16RA100_Q A_(Part_1).pdf

PDF 97 KB Posted

Attached to
Nellis AFB Multiple Award Construction Contract (MACC) Solicitation Federal contract opportunity
Solicitation number
FA4861-16-R-A100
Issued by
Department of the Air Force Air Combat Command

About this file

Questions Answers (Part 1)

View the file

Other files for this federal contract opportunity

Other files attached to Nellis AFB Multiple Award Construction Contract (MACC) Solicitation, newest first.
File Type Posted
SYNOPSIS_OF_AWARD.docx DOCX document
Atch_62__Nellis_Creech_AFB_Facility_Metering_Requirements.pdf PDF
Atch_60_ETL_07-04_AF_Carpet_Standard.pdf PDF
16RA100_Tech_QA_(Part_3).pdf PDF
Atch_61__AF_Facility_Metering_Policy.pdf PDF
Atch_53_Statement_of_Work _RKMF_16-0062_Rpr_Courtroom _Bldg_16_Revision_2.pdf PDF
Atch_43_Schedule_of_Values_Template_UNLOCKED.xlsx XLSX spreadsheet
Atch_01_MACC_SOW_Revision_1.pdf PDF
16RA100SignInRosters.pdf PDF
Atch_54_Demolition_Plan _RKMF_16-0062_Rpr_Courtroom _Bldg_16.pdf PDF
Atch_48_Teaming_List.doc DOC document
16RA100_General_Q As_(Part_2).pdf PDF
Atch_53_Statement_of_Work _RKMF_16-0062_Rpr_Courtroom _Bldg_16_Revision1.pdf PDF
FA4861-16-R-A100-0003_Amendment.pdf PDF
FA4861-16-R-A100-0001_Amendment.pdf PDF
Atch_25_3PH__CJE_CREECH_4in-Profile_A-size.pdf PDF
Atch_29_Trench_Sand.pdf PDF
Atch_46_WD_NV160022_201600603.pdf PDF
Atch_50_Subcontractor_Teaming_Partner_Consent_Form.doc DOC document
Atch_19_AFI_33-580_Spectrum_Management.pdf PDF
Atch_31_UM3-14-Profile_A-size.pdf PDF
Atch_45_WD_NV160004_20160603.pdf PDF
Atch_06_Engineering_Technical_Letter_20020627.pdf PDF
Atch_52_Past_Performance_Questionnaire.doc DOC document
Atch_41_AF_3064_Progress_Schedule.xfdl XFDL file
Atch_11_AFI_23-204_Material_Management.pdf PDF
Atch_40_AF_3052_Construction_Cost_Estimate_Breakdown.xlsx XLSX spreadsheet
Atch_42_Contract_Progress_Report_Template.xfdl XFDL file
Atch_24_1PH_CJE-Profile_A-size.pdf PDF
Atch_55_Facility_Photos _RKMF_16-0062_Rpr_Courtroom _Bldg_16.pdf PDF
Atch_16_AFI_32-7042_Waste_Management.pdf PDF
Atch_10_ACCMAN32-7051_hollomanafbsup_1.pdf PDF
Atch_02_Nellis_Creech_ID2_Handbook_201108.pdf PDF
Atch_12_AFI_32-1021_Planning_and_Programming_MILCON_Projects.pdf PDF
Atch_08_ACC_Architectural_and_Interior_Design_Stds_200201.pdf PDF
Atch_17_AFI_32-7086_Hazardous_Materials.pdf PDF
Atch_32_UM17-2_XFMR-Profile_A-size.pdf PDF
Atch_54_Demolition_Plan _RKMF_16-0062_Rpr_Courtroom _Bldg_16.pdf PDF
Atch_18_NAFB_Plan_32-7086_Hazardous_Materials_Management_Plan.pdf PDF
Atch_51_Sample_Client_Authorization_Letter.doc DOC document
FA486116RA100_Solicitaion.pdf PDF
Atch_20_AFI_40-201_Radioactive_Materials_Management.pdf PDF
Atch_14_AFI_32-1044_Visual_Air_Navigation_Systems.pdf PDF
Atch_15_AFI_32-7044_Storage_Tank.pdf PDF
Atch_07_Communication_Installation_Stds_20140320.pdf PDF
Atch_03_Nellis_Creech_AFB_Lighting_Fixture_Req_20150528.pdf PDF
Atch_47_WD_NV160034_20160108.pdf PDF
Atch_26_3PH__CJE-Profile_A-size.pdf PDF
Atch_27_1728F-806_UG__Main_VEA_standard.pdf PDF
Atch_53_Statement_of_Work _RKMF_16-0062_Rpr_Courtroom _Bldg_16.pdf PDF
Show all 50

Nellis AFB Multiple Award Construction Contract (MACC) Solicitation has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4861-16-R-A100

MACC Questions and Answers (Part 1)

Q. Was the intent for E.2.b to have unlimited page count as opposed to E.2.a?

A.

Yes. VOLUME 1 – TECHNICAL (FACTOR 1) 35% design referenced the incorrect paragraph. The 35% design described in paragraph E.2.b is unlimited page count. See amended “Instructions to Offerors” paragraph E

Q. Cannot open XFDL Files

A. http://www.e-publishing.af.mil/viewerdownload.asp

Q.

Shouldn’t “Unlimited for 35% design as described in para E.2.a,” read to include paragraphs E 2 (b) and (c)?

A. See answer to question 1

Q.

Subfactor 3 requires a surety and SBA letter, typically the surety and bonding letters are excluded from the page count?

A.

Volume 1 – Technical, is limited to 20 pages with exemption of the 35% design which is unlimited pages

Q. Are we to assume Subfactor 3 is excluded from the 20 page limitation?

A.

Volume 1 – Technical, is limited to 20 pages with exemption of the 35% design which is unlimited pages

Q.

Are we to assume paragraphs E 2 (b) and (c) are included in the unlimited 35% design page limitation?

A. See answer to question 1; Items in required E.2 (c) are not unlimited.

Q.

SOW Para. 1.3.2.1.6- 'Walls require sufficient sound attenuation so in-person and telephone conversations remain confidential.' Please define what specifically is required. What is required for the walls? What is required for the doors? What is required for the ceilings? Do the remaining exterior windows require sound attenuation?

A.

See paragraphs 1.3.2.1.2 and 1.3.2.1.6.1 of the revised SOW, dated 17 February

2016, for the responses to the questions regarding the walls and doors. The remaining windows do not require sound attenuation.

Q.

SOW Para. 1.3.2.1.7- 'Install "black out" gypsum wall board to five (5) windows.'

There are 4 windows in the court room / gallery. Is the 5th window the one in the

Deliberation Room?

A.

That is correct. The five (5) windows are those four (4) in the courtroom and the one (1) in the jury deliberation room.

Q. Is this project exempt from UFC 04-010-01 – ATFP requirements?

A.

The project does not have the triggers for mandatory compliance to UFC 04-010-

01. The project cost is below 50% of the plant replacement value of the existing building. Additionally, this building would be routinely occupied by less than 50 personnel which is different from the 116 personnel you estimated. Our estimate includes: 12 Jurors, 25 Gallery, 1 Judge, 1 Bailiff, 1 Court Reporter, 4 Witnesses, 3

Defense Team, and 2 Prosecution Team for a total of 49. USAFWC/JA and the

Fire Department concurred with this estimate. USAFWC/JA also indicated that it is a rarity for the gallery to be at full capacity.

http://www.e-publishing.af.mil/viewerdownload.asp

Q.

Is the project exempt from ABA (Architectural Barriers Act) requirements as required by UFC 01-200-01 General Building Requirements?

A.

It would have been ideal to meet ABA requirements. However, it is not possible to accomplish that with the constraints and limited space available in the existing facility. Ramps to elevated areas are not required for this project. This facility will be used by able-bodied military members. Accessibility is only being provided at the main entrance for potential civilian witnesses or spectators with special needs since the existing restrooms are already ADA compliant.

Q.

If ABA is required the vestibule will need to be enlarged and the roof modified. Is an enclosed vestibule required?

A.

Yes, an enclosed vestibule is required. The measurements we took confirm there is adequate room to provide an enclosed vestibule and meet ADA maneuvering clearances. Refer to para 1.3.2.1.11 of the revised SOW, dated 17 February 2016.

Q.

Please confirm the desired location of the SF 1442 within the submitted proposal;

Volume 3 or Volume 4 or both.

A.

SF 1442 shall be in Volume 4. See amended “Instructions to Offerors” paragraph

D(1)

Q. Can the PPIS be formatted to fit the criteria of the proposal format?

A.

PPIS shall be in format provided. See amended “Instructions to Offerors” paragraph 10

Q.

Will the Government consider assigning a “Very Relevant” rating to Past/Present

Performance projects submitted which involved a contractually required period of performance shorter than 120 days, but exceeded magnitude requirements (~$2M) and which involved essentially the same level of effort/complexities as projects under this solicitation?

A. Past performance submissions will be evaluated as stated in the solicitation criteria.