Atch_36_NAFB_0-74_Range_Pass.pdf PDF
Atch_34_UM48-2_Multi-ground_rod-Profile_A-size.pdf PDF
Atch_30_Ug_17-2_Delta-Wye.pdf PDF
Atch_38_Nuclear_Gauge_Form_2.dotx DOTX file
Atch_57_As-Built_Drawings _RKMF_16-0062_Rpr_Courtroom _Bldg_16.pdf PDF
Atch_44_WD_NV160001_20160311.pdf PDF
Atch_22_(CREECH)_UM1-6C.PDF PDF
Atch_28_Cooper_Transformers_Three_Phase_List.pdf PDF
Atch_39_AF_103_Base_Civil_Engineering_Work_Order_Request.xfdl XFDL file
Atch_25_3PH__CJE_CREECH_4in-Profile_A-size.pdf PDF
Atch_29_Trench_Sand.pdf PDF
Atch_46_WD_NV160022_201600603.pdf PDF
Atch_50_Subcontractor_Teaming_Partner_Consent_Form.doc DOC document
Atch_19_AFI_33-580_Spectrum_Management.pdf PDF
Atch_31_UM3-14-Profile_A-size.pdf PDF
Atch_45_WD_NV160004_20160603.pdf PDF
Atch_06_Engineering_Technical_Letter_20020627.pdf PDF
Atch_52_Past_Performance_Questionnaire.doc DOC document
Atch_41_AF_3064_Progress_Schedule.xfdl XFDL file
Atch_11_AFI_23-204_Material_Management.pdf PDF
Atch_20_AFI_40-201_Radioactive_Materials_Management.pdf PDF
Atch_14_AFI_32-1044_Visual_Air_Navigation_Systems.pdf PDF
Atch_15_AFI_32-7044_Storage_Tank.pdf PDF
Atch_07_Communication_Installation_Stds_20140320.pdf PDF
Atch_03_Nellis_Creech_AFB_Lighting_Fixture_Req_20150528.pdf PDF
Atch_47_WD_NV160034_20160108.pdf PDF
Show all 50

Nellis AFB Multiple Award Construction Contract (MACC) Solicitation has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE OF VALUES
Contract No: FA4861-XX
Project No & Title: RKMF/LKTC XX-XXXX Construct Warehouse
DIVISION 01 - GENERAL REQUIREMENTS
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
1.1Project Management$38,098.730.98%
1.2Supervision$37,709.970.97%
1.3Project Trailer$1,555.050.04%
1.4Dumpsler$777.530.02%
1.5Temporary Fence$777.530.02%
1.6Bond$54,038.001.39%
Division 01 Total$132,956.813.42%3.42%
DIVISION 02 - EXISTING CONDITIONS
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
2.1Demolition Interior (Electrical)$11,662.880.30%
2.2Demolition Interior (Mechanical)$17,494.320.45%
2.3Demolition (Plumbing)$4,665.150.12%
2.4Demolition (Flooring)$4,665.150.12%
2.5Demolition (Openings)$11,662.880.30%
2.6Demolition (Concrete)$11,662.880.30%
2.7Demolition (Ceilings)$11,662.880.30%
2.8Demolition (Walls)$17,105.550.44%
2.9Demolition (Fire Suppression)$11,662.880.30%
2.10Demolition (Fire Alarm System)$5,442.680.14%
2.11Demolition (Communications)$7,775.250.20%
Division 02 Total$115,462.502.97%2.97%
DIVISION 03 - CONCRETE
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
3.1Concrete Pad (Generator)$48,595.321.25%
3.2Concrete Ceiling {Vault)$5,442.680.14%
3.3Concrete Pad (Mechanical Yard}$34,599.870.89%
3.4Concrete Pad (HVAC Units)$6,608.960.17%
3.5Concrete Reinforcements$27,602.140.71%
3.6Expansion Joints, Contraction Joinls$20,993.180.54%
Division 03 Total$143,842.153.70%3.70%
DIVISION 04 - MASONRY
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
4.1Mechanical Yard Masonrv Wall$40,431.311.04%
4.2Generator Pad Masonry Wall$20,215.650.52%
4.3Infill (Front Entry Area)$6,608.960.17%
4.4Masonry Patch Work (Roll-up Door)$6,608.960.17%
4.5Infill (Mechanical Louver Area$6,220.200.16%
4.6Vault$13,217.930.34%
Division 04 Total$93,303.012.40%2.40%
DIVISION 05 - METALS
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
5.1Metal Stud Framing (Interior)$8,552.780.22%
5.20.00%
5.30.00%
Division 05 Total$8,552.780.22%0.22%
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
6.1Casework (Women's Restroom)$2,721.340.07%
6.2Casework (Men's Restroom)$2,721.340.07%
6.3Casework (Break Room)0.00%
Division 06 Total$5,442.680.14%0.14%
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
7.1Mineral Fiber Blanket lnsulation (Interior)$40,042.541.03%
7.20.00%
7.30.00%
Division 07 Total$40,042.541.03%1.03%
DIVISION 08 - OPENINGS
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
8.1Steel Doors and Frames$186,606.034.80%
8.2Rolling Service Doors$10,885.350.28%
8.3Windows$4,276.390.11%
Division 08 Total$201,767.775.19%5.19%
DIVISION 09 - FINISHES
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
9.1Gypsum Board$148,507.303.82%
9.2Paints and Coatings$65,312.111.68%
9.3Epoxv Flooring$9,719.060.25%
9.4Acoustlcal Ceiling$35,766.160.92%
9.5Resilient Flooring & Ceramic Tile$20,604.420.53%
9.6Rigid Access Flooring$146,174.733.76%
Division 09 Total$426,083.7810.96%10.96%
DIVISION 10 - SPECIALTIES
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
10.1Toilet Accessories$4,665.150.12%
10.2Interior Signage$3,498.860.09%
10.30.00%
Division 10 Total$8,164.010.21%0.21%
DIVISION 13 - SPECIAL CONSTRUCTION
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
13.1Steel Deck Vault$17,105.550.44%
13.2Steel I-beam (Openings)$27,990.900.72%
13.3Steel louvers (Mech Yard)$8,552.780.22%
13.4Steel Gale (Generator)$2,332.580.06%
Division 13 Total$55,981.811.44%1.44%
DIVISION 21 - FIRE SUPPRESSION
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
21.1Riser$39,265.021.01%
21.2Wet Pipe Fire Sprinkler Piping$27,602.140.71%
21.3Testing$8,552.780.22%
Division 21 Total$75,419.941.94%1.94%
DIVISION 22 - PLUMBING
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
22.1Plumbing (Fixtures)$80,085.092.06%
22.2Plumbing Piping& Materials$38,098.730.98%
22.30.00%
Division 22 Total$118,183.823.04%3.04%
DIVISION 23 - HEATING, VENTILATION AND AIR CONDITIONING
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
23.1HVAC Air Handlers$204,489.115.26%
23.2Acoustics Duct Silencers$20,993.180.54%
23.3Exhaust & Supply Fans$10,885.350.28%
23.4Boiler & Computer Room Units (CRAC)$257,749.586.63%
23.5Variable Air Volume 0JAV) Boxes$15,161.740.39%
23.6Fire Smoke Dampers & Louvers$10,885.350.28%
23.7Testing, Adjusting & Balancing of HVAC Sys$34,211.110.88%
23.8Thermal lnsulation for Mechanical Sys$10,885.350.28%
23.9Duct Insulation$53,649.231.38%
23.10Duct Work & Duct Work Accessories$123,626.503.18%
23.11Diffusers, Registers & Grills$45,485.221.17%
23.12HVAC Controls$214,985.705.53%
Division 23 Total$1,003,007.4225.80%25.80%
DIVISION 26 - ELECTRICAL
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
26.1Electrical Conduit, Fillings, Boxes$138,788.243.57%
26.2Electrical Wire & Cable$291,571.937.50%
26.3Interior Distribution Systems$198,268.915.10%
26.4Low Voltage SwitchQear$192,826.234.96%
26.5Switchboards & Panel Boards$46,651.511.20%
26.6Interior lighting$65,312.111.68%
26.7Electrical Exterior Underground$77,363.751.99%
Division 26 Total$1,010,782.6826.00%26.00%
DIVISION 27 - COMMUNICATIONS
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
27.1Comm Piping, Fittings and Boxes$96,801.882.49%
27.2Communications Wire$145,008.443.73%
27.3Communications Cable Tray$47,817.801.23%
27.4Testing$32,656.060.84%
Division 27 Total$322,284.188.29%8.29%
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
28.1Fire Alarm System Conduit & Fittings$43,930.171.13%
28.2Fire Alarm Panel and Power Boosters$6,608.960.17%
28.3Fire Alarm Programming & Testing$1,555.050.04%
28.4MNS Conduit and Fittings$22,159.470.57%
28.5MNS Panels$12,440.400.32%
28.6MNS Programming & Testing$1,166.290.03%
Division 28 Total$87,860.342.26%2.26%
DIVISION 31 - EARTHWORK
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
31.1Landscaping (Demo)$9,719.060.25%
31.2Landscaping (Replace)$9,719.060.25%
31.3Soi! Compaction Test$4,665.150.12%
Division 31 Total$24,103.270.62%0.62%
DIVISION 32 - EXTERIOR IMPROVEMENTS
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
32.1Bollards$2,332.580.06%
32.2Concrete Sidewalks$1,555.050.04%
32.3Fog Seal (Parking Lot)$3,887.630.10%
32.4Curb Stops (Parking Lot)$1,555.050.04%
32.5Restnping (Parking Lot)$1,166.290.03%
Division 32 Total$10,496.600.27%0.27%
DIVISION 33 - UTILITIES
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
33.1Natural Gas$3,887.630.10%
33.20.00%
33.30.00%
Division 33 Total$3,887.630.10%0.10%
CLOSE-OUT DOCUMENTS
LINE NO.DESCRIPTIONVALUEPERCENTAGETOTAL
AAs-Built Drawings0.00%
BWarranties
CO&M Manuals0.00%
D0.00%
Close-out Total$0.000.00%0.00%
BID TOTAL$3,887,625.72100.00%100.00%